SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
HVAC
01 14 00 SD-01 Preconstruction Submittals
List of Contact Personnel
01 20 00 SD-01 Preconstruction Submittals
1.3Schedule of Prices
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2Baseline Construction Schedule
SD-07 Certificates
1.4Monthly Updates
01 35 26 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
SD-07 Certificates
1.7.3.1Standard Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
License Certificates
01 45 00.10 20 SD-01 Preconstruction Submittals
1.6QC Plan
01 50 00 SD-01 Preconstruction Submittals
1.3Construction Site Plan
01 78 00 SD-10 Operation and Maintenance
Data
3.2Operation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1As-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 78 00 Record Drawings
23 05 15 SD-03 Product Data
2.1Pipe and Fittings
2.2Valves
Supporting Elements
23 05 93 SD-06 Test Reports
Proportional Balancing
SD-07 Certificates
1.5.1Independent TAB Agency and
Personnel Qualifications
1.5.5Instrument Calibration
Certificates
23 07 00 SD-03 Product Data
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
Equipment Insulation Systems
23 09 00 SD-03 Product Data
BMS network architecture diagrams
Systems schematics, sequences, and flow diagrams
Points schedule
Samples of Graphic Display screen types and associated menus
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
23 09 00 Bill of Material list
Room Schedule
Control Valve Schedules
BMS Interface Details
Product Data Sheets
23 30 00 SD-03 Product Data
2.4.1.1Metallic Flexible Duct
2.4.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.4.1.2Duct Connectors
Duct Access Doors
2.4.2Manual Balancing Dampers
2.4.5.1Diffusers
2.4.5.2Registers and Grilles
2.5.1Room Fan-Coil Units
26 20 00 SD-03 Product Data
Circuit Breakers
Motor Controllers
Cable Trays
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
| Cover Sheet |
| REGISTER |
| PUBLISH |
| PROJECT TABLE OF CONTENTS |
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| 00 01 15 - LIST OF DRAWINGS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 CONTRACT DRAWINGS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 WORK COVERED BY CONTRACT DOCUMENTS |
| 1.2.1 Project Description |
| 1.2.2 Location |
| 1.3 OCCUPANCY OF PREMISES |
| 1.4 EXISTING WORK |
| 01 14 00 - WORK RESTRICTIONS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 SPECIAL SCHEDULING REQUIREMENTS |
| 1.3 CONTRACTOR ACCESS AND USE OF PREMISES |
| 1.3.1 Activity Regulations |
| 1.3.1.1 Subcontractors and Personnel Contacts |
| 1.3.1.2 Additional Personnel Requirements |
| 1.3.1.2.1 General Construction and Finish Work |
| 1.3.1.2.2 General Construction |
| 1.3.1.3 Installation Access |
| 1.3.1.3.1 Registration for DBIDS |
| 1.3.1.3.2 DBIDS Eligibility Requirements |
| 1.3.1.3.3 DBIDS Notification Requirements |
| 1.3.1.3.4 One-Day Passes |
1.3.1.4 No Smoking Policy
| 1.3.2 Working Hours |
