J-2 SCH SOW-StormRemediation.pdf

PDF 539 KB Posted

Attached to
Water Damage Remediation at Schenck Job Corps Center
Solicitation number
1282A721R0009
Issued by

About this file

This document outlines a statement of work for water damage remediation services at the Schenck Job Corps Center in Pisgah Forest, North Carolina. The scope of work includes removing debris from building interiors, disposing of affected materials, conducting dehumidification, cleaning floors and walls, sanitizing and disinfecting affected areas, removing exterior debris, providing waste disposal dumpsters, coordinating hazardous material testing, and cleaning floor drains. The solicitation requests these services be provided as a lump sum for all 71,400 square feet of damaged buildings specified. Interested vendors must visit the site and are responsible for all labor, equipment, and valid licenses to complete the work by an unspecified deadline. The U.S. Forest Service Job Corps seeks these remediation services following widespread water intrusion of up to 49 inches at the Schenck facility from a major flood event on August 16, 2021.

View the file

Other files

File Type Posted
1282A721R0009 Q.pdf PDF
J-3 DBANC202010061.pdf PDF
1282A721R0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORMWATER DAMAGE REMEDIATION 101050 - 1

SCHENCK JOB CORPS CCC GENERAL REQUIREMENTS

STORMWATER DAMAGE REMEDIATION

SCHENCK JOB CORPS CENTER

SECTION 101050

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 BACKGROUND

A. On 08/16/21, Schenck Job Corps experienced a major flood event that resulted in numerous buildings throughout the campus to have water intrusion from 2” and up to 49”. The affected areas are approximately 71,400 GSF. The flood caused damage to floor coverings, walls, furniture, and equipment in the following buildings:

Building Name Flood Height

(inches) SF Comment

10 Center Maintenance 49" 2748 Recommended for future demo

Facility Maintenance Classroom 40" 1551

Recommended for future demo

16 Welding/Fire Cache 14"/27" 8990

20 IT Offices 20" 918 Recommended for future demo

26 Counseling 24.5" 2030 Recommended for future demo

28 Storage 9" 2070 29 Paint Booth/Storage 29.5" 3535 30 Gymnasium 4" 20682

32 Green House 36" 600 Recommended for future demo

32-3 Portable Storage Building 36" 200 Recommended for future demo

32-2 Pumphouse 18' 36 Forestry Dormitory crawlspace only 2133 45 Independent Living crawlspace only 1476 46 Independent Living crawlspace only 1928 47 Independent Living crawlspace only 1928

Automotive Mechanics Shop 16" 4728

60 Fresh Start Storage 8" 620 62 Vocational Building 2" 8865 66 Vocational Offices 2" 1800

Facility Maintenance Shop 36' 820

Recommended for future demo

STORMWATER DAMAGE REMEDIATION 101050 - 2

B. Some of the flooded facilities housed solvents, chemicals and petroleum products, including an oil/water separator that is adjacent to the automotive trade building. There may be some materials to dispose of that have been contaminated with these substances.

1.2 SCOPE OF WORK

1. Work for this project requires the contractor to supply all labor, equipment, miscellaneous items, and all necessary valid licenses to perform the work:

a. Remove muck and debris from building interiors

b. Remove and dispose of affected building materials (drywall, insulation, paneling, porous flooring, etc.).

c. Conduct dehumidification operations to achieve 50% of less in interior of building and 15% or less moisture content on building elements (studs, paneling, sheetrock, etc.)

d. Clean affected floors and walls (interior and exterior). Building identified for future demolition do not required detailed cleaning. All other buildings will require detailed cleaning.

e. Sanitize and disinfect affected areas inside the buildings.

f. Clean up and dispose of exterior debris (logs, excessive silt and sand, etcl).

g. Provide dumpsters and timely removal of waste off-site.

h. Coordinate testing for hazardous materials and dispose of contaminated materials in accordance with state and federal regulations.

i. Clean out floor drains, capturing sediment prior to it entering the sewer system.

2. All interested vendors are required to conduct a site visit to assess the current state of the buildings and site prior to submitting a proposal. Center personnel are conducting preliminary cleanup of muck and removing equipment and personal property from the affected buildings, therefore the photos included in the solicitation may not reflect current conditions.

B. Item 0001 – Stormwater Damage Remediation – 1 Lump Sum

1.3 LOCATION

A. Schenck Job Corps is located at 98 Schenck Drive, Pisgah Forest N.C 28768. The Driving instructions can be obtained from the Center by calling 828.862.6100.

78 Maintenance Storage 49" 565 Recommended for future demo

80 Fire Management 2" 1800 82 Ballfield Restroom minimal 325

85 Storage 49" 280 Recommended for future demo

87 Grounds Storage 49" 825 Recommended for future demo

Total 25 71417

STORMWATER DAMAGE REMEDIATION 101050 - 3

1.4 USE OF PREMISES

A. Driveways and Entrances: Keep unaffected driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

1.5 WORK RESTRICTIONS

A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.6 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.

B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights

1.7 CONTRACTOR’S RESPONSIBILITIES

A. Confine storage of materials to areas as approved by the CO.

B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.

1.8 FIELD VERIFICATION

A. Field verify all conditions affecting the work of this contract before starting construction.

PART 3 – TEMPORARY FACILITIES AND CONTROLS

2.1 DESCRIPTION

A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.

