This document is a Justification and Approval (J&A) for Other than Full and Open Competition under FAR 6.302-3 for the procurement of ASZM-TEDA Carbon by the U.S. Army Contracting Command - Rock Island (ACC-RI). The purpose is to allow Molecular Products Inc. (MPI) to demonstrate its capability to produce ASZM-TEDA Carbon that meets the required specifications for use in chemical and biological filtration systems. MPI is currently the only vendor that has expressed interest and passed preliminary testing to become qualified to produce this specialized carbon. The procurement will allow MPI to complete a full production run to prove its ability to manufacture the carbon to the necessary standards. The estimated dollar value is $594,652.32. ACC-RI plans to award a Firm Fixed Price contract using Army Procurement Funds. This procurement is an attempt to create open competition and provide a secondary source for ASZM-TEDA Carbon, as Calgon has been the sole available supplier since the 1990s.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control No:
Contractor: Molecular Products Inc.
Supply/Service: Supply ASZM/TEDA Carbon Est Dollar Value:
JUSTIFICATION REVIEW DOCUMENT
FOR JUSTIFICATION AND APPROVAL FOR OTHER THAN
FULL AND OPEN COMPETITION
Supply/Service: ASZM-TEDA CARBON
Authority: 10 U.S.C. 3204(a)(3)
Prepared by: Greg Brown DSN: 793-4997 Contract Specialist Email: greg.j.brown.civ@army.mil
Contracting Officer: John Fotos DSN: 793-8563 Contracting Officer Email: john.g.fotos.civ@army.mil
Technical:
Requirements:
Department of Army Justification and Approval for Other than
Full and Open Competition
1. Contracting Activity: U.S. Army Contracting Command – Rock Island (ACC-RI) Rock Island Arsenal, Rock Island, IL 61299-8000.
2. Description of Action: JMPB/CBP at Pine Bluff Arsenal requests a Firm Fixed Price contract with Molecular Products Inc. to test their new carbon product in live filters built at Pine Bluff Arsenal. ACC-RI projects award for
, Army Procurement Funds funds. An acquisition plan is not required because this procurement does not meet the threshold at Defense Federal Acquisition Regulation Supplement 207.103(d)(i)(B).
3. Description of Supplies/Services: ASZM-TEDA Carbon. The required quantity is
, to be delivered The proposed contract will not include an option provision. The Independent Government Estimate was $594,652.32.
4. Authority Cited:
10 U.S.C. 3204(a)(3), as implemented by Federal Acquisition Regulation (FAR) 6.302-3, Industrial mobilization; engineering, development, or research capability; or expert services.
5. Reason for Authority Cited:
As described in FAR 6.302-3(b)(1)(iv)(B), full and open competition need not be provided for when it is necessary to award the contract to a particular source or sources to create or maintain the required domestic capability for production of critical supplies by limiting competition to items manufactured in the United States, its outlying areas, or Canada.
The purpose of this contract is to determine if Molecular Products Inc. (MPI) has the skills, equipment, and production facilities to produce acceptable ASZM-TEDA Carbon with the required density, carbon particle size, levels of impregnation and gas life needed to successfully produce the M48, M49 and M98 filters. It will also demonstrate MPI can produce MIL-DTL-32101B w/Amd 1 compliant ASZM-TEDA Carbon on a scale that will support the governments filter production requirements.
To qualify to produce ASZM TEDA Carbon, vendors must demonstrate that they can successfully produce carbon that passes the preliminary testing process to the standard of MIL-DTL-32101B w/Amd 1. The preliminary testing is done at the vendors expense.
Only has passed all the requirements and is currently fully capable to produce ASZM-TEDA Carbon for the Government. Through Market Research, multiple additional vendors were identified that could potentially produce this carbon, however Molecular Products Inc
(MPI)/CAGE 4TMH3, was the only source who expressed interest in taking the necessary steps to become qualified and has already passed the preliminary test included in the MIL-DTL-32101B w/Amd 1 standard. This procurement will allow MPI to produce a full production run to demonstrate that they can successfully produce this carbon.
Only one brand of Carbon, produced by , has been available for production of Chemical and Biological filtration systems and individual filters since the 1990s. The government, and commercial manufacturers producing for government consumption, have been forced into a sole source purchasing pattern from Calgon. TACOM has requested filters be manufactured for testing, shelf life and distribution to approve Molecular Products Inc. as a second source for ASZM-TEDA.
Failure to achieve this acquisition from Molecular Products Inc. will halt First Article Testing, approval requested by Pine Bluff’s Customer (TACOM) and acceptance of a product that could provide competition into the market and remove the restriction to only purchase from in the future.
This purchase is an attempt to create open competition and provide multiple sources in the event the government has a need to ramp up production due to a war or peacekeeping effort. As well as create a secondary source to maintain current production operations should Calgon experience production delays.
6. Efforts to Obtain Competition: ACC-RI shall publish the notices required by FAR
5.201. Because this is a sole source action, effective competition is not applicable. This requirement does not present any opportunities for subcontracting.
7. Actions to Increase Competition: Acquiring, testing, and building confidence in MPIs ASZM-TEDA carbon production is an attempt for the government to increase competition and provide options in the market for future production.
8. Market Research: IAW AFARS 5153.303-5 Market Research was completed in May 2023 and again in Oct. 2023. The result of the Market Research was that
9. Interested Sources: To date, no other sources have expressed a written interest in this requirement.
10. Other Facts: Only meet the requirements to produce ASZM-Teda Carbon:
11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
12. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.
13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable. A fair and reasonable price will be determined in accordance with FAR 15.404-1(2)(ii) Comparison of the proposed prices to historical prices paid and FAR 15.404-1(2)(v) Comparison of proposed prices with Independent Government cost estimate. Certified cost or pricing data will not be requested in accordance with FAR 15.403-1(b)(3) as the product requested can be produced commercially.
Date: _________________ ____________________________
John Fotos Contracting Officer
14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Date: _________________ ____________________________
John Fotos Contracting Officer
FOTOS.JOHN.G.13
90769209
Digitally signed by
FOTOS.JOHN.G.1390769209
Date: 2024.03.19 14:20:35 -05'00'
FOTOS.JOHN.G.1390769209
Digitally signed by
FOTOS.JOHN.G.1390769209
Date: 2024.03.19 14:20:53 -05'00'
File details come from the government source that posted it. Updated .