SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

HVAC

01 14 00 SD-01 Preconstruction Submittals

List of Contact Personnel

01 20 00 SD-01 Preconstruction Submittals

1.3Schedule of Prices

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2Baseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 35 26 SD-01 Preconstruction Submittals

1.7Accident Prevention Plan (APP)

SD-07 Certificates

1.7.3.1Standard Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

License Certificates

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6QC Plan

01 50 00 SD-01 Preconstruction Submittals

1.3Construction Site Plan

01 78 00 SD-10 Operation and Maintenance

Data

3.2Operation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 78 00 Record Drawings

23 05 15 SD-03 Product Data

2.1Pipe and Fittings

2.2Valves

Supporting Elements

23 05 93 SD-06 Test Reports

Proportional Balancing

SD-07 Certificates

1.5.1Independent TAB Agency and

Personnel Qualifications

1.5.5Instrument Calibration

Certificates

23 07 00 SD-03 Product Data

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

Equipment Insulation Systems

23 09 00 SD-03 Product Data

BMS network architecture diagrams

Systems schematics, sequences, and flow diagrams

Points schedule

Samples of Graphic Display screen types and associated menus

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

23 09 00 Bill of Material list

Room Schedule

Control Valve Schedules

BMS Interface Details

Product Data Sheets

23 30 00 SD-03 Product Data

2.4.1.1Metallic Flexible Duct

2.4.1.2Insulated Nonmetallic Flexible

Duct Runouts

2.4.1.2Duct Connectors

Duct Access Doors

2.4.2Manual Balancing Dampers

2.4.5.1Diffusers

2.4.5.2Registers and Grilles

2.5.1Room Fan-Coil Units

26 20 00 SD-03 Product Data

Circuit Breakers

Motor Controllers

Cable Trays

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

Cover Sheet
REGISTER
PUBLISH
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 - LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 OCCUPANCY OF PREMISES
1.4 EXISTING WORK
01 14 00 - WORK RESTRICTIONS
PART 1 GENERAL
1.1 SUBMITTALS
1.2 SPECIAL SCHEDULING REQUIREMENTS
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
1.3.1.1 Subcontractors and Personnel Contacts
1.3.1.2 Additional Personnel Requirements
1.3.1.2.1 General Construction and Finish Work
1.3.1.2.2 General Construction
1.3.1.3 Installation Access
1.3.1.3.1 Registration for DBIDS
1.3.1.3.2 DBIDS Eligibility Requirements
1.3.1.3.3 DBIDS Notification Requirements
1.3.1.3.4 One-Day Passes