| 1.3.3 Work Outside Regular Hours |
| 1.3.4 Occupied Building |
| 1.3.5 Utility Cutovers and Interruptions |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 SCHEDULE OF PRICES |
| 1.3.1 Data Required |
| 1.3.2 Payment Schedule Instructions |
| 1.3.3 Schedule Requirements for HVAC TAB |
| 1.4 CONTRACT MODIFICATIONS |
| 1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT |
| 1.5.1 Content of Invoice |
| 1.5.2 Submission of Invoices |
| 1.6 PAYMENTS TO THE CONTRACTOR |
| 1.6.1 Obligation of Government Payments |
| 1.6.2 Payment for Onsite and Offsite Materials |
| 01 30 00 - ADMINISTRATIVE REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUPERVISION |
| 1.2.1 Superintendent Qualifications |
| 1.2.2 Minimum Communication Requirements |
| 1.2.3 Duties |
| 1.2.4 Non-Compliance Actions |
| 1.3 PRECONSTRUCTION MEETING |
| 1.3.1 Attendees |
| 1.4 WAIVER FOR WORKER'S COMPENSATION |
| 1.5 PARTNERING |
| 01 32 16.00 20 - SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 PRE-CONSTRUCTION SCHEDULE REQUIREMENT |
| 1.3 SCHEDULE FORMAT |
| 1.3.1 Schedule Submittals and Procedures |
| 1.4 SCHEDULE MONTHLY UPDATES |
| 1.5 3-WEEK LOOK AHEAD SCHEDULE |
| 1.6 CORRESPONDENCE AND TEST REPORTS: |
| 1.7 ADDITIONAL SCHEDULING REQUIREMENTS |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.1.1 Submittal Descriptions SD |
| 1.1.2 Approving Authority |
| 1.1.3 Work |
| 1.2 SUBMITTALS |
| 1.3 SUBMITTAL CLASSIFICATION |
| 1.3.1 Government Approved G |
| 1.3.2 For Information Only |
| 1.4 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL |
| 1.4.1 O&M Data |
| 1.5 PREPARATION |
| 1.5.1 Transmittal Form |
| 1.5.2 Identifying Submittals |
| 1.5.3 Submittal Format |
| 1.5.3.1 Format of SD-01 Preconstruction Submittals |
| 1.5.3.2 Format of SD-03 Product Data |
| 1.5.3.2.1 Product Information |
| 1.5.3.2.2 Standards |
| 1.5.3.2.3 Data Submission |
| 1.5.3.3 Format of SD-05 Design Data |
| 1.5.3.4 Format of SD-06 Test Reports |
| 1.5.3.5 Format of SD-07 Certificates |
| 1.5.3.6 Format of SD-08 Manufacturer's Instructions |
| 1.5.3.6.1 Standards |
| 1.5.3.7 Format of SD-09 Manufacturer's Field Reports |
| 1.5.3.8 Format of SD-10 Operation and Maintenance Data O&M |
| 1.5.3.9 Format of SD-11 Closeout Submittals |
| 1.5.4 Source Drawings for Shop Drawings |
| 1.5.4.1 Source Drawings |
| 1.5.4.2 Terms and Conditions |
| 1.6 QUANTITY OF SUBMITTALS |
| 1.7 VARIATIONS |
| 1.7.1 Considering Variations |
| 1.7.2 Warranting that Variations are Compatible |
| 1.7.3 Review Schedule Extension |
| 1.8 SCHEDULING |
| 1.8.1 Reviewing, Certifying, and Approving Authority |
| 1.8.2 Constraints |
| 1.8.3 QC Organization Responsibilities |
| 1.9 GOVERNMENT APPROVING AUTHORITY |
| 1.9.1 Review Notations |
| 1.10 DISAPPROVED SUBMITTALS |
| 1.11 APPROVED SUBMITTALS |
| 1.12 APPROVED SAMPLES |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 35 26 - GOVERNMENTAL SAFETY REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Competent Person CP |
