This document contains an independent government cost estimate and statement of work for the overhaul of a fire pump and motor unit aboard a naval vessel. The Navy seeks a contractor to remove, repair, reinstall, and test the NR-4 fire pump and motor assembly onboard USS Ashland. Services include rigging, transportation to and from the shipyard, complete overhaul and refurbishment of the pump and motor in accordance with technical manuals, as well as painting and operational testing. Estimated period of performance is from August 24 to October 12, 2023. The contractor will provide all labor, equipment, and materials. Additional machining may be required pending inspection results.

View the file

Other files

File Type Posted
SCREEN SHOT TECH MANUAL S6226-Z2-MMC-010.pdf PDF
TechDocRequestForm.pdf PDF
SCREEN SHOT TECH MANUAL S6226-CF-MMA-010.pdf PDF
RFC Q0192.docx DOCX document
ItemizedPricingCLIN0001.xlsx XLSX spreadsheet
SOLICITATION 23Q0193.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

INDEPENDENT GOVERNMENT ESTIMATE
CONTRACT:PUMP AND MOTOR CONTINGENCY
CONTRACTOR:TBD
PURCHASE ORDER:TBD
SHIP:USS ASHLAND (LSD-49)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQUANTITYUNITUNIT PRICEAMOUNT
0001COMMERCIAL INDUSTRIAL SERVICES (CIS) PUMPS AND MOTORS CONTRACT IS TO PROVIDE LABOR, RIGGING SERVICES, CRANE, TRANSPORTATION, EQUIPMENT, AND MATERIALS FOR THE REMOVAL, REPAIR, REASSEMBLY, SHOP TEST, RE-INSTALLATION, ALIGNMENT AND ADJUSTMENTS, SHIPBOARD OPERATIONAL TEST OF THE NR-4 FIRE PUMP AND MOTOR UNIT ASSEMBLY ONBOARD THE USS ASHLAND (LSD-48).1LOT
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE NR-4 FIRE PUMP AND MOTOR UNIT FROM THE SHIP TO THE SHOP FOR REPAIRS AND TRANSPORT REPAIRED FIRE PUMP AND MOTOR UNIT BACK TO THE SHIP FOR RE-INSTALLATION AND OPTEST IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE FIRE PUMP IN ACCORDANCE WITH TECH MANUAL S6226-CF-MMA-010 TO INCLUDE REPLACEMENT OF THE SHAFT SLEEVES, BEARINGS, LUBRICATION FITTINGS, O-RINGS, GASKETS, SLINGERS, MECHANICAL SEAL, CASE AND WEARING RINGS.

ACCOMPLISH THE OVERHAUL OF THE FIRE PUMP MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-17 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, THERMISTORS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, CONDUIT BOX, SHAFT BUILD-UP, IMPELLER HOUSING HARDWARE, IMPELLER HOUSING COVER REPAIR, REFURBISHMENT AND PAINTING FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK. ADDITIONAL WORK ALSO COVERS THE BUILD-UP AND MACHINING OF THE BEARING HOUSINGS OR MOTOR SHAFT WHEN REQUIRED.

(SEE NOTES 2 AND 3)

PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHIPBOARD AND SHOP OERATIONAL TEST OF THE REPAIRED FIRE PUMP AND MOTOR UNIT ASSEMBLY
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE FIRE PUMP AND MOTOR UNIT IN ACCORDANCE WITH NAVSEA STANDARD ITEMS 009-32
PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK

(SEE NOTE 3)

NET AMT $0.00

MILESTONE EVENT
1. Purchase Order Start Date24-Aug-23
2. Remove and transport to shop24-28-Aug-23
3. Overhaul and Shop Test28-Aug to 6-Oct-23
4. Delivery to ship, install and OPTEST6-12-Oct-23
5. Purchase Order End Date12-Oct-23
NOTES:
1. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-17 to 009-113 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. the change in scope will require the Contractor to submit a revised estimated cost toward the performance of the new repair recommendation.
2. Refer to Technical Manual S6225-W6-MMA-010, Technical Manual for Navy Standard Titanium Centrifugal Pump 1000 GPM (NAVSEA Drawing No. 803-5773203) for detailed procedures on the overhaul of the Fire Pump and Motor to include shipboard shop operational testing.
3. If machining hours are required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6225-W6-MMA-010, Technical Manual for Navy Standard Titanium Centrifugal Pump 1000 GPM (NAVSEA Drawing No. 803-5773203).