1.3.1.4 No Smoking Policy

1.3.2 Working Hours
1.3.3 Work Outside Regular Hours
1.3.4 Occupied Building
1.3.5 Utility Cutovers and Interruptions
01 20 00 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SCHEDULE OF PRICES
1.3.1 Data Required
1.3.2 Payment Schedule Instructions
1.3.3 Schedule Requirements for HVAC TAB
1.4 CONTRACT MODIFICATIONS
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
1.5.2 Submission of Invoices
1.6 PAYMENTS TO THE CONTRACTOR
1.6.1 Obligation of Government Payments
1.6.2 Payment for Onsite and Offsite Materials
01 30 00 - ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUPERVISION
1.2.1 Superintendent Qualifications
1.2.2 Minimum Communication Requirements
1.2.3 Duties
1.2.4 Non-Compliance Actions
1.3 PRECONSTRUCTION MEETING
1.3.1 Attendees
1.4 WAIVER FOR WORKER'S COMPENSATION
1.5 PARTNERING
01 32 16.00 20 - SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 PRE-CONSTRUCTION SCHEDULE REQUIREMENT
1.3 SCHEDULE FORMAT
1.3.1 Schedule Submittals and Procedures
1.4 SCHEDULE MONTHLY UPDATES
1.5 3-WEEK LOOK AHEAD SCHEDULE
1.6 CORRESPONDENCE AND TEST REPORTS:
1.7 ADDITIONAL SCHEDULING REQUIREMENTS
01 33 00 - SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions SD
1.1.2 Approving Authority
1.1.3 Work
1.2 SUBMITTALS
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved G
1.3.2 For Information Only
1.4 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL
1.4.1 O&M Data
1.5 PREPARATION
1.5.1 Transmittal Form
1.5.2 Identifying Submittals
1.5.3 Submittal Format
1.5.3.1 Format of SD-01 Preconstruction Submittals
1.5.3.2 Format of SD-03 Product Data
1.5.3.2.1 Product Information
1.5.3.2.2 Standards
1.5.3.2.3 Data Submission
1.5.3.3 Format of SD-05 Design Data
1.5.3.4 Format of SD-06 Test Reports
1.5.3.5 Format of SD-07 Certificates
1.5.3.6 Format of SD-08 Manufacturer's Instructions
1.5.3.6.1 Standards
1.5.3.7 Format of SD-09 Manufacturer's Field Reports
1.5.3.8 Format of SD-10 Operation and Maintenance Data O&M
1.5.3.9 Format of SD-11 Closeout Submittals
1.5.4 Source Drawings for Shop Drawings
1.5.4.1 Source Drawings
1.5.4.2 Terms and Conditions
1.6 QUANTITY OF SUBMITTALS
1.7 VARIATIONS
1.7.1 Considering Variations
1.7.2 Warranting that Variations are Compatible
1.7.3 Review Schedule Extension
1.8 SCHEDULING
1.8.1 Reviewing, Certifying, and Approving Authority
1.8.2 Constraints
1.8.3 QC Organization Responsibilities
1.9 GOVERNMENT APPROVING AUTHORITY
1.9.1 Review Notations
1.10 DISAPPROVED SUBMITTALS
1.11 APPROVED SUBMITTALS
1.12 APPROVED SAMPLES
PART 2 PRODUCTS
PART 3 EXECUTION
01 35 26 - GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Competent Person CP
1.2.2 Competent Person, Confined Space
1.2.3 Competent Person, Cranes and Rigging
1.2.4 Competent Person, Excavation/Trenching
1.2.5 Competent Person, Fall Protection
1.2.6 Competent Person, Scaffolding
1.2.7 Competent Person CP Trainer
1.2.8 High Risk Activities
1.2.9 High Visibility Accident
1.2.10 Load Handling Equipment LHE
1.2.11 Medical Treatment
1.2.12 Near Miss
