J-6 - Standardized Proposal Breakdown.xls
XLS spreadsheet 47 KB Posted
- Attached to
- BIL - DTWA Base Building Elevator Modernization Federal contract opportunity
- Solicitation number
- 697DCK-24-R-00304
About this file
The document provided appears to be a Modernization Standardized Proposal Breakdown template related to a federal contract opportunity. The template includes line items for various elevator modernization requirements such as electronics/controls/software, electrical, mechanical/drives/sheaves/traveling cable, safety equipment, and cab interior/finishes. It also includes line items for construction/installation activities such as mobilization/demobilization, removal/demolition, installation, and permits. The template allows vendors to input their proposed equipment, labor, and other costs for each line item.
The related federal contract opportunity is for the BIL - DTWA Base Building Elevator Modernization project, solicitation number 697DCK-24-R-00304, issued by the Federal Aviation Administration (FAA). The solicitation is for a stand-alone contract with a firm fixed-price pricing arrangement. Contractors must be registered in the System for Award Management (SAM) by the established proposal due date. The FAA reserves the right to communicate with offerors and review their program eligibility during the solicitation process. Questions regarding the project or specifications must be received by April 26, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-9 DTW base building Elevator Information Sheet form.pdf | ||
| 697DCK-24-R-00304-001.pdf | ||
| Questions and Answers.docx | DOCX document | |
| J-4 Wage Determination.pdf | ||
| J-2 - FAA-C-1217H Chg. 1 Electrical Work Premises Wiring.pdf | ||
| 697DCK-24-R-00304.pdf | ||
| J-1 PWS.pdf | ||
| J-8 Past Performance Questionnaire.pdf | ||
| J-5 SCA.pdf | ||
| J-3 - FAA-STD-019f Chg 3 20200401.pdf | ||
| J-7- Uniform Bipartisan Infrastructure Law Data Report.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | |||
| PROJECT: DTWA Elevator | ||||
| VENDOR: | ||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | |||
| ITEM | EQUIPMENT COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | ||
| Modernization Requirements: | ||||
| Electronics/Controls/Software | thiat | $ - 0 | $ - 0 | |
| Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical/Drives/Sheaves/Traveling Cable | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Cab Interior/Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | |
| Construction/Install: | ||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| After Hours Variance: | ||||
| Modernization/Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MODERNIZATION TOTAL | $ - 0 | |||
| Performance Maintenance: | ||||
| Maintenance Fee (monthly) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Maintenance Monitoring (as required) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MAINTENANCE TOTAL (Annual) Base Year | $ - 0 | |||
| Maintenance Option Year 1 | ||||
| Maintenance Option Year 2 | ||||
| Maintenance Option Year 3 | ||||
| Maintenance Option Year 4 | ||||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
File details come from the government source that posted it. Updated .