| 1.2.2 Competent Person, Confined Space |
| 1.2.3 Competent Person, Cranes and Rigging |
| 1.2.4 Competent Person, Excavation/Trenching |
| 1.2.5 Competent Person, Fall Protection |
| 1.2.6 Competent Person, Scaffolding |
| 1.2.7 Competent Person CP Trainer |
| 1.2.8 High Risk Activities |
| 1.2.9 High Visibility Accident |
| 1.2.10 Load Handling Equipment LHE |
| 1.2.11 Medical Treatment |
| 1.2.12 Near Miss |
| 1.2.13 Operating Envelope |
| 1.2.14 Qualified Person QP |
| 1.2.15 Qualified Person, Fall Protection QP for FP |
| 1.2.16 Recordable Injuries or Illnesses |
| 1.2.17 Government Property and Equipment |
| 1.2.18 Load Handling Equipment LHE Accident or Load Handling Equipment |
| 1.3 SUBMITTALS |
| 1.4 MONTHLY EXPOSURE REPORTS |
| 1.5 REGULATORY REQUIREMENTS |
| 1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS |
| 1.6.1 Personnel Qualifications |
| 1.6.1.1 Site Safety and Health Officer SSHO |
| 1.6.1.1.1 Additional Site Safety and Health Officer SSHO Requirements |
| 1.6.1.2 Competent Person Qualifications |
| 1.6.1.2.1 Competent Person for Scaffolding |
| 1.6.1.2.2 Competent Person for Fall Protection |
| 1.6.1.3 Qualified Trainer Requirements |
| 1.6.1.4 Crane Operators/Riggers |
| 1.6.2 Personnel Duties |
| 1.6.2.1 Duties of the Site Safety and Health Officer SSHO |
| 1.6.3 Meetings |
| 1.6.3.1 Preconstruction |
| 1.6.3.2 Safety Meetings |
| 1.7 ACCIDENT PREVENTION PLAN APP |
| 1.7.1 APP - Construction |
| 1.7.2 Names and Qualifications |
| 1.7.3 Plans |
| 1.7.3.1 Standard Lift Plan SLP |
| 1.7.3.2 Fall Protection and Prevention FP&P Plan |
| 1.7.3.3 Rescue and Evacuation Plan |
| 1.7.3.4 Hazardous Energy Control Program HECP |
| 1.8 ACTIVITY HAZARD ANALYSIS AHA |
| 1.8.1 AHA Management |
| 1.8.2 AHA Signature Log |
| 1.9 DISPLAY OF SAFETY INFORMATION |
| 1.9.1 Safety Bulletin Board |
| 1.9.2 Safety and Occupational Health SOH Deficiency Tracking System |
| 1.10 SITE SAFETY REFERENCE MATERIALS |
| 1.11 EMERGENCY MEDICAL TREATMENT |
| 1.12 NOTIFICATIONS and REPORTS |
| 1.12.1 Mishap Notification |
| 1.12.2 Accident Reports |
| 1.12.3 LHE Inspection Reports |
| 1.12.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and |
| 1.13 HOT WORK |
| 1.13.1 Permit and Personnel Requirements |
| PART 3 EXECUTION |
| 2.1 CONSTRUCTION AND OTHER WORK |
| 2.1.1 Worksite Communication |
| 2.1.2 Hazardous Material Exclusions |
| 2.1.3 Unforeseen Hazardous Material |
| 2.2 UTILITY OUTAGE REQUIREMENTS |
| 2.3 OUTAGE COORDINATION MEETING |
| 2.4 CONTROL OF HAZARDOUS ENERGY LOCKOUTTAGOUT |
| 2.4.1 Safety Preparatory Inspection Coordination Meeting with the |
| 2.4.2 Lockout/Tagout Isolation |
| 2.4.3 Lockout/Tagout Removal |
| 2.5 FALL PROTECTION PROGRAM |
| 2.5.1 Training |
| 2.5.2 Fall Protection Equipment and Systems |
| 2.5.2.1 Additional Personal Fall Protection Measures |
| 2.5.2.2 Personal Fall Protection Equipment |
| 2.5.3 Fall Protection for Roofing Work |
| 2.5.4 Horizontal Lifelines HLL |