1.2.13 Operating Envelope
1.2.14 Qualified Person QP
1.2.15 Qualified Person, Fall Protection QP for FP
1.2.16 Recordable Injuries or Illnesses
1.2.17 Government Property and Equipment
1.2.18 Load Handling Equipment LHE Accident or Load Handling Equipment
1.3 SUBMITTALS
1.4 MONTHLY EXPOSURE REPORTS
1.5 REGULATORY REQUIREMENTS
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer SSHO
1.6.1.1.1 Additional Site Safety and Health Officer SSHO Requirements
1.6.1.2 Competent Person Qualifications
1.6.1.2.1 Competent Person for Scaffolding
1.6.1.2.2 Competent Person for Fall Protection
1.6.1.3 Qualified Trainer Requirements
1.6.1.4 Crane Operators/Riggers
1.6.2 Personnel Duties
1.6.2.1 Duties of the Site Safety and Health Officer SSHO
1.6.3 Meetings
1.6.3.1 Preconstruction
1.6.3.2 Safety Meetings
1.7 ACCIDENT PREVENTION PLAN APP
1.7.1 APP - Construction
1.7.2 Names and Qualifications
1.7.3 Plans
1.7.3.1 Standard Lift Plan SLP
1.7.3.2 Fall Protection and Prevention FP&P Plan
1.7.3.3 Rescue and Evacuation Plan
1.7.3.4 Hazardous Energy Control Program HECP
1.8 ACTIVITY HAZARD ANALYSIS AHA
1.8.1 AHA Management
1.8.2 AHA Signature Log
1.9 DISPLAY OF SAFETY INFORMATION
1.9.1 Safety Bulletin Board
1.9.2 Safety and Occupational Health SOH Deficiency Tracking System
1.10 SITE SAFETY REFERENCE MATERIALS
1.11 EMERGENCY MEDICAL TREATMENT
1.12 NOTIFICATIONS and REPORTS
1.12.1 Mishap Notification
1.12.2 Accident Reports
1.12.3 LHE Inspection Reports
1.12.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and
1.13 HOT WORK
1.13.1 Permit and Personnel Requirements
PART 3 EXECUTION
2.1 CONSTRUCTION AND OTHER WORK
2.1.1 Worksite Communication
2.1.2 Hazardous Material Exclusions
2.1.3 Unforeseen Hazardous Material
2.2 UTILITY OUTAGE REQUIREMENTS
2.3 OUTAGE COORDINATION MEETING
2.4 CONTROL OF HAZARDOUS ENERGY LOCKOUTTAGOUT
2.4.1 Safety Preparatory Inspection Coordination Meeting with the
2.4.2 Lockout/Tagout Isolation
2.4.3 Lockout/Tagout Removal
2.5 FALL PROTECTION PROGRAM
2.5.1 Training
2.5.2 Fall Protection Equipment and Systems
2.5.2.1 Additional Personal Fall Protection Measures
2.5.2.2 Personal Fall Protection Equipment
2.5.3 Fall Protection for Roofing Work
2.5.4 Horizontal Lifelines HLL
2.5.5 Guardrails and Safety Nets
2.5.6 Rescue and Evacuation Plan and Procedures
2.6 WORK PLATFORMS
2.6.1 Elevated Aerial Work Platforms AWPs
2.7 EQUIPMENT
2.7.1 Material Handling Equipment MHE
2.7.2 Load Handling Equipment LHE
2.7.3 Machinery and Mechanized Equipment
2.7.4 Base Mounted Drum Hoists
2.8 ELECTRICAL
2.8.1 Conduct of Electrical Work
2.8.2 Qualifications
2.8.3 Arc Flash
2.8.4 Grounding
2.8.5 Testing
01 45 00.10 20 - QUALITY CONTROL FOR MINOR CONSTRUCTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 INFORMATION FOR THE CONTRACTING OFFICER
1.4 QC PROGRAM REQUIREMENTS
1.4.1 Preliminary Work Authorized Prior to Acceptance
1.4.2 Acceptance
1.4.3 Notification of Changes
1.5 QC ORGANIZATION
1.5.1 QC Manager
1.5.1.1 Duties
1.5.1.2 Qualifications
1.5.1.3 Construction Quality Management Training

