J-3_FSSS Supplemental Specs_1284LM22Q0096.pdf
PDF 396 KB Posted
- Attached to
- STRAWBERRY RECREATION SITE IMPROVEMENTS (Construct Tent Pads and Picnic Areas) / Black Hills National Forest
- Solicitation number
- 1284LM22Q0096
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-4_WD_General Decision Number_SD20220001.pdf | ||
| J-2_PlansDrawings_1284LM22Q0096.pdf | ||
| RFQ_1284LM22Q0096_StrawberryRecImprove.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS
Specification List
Project Name: Strawberry Lake LivingAreas/Tent Pads
Title Date Prepared 08/12
(Latest Revision Date) Specification Number:
101 Terms, Format, and Definitions 2014
SCR 101-109 Terms, Format, and Definitions 08/12
102 Bid, Award, and Execution of Contract 2014
SCR 101-109 Bid, Award, and Execution of Contract 08/12
103 Scope of Work 2014
SCR 101-109 Scope of Work 08/12
104 Control of Work 2014
SCR 101-109 Control of Work 08/12
105 Control of Material 2014
SCR 101-109 Control of Material 08/12
106 Acceptance of Work 2014
SCR 101-109 Acceptance of Work 08/12
107 Legal Relations and Responsibilities to the Public 2014
SCR 101-109 Legal Relations and Responsibilities to the Public 08/12
108 Prosecution and Progress 2014
SCR 101-109 Prosecution and Progress 08/12
109 Measurement and Payment 2014
SCR 101-109 Measurement and Payment 08/12
151 Mobilization 2014
155 Schedules for Construction Contracts 2014
SCR 155 Schedules for Construction Contracts 08/12
203 Removal of Structures and Obstructions 2014
301 Untreated Aggregate Courses 2014
SCR 301 Untreated Aggregate Courses 08/12
557 Timber Structures 2014
SCR 557 Timber Structures 08/12
Note: All of the specifications cited are applicable to this project. The Special Contract Requirements (SCR) are included with this solicitation. The other specifications are within the 2014 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Other specifications referred to within these specifications (even though not specifically listed herein) are also fully applicable to this project.
101.01_nat_04_02_2004
101 - Terms, Format, and Definitions
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-14 to Transportation Acquisition Regulations (TAR). For Timber Sales, delete all references in FP-14 to Federal Acquisition Regulations (FAR).
101.03_nat_04_02_2004
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NEC
WCLIB
WWPA
ALSC
WWPI
NLGA
NSLB
NLMA
RIS
SPIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Western Wood Products Association
American Lumber Standards Committee
Western Wood Preservers Institute
National Lumber Grades Authority
Northern Softwood Lumber Bureau
Northeastern Lumber Manufacturer’s Association
Redwood Inspection Service
Southern Pine Inspection Bureau
101.04_nat_04_29_2004
101.03 Abbreviations.
Add the following to (b) SI Symbols:
mp Milepost ppm Part Per Million
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Right - of - Way Roadside Roadside
Clearing Width
Roadway Clearing
Limit X Y
Ground Line
Traveled Way
CL Berm Surface Course
Base Course
Fill Slope
Back Slope
Drainage Ditch
Ground Line
Subgrade
Road Bed
Shapes and dimensions will vary to fit local conditions.
See drawings for typical sections.
X and Y denote clearing outside of roadway.
Note:
R ig ht o f -
W a y Li ne
R ig ht o f -
W a y Li ne
C le a rin g Li m it
S ho u ld er
S ho u ld er
Figure 101-1--Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_03_27_2004
102 Delete
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_04_02_2004
103 Delete
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.01_nat_03_27_2004
104 Control of Work.
Delete sections 104.01 and 104.02.
104.03_nat_03_23_2004
104.03 Specifications and Drawings.
104.03(c) As-built Drawings.
Replace with the following:
(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project. Use red pencil or red ink to record the information on the as-built plans.
Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.
Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.
Show the following types of changes on the as-built plans:
(1) Typical section(s)
(a) Revisions in dimensions
(b) Revisions in materials
(2) Plan and profile
Revisions to the alignment Changes in the construction limits Revisions in location, type, and grade of road approaches Location and type of utilities Location, size, and type of underdrains Skew of culverts Channel changes Location of monuments and permanent references Locations for all aerial and underground crossings of utilities Location, length, and type of fencing Revisions to grades, elevations, and stationing of intersection PIs Equations Culvert diameter, length, type, and stationing. On culvert extensions, indicate the length of the existing pipe and the length of the extension.
