J-2 Appendices Drawings-Photos-Plans.pdf
PDF 9 MB Posted
- Attached to
- Dams Drain Cleaning & Video Inspection Federal contract opportunity
- Solicitation number
- W912DR23Q0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-3 Quote Sheet REVISED 9-JAN-2023.docx | DOCX document | |
| W912DR23Q0003 Synopsis-Solicitation Drain cleaning REVISED 9-JAN-2023.pdf | ||
| J-2 Appendices Drawings-Photos-Plans REVISED-9-JAN-2023.pdf | ||
| Amendment 0002 W912DR23Q0003 drain cleaning.pdf | ||
| Amendment 0001 W912DR23Q0003 QA drain cleaning.pdf | ||
| J-3 Quote Sheet.docx | DOCX document | |
| J-4 Past Performance Questionnaire.pdf | ||
| W912DR23Q0003 Synopsis-Solicitation Drain cleaning.pdf | ||
| J-1_Wage_Determinations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
EAST SIDNEY DAM
DRAWINGS, PHOTOS, AND PLANS
Figure 1: Project Location
Figure 2: Plan view of East Sidney Dam project detailing the downstream and upstream sides.
Figure 3: Design plan view of East Sidney Dam detailing the north and south drains.
Figure 4: Plan view of East Sidney Dam detailing the north and south drains.
Figure 5: Design plan view of the stilling basin and the north and south drains. (orientation rotated 180º from Figure 4)
Figure 6: Sectional views of East Sidney Dam stilling basin and drains.
Figure 7: Photos from a 2022 inspection of the north 8” perforated tile drain.
Figure 8: Photos from a 2020 inspection of the south 8-inch perforated tile drain.
Figure 9: Photo of the exterior of the north stilling basin
North stilling basin drain
Figure 10: Photo of the exterior of the north stilling basin
Figure 11: Photo of the exterior of the south stilling basin.
Figure 12: Photo of the exterior of the south stilling basin.
APPENDIX B
ARKPORT DAM
Figure 13: Project Location.
Figure 14: Plan view of Arkport Dam project detailing the downstream and upstream sides.
Figure 15: Design profile view of Arkport Dam toe drain collector pipe.
Figure 16: Design profile view of Arkport Dam catch basin.
Figure 17: Photo from a 2018 inspection of the north 36” corrugated metal toe drain collector pipe.
Figure 18: Photos of the catch basin.
Figure 19: Photo of inside the catch basin.
Figure 20: Photo from downstream the embankment, toe drain collector pipe continues downstream beyond image.
Figure 21: Photos of the flap gate at the end of the toe drain collector pipe.
Figure 22: Photos at the end of the toe drain collector pipe.
Figure 23: Photos at the end of the toe drain collector pipe
APPENDIX C
AYLESWORTH DAM
Figure 24: Aylesworth Creek Lake Dam Location Map.
Figure 25: Aylesworth Dam Project Features.
Figure 26: Plans, Elevations, and Detail (Original Construction Drawings).
Figure 27: Outlet Works Inlet Structure and Conduit (Original Construction Drawings).
Figure 28: Outlet Structure (Original Construction Drawings).
Figure 29: Upstream Embankment Side, View of Drop Inlet Structure
Figure 30: View of Drop Inlet Structure and Walking Platform
Figure 31: Close-Up Image of Drop Inlet Structure Uncontrolled Intake
Figure 32: Downstream End of the Outlet Conduit Discharge with Outflow Shut-off.
Figure 33: Outlet structure
Figure 34: Intake for Diversion Conduit (Photo taken from original construction before lake filling).
Figure 35: CCTV Camera Still From Inside of Outlet Conduit Looking Towards Valve Gate Inside The Drop Inlet Structure.
File details come from the government source that posted it. Updated .