1.5.2 Alternate QC Manager Duties and Qualifications

1.6 QC PLAN
1.6.1 Requirements
1.7 COORDINATION AND MUTUAL UNDERSTANDING MEETING
1.8 QC MEETINGS
1.9 THREE PHASES OF CONTROL
1.9.1 Preparatory Phase
1.9.2 Initial Phase
1.9.3 Follow-Up Phase
1.9.4 Additional Preparatory and Initial Phases
1.9.5 Notification of Three Phases of Control for Off-Site Work
1.10 SUBMITTAL REVIEW AND APPROVAL
1.11 TESTING
1.11.1 Accreditation Requirements
1.11.2 Laboratory Accreditation Authorities
1.11.3 Capability Check
1.11.4 Test Results
1.12 QC CERTIFICATIONS
1.12.1 Contractor Quality Control Report Certification
1.12.2 Invoice Certification
1.12.3 Completion Certification
1.13 COMPLETION INSPECTIONS
1.13.1 Punch-Out Inspection
1.13.2 Pre-Final Inspection
1.13.3 Final Acceptance Inspection
1.14 DOCUMENTATION
1.14.1 Quality Control Validation
1.14.2 As-Built Drawings

1.15 NOTIFICATION ON NON-COMPLIANCE

01 50 00 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CONSTRUCTION SITE PLAN
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
2.1.2 Project Identification Signs
2.1.3 Warning Signs
01 78 00 - CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 As-Built Drawings
1.2.2 Record Drawings
1.3 SOURCE DRAWING FILES
1.3.1 Terms and Conditions
1.4 SUBMITTALS
1.5 WARRANTY MANAGEMENT
1.5.1 Warranty Management Plan
1.5.2 Performance Bond
1.5.3 Pre-Warranty Conference
1.5.4 Warranty Tags
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 AS-BUILT DRAWINGS
3.1.1 Markup Guidelines
3.1.2 As-Built Drawings Content

3.2 OPERATION AND MAINTENANCE MANUALS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 - COMMON PIPING FOR HVAC
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Material and Equipment Qualifications
1.4.2 Alternative Qualifications
1.4.3 Manufacturer's Nameplate
1.4.4 Modification of References
1.4.4.1 Definitions
1.4.4.2 Administrative Interpretations

1.5 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS
2.1 PIPE AND FITTINGS
2.2 VALVES
2.2.1 Ball and Butterfly Valves
PART 3 EXECUTION
3.1 VALVES
3.2 SUPPORTING ELEMENTS INSTALLATION
3.3 PENETRATIONS
3.4 SLEEVES
3.5 OPERATION AND MAINTENANCE
23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Similar Terms
1.3 WORK DESCRIPTION
1.3.1 Air Distribution Systems
1.3.2 TAB SCHEMATIC DRAWINGS
1.3.3 Related Requirements
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Independent TAB Agency and Personnel Qualifications
1.5.1.1 TAB Standard
1.5.1.2 Qualifications
1.5.2 Responsibilities
1.5.2.1 Contractor
1.5.2.2 TAB Agency
1.5.2.3 TAB Team Supervisor
1.5.2.4 TAB Team Field Leader
1.5.3 Project/Site Conditions
1.5.4 Subcontractor Special Requirements
1.5.5 Instrument Calibration Certificates
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 WORK DESCRIPTIONS OF PARTICIPANTS
3.2 TAB PROCEDURES
3.2.1 TAB Field Work
3.2.2 Preliminary Procedures
3.2.3 TAB Work on Performance Tests Without Seasonal Limitations
3.2.3.1 Performance Tests
3.2.4 Workmanship
3.2.5
3.3 MARKING OF SETTINGS
3.4 MARKING OF TEST PORTS
23 07 00 - THERMAL INSULATION FOR MECHANICAL SYSTEMS
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 General
1.3 SUBMITTALS
1.4 CERTIFICATIONS
1.4.1 Adhesives and Sealants
1.5 QUALITY ASSURANCE
1.5.1 Installer Qualification

