Item Description_ B52 Nose Cowl Fod Removal Fixture.docx

DOCX document 40 KB Posted

Attached to
B52 Nose Cowl Fod Removal Fixture
Solicitation number
FA8125A21019
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

OKLAHOMA CITY AIR LOGISTICS COMPLEX (OC-ALC)

TINKER AIR FORCE BASE OKLAHOMA

Statement of Requirement / Item Description

76 AMXG/565 AMXS request the purchase of the following item (s):

· Fabricate two (2) "B-52 Engine Nose Cowl FOD Removal Fixture" per drawing X201961718.

· The first article shall be made as a prototype.

· The second article shall be fabricated only after Engineering has validated and verified (val/ver) the first article and made any necessary changes to the design of the fixture.

· The second article shall be fabricated only after Engineering has validated and verified (val/ver) the first article and made any necessary changes to the design of the fixture. An updated drawing will be furnished to the contractor if changes are made.

· The second article shall be delivered no more than sixty (60) days after Engineering has val/ver the first. Engineering shall val/ver the first article within thirty (30) days after delivery.

· Deliver fully assembled or the contractor shall fully assemble the fixtures upon delivery on-site.

· All substitutions or deviations from drawing must be approved by Technical POC (Engineering).

· Delivery shall be directly to Building 2121, addressed to the 565th AMXS Tool Crib.

· Contractor must have access to all standards or specifications referenced in the drawing X201961718.

· For the purposes of the correction of fabrication errors and/or discussion of design changes, the contractor shall be available for no more than three (3) on-site visits of one business day or less.

· Any operations manuals, technical information, instruction guidance, etc. included with Consumer Off-The-Shelf (COTS) items on the fixtures shall be furnished by the contractor to Engineering.

· All welders must be AWS Certified Welders (CW) with at least 5 years’ experience.

· Parts which include Geometric Dimensions and Tolerance (GD&T / GDT) must be fabricated by personnel who have received formal GD&T training with experience machining GD&T parts.

· Components which re-quire electrical wiring must be inspected by a licensed electrician. Contractor must have access to all standards or specifications referenced in the drawing X201961718.

image1.wmf

File details come from the government source that posted it. Updated .