ITEMIZED PRICING LIST.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- USS SAN DIEGO (LPD-22) CIS - PUMPS & MOTORS
- Solicitation number
- N5523623Q0200
About this file
This itemized pricing list outlines the products and services required for the overhaul of a reverse osmosis unit motor onboard the USS San Diego. The contractor will be responsible for removing the existing motor, transporting it to their shop for overhaul, and then reinstalling it. Specifically, the contractor must provide labor, rigging, crane and transportation services to remove and return the motor. In the shop, the contractor must overhaul the motor in accordance with the technical manual, which involves installing new bearings, seals and other components. The contractor must also operationally test the overhauled motor in the shop and paint it before transporting it back to the ship for reinstallation. The pricing list establishes a cost of $0 for the overall scope of work, and provides milestone dates for the removal, overhaul, testing and reinstallation process between August 31st and October 6th, 2023. This work is being procured under solicitation number N5523623Q0200 issued by the Naval Sea Systems Command for pumps and motors services on the USS San Diego.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TechDocRequestForm.pdf | ||
| N5523623Q0200_SF18.pdf | ||
| 23Q0200_RFC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITEMIZED PRICING LIST | |||||
| CONTRACT: | PUMP AND MOTOR CONTINGENCY | ||||
| CONTRACTOR: | TBD | ||||
| PURCHASE ORDER: | TBD | ||||
| SHIP: | USS SAN DIEGO (LPD-22) | ||||
| LOCATION: | NAVY REGION SOUTHWEST | ||||
| ITEM NO CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | COMMERCIAL INDUSTRIAL SERVICES (CIS) PUMPS AND MOTORS CONTRACT IS TO PROVIDE LABOR, RIGGING SERVICES, CRANE, TRANSPORTATION, EQUIPMENT, AND MATERIALS FOR THE REMOVAL, OVERHAUL, REASSEMBLY, SHOP TEST, RE-INSTALLATION OF THE NR-3 REVERSE OSMOSIS UNIT MOTOR ONBOARD THE USS SAN DIEGO (LPD-22). | 1 | LOT | ||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE NR-3 REVERSE OSMOSIS UNIT MOTOR FROM THE PIER TO THE SHOP FOR REWIND AND TRANSPORT REPAIRED REVERSE OSMOSIS UNIT MOTOR BACK TO THE PIER FOR THE RE-INSTALLATION IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR-3 REVERSE OSMOSIS UNIT MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, THERMISTORS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP OPERATIONAL TEST OF THE OVERHAULED REVERSE OSMOSIS UNIT MOTOR |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE REVERSE OSMOSIS UNIT MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEMS 009-32 |
| PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK |
(SEE NOTE 2)
NET AMT $0.00
| MILESTONE EVENT | |
| 1. Purchase Order Start Date | 31-Aug-23 |
| 2. Remove and transport to shop | 31-Aug to 01-Sep-23 |
| 3. Overhaul and Shop Test | 01 -Sep to 4-Oct-23 |
| 4. Delivery to ship and OPTEST | 05-06-Oct-23 |
| 5. Purchase Order End Date | 06-Oct-23 |
| NOTES: | |
| 1. Refer to Technical Manual S6225-P1-MMA-010, Technical Manual for Reverse Osmosis Feedwater Pump for detailed procedures on the overhaul of the Reverse Osmosis Feedwater Pump to include shop operational testing. | |
| 2. If machining hours are required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6225-P1-MMA-010, Technical Manual for Reverse Osmosis Feedwater Pump | |
| 3. Pick up existing NR-3 Reverse Osmosis Unit Motor from Pier and deliver repaired Pump and Motor back onto the Pier. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .