J-1a Draft Drawings.pdf
PDF 451 KB Posted
- Attached to
- ATCT Cab Window Defogger System at Joint Base Andrews (ADW) Federal contract opportunity
- Solicitation number
- ES-22-02149
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00480 (4).pdf | ||
| 697DCK-22-R-00480-0001 (6).pdf | ||
| 697DCK-22-R-00480 - 0002.pdf | ||
| J-1 Draft SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING SERVICES
SURV./WEATHER
ATCT
SYMBOLS AND GENERAL NOTES
ATCT CAB DEFOGGER SYSTEM
MDJOINT BASE ANDREWSCAMP SPRINGS
KH
PROJECT ENGINEER MGR: ENGINEERING - CENTER B
05/03/2022 19006446
ADW-19006446-P001
a d w -1
-p
.d g n
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N a d w -1
-p
.d g n
/1
/2
:2
:2
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
E D
M
IS
S
U E
D F
O R
DT#19856
T-X
RPZ BFP
F
CW
CFP-X
DW
TEST DRINKING WATER PRIOR TO PERFORMING ANY WORK.
PROVIDE INSULATION FOR ALL DOMESTIC COLD WATER PIPING PER SPECIFICATIONS.
DO NOT PLACE PIPING ABOVE ELECTRICAL, COMMUNICATIONS, DATA EQUIPMENT OR ELECTRICAL PANELS.
INSPECTION.
COPPER, AND TOTAL COLIFORMS. TESTING SHALL BE CONDUCTED PRIOR TO THE CONTRACTOR ACCEPTANCE
UPON COMPLETED DEFOGGER SYSTEM INSTALLATION, CAB DRINKING WATER SHALL BE TESTED FOR PH, LEAD, BACK-SIPHONAGE EXISTS.
PROVIDE APPROPRIATE BACKFLOW PREVENTING DEVICE IN LOCATIONS WHERE POSSIBILITY OF
STAINLESS STEEL AISI 304, OR AISI 316.
TO SUPPORT OR INSTALL ANY EXTERIOR EQUIPMENT, PIPE, CONDUIT, BOX OR OTHER DEVICE SHALL BE
ALL HARDWARE, INCLUDING CLAMPS, BOLTS, NUTS, WASHERS, STRUTS, ANCHOR BOLTS, ANGLES, ETC. USED
SLOPE DRAINAGE PIPING AT MINIMUM 1/8" PER FOOT IN DIRECTION OF FLOW.
AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ADDITIONAL EXPENSE TO THE GOVERNMENT.
COORDINATE PIPING WITH DUCTWORK, ELECTRICAL, STRUCTURAL AND FIRE PROTECTION. MAKE OFFSETS
CONTRACT DOCUMENTS PRIOR TO INSTALLATION OF EQUIPMENT.
DOCUMENTS PRIOR TO ORDERING. PROVIDE WRITTEN VERIFICATION OF COORDINATION WITH ELECTRICAL
COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH ELECTRICAL CONTRACT
REQUIRED CODE CLEARANCES PRIOR TO ANY PROCUREMENT, FABRICATION OR INSTALLATION.
SHALL BE PROVIDED FOR REVIEW AND APPROVAL SHOWING SPACE FOR ACCESS, EGRESS, MAINTENANCE AND
EQUIPMENT SIZES SHOWN ARE BASED UPON TYPICAL MANUFACTURER EQUIPMENT AVAILABLE. SHOP DRAWINGS
UNDER THOSE CIRCUMSTANCES.
WITH ANY CONSTRUCTION, FABRICATION, OR MATERIAL/EQUIPMENT PURCHASE WHICH WOULD BE UNUSABLE
ATTENTION OF THE FAA CONTRACTING OFFICER REPRESENTATIVE FOR RESOLUTION BEFORE PROCEEDING
DIFFER FROM THOSE SHOWN ON THESE DRAWINGS. ANY SUCH DEVIATIONS SHALL BE BROUGHT TO THE
FABRICATION OR PURCHASE OF MATERIALS AND ASSEMBLIES. THERE MAY EXIST FIELD CONDITIONS WHICH
BASIS FOR MANY OF THESE DRAWINGS. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO
THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY, AND PREVIOUS RECORD DRAWINGS FORM THE
BEFORE ORDERING OR INSTALLING ANY MATERIALS OR EQUIPMENT.
DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL SIZES, MATERIALS, TEMPERATURE AND PRESSURE RATINGS
ALL THE CONTRACT DOCUMENTS AND COORDINATE BETWEEN ALL TRADES PRIOR TO SUBMITTING SHOP
ALL NECESSARY EQUIPMENT, APPURTENANCES AND CONTROLS. THE CONTRACTOR SHALL CAREFULLY REVIEW
(DO NOT SCALE FOR LOCATIONS). IT IS INTENDED THAT A COMPLETE PLUMBING SYSTEM BE PROVIDED WITH
THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS
A PRE-BID SITE VISIT IS MANDATORY FOR ALL CONTRACTORS INTERESTED IN BIDDING THIS PROJECT.
LEGEND
SURFACTANT TANK
REDUCED PRESSURE ZONE BACKFLOW PREVENTER
CHEMICAL FEED PUMP
UNION
FLOW SWITCH
RISE IN PIPING
DROP IN PIPING
PRESSURE GAUGE
DEGOGGER WATER PIPING
DOMESTIC COLD WATER PIPING
HEAVY LINE
NEW WORK AS SHOWN
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PLUMBING GENERAL NOTES:
adw-19006446-p001
| 2022-05-17T09:41:29-0400 | |
| SANDRA L PIETTRO |
| 2022-05-17T08:41:20-0400 | |
| KEITH H HOOD |
File details come from the government source that posted it. Updated .