1.6 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
2.1.1 Insulation System
2.1.2 Surface Burning Characteristics
2.2 MATERIALS
2.2.1 Adhesives
2.2.1.1 Mineral Fiber Insulation Cement
2.2.1.2 Lagging Adhesive
2.2.1.3 Contact Adhesive
2.2.2 Caulking
2.2.3 Corner Angles
2.2.4 Fittings
2.2.5 Finishing Cement
2.2.6 Fibrous Glass Cloth and Glass Tape
2.2.7 Jackets
2.2.7.1 Polyvinyl Chloride PVC Jackets
2.2.7.2 Vapor Barrier/Vapor Retarder
2.2.8 Vapor Retarder Required
2.2.8.1 White Vapor Retarder All Service Jacket ASJ
2.2.8.2 Vapor Retarder/Vapor Barrier Mastic Coatings
2.2.8.2.1 Vapor Barrier
2.2.8.2.2 Vapor Retarder
2.2.8.3 Laminated Film Vapor Retarder
2.2.8.4 Polyvinylidene Chloride PVDC Film Vapor Retarder
2.2.8.5 Polyvinylidene Chloride Vapor Retarder Adhesive Tape
2.2.9 Vapor Retarder Not Required
2.2.10 Wire
2.2.11 Insulation Bands
2.2.12 Sealants
2.3 PIPE INSULATION SYSTEMS
2.3.1 Recycled Materials
2.3.2 Aboveground Cold Pipeline -30 to 60 deg. F
2.3.2.1 Cellular Glass
2.3.2.2 Flexible Elastomeric Cellular Insulation
2.3.3 Aboveground Hot Pipeline Above 60 deg. F
2.3.3.1 Cellular Glass
2.3.3.2 Flexible Elastomeric Cellular Insulation
2.4 DUCT INSULATION SYSTEMS
2.4.1 Factory Applied Insulation
2.4.1.1 Blanket Insulation
2.4.2 Duct Insulation Jackets
2.4.2.1 All-Purpose Jacket
2.4.2.2 Metal Jackets
2.4.2.2.1 Stainless Steel Jackets
PART 3 EXECUTION
3.1 APPLICATION - GENERAL
3.1.1 Installation
3.1.2 Firestopping
3.1.3 Installation of Flexible Elastomeric Cellular Insulation
3.1.3.1 Adhesive Application
3.1.3.2 Adhesive Safety Precautions
3.1.4 Welding
3.1.5 Pipes/Ducts/Equipment That Require Insulation
3.2 PIPE INSULATION SYSTEMS INSTALLATION
3.2.1 Pipe Insulation
3.2.1.1 General
3.2.1.2 Pipes Passing Through Walls, Roofs, and Floors
3.2.1.2.1 Penetrate Interior Walls
3.2.1.3 Pipes Passing Through Hangers
3.2.1.3.1 Horizontal Pipes Larger Than 2 Inches at 60 Degrees F and Above
3.2.1.3.2 Horizontal Pipes Larger Than 2 Inches and Below 60 Degrees F
3.2.1.3.3 Inserts
3.2.1.4 Flexible Elastomeric Cellular Pipe Insulation
3.2.1.5 Pipe Insulation Material and Thickness
3.2.2 Aboveground Cold Pipelines
3.2.2.1 Insulation Material and Thickness
3.2.2.2 Factory or Field applied Jacket
3.2.2.3 Installing Insulation for Straight Runs Hot and Cold Pipe
3.2.2.3.1 Longitudinal Laps of the Jacket Material
3.2.2.3.2 Laps and Butt Strips
3.2.2.3.3 Factory Self-Sealing Lap Systems
3.2.2.3.4 Breaks and Punctures in the Jacket Material
3.2.2.3.5 Penetrations Such as Thermometers
3.2.2.3.6 Flexible Elastomeric Cellular Pipe Insulation
3.2.2.4 Insulation for Fittings and Accessories
3.2.2.5 Optional PVC Fitting Covers
3.2.3 Aboveground Hot Pipelines
3.2.3.1 General Requirements
3.2.3.2 Insulation for Fittings and Accessories
3.2.3.2.1 Precut or Preformed
3.2.3.2.2 Rigid Preformed
3.3 DUCT INSULATION SYSTEMS INSTALLATION
3.3.1 Duct Insulation Minimum Thickness
3.3.2 Insulation and Vapor Retarder/Vapor Barrier for Cold Air Duct
3.3.2.1 Installation on Concealed Duct
3.3.2.2 Installation on Exposed Duct Work
3.3.3 Insulation for Warm Air Duct
3.3.3.1 Installation on Concealed Duct
3.3.3.2 Installation on Exposed Duct
3.3.4 Ducts Handling Air for Dual Purpose
3.3.5 Duct Test Holes
23 09 00 - INSTRUMENTATION AND CONTROL FOR HVAC
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Instrumentation and Control Devices for HVAC
1.1.1.1 Actuators and Operators
1.1.1.2 Sensors and Transmitters
1.1.1.3 Control Valves
1.1.2 System Requirements
1.1.3 Verification of Dimensions
1.1.4 Drawings
1.2 RELATED DOCUMENTS
1.3 DEFINITIONS
1.3.1 Analog
1.3.2 Binary
1.3.3 Building Management System BMS
1.3.4 BMS Contractor
1.3.5 Control Sequence
1.3.6 Digital Direct Control
1.3.7 BMS Network
1.3.8 Node
1.3.9 BMS Integration
1.3.10 Provide
1.3.11 PC
1.3.12 Furnish
1.3.13 Wiring
1.3.14 Install
1.3.15 Protocol
1.3.16 Software
1.4 BMS DESCRIPTION
1.4.1 DDC SYESTEM
1.4.2 BMS WORK
1.4.3 BMS INSTALLATION
1.5 QUALITY ASSURANCE
1.5.1 GENERAL
1.5.2 QUALITY MANAGEMENT SYSTEM
1.6 SUBMITTALS
1.7 RECORD DOCUMENTATION
1.8 WARRANTY
PART 2 PRODUCTS
2.1 GENERAL DESCRIPTION
2.2 BMS ARCHITECTURE
2.3 USER INTERFACE
2.4 NETWORK AUTOMATION ENGINES
2.5 DDC SYSTEM CONTROLLERS
2.6 COMPUTING HARDWARE AND SOFTWARE
2.7 LOCAL CONTROL PANELS
PART 3 PERFORMANCE / EXECUTION
3.1 BMS SPECIFIC REQUIREMENTS
3.2 INSTALLATION PRACTICES
3.3 TRAINING
3.4 COMMISSIONING REQUIREMENTS
23 30 00 - HVAC AIR DISTRIBUTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.2.1 Mechanical Equipment Identification
1.2.1.1 Charts
1.2.2 Service Labeling
1.2.3 Color Coding
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Prevention of Corrosion
1.4.2 Asbestos Prohibition
1.4.3 Test Procedures