Location, length, stationing, and type of retaining walls
Location, length, stationing, and end treatment of guardrail
(3) Bridge
(a) Stationing of bridge ends
(b) Revisions to footing and seal elevations
(c) Pile length, size, type, and tip elevation
(d) Any changes in plan or dimensions including any major changes in reinforcing
(4) Miscellaneous
(a) Revisions to parking areas or turnouts
(b) Final location, type and length of curbs, sidewalks, etc.
Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.
104.04 Coordination of Contract Documents.
Replace with the following:
The special contract requirements, standard specifications, and plans are contract documents. A requirement in one document is binding as though occurring in all contract documents. The contract documents are intended to be complementary and to describe and provide for a complete contract. In case of discrepancy, calculated and shown dimensions govern over scaled dimensions. The contract documents govern in the following order:
(a) Special contract requirements;
(b) Standard specifications; and,
(c) Plans.
104.05_nat_03_23_2004
104.06 Use of Roads by Contractor.
Add section 104.06
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
104.07 Other Contracts.
Add section 104.07
The contractor shall schedule activities to coordinate and cooperate with other contracts, when applicable.
105 - Control of Material
105.02_nat_03_26_2004
105.02 Material Sources.
105.02(a) Government Provided Sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.02(c) Contractor-located sources.
Add the following:
All certifiable material (e.g., soil, gravel, seed, mulch etc.) transported onto National Forest System land or incorporated into the work will be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor. Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area.
All seed and mulch materials must be certified weed free.
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more restrictive.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Three methods of determining conformity and accepting work are described in Subsections 106.02 to
106.04 inclusive. The primary method of acceptance is specified in each Section of work.
However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.
Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.
If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work).
Replace the entire section with the following:
Statistical evaluation of the work will not be required. All specifications referring to this Subsection shall instead be referred to Subsections 106.02 through 106.04 as appropriate for the work performed.
106.07_nat_04_02_2004
106.07 Partial and Final Acceptance
Delete subsection 106.07.
107 - Legal Relations and Responsibility To the Public
107.02 Protection and Restoration of Property and Landscape.
Add the following:
Work in the Middle Saint Vrain Creek is not restricted except for high water periods.
107.05 Responsibility for Damage Claims.
Delete subsection 107.05.
107.06 Contractor’s Responsibility for Work.
Delete the following:
“except as provided in Subsection 106.07”.
107.08_nat_03_24_2004
107.08 Sanitation, Health, and Safety.
Add the following:
Perform all operations in a prudent, conscientious, safe and professional manner. Ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120). Notify the Forest Service of all hazardous material that may be brought onto the National Forest.
107.09 Legal Relationship of the Parties.
Delete subsection 107.09.
107.10_nat_03_24_2004
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_03_24_2004
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.01 Measurement of Work
Replace the sixth paragraph with the following:
Submit measurement notes to the CO as directed. For lump sum items, submit documentation to support invoiced progress payment.
109.02_nat_03_25_2004
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
(c) Cubic Yard
Delete methods (2) and (4).
Measurement Terms and Definitions.
Replace 109.02(p) with the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.05 Scope of Payment.
Replace the last paragraph with the following:
The quantities shown in the bid schedule are contract quantities unless designated otherwise.
Limit pay quantities to those shown on the bid schedule or otherwise authorized before performing the work. Payment will be made for contract quantities unless designated otherwise on the bid schedule. For designated quantities to be measured for payment and for quantities to be adjusted according to Section 109.02(b), measure quantities as directed in each associated Standard Section or Special Contract Requirement.
109.06_nat_03_24_2004
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
154 – Contractor Sampling And Testing
Delete this section in its entirety.
155 - Schedules for Construction Contracts
155.00_nat_03_23_2004
Replace Section 155 with the following.
155.01 This work consists of scheduling and monitoring all construction activities. See FAR Clause 52.236-15 Schedules for Construction Contracts.
155.02 Submit 3 copies of a construction schedule at least 14 days before work commences.
301 - Untreated Aggregate Courses
301.00_nat_03_27_2004
301 Title Change
Title. Change the title to: Section 301 Aggregate Courses 301.03_nat_03_24_2004
301.03 General.
Add the following:
Request approval in writing of the roadbed before placing aggregate.
For pit run or grid-rolled material, furnish material smaller than the maximum size. No gradation other than maximum size will be required for pit-run or grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size. After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.
Provide additives or binder, if required, at the proportions specified.
Develop and use Government furnished sources according to Section 105.
If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320.