STORMWATER DAMAGE REMEDIATION 101050 - 4

2.2 UTILITIES

A. Water Service: Use of Government existing water service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

B. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.

D. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction.

2.3 STORAGE AREAS

A. Coordinate on-site storage requirements with the Contracting Officer.

2.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.

B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights.

C. Fire Protection:

1. Store combustible materials in containers in fire-safe locations.

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

STORMWATER DAMAGE REMEDIATION 101050 - 5

PART 4 –WASTE HANDLING

A. Waste Disposal: Burying or burning waste materials on-site will not be permitted.

Washing waste materials down sewers or into waterways will not be permitted.

E. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 010150

wnmccall Rectangle wnmccall Text Box

CRAWLSPACE AFFECTED

wnmccall Rectangle wnmccall Text Box 36"-49" wnmccall Rectangle wnmccall Text Box 29 1/2" wnmccall Callout 9" wnmccall Callout 12" wnmccall Line wnmccall Text Box

32-1 AND 32-5 DO NOT EXIST

wnmccall Text Box 2" wnmccall Rectangle wnmccall Text Box 16" wnmccall Line wnmccall Text Box

VERIFY BUILDING

wnmccall Text Box

DID NOT ACCESS, CHECK FOR DAMAGE

wnmccall Rectangle wnmccall Rectangle wnmccall Rectangle wnmccall Rectangle wnmccall Rectangle wnmccall Text Box 20" wnmccall Rectangle wnmccall Text Box 8" wnmccall Rectangle wnmccall Text Box 4" wnmccall Text Box

NO PHOTOS

wnmccall Text Box

DID NOT ACCESS, CHECK FOR DAMAGE

wnmccall Text Box

DID NOT ACCESS, CHECK FOR DAMAGE

wnmccall Line wnmccall Text Box

FIRE MANAGEMENT CACHE

wnmccall Text Box 14"-27" wnmccall Text Box 2" wnmccall Text Box 2" wnmccall Text Box

ISOLATED STUDENT OCCUPIED DURING INSPECTION- DID NOT ACCESS

wnmccall Rectangle wnmccall Text Box 24 1/2" wnmccall Rectangle wnmccall Text Box

WTP

wnmccall Rectangle wnmccall Text Box

CLEAN, DISINFECT, DEHUMIDIFY. ABANDON TILL DEMOLITION

wnmccall Text Box

CLEAN, DISINFECT, DEHUMIDIFY. ABANDON TILL DEMOLITION

wnmccall Arrow wnmccall Text Box

DEMOLITION

wnmccall Text Box

CLEAN, DISINFECT, DEHUMIDIFY. ABANDON TILL DEMOLITION

wnmccall Arrow wnmccall Rectangle wnmccall Text Box

RECOMMEND DEMOLITION

(NOT IN CONTRACT)

1.
1.1 background
A. On 08/16/21, Schenck Job Corps experienced a major flood event that resulted in numerous buildings throughout the campus to have water intrusion from 2” and up to 49”. The affected areas are approximately 71,400 GSF. The flood caused damage to floo...
B. Some of the flooded facilities housed solvents, chemicals and petroleum products, including an oil/water separator that is adjacent to the automotive trade building. There may be some materials to dispose of that have been contaminated with these ...
1.2 scope of work
1. Work for this project requires the contractor to supply all labor, equipment, miscellaneous items, and all necessary valid licenses to perform the work:
a. Remove muck and debris from building interiors
b. Remove and dispose of affected building materials (drywall, insulation, paneling, porous flooring, etc.).
c. Conduct dehumidification operations to achieve 50% of less in interior of building and 15% or less moisture content on building elements (studs, paneling, sheetrock, etc.)
d. Clean affected floors and walls (interior and exterior). Building identified for future demolition do not required detailed cleaning. All other buildings will require detailed cleaning.
e. Sanitize and disinfect affected areas inside the buildings.
f. Clean up and dispose of exterior debris (logs, excessive silt and sand, etcl).
g. Provide dumpsters and timely removal of waste off-site.
h. Coordinate testing for hazardous materials and dispose of contaminated materials in accordance with state and federal regulations.
i. Clean out floor drains, capturing sediment prior to it entering the sewer system.
2. All interested vendors are required to conduct a site visit to assess the current state of the buildings and site prior to submitting a proposal. Center personnel are conducting preliminary cleanup of muck and removing equipment and personal proper...
B. Item 0001 – Water Damage Remediation – 1 Lump Sum
1.3 location
A. Schenck Job Corps is located at 98 Schenck Drive, Pisgah Forest N.C 28768. The Driving instructions can be obtained from the Center by calling 828.862.6100.
1.4 USE OF PREMISES
A. Driveways and Entrances: Keep unaffected driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or ...
1.5 WORK RESTRICTIONS
A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
1.6 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution...
B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where...
1.7 contractor’s responsibilities
A. Confine storage of materials to areas as approved by the CO.
B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.
1.8 Field verification
A. Field verify all conditions affecting the work of this contract before starting construction.
2.
2.1 description
A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.
2.2 UTILITies
A. Water Service: Use of Government existing water service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion,...
B. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initi...
C. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.
D. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction.
2.3 Storage areas
A. Coordinate on-site storage requirements with the Contracting Officer.
2.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution...
B. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where...
C. Fire Protection:
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

A. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

3.
E. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from...