| 2.5.5 Guardrails and Safety Nets |
| 2.5.6 Rescue and Evacuation Plan and Procedures |
| 2.6 WORK PLATFORMS |
| 2.6.1 Elevated Aerial Work Platforms AWPs |
| 2.7 EQUIPMENT |
| 2.7.1 Material Handling Equipment MHE |
| 2.7.2 Load Handling Equipment LHE |
| 2.7.3 Machinery and Mechanized Equipment |
| 2.7.4 Base Mounted Drum Hoists |
| 2.8 ELECTRICAL |
| 2.8.1 Conduct of Electrical Work |
| 2.8.2 Qualifications |
| 2.8.3 Arc Flash |
| 2.8.4 Grounding |
| 2.8.5 Testing |
| 01 45 00.10 20 - QUALITY CONTROL FOR MINOR CONSTRUCTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 INFORMATION FOR THE CONTRACTING OFFICER |
| 1.4 QC PROGRAM REQUIREMENTS |
| 1.4.1 Preliminary Work Authorized Prior to Acceptance |
| 1.4.2 Acceptance |
| 1.4.3 Notification of Changes |
| 1.5 QC ORGANIZATION |
| 1.5.1 QC Manager |
| 1.5.1.1 Duties |
| 1.5.1.2 Qualifications |
| 1.5.1.3 Construction Quality Management Training |
1.5.2 Alternate QC Manager Duties and Qualifications
| 1.6 QC PLAN |
| 1.6.1 Requirements |
| 1.7 COORDINATION AND MUTUAL UNDERSTANDING MEETING |
| 1.8 QC MEETINGS |
| 1.9 THREE PHASES OF CONTROL |
| 1.9.1 Preparatory Phase |
| 1.9.2 Initial Phase |
| 1.9.3 Follow-Up Phase |
| 1.9.4 Additional Preparatory and Initial Phases |
| 1.9.5 Notification of Three Phases of Control for Off-Site Work |
| 1.10 SUBMITTAL REVIEW AND APPROVAL |
| 1.11 TESTING |
| 1.11.1 Accreditation Requirements |
| 1.11.2 Laboratory Accreditation Authorities |
| 1.11.3 Capability Check |
| 1.11.4 Test Results |
| 1.12 QC CERTIFICATIONS |
| 1.12.1 Contractor Quality Control Report Certification |
| 1.12.2 Invoice Certification |
| 1.12.3 Completion Certification |
| 1.13 COMPLETION INSPECTIONS |
| 1.13.1 Punch-Out Inspection |
| 1.13.2 Pre-Final Inspection |
| 1.13.3 Final Acceptance Inspection |
| 1.14 DOCUMENTATION |
| 1.14.1 Quality Control Validation |
| 1.14.2 As-Built Drawings |
1.15 NOTIFICATION ON NON-COMPLIANCE
| 01 50 00 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 CONSTRUCTION SITE PLAN |
| PART 2 PRODUCTS |
| 2.1 TEMPORARY SIGNAGE |
| 2.1.1 Bulletin Board |
| 2.1.2 Project Identification Signs |
| 2.1.3 Warning Signs |
| 01 78 00 - CLOSEOUT SUBMITTALS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 As-Built Drawings |
| 1.2.2 Record Drawings |
| 1.3 SOURCE DRAWING FILES |
| 1.3.1 Terms and Conditions |
| 1.4 SUBMITTALS |
| 1.5 WARRANTY MANAGEMENT |
| 1.5.1 Warranty Management Plan |
| 1.5.2 Performance Bond |
| 1.5.3 Pre-Warranty Conference |
| 1.5.4 Warranty Tags |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 AS-BUILT DRAWINGS |
| 3.1.1 Markup Guidelines |
| 3.1.2 As-Built Drawings Content |
3.2 OPERATION AND MAINTENANCE MANUALS
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) |
| 23 05 15 - COMMON PIPING FOR HVAC |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL REQUIREMENTS |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Material and Equipment Qualifications |