Establish stockpile sites at locations approved by the CO. Clear and grub stockpile sites according to Section 201.
Delete the following segment of the second paragraph:
“along with a representative 300-pound sample”
301.04_nat_03_24_2004
301.04 Mixing and Spreading.
Delete the first sentence of the first paragraph and add the following:
Ensure that aggregate and any required additives, water, mineral filler, and binder are mixed by the specified method except, if crushed aggregate products are being produced and mineral filler, binder, or additives are required, uniformly blend during crushing. Control additive proportions to 0.5 percent dry weight.
Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer. Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.
Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant. During mixing, add water to provide the necessary moisture content for compacting.
Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.
Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.
When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.
Route and distribute hauling and leveling equipment over the width and length of each layer.
301.05_nat_03_24_2004
301.05 Compacting.
Delete the first and third paragraphs and add the following:
Compact the aggregate using one of the following methods as specified:
(a) Compaction A. Compact the aggregate by operating spreading and hauling equipment.
(b) Compaction B. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a).
(c) Compaction C. Compact each layer of aggregate to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
(1) Compaction C-1. Compact each layer of aggregate to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
(d) Compaction D. Compact each layer of aggregate to a density of at least 95 percent of the maximum density, as determined by AASHTO T 180, method C or D.
(1) Compaction D-1. Compact each layer of aggregate to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
(e) Compaction E. Operate rollers and compact as specified in Subsection 204.11(a).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.06_nat_03_24_2004
301.06 Surface Tolerance.
Add the following:
Thickness and Width requirements:
The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements along the reconstructed road segment is within + ¼ inch of the specified thickness.
The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along the reconstructed road segment is within +4 inches of the specified width.
301.08_nat_03_24_2004
301.08(b) Plasticity Index.
Add the following to the first sentence: “and under Special Contract Requirement 703.05(c)(3)”.
301.09_nat_03_24_2004
301.09 Measurement.
Add the following: Measure aggregate by cubic yard compacted in place when payment is by contract quantities.
301.10 (Payment).
Delete the following:
…”adjusted according to Subsection 106.05”...
Table 301-1: Add the following:
Table 301-1—Acceptance Sampling and Testing Requirements.
Material or Product
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Subbase & Base Courses L, M, N, O, P, Q, R
Measured and tested conformance
(Subsection 106.04)
Plastic Limit - AASHTO T 90 3 per each abutment approach road
From the windrow or roadbed after processing
Yes 4 Hours
Table 301-1—Acceptance Sampling and Testing Requirements.
Material or
Product Type of
Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Aggregate Width Measured and tested conformance
(Subsection 106.04)
Width - - 3 per each abutment approach road
Roadbed after processing
- 4 Hours
Aggregate Thickness Measured and tested conformance
(Subsection 106.04)
Thickness - - 3 per each abutment approach road
Roadbed after processing
- 4 Hours
Additive Measured and tested conformance
(Subsection 106.04)
Amount of Additive - 3 per each abutment approach road
From the windrow or roadbed after processing
No 4 Hours
Table 301-1 Field Density Requirements.
Table 301-1: Delete laboratory and field density requirements for base, subbase, and surfacing and replace with the following:
Material or Product
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Base and Subbase
Measured and tested conformance (Subsection 106.04)
Moisture Density ---
Method C --- AASHTO T 99 1 per type and source of material
Source of material
Yes Before using in work
Method C-1 --- R-1 Marshall “ “ “ “
Method D --- AASHTO T 180 “ “ “ “
Method D-1 --- R-1 Marshall “ “ “ “
Compaction ---
Method C, C-1, D, D-1
--- AASHTO T 310 or other approved procedures
3 per each abutment approach road
In-place --- Before placing the next layer
Surfacing Measured and tested conformance (Subsection 106.04)
Moisture Density
Method C-1 --- R-1 Marshall “ “ “ Before using in work
Method D --- AASHTO T 180 “ “ “ “
Method D-1 --- R-1 Marshall “ “ “ “
Compaction
Method C, C-1, D, D-1
--- AASHTO T 310 or other approved procedures
3 per each abutment approach road
In-place --- Before placing the next layer
557 – Timber Structures
557.01 (Description)
Replace section with the following:
The work shall consist of fabricating, furnishing, and erecting two trail bridges.
557.03 General
Replace the first sentence with the following:
Excavate and backfill according to Section 208.
557.04 Treated Timber.
Delete the first sentence of the third paragraph.
557.07 Countersinking.
Replace the last sentence with the following:
After bolts or lag screws (except lag screws in the running planks) are in place, fill the holes with hot pitch, asphalt roofing cement, or other CO approved filler.
