ITEMIZED LIST.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
USS HALSEY (DDG-97) CIS PUMPS AND MOTORS
Solicitation number
N5523623Q0028
Issued by

View the file

Other files

File Type Posted
SF18.pdf PDF
Q0028-RFC.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACT:PUMPS AND MOTORS CONTINGENCY
CONTRACTOR:
D.O. #
SHIP:USS HALSEY (DDG-97)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONLOTUNIT PRICEEXT PRICE
ER09-184901-338-3-Q, FAN ROOM, VANEAXIAL SUPPLY VENT FAN MOTOR ASSEMBLY1
ELIN 0001
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO DISCONNECT AND REMOVE EXISTING VANEAXIAL SUPPLY FAN MOTOR ASSEMBLY, ELECTRICAL COMPONENTS AND INTERFERENCES. RE-INSTALL THE NEW GFM VANEAXIAL SUPPLY VENT FAN MOTOR ASSEMBLY, ELECTRICAL COMPONENTS AND INTERFERENCES IN ACCORDANCE WITH THE CONTRACT (SEE NOTES 1 AND 2)1$0.00$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
ER09-184901-338-3-Q, FAN ROOM, VANEAXIAL SUPPLY VENT FAN MOTOR ASSEMBLY1
ELIN 0002
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING OF NEW GFM FAN MOTOR ASSEMBLY LOCATED IN THE PORT SIDE FWD HELO HANGER TO FAN ROOM, 01-338-3-Q, AND FOR THE RIGGING OF REMOVED VANEAXIAL SUPPLY VENT FAN MOTOR ASSEMBLY TO THE PORT SIDE FWD HELO HANGER IN ACCORDANCE WITH THE CONTRACT1$0.00$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
ER09-184901-338-3-Q, FAN ROOM, VANEAXIAL SUPPLY VENT FAN MOTOR ASSEMBLY1
ELIN 0003
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION IN ACCORDANCE WITH THE CONTRACT1$0.00$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
ER09-184901-338-3-Q, FAN ROOM, VANEAXIAL SUPPLY VENT FAN MOTOR ASSEMBLY1
ELIN 0004
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE VANEAXIAL SUPPLY FAN MOTOR ASSEMBLY AND NEW AND DISTURBED SURFACES TO INCLUDE INSULLATION AND LAGGING IN ACCORDANCE WITH THE CONTRACT1$0.00$0.00
OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order.ESTIMATED AMOUNTUNIT OF ISSUEFBLR for ELIN 0005. MATERIAL HANDLING RATE FOR ELIN 0006TOTAL
ELIN 0005ADDITIONAL WORK - LABOR Estimated Straight Time (ST) Man-hours - 100 HRS

ST Fully Burdened Labor Hour Rate $________

NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.100HR$0.00
ELIN 0006ADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor.30,000.00DOLLARS, US0%

TOTAL $0.00

MILESTONE EVENTDATE
1. Purchase Order Start Date17-Nov-22
2. Vaneaxial Supply Vent Fan Motor Assembly removal, installation and OPTEST17-28 Nov 22
3. Delivery order end.28-Nov-22
NOTES:
1. The Contractor shall remove the Existing Vaneaxial Supply Fan Motor Assembly from the Fan room and rig the assembly (offload onto pallet) to the Helo Hanger.
2. Rig and install new GFM Vaneaxial Supply Vent Fan Motor Assembly from the Port Side FWD Helo Hanger into the Fan Room and conduct the Shipboard Operational Test to full system capacity.