| 1.4.2 Alternative Qualifications |
| 1.4.3 Manufacturer's Nameplate |
| 1.4.4 Modification of References |
| 1.4.4.1 Definitions |
| 1.4.4.2 Administrative Interpretations |
1.5 DELIVERY, STORAGE, AND HANDLING
| PART 2 PRODUCTS |
| 2.1 PIPE AND FITTINGS |
| 2.2 VALVES |
| 2.2.1 Ball and Butterfly Valves |
| PART 3 EXECUTION |
| 3.1 VALVES |
| 3.2 SUPPORTING ELEMENTS INSTALLATION |
| 3.3 PENETRATIONS |
| 3.4 SLEEVES |
| 3.5 OPERATION AND MAINTENANCE |
| 23 05 93 - TESTING, ADJUSTING, AND BALANCING FOR HVAC |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Similar Terms |
| 1.3 WORK DESCRIPTION |
| 1.3.1 Air Distribution Systems |
| 1.3.2 TAB SCHEMATIC DRAWINGS |
| 1.3.3 Related Requirements |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Independent TAB Agency and Personnel Qualifications |
| 1.5.1.1 TAB Standard |
| 1.5.1.2 Qualifications |
| 1.5.2 Responsibilities |
| 1.5.2.1 Contractor |
| 1.5.2.2 TAB Agency |
| 1.5.2.3 TAB Team Supervisor |
| 1.5.2.4 TAB Team Field Leader |
| 1.5.3 Project/Site Conditions |
| 1.5.4 Subcontractor Special Requirements |
| 1.5.5 Instrument Calibration Certificates |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 WORK DESCRIPTIONS OF PARTICIPANTS |
| 3.2 TAB PROCEDURES |
| 3.2.1 TAB Field Work |
| 3.2.2 Preliminary Procedures |
| 3.2.3 TAB Work on Performance Tests Without Seasonal Limitations |
| 3.2.3.1 Performance Tests |
| 3.2.4 Workmanship |
| 3.2.5 |
| 3.3 MARKING OF SETTINGS |
| 3.4 MARKING OF TEST PORTS |
| 23 07 00 - THERMAL INSULATION FOR MECHANICAL SYSTEMS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SYSTEM DESCRIPTION |
| 1.2.1 General |
| 1.3 SUBMITTALS |
| 1.4 CERTIFICATIONS |
| 1.4.1 Adhesives and Sealants |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Installer Qualification |
1.6 DELIVERY, STORAGE, AND HANDLING
| PART 2 PRODUCTS |
| 2.1 STANDARD PRODUCTS |
| 2.1.1 Insulation System |
| 2.1.2 Surface Burning Characteristics |
| 2.2 MATERIALS |
| 2.2.1 Adhesives |
| 2.2.1.1 Mineral Fiber Insulation Cement |
| 2.2.1.2 Lagging Adhesive |
| 2.2.1.3 Contact Adhesive |
| 2.2.2 Caulking |
| 2.2.3 Corner Angles |
| 2.2.4 Fittings |
| 2.2.5 Finishing Cement |
| 2.2.6 Fibrous Glass Cloth and Glass Tape |
| 2.2.7 Jackets |
| 2.2.7.1 Polyvinyl Chloride PVC Jackets |
| 2.2.7.2 Vapor Barrier/Vapor Retarder |
| 2.2.8 Vapor Retarder Required |
| 2.2.8.1 White Vapor Retarder All Service Jacket ASJ |
| 2.2.8.2 Vapor Retarder/Vapor Barrier Mastic Coatings |
| 2.2.8.2.1 Vapor Barrier |
| 2.2.8.2.2 Vapor Retarder |
| 2.2.8.3 Laminated Film Vapor Retarder |
| 2.2.8.4 Polyvinylidene Chloride PVDC Film Vapor Retarder |
| 2.2.8.5 Polyvinylidene Chloride Vapor Retarder Adhesive Tape |
| 2.2.9 Vapor Retarder Not Required |
| 2.2.10 Wire |
| 2.2.11 Insulation Bands |
| 2.2.12 Sealants |
| 2.3 PIPE INSULATION SYSTEMS |
| 2.3.1 Recycled Materials |
| 2.3.2 Aboveground Cold Pipeline -30 to 60 deg. F |
| 2.3.2.1 Cellular Glass |
| 2.3.2.2 Flexible Elastomeric Cellular Insulation |
