This solicitation is for commercial industrial services to overhaul the NR-1 lube oil purifier motor onboard the USS Sterett (DDG-104). The required services include removing, overhauling, reassembling, testing, and reinstalling the motor. Quotes are due by 26 May 2023 and must be submitted to the Navy via email. The solicitation will result in a fixed-price purchase order awarded using best value tradeoff to the responsible offeror providing the best overall value based on price, technical acceptability, and past performance. Prices shall be FOB destination. The contractor must have an approved quality management system and follow all applicable safety and environmental regulations. Hazardous waste must be removed daily. The period of performance is expected to be completed by 30 June 2023.

View the file

Other files

File Type Posted
N5523623Q0143_RFC.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Itemized Pricing
CONTRACT:PUMP AND MOTOR CONTINGENCY
CONTRACTOR:
PURCHASE ORDER:
SHIP:USS STERETT (DDG-104)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQUANTITYUNITUNIT PRICEAMOUNT
0001COMMERCIAL INDUSTRIAL SERVICES (CIS) PUMPS AND MOTORS CONTRACT IS TO PROVIDE LABOR, RIGGING SERVICES, CRANE, TRANSPORTATION, EQUIPMENT, AND MATERIALS FOR THE REMOVAL, OVERHAUL, REASSEMBLY, SHOP TEST, RE-INSTALLATION, ALIGNMENT AND ADJUSTMENTS OF THE LUBE OIL PURIFIER PUMP MOTOR ONBOARD THE USS STERETT (DDG-104).1LOT$0.00
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO MECHANICALLY AND ELECTRICALLY DISCONNECT AND REMOVE THE EXISTING NR-1 LUBE OIL PURIFIER PUMP MOTOR UNIT FROM THE FOUNDATION AND ASSOCIATE PIPING. AFTER OVERHAUL, INSTALL THE OVERHAULED MOTOR ONTO FOUNDATION AND CONNECT MECHANICALLY AND ELECTRICALLY IN ACCORDANCE WITH THE STATEMENT OF WORK.
ACCOMPLISH THE OVERHAUL OF THE NR-1 LUBE OIL PURIFIER PUMP MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, REMOVAL AND INSTALLATION OF GFM COUPLING, SHAFT BUILD-UP, THERMISTORS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, BALANCING, FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK.

(SEE NOTE-1)

PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (REMOVAL AND INSTALL) OF NR-1 LUBE OIL PURIFIER MOTOR FROM THE FOUNDATION TO THE SHOP FOR OVERHAUL, AND BACK ONTO THE FOUNDATION AFTER OVERHAUL
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO DRAIN AND DISPOSE ANY LIQUID IN SUPPORT OF OVERHAULING THE NR-1 LUBE OIL PURIFIER PUMP MOTOR.
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP TEST AND SHIPBOARD OPERATIONAL TESTING OF THE OVERHAULED NR-1 LUBE OIL PURIFIER PUMP MOTOR.
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE NR-1 LUBE OIL PURIFIER PUMP MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEMS 009-32
PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK

(SEE NOTE 3)

NET AMT $0.00

MILESTONE EVENT
1. Purchase Order Start Date02-Jun-23
2. Remove and transport to shop02-04-Jun-23
3. Overhaul and Shop Test05-Jun to 26-Jun-23
4. Delivery to ship and Optest27-30-Jun-23
5. Purchase Order End Date30-Jun-23
NOTES:
1. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-113 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation.
2. Refer to Technical Manual S9541-AN-MMA-010, Technical Manual for Lube Oil Purifier Assembly for detailed procedures on the overhaul of the Lube oil Purfier Motor to include shop and shipboard operational testing.
3. If machining hours are required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S9541-AN-MMA-010.