557.20 (Measurement).
Replace the second paragraph with the following:
Measure untreated and treated structural timber and lumber as specified in Special Contract Requirement 109.02.
Supplemental Specifications FP-03 Standard Specifications
(https://flh.fhwa.dot.gov/resources/specs/fp-03.htm)
703 - Aggregate
703.05_nat_us_08_14_2009
Delete 703.05 and replace with the following:
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-2
(2) Liquid limit, AASHTO T 89 25 max.
(3) Plastic limit, AASHTO T 90 Nonplastic
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 50% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-3
(2) Liquid limit, AASHTO T 89 35 max.
(3) Plastic Index, AASHTO T 90
a) If the percent passing the No. 200 sieve is less than 12% 2 to 9
b) If the percent passing the No. 200 sieve is greater than 12% Less than 2
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 75% min.
(9) Free from organic matter and lumps or balls of clay
Do not furnish material that contains asbestos fibers.
(https://flh.fhwa.dot.gov/resources/specs/fp-03.htm)
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:
(1) Gradation Table 703-16
(2) Plastic Index, AASHTO T 90 Less than 9
(3) Los Angeles abrasion, AASHTO T 96 55% max.
(4) Free from organic matter and lumps or balls of clay.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
(https://flh.fhwa.dot.gov/resources/specs/fp-03.htm)
Delete Table 703-2 and replace with the following:
U (Base)
36 – 74 (6)
15-45
<20
Table 703-2 Target Value Ranges for Subbase and Base Gradation
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
E (Base)
62 – 90 (6)
36 – 74 (6)
12 – 26 (4)
4.0 – 7.0 (3)
( ) The value in the parentheses is the allowable deviation () from the target values..
D (Base)
86 – 100 (6)
51 – 82 (6)
36 – 64 (6)
12 – 26 (4)
4.0 – 7.0 (3)
C (Base)
80 – 100 (6)
64 – 94 (6)
40 – 69 (6)
31 – 54 (6)
4.0 –7.0 (3)
B (Subbase)
97 – 100
40 – 60 (8)
4.0 – 12.0 (4)
A (Subbase)
97 – 100
65 – 79 (6)
45 – 59 (7)
28 – 42 (6)
9 – 17 (4)
4.0 – 8.0 (3)
Sieve Size
2½ inch
2 inch
1½ inch
1 inch
3/4 inch
1/2 inch
3/8 inch
No. 4
No. 40
No. 200
(https://flh.fhwa.dot.gov/resources/specs/fp-03.htm) Delete Table 703-3 and replace with the following:
Table 703-3 Target Value Ranges for Surface Gradation
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
V
70 -98
36 - 70
25 - 55
12 - 35
3 - 20
UU
71 – 90 (6)
50 – 68 (7)
34 – 51 (6)
19 – 30 (5)
8.0 – 15.0 (4)
( ) The value in the parentheses is the allowable deviation () from the target values.
If the plasticity index (PI) is greater than 0, the TV range for the No. 200 sieve size is 8-12 (4).
* Grading T shall be crushed Limestone.
T*
90 - 100
50 - 70
15 - 35
6 - 16
S
72 – 92 (6)
51 – 71 (6)
36 – 53 (7)
26 – 40 (6)
14 – 25 (5)
8.0 – 15.0 (4)
H
97 - 100
80 – 92 (6)
58 – 70 (7)
28 – 40 (6)
16 – 26 (5)
9.0 – 14.0 (4)
G
97 - 100
70 – 80 (6)
51 – 63 (7)
28 – 39 (6)
19 – 27 (5)
10.0 – 16.0 (4)
F
97-100
76-89 (6)
56-68 (6)
43-53 (7)
23-32 (6)
15-23 (5)
10.0-16.0 (4)
Sieve Size
1 1/2 inch
1 inch
3/4 inch
1/4 inch
3/8 inch
No. 4
No. 8
No. 16
No. 30
No. 40
No. 200
(https://flh.fhwa.dot.gov/resources/specs/fp-03.htm) Add Table 703-16:
Table 703-16
Gradation Requirements for Screened Aggregate
Sieve Size
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
L M N O P R
6 inch 100 100
4 inch 100 100
3 inch 100
2 inch 100
No. 4 15-45 15-45
| Proj Specials List |
| SCR_101-109 |
| SCR_154 |
| SCR_155 |
| SCR_301 |
| SCR_557 |
| SCR_703 |
File details come from the government source that posted it. Updated .