| 2.3.3 Aboveground Hot Pipeline Above 60 deg. F |
| 2.3.3.1 Cellular Glass |
| 2.3.3.2 Flexible Elastomeric Cellular Insulation |
| 2.4 DUCT INSULATION SYSTEMS |
| 2.4.1 Factory Applied Insulation |
| 2.4.1.1 Blanket Insulation |
| 2.4.2 Duct Insulation Jackets |
| 2.4.2.1 All-Purpose Jacket |
| 2.4.2.2 Metal Jackets |
| 2.4.2.2.1 Stainless Steel Jackets |
| PART 3 EXECUTION |
| 3.1 APPLICATION - GENERAL |
| 3.1.1 Installation |
| 3.1.2 Firestopping |
| 3.1.3 Installation of Flexible Elastomeric Cellular Insulation |
| 3.1.3.1 Adhesive Application |
| 3.1.3.2 Adhesive Safety Precautions |
| 3.1.4 Welding |
| 3.1.5 Pipes/Ducts/Equipment That Require Insulation |
| 3.2 PIPE INSULATION SYSTEMS INSTALLATION |
| 3.2.1 Pipe Insulation |
| 3.2.1.1 General |
| 3.2.1.2 Pipes Passing Through Walls, Roofs, and Floors |
| 3.2.1.2.1 Penetrate Interior Walls |
| 3.2.1.3 Pipes Passing Through Hangers |
| 3.2.1.3.1 Horizontal Pipes Larger Than 2 Inches at 60 Degrees F and Above |
| 3.2.1.3.2 Horizontal Pipes Larger Than 2 Inches and Below 60 Degrees F |
| 3.2.1.3.3 Inserts |
| 3.2.1.4 Flexible Elastomeric Cellular Pipe Insulation |
| 3.2.1.5 Pipe Insulation Material and Thickness |
| 3.2.2 Aboveground Cold Pipelines |
| 3.2.2.1 Insulation Material and Thickness |
| 3.2.2.2 Factory or Field applied Jacket |
| 3.2.2.3 Installing Insulation for Straight Runs Hot and Cold Pipe |
| 3.2.2.3.1 Longitudinal Laps of the Jacket Material |
| 3.2.2.3.2 Laps and Butt Strips |
| 3.2.2.3.3 Factory Self-Sealing Lap Systems |
| 3.2.2.3.4 Breaks and Punctures in the Jacket Material |
| 3.2.2.3.5 Penetrations Such as Thermometers |
| 3.2.2.3.6 Flexible Elastomeric Cellular Pipe Insulation |
| 3.2.2.4 Insulation for Fittings and Accessories |
| 3.2.2.5 Optional PVC Fitting Covers |
| 3.2.3 Aboveground Hot Pipelines |
| 3.2.3.1 General Requirements |
| 3.2.3.2 Insulation for Fittings and Accessories |
| 3.2.3.2.1 Precut or Preformed |
| 3.2.3.2.2 Rigid Preformed |
| 3.3 DUCT INSULATION SYSTEMS INSTALLATION |
| 3.3.1 Duct Insulation Minimum Thickness |
| 3.3.2 Insulation and Vapor Retarder/Vapor Barrier for Cold Air Duct |
| 3.3.2.1 Installation on Concealed Duct |
| 3.3.2.2 Installation on Exposed Duct Work |
| 3.3.3 Insulation for Warm Air Duct |
| 3.3.3.1 Installation on Concealed Duct |
| 3.3.3.2 Installation on Exposed Duct |
| 3.3.4 Ducts Handling Air for Dual Purpose |
| 3.3.5 Duct Test Holes |
| 23 09 00 - INSTRUMENTATION AND CONTROL FOR HVAC |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.1.1 Instrumentation and Control Devices for HVAC |
| 1.1.1.1 Actuators and Operators |
| 1.1.1.2 Sensors and Transmitters |
| 1.1.1.3 Control Valves |
| 1.1.2 System Requirements |
| 1.1.3 Verification of Dimensions |
| 1.1.4 Drawings |
| 1.2 RELATED DOCUMENTS |
| 1.3 DEFINITIONS |
| 1.3.1 Analog |
| 1.3.2 Binary |
| 1.3.3 Building Management System BMS |
| 1.3.4 BMS Contractor |
| 1.3.5 Control Sequence |
