J-A Sole Source - redacted.pdf
PDF 951 KB Posted
- Solicitation number
- 36C26320R0141
About this file
This document contains a justification and approval for other than full and open competition for a sole source procurement. The Department of Veterans Affairs intends to award a firm-fixed price contract to Four Front Design Inc. to provide construction period services and site visits for a project to renovate the basement of Building 4 at the St. Cloud VA Medical Center for sterile processing services and a sterile processing department. The estimated value of the contract is $280,884 to be awarded on July 1, 2020 for a period of 675 calendar days. Only Four Front Design Inc. is considered the one responsible source available due to their role in designing the project and coordinating with equipment manufacturers. Awarding these follow-on services to another firm would cause duplication of costs and delays.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26320R0141_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAPM Part 806.3 Other Than Full and Open Competition (OFOC) SOP
Attachment 2: Request for Sole Source Justification Format >SAT
DEPARTMENT OF VETERANS AFFAIRS
Justification and Approval (J&A)
For
Other Than Full and Open Competition (>SAT)
NRM Project 656-16-270
Renovate Building 4 Basement for Sterile Processing Services and Sterile Processing Department
Acquisition Plan Action ID: 36C263-20-AP-3477
1. Contracting Activity:
NCO 23 St. Paul
ATTN: Chris Gauthier
316 Robert Street N, Suite 506
St. Paul, MN 55101
2. Nature and/or Description of the Action Being Processed:
Sole source procurement of A/E Construction Period Services and Site Visits to support construction of the subject project. This action is proposed to be a new firm-fixed price contract awarded for the NRM construction project to renovate Building 4 Basement for Sterile Processing Services and Sterile
Processing Department at the St. Cloud VAMC.
This document is a justification and authorization for construction period services and site visits as described by the A/E Scope of Work. The A/E contractor will be Four Front Design Inc. The estimated value of the contract is $280,884. The proposed contract duration is 675 calendar days from Notice to
Proceed. The estimated award date is July 1, 2020. The contract duration covers the bidding/award process, construction contract duration of 540 calendar days, and as-built drawing preparation.
3: Description of Supplies/Services Required to Meet the Agency's Needs:
A/E Construction Period Services and Site Visits are required to successfully administer the construction of the Building 4 SPS project. The need date of this service is estimated to be July 1, 2020, based on a summer construction solicitation period. See IGE narrative for estimate methodology of below total price.
ITEM QTY U/P TOTAL PRICE
A/E CPS and Site Visits 1 $280,884 $280,884
4. Statutory Authority Permitting Other than Full and Open Competition:
( x ) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy
Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1;
( ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by FAR 6.302-2;
( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3;
( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by FAR 6.302-4
( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by FAR 6.302-5;
OFOC SOP Revision 09
Original Date: 03/22/11
Revision 09 Date: 04/17/2020
( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6;
( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7;
5. Demonstration that the Contractor's Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority):
Four Front Design Inc is the only responsible source available to provide A/E Construction Period
Services and Site Visits for this procurement. The construction project that will be supported by these services is a very complicated project, including highly specialized equipment. Four Front
Design was contracted to prepare the construction drawings and specifications for this project, which included detailed coordination with multiple manufacturers of the specialized sterile processing equipment. The A/E Construction Period Services and Site Visits is a follow-on contract to the original design contract.
Award of these services to another A/E firm would cause both substantial duplication of cost to the Government and unacceptable delays in fulfilling the VA's requirements. Were another A/E firm to perform these services, the design team would need to invest substantial time familiarizing themselves with a design they did not perform. Considering the many disciplines involved, the size of the project and the amount of coordination that has been performed with the equipment manufacturers, this is likely to take each member of the team dozens of hours.
This investment in familiarization is one that Four Front Design would not have to make.
Unacceptable delays in fulfilling the VA's requirements is expected due to the additional familiarization that would be required if these services are awarded to an A/E firm other than
Four Front Design. If the A/E firm is not prepared at the time of award to attend the construction pre-bid conference, present the project to contractors and provide accurate answers to bidding questions, the construction procurement will likely be delayed. Any such delays will be avoided by awarding these services to Four Front Design.
6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable:
Due to the authority used for this J&A (Only One Responsible Source), no efforts made.
7. Determination by the CO that the Anticipated Cost to the Government will be Fair and
Reasonable:
The Contracting Officer shall determine the estimated cost for this item will be fair and reasonable because the CO will thoroughly review, compare, and analyze the IGE and the support information the COR submitted with this J&A.
8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons
Market Research Was Not Conducted:
Market research was not conducted because only one A/E firm provided services to perform the design and prepare construction drawings and specifications. Four Front Design is the only A/E firm is the only responsible source available to provide A/E Construction Period Services and Site Visits
OFOC SOP Revision 09
Original Date: 03/22/11
Revision 09 Date: 04/17/2020
6/2/2020
b. One Level Above the Contracting Officer (Required over SAT but not exceeding $700K): I certify the justification meets requirements for other than full and open competition.
Shea Colby
Branch Chief
NCO 23
OFOC SOP Revision 09
Original Date: 03/22/11
Revision 09 Date: 04/17/2020
Date
| 2020-06-02T15:27:57-0500 | |
| Christine J Gauthier 369110 |
| 2020-06-03T07:04:35-0500 | |
| SHEA A. COLBY 414330 |