J-6 Standardized Proposal Breakdown.xls
XLS spreadsheet 46 KB Posted
- Attached to
- PDX ATCT Elevator Modernization Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00026
About this file
This standardized proposal breakdown template is for an elevator modernization and maintenance agreement opportunity with the Federal Aviation Administration for their PDX ATCT facility in Portland, Oregon. Vendors are instructed to enter component costs into the white cells, with embedded formulas auto-populating totals in pink cells. A narrative description of the modernization effort is also required to be included along with technical proposals. The modernization scope includes electronics/controls/software, electrical, mechanical/drives/sheaves/traveling cable, safety equipment, and cab interior/finishes. Construction/installation includes mobilization/demobilization, removal/demolition, installation, and permits. After hours variance and maintenance costs should also be broken out. Proposals are due in accordance with the solicitation number and details provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-23-R-00026.pdf | ||
| J-2 FAA-STD-019f Chg 3 20200401.pdf | ||
| J-5 SCA Wage Rates.pdf | ||
| J-7 Solicitation Questions Form.doc | DOC document | |
| J-8 Site Visit Registration Form.doc | DOC document | |
| J-3 FAA-C-1217H Chg. 1 Electrical Work Premises Wiring.pdf | ||
| J-9 Past Performance Questionnaire.pdf | ||
| 697DCK-23-R-00026.pdf | ||
| J-1 PDX Elevator PWS.pdf | ||
| J-4 Davis Bacon Wage Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | |||
| PROJECT: | ||||
| VENDOR: | ||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | |||
| ITEM | EQUIPMENT COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | ||
| Modernization Requirements: | ||||
| Electronics/Controls/Software | thiat | $ - 0 | $ - 0 | |
| Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical/Drives/Sheaves/Traveling Cable | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Cab Interior/Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | |
| Construction/Install: | ||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| After Hours Variance: | ||||
| Modernization/Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MODERNIZATION TOTAL | $ - 0 | |||
| Performance Maintenance: | ||||
| Maintenance Fee (monthly) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Maintenance Monitoring (as required) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MAINTENANCE TOTAL (Annual) Base Year | $ - 0 | |||
| Maintenance Option Year 1 | ||||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
File details come from the government source that posted it. Updated .