1.5 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
2.2 IDENTIFICATION PLATES
2.3 INDOOR AIR QUALITY
2.4 DUCT SYSTEMS
2.4.1 Metal Ductwork
2.4.1.1 Metallic Flexible Duct
2.4.1.2 Insulated Nonmetallic Flexible Duct Runouts
2.4.1.3 General Service Duct Connectors
2.4.2 Manual Balancing Dampers
2.4.2.1 Square or Rectangular Dampers
2.4.2.1.1 Duct Height 12 inches and Less
2.4.2.1.1.1 Frames
2.4.2.1.1.2 Single Leaf Blades
2.4.2.1.1.3 Blade Axles
2.4.2.1.1.4 Axle Bearings
2.4.2.1.1.5 Control Shaft/Hand Quadrant
2.4.2.1.1.6 Finish
2.4.2.1.2 Duct Height Greater than 12 inches
2.4.2.1.2.1 Dampers
2.4.2.1.2.2 Frames
2.4.2.1.2.3 Blades
2.4.2.1.2.4 Blade Axles
2.4.2.1.2.5 Axle Bearings
2.4.2.1.2.6 Blade Actuator
2.4.2.1.2.7 Blade Actuator Linkage
2.4.2.1.2.8 Control Shaft/Hand Quadrant
2.4.2.1.2.9 Finish
2.4.2.2 Round Dampers
2.4.2.2.1 Frames
2.4.2.2.2 Blades
2.4.2.2.3 Blade Axles
2.4.2.2.4 Axle Bearings
2.4.2.2.5 Control Shaft/Hand Quadrant
2.4.2.2.6 Finish
2.4.3 Automatic Balancing Dampers
2.4.4 Sound Attenuation Equipment
2.4.4.1 System with total pressure of 4 Inch Water Gauge and Lower
2.4.5 Diffusers, Registers, and Grilles
2.4.5.1 Diffusers
2.4.5.2 Registers and Grilles
2.4.5.3 Registers
2.5 TERMINAL UNITS
2.5.1 Room Fan-Coil Units
2.5.1.1 Enclosures
2.5.1.2 Fans
2.5.1.3 Coils
2.5.1.4 Drain Pans
2.5.1.5 Manually Operated Outside Air Dampers
2.5.1.6 Filters
2.5.1.7 Motors
PART 3 EXECUTION
3.1 EXAMINATION
3.2 INSTALLATION
3.2.1 Condensate Drain Lines
3.2.2 Equipment and Installation
3.2.3 Access Panels
3.2.4 Flexible Duct
3.2.5 Metal Ductwork
3.2.6 Dust Control
3.2.7 Insulation
3.2.8 Duct Test Holes
3.2.9 Power Transmission Components Adjustment
3.3 CLEANING
3.4 PENETRATIONS
3.4.1 Sleeves
3.4.2 Framed Prepared Openings
3.4.3 Insulation
3.4.4 Closure Collars
3.5 IDENTIFICATION SYSTEMS
3.6 DAMPER ACCEPTANCE TEST
3.7 TESTING, ADJUSTING, AND BALANCING
3.8 PERFORMANCE TESTS
3.9 CLEANING AND ADJUSTING
3.10 OPERATION AND MAINTENANCE
3.10.1 Operation and Maintenance Manuals
DIVISION 26 - ELECTRICAL
26 20 00 - INTERIOR DISTRIBUTION SYSTEM
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Regulatory Requirements
1.4.2 Standard Products
1.4.2.1 Alternative Qualifications
1.4.2.2 Material and Equipment Manufacturing Date