| 1.3.6 Digital Direct Control |
| 1.3.7 BMS Network |
| 1.3.8 Node |
| 1.3.9 BMS Integration |
| 1.3.10 Provide |
| 1.3.11 PC |
| 1.3.12 Furnish |
| 1.3.13 Wiring |
| 1.3.14 Install |
| 1.3.15 Protocol |
| 1.3.16 Software |
| 1.4 BMS DESCRIPTION |
| 1.4.1 DDC SYESTEM |
| 1.4.2 BMS WORK |
| 1.4.3 BMS INSTALLATION |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 GENERAL |
| 1.5.2 QUALITY MANAGEMENT SYSTEM |
| 1.6 SUBMITTALS |
| 1.7 RECORD DOCUMENTATION |
| 1.8 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 GENERAL DESCRIPTION |
| 2.2 BMS ARCHITECTURE |
| 2.3 USER INTERFACE |
| 2.4 NETWORK AUTOMATION ENGINES |
| 2.5 DDC SYSTEM CONTROLLERS |
| 2.6 COMPUTING HARDWARE AND SOFTWARE |
| 2.7 LOCAL CONTROL PANELS |
| PART 3 PERFORMANCE / EXECUTION |
| 3.1 BMS SPECIFIC REQUIREMENTS |
| 3.2 INSTALLATION PRACTICES |
| 3.3 TRAINING |
| 3.4 COMMISSIONING REQUIREMENTS |
| 23 30 00 - HVAC AIR DISTRIBUTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SYSTEM DESCRIPTION |
| 1.2.1 Mechanical Equipment Identification |
| 1.2.1.1 Charts |
| 1.2.2 Service Labeling |
| 1.2.3 Color Coding |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Prevention of Corrosion |
| 1.4.2 Asbestos Prohibition |
| 1.4.3 Test Procedures |
1.5 DELIVERY, STORAGE, AND HANDLING
| PART 2 PRODUCTS |
| 2.1 STANDARD PRODUCTS |
| 2.2 IDENTIFICATION PLATES |
| 2.3 INDOOR AIR QUALITY |
| 2.4 DUCT SYSTEMS |
| 2.4.1 Metal Ductwork |
| 2.4.1.1 Metallic Flexible Duct |
| 2.4.1.2 Insulated Nonmetallic Flexible Duct Runouts |
| 2.4.1.3 General Service Duct Connectors |
| 2.4.2 Manual Balancing Dampers |
| 2.4.2.1 Square or Rectangular Dampers |
| 2.4.2.1.1 Duct Height 12 inches and Less |
| 2.4.2.1.1.1 Frames |
| 2.4.2.1.1.2 Single Leaf Blades |
| 2.4.2.1.1.3 Blade Axles |
| 2.4.2.1.1.4 Axle Bearings |
| 2.4.2.1.1.5 Control Shaft/Hand Quadrant |
| 2.4.2.1.1.6 Finish |
| 2.4.2.1.2 Duct Height Greater than 12 inches |
| 2.4.2.1.2.1 Dampers |
| 2.4.2.1.2.2 Frames |
| 2.4.2.1.2.3 Blades |
| 2.4.2.1.2.4 Blade Axles |
| 2.4.2.1.2.5 Axle Bearings |
| 2.4.2.1.2.6 Blade Actuator |
| 2.4.2.1.2.7 Blade Actuator Linkage |
| 2.4.2.1.2.8 Control Shaft/Hand Quadrant |
| 2.4.2.1.2.9 Finish |
| 2.4.2.2 Round Dampers |
| 2.4.2.2.1 Frames |
| 2.4.2.2.2 Blades |
| 2.4.2.2.3 Blade Axles |
| 2.4.2.2.4 Axle Bearings |
| 2.4.2.2.5 Control Shaft/Hand Quadrant |
| 2.4.2.2.6 Finish |
| 2.4.3 Automatic Balancing Dampers |
| 2.4.4 Sound Attenuation Equipment |
| 2.4.4.1 System with total pressure of 4 Inch Water Gauge and Lower |
| 2.4.5 Diffusers, Registers, and Grilles |
| 2.4.5.1 Diffusers |
| 2.4.5.2 Registers and Grilles |
| 2.4.5.3 Registers |
| 2.5 TERMINAL UNITS |
| 2.5.1 Room Fan-Coil Units |
| 2.5.1.1 Enclosures |
| 2.5.1.2 Fans |
| 2.5.1.3 Coils |
| 2.5.1.4 Drain Pans |
| 2.5.1.5 Manually Operated Outside Air Dampers |
| 2.5.1.6 Filters |
| 2.5.1.7 Motors |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.2 INSTALLATION |
| 3.2.1 Condensate Drain Lines |
| 3.2.2 Equipment and Installation |
| 3.2.3 Access Panels |
| 3.2.4 Flexible Duct |
| 3.2.5 Metal Ductwork |
| 3.2.6 Dust Control |
| 3.2.7 Insulation |
| 3.2.8 Duct Test Holes |
| 3.2.9 Power Transmission Components Adjustment |
| 3.3 CLEANING |
| 3.4 PENETRATIONS |
| 3.4.1 Sleeves |
| 3.4.2 Framed Prepared Openings |
| 3.4.3 Insulation |
| 3.4.4 Closure Collars |
| 3.5 IDENTIFICATION SYSTEMS |
| 3.6 DAMPER ACCEPTANCE TEST |
| 3.7 TESTING, ADJUSTING, AND BALANCING |
| 3.8 PERFORMANCE TESTS |
| 3.9 CLEANING AND ADJUSTING |
| 3.10 OPERATION AND MAINTENANCE |
| 3.10.1 Operation and Maintenance Manuals |
| DIVISION 26 - ELECTRICAL |
| 26 20 00 - INTERIOR DISTRIBUTION SYSTEM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Regulatory Requirements |
| 1.4.2 Standard Products |
| 1.4.2.1 Alternative Qualifications |
| 1.4.2.2 Material and Equipment Manufacturing Date |
1.5 WARRANTY
| PART 2 PRODUCTS |
| 2.1 MATERIALS AND EQUIPMENT |
| 2.2 CONDUIT AND FITTINGS |
| 2.2.1 Rigid Metallic Conduit |
| 2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit |
| 2.2.2 Electrical, Zinc-Coated Steel Metallic Tubing EMT |
| 2.2.3 Flexible Metal Conduit |
| 2.2.3.1 Liquid-Tight Flexible Metal Conduit, Steel |
| 2.2.4 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit |
| 2.2.4.1 Fittings for Rigid Metal Conduit. |
| 2.2.4.2 Fittings for EMT |
| 2.3 CABINETS, JUNCTION BOXES, AND PULL BOXES |
| 2.4 WIRES AND CABLES |
| 2.4.1 Conductors |
| 2.4.1.1 Minimum Conductor Sizes |
| 2.4.2 Color Coding |
| 2.4.2.1 Ground and Neutral Conductors |
| 2.4.3 Insulation |
| 2.4.4 Bonding Conductors |
| 2.5 SPLICES AND TERMINATION COMPONENTS |
| 2.6 DEVICE PLATES |
| 2.7 SWITCHES |
| 2.7.1 Disconnect Switches |
| 2.8 MOTORS |
| 2.8.1 Motor Sizes |
| 2.8.2 Wiring and Conduit |
| 2.9 MANUAL MOTOR STARTERS MOTOR RATED SWITCHES |
| 2.9.1 Pilot Lights |
| 2.10 LOCKOUT REQUIREMENTS |
| 2.11 MANUFACTURER'S NAMEPLATE |
| 2.12 FIELD FABRICATED NAMEPLATES |
| 2.13 FIRESTOPPING MATERIALS |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Wiring Methods |
| 3.1.1.1 Pull Wire |
| 3.1.2 Conduit Installation |
| 3.1.2.1 Restrictions Applicable to EMT |
| 3.1.2.2 Restrictions Applicable to Flexible Conduit |
| 3.1.2.3 Conduit Support |
| 3.1.2.4 Directional Changes in Conduit Runs |
| 3.1.2.5 Locknuts and Bushings |
| 3.1.2.6 Flexible Connections |
| 3.1.3 Boxes, Outlets, and Supports |
| 3.1.3.1 Boxes |
| 3.1.3.2 Pull Boxes |
| 3.1.3.3 Extension Rings |
| 3.1.4 Conductor Identification |
| 3.1.4.1 Marking Strips |
| 3.1.5 Splices |
| 3.1.6 Covers and Device Plates |
| 3.1.7 Electrical Penetrations |
| 3.1.8 Grounding and Bonding |
| 3.1.8.1 Resistance |
| 3.1.9 Equipment Connections |
| 3.1.10 Repair of Existing Work |
| 3.1.10.1 Workmanship |
| 3.1.10.2 Existing Concealed Wiring to be Removed |
| 3.1.10.3 Removal of Existing Electrical Distribution System |
| 3.1.10.4 Continuation of Service |
3.2 FIELD FABRICATED NAMEPLATE MOUNTING