This document is a Performance Work Statement (PWS) for an electrical contract (Contract No. N4034524x0000) for the USNS Ericsson (TAO 194), specifically focused on Siemens PTO (Power Take-Off) service. The contract requires a Siemens authorized field service representative to troubleshoot and repair the No. 2 PTO Controller PLC located in the Engine Room. The service representative will be required onboard for seven days to perform tasks including static equipment checks, system operational tests, and multiple operational tests to ensure functionality of PTOs in Mode 2 and Mode 3.
Key deliverables include providing written service reports describing "as found" conditions, corrective actions, and recommended future repairs, as well as submitting electronic PDF condition reports to the OMT REP. The work must be completed to the satisfaction of the Chief Engineer and Port Engineer, with the service representative expected to be present during sea and dock trials. Possible service sources include Siemens Energy Pte Ltd in Singapore and two specific Siemens Marine contacts. The contract is categorized as "A" and is dated 2024-02-28, with the service focused on control equipment for two Siemens Energy and Automation 2500 kw, 60Hz, 450 Volts 3 Phase PTO Generators.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925QL013 0001.pdf | ||
| N6264925QL013 RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS Ericsson
( TAO 194 )
ELECTRICAL CONTRACT NO. N4034524x0000
ITEM NO. 0305 CATEGORY "A" 2024-02-28
TAO187_CSI_PTO SERVICE- SIEMENS Cao, Dang
0305 - 1
1.0 ABSTRACT
This item describes the requirement to provide a Siemens authorized field service representative to troubleshoot and repair No.2 PTO Controller PLC.
2.0 REFERENCES
2.1 NAVSEA Tech Manual T9311-A9-MMC-050, Operation, Maintenance and Repair Instructions with Parts List for PTO Electrical Generating System, Ship Service Generators (Volume V)
2.2 NO. 2 PTO SEIMENS SERVICE REPORT MTA 2025
3.0 Location/Quantity/Description
3.1 Location: Engine Room (4-60-0)
3.2 Quantity/Description: Control equipment for two
Siemens Energy and Automation; 2500 kw; 60Hz; 450 Volts 3 Phase PTO Generators
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None
5.0 NOTES
5.1 The contractor and all subcontractors, regardless of
tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.
6.0 QUALITY ASSURANCE REQUIREMENTS:
6.1 All work to be done to the satisfaction of the Chief
Engineer and Port Engineer.
7.0 STATEMENT OF WORK REQUIRED
7.1 With the assistance of ship’s force, isolate and tag
out the ship’s main engine and main engine propulsion system.
ELECTRICAL CONTRACT NO. N4034524x0000
0305 - 2
7.2 Provide the services of a Siemens qualified field
service representative to provide support for the troubleshooting, testing, inspection and repair No. 2 PTO Controller PLC. For estimating purposes, assume the field service representative will be required onboard for seven days.
7.3 Perform static checks prior to start up and
recommissioning including checks of relays, contactors and breakers.
7.4 With the assistance of ship’s force, conduct system
operational test of the No. 2 PTO PLC and control cabinet.
7.5 Run multiple operational tests to ensure functionality
and reliability of PTOs in Mode 2 and Mode 3.
7.6 Provide a written service report which describes the
“as found” conditions, corrective actions taken, and recommended future repairs.
7.7 Reports
7.7.1 When inspection, service and testing reveal any
deficiency a condition report is to be submitted to the OMT REP with recommended repairs and parts required. Submit one electronic copy in Portable Document Format (PDF).
7.7.2 Submit a report that includes “as released”
condition of the ship’s PTO No.2 and control systems. Submit one electronic copy in Portable Document Format (PDF).
7.7.3 All reports and checklists are to be completed
and signed by the person who carried out the inspection and maintenance work and countersigned by the Company’s representative.
7.8 Painting: None
7.9 Manufacturer’s Representative
ELECTRICAL CONTRACT NO. N4034524x0000
0305 - 3
7.9.1 Provide the services of an OEM authorized field
service representative to accomplish all work and testing on the ship’s PTOs and associated control systems identified in paragraph 3.0 ensuring compliance with the manufacturer’s standards and performance specifications. Technical representative to be present during sea and dock trials.
7.9.2 Possible Sources
Siemens Energy Pte Ltd Singapore Management Office 60 MacPherson Road Singapore 348615 Phone: +65 6490 6000 Fax : +65 6490 6001 Email: communications.sg@siemens-energy.com
Siemens Marine POC: Sven Fritzsche Office Phone: 954-527-0431 Cell Phone: 954-778-9097 Email: fritzsche.sven@siemens.com
Siemens Marine POC: Daniel Enge Office Phone: 770-740-3570 Cell Phone: 404-934-0869 Email: daniel.enge@siemens.com
7.9.3 Provide the OMT REP with a signed letter of
qualification from the Original Equipment Manufacturer and certificate of training for the field service representative for the equipment listed in paragraph 3.0 prior to the start of any work.
7.10 Preparation of Drawings
7.10.1 Provide electronic copies of all revised and/or
updated technical documentation including drawings, technical manuals, service bulletins, parts lists, certification and test
ELECTRICAL CONTRACT NO. N4034524x0000
0305 - 4 data associated with the work performed or parts supplied to the
OMT REP.
8.0 GENERAL REQUIREMENTS: None additional