1.5 WARRANTY

PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.2 CONDUIT AND FITTINGS
2.2.1 Rigid Metallic Conduit
2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit
2.2.2 Electrical, Zinc-Coated Steel Metallic Tubing EMT
2.2.3 Flexible Metal Conduit
2.2.3.1 Liquid-Tight Flexible Metal Conduit, Steel
2.2.4 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit
2.2.4.1 Fittings for Rigid Metal Conduit.
2.2.4.2 Fittings for EMT
2.3 CABINETS, JUNCTION BOXES, AND PULL BOXES
2.4 WIRES AND CABLES
2.4.1 Conductors
2.4.1.1 Minimum Conductor Sizes
2.4.2 Color Coding
2.4.2.1 Ground and Neutral Conductors
2.4.3 Insulation
2.4.4 Bonding Conductors
2.5 SPLICES AND TERMINATION COMPONENTS
2.6 DEVICE PLATES
2.7 SWITCHES
2.7.1 Disconnect Switches
2.8 MOTORS
2.8.1 Motor Sizes
2.8.2 Wiring and Conduit
2.9 MANUAL MOTOR STARTERS MOTOR RATED SWITCHES
2.9.1 Pilot Lights
2.10 LOCKOUT REQUIREMENTS
2.11 MANUFACTURER'S NAMEPLATE
2.12 FIELD FABRICATED NAMEPLATES
2.13 FIRESTOPPING MATERIALS
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Wiring Methods
3.1.1.1 Pull Wire
3.1.2 Conduit Installation
3.1.2.1 Restrictions Applicable to EMT
3.1.2.2 Restrictions Applicable to Flexible Conduit
3.1.2.3 Conduit Support
3.1.2.4 Directional Changes in Conduit Runs
3.1.2.5 Locknuts and Bushings
3.1.2.6 Flexible Connections
3.1.3 Boxes, Outlets, and Supports
3.1.3.1 Boxes
3.1.3.2 Pull Boxes
3.1.3.3 Extension Rings
3.1.4 Conductor Identification
3.1.4.1 Marking Strips
3.1.5 Splices
3.1.6 Covers and Device Plates
3.1.7 Electrical Penetrations
3.1.8 Grounding and Bonding
3.1.8.1 Resistance
3.1.9 Equipment Connections
3.1.10 Repair of Existing Work
3.1.10.1 Workmanship
3.1.10.2 Existing Concealed Wiring to be Removed
3.1.10.3 Removal of Existing Electrical Distribution System
3.1.10.4 Continuation of Service

3.2 FIELD FABRICATED NAMEPLATE MOUNTING

File details come from the government source that posted it. Updated .