Control Number:

Contractor: D R S Architects

JUSTIFICATION REVIEW DOCUMENT

FAR PART 6 JUSTIFICATION AND APPROVAL FOR OTHER THAN

FULL AND OPEN COMPETITION

Supply/Service: Repair Stormwater Infrastructure – Additional Design (A-E)

Authority: 10 U.S.C. 2304(c)(1) as implemented by FAR Part 6.302-1 -- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.

Amount: $18,811.98

Prepared by: Michael W. Boyd DSN: 294-7660 Contract Specialist Email: michael.w.boyd2.mil@mail.mil

Contracting Officer: Holly A. Steel Office: (215) 323-7106 Contracting Officer Email: holly.a.steel.civ@mail.mil

Technical: DSN: 294-7539

Requirements: DSN: 294-7474

Shanna L. Denny Civil Engineer Email: shanna.l.denny.mil@mail.mil

Jeremy K. Ketter Base Civil Engineer Email: jeremy.k.ketter.mil@mail.mil

Reviews: I have reviewed this justification and find it adequate to support other than full and open competition.

Program Manager: Jeremy K. Ketter DSN: 294-7474 Base Civil Engineer Email: jeremy.k.ketter.mil@mail.mil

Signature: ____________________ Date:____________________

Legal Counsel: Comm: (717) 861-2513 Johnny B. Davis

JAG

Email: johnny.b.davis10.mil@mail.mil

Signature: ____________________ Date: ____________________

Control Number: N/A Contractor: DRS Architects, Inc.

Department of Army FAR Part 6 Justification and Approval for Other than

Full and Open Competition

1. Contracting Activity: US PROPERTY AND FISCAL OFFICE FOR

PENNSYLVANIA DEPARTMENT OF MILITARY AND VETERANS AFFAIRS

ANNVILLE, PENNSYLVANIA

2. Description of Action: The 171st ARW of the PA Air National Guard requests a Firm-Fixed Price Contract for additional design services pertaining to an existing design for to Repair Base Stormwater Infrastructure. The Government projects award using SRM funds.

3. Description of Supplies/Services: The Government requires contractor support to provide additional design work to an existing design for the repair of base stormwater infrastructure. The existing design dates to FY13, and following a Code & Compliance Review in late FY19, it was determined that minor additional design work is required.

The Government intends to award a Firm-Fixed Price Purchase Order to the A-E firm responsible for the original design. The period of performance shall be from contract award to six (6) months, hereafter referred to as the Period of Performance (PoP).

4. Authority Cited: 10 U.S.C. 2304(c)(1), as implemented by FAR 6.302-1(a)(2)(iii), Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Reason for Authority Cited:

The 171st ARW of the Pennsylvania Air National Guard (PAANG) has a requirement for additional design work to an existing design to repair the Base Stormwater Infrastructure.

a. The PAANG utilized DRS, Inc, the A-E responsible for the original FY13 design, to conduct a Code & Criteria (C&C) review on the original FY13 design, utilizing the Government Purchase Card (GPC) in late FY19. Its rationale for utilizing the original firm for the C&C review was that the team responsible for the FY13 design was still mostly intact at DRS, Inc. Their familiarity with the previous design work meant that they were best positioned to conduct a C&C review, as well as additional design. Hiring a different firm to provide the additional design will inevitably result in a significant increase of both time and money on the part of the Government.

b. The quoted price of the additional design work is $18,811.98, or roughly 23% of the original Task Order price of $79,407.91 (including a NTE CLIN of $10,000.00).

Hiring a different firm to provide the additional design will result in a significantly higher cost, since a different firm would need to essentially re-design the entire project, and then only after conducting their own reviews and taking additional time to familiarize themselves with the existing design, not to mention the undertaking of their own separate liability precautions, all of which would inevitably passed down to the Government.

6. Efforts to Obtain Competition: This is a one-time action and necessary only to bring an existing drawing into compliance with current code. No future related actions are contemplated, and any new A-E requirements will be competed in accordance with all applicable rules and regulations.

7. Actions to Increase Competition: A new competitive action is currently in the pre-solicitation stage.

8. Market Research: Market Research in the form of an Independent Government Estimate (IGE) was conducted.

9. Interested Sources: No Market Research was conducted in terms of other interested sources.

10. Other Facts:

a. Procurement history. This should just include the contract data

Contractor: D R S Architects, Inc. Dollar Value: $18,811.98 Contract# : W50S91-20-P-0007 Period of Performance: 4 Months Business Size: Small Competitive/Noncompetitive: Noncompetitive

11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Date: _________________ ____________________________ Shanna L. Denny Civil Engineer

12. Requirements Certification: I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.

Date: __________________________ ______________________________ Jeremy K. Ketter Base Civil Engineer

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated price to the Government for this contract action will be fair and reasonable. This determination will be made using price analysis techniques as prescribed in FAR 15.402(a)(2)(ii). Specifically, an Independent Government Estimate (IGE) was utilized to determine fairness and reasonableness.

As a part of this basis, certified cost or pricing data will not be required and the following exception applies: FAR 15.403-1(a), “Certified cost or pricing data shall not be obtained for acquisitions at or below the simplified acquisition threshold.”

Date: __________________________ ______________________________ Holly A. Steel Contracting Officer

Approval

Based on the foregoing justification, I hereby approve the procurement of the Additional Design for Repair of Stormwater Infrastructure on an other than full and open competition basis pursuant to the authority of 10 U.S.C. 2304(c)(1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements., subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.

Date: __ _____________________________________ Terry L. Fetterman Chief of Contracting

2020-04-21T14:48:56-0400
KETTER.JEREMY.K.1365792832
2020-04-21T16:35:34-0400
DAVIS.JOHNNY.BRUCE.1274349995
2020-04-21T14:14:58-0400
DENNY.SHANNA.L.1240378686
2020-04-21T14:49:27-0400
KETTER.JEREMY.K.1365792832
2020-05-06T09:41:36-0400
Holly A. Steel
Text9:
Text10: 6 May 2020
Text11: 21 April 2020
Text12: 21 APR 2020
Text13: 21 April 2020
Text14: 21 April 2020

File details come from the government source that posted it. Updated .