ITB 748: HVAC Services in Orofino, Idaho
This Invitation to Bid (ITB) is issued by the State of Idaho, Department of Health and Welfare, for Heating, Ventilation, and Air Conditioning (HVAC) maintenance and repair services at State Hospital North in Orofino, Idaho. The facility encompasses a 60-bed psychiatric hospital, supply and maintenance outbuildings, and three cottages. The scope of work includes scheduled preventive maintenance of all HVAC equipment listed in Attachment A, plus repair maintenance on an as-needed basis. Approximately 55% of HVAC equipment was replaced in early 2024, with the remaining 45% varying in age. The question deadline is Wednesday, January 22, 2025, at 11:59:59 p.m. Mountain Time. Bids must be submitted electronically via IPRO by Wednesday, February 12, 2025, at 5:00 p.m. Mountain Time, with bid opening on Thursday, February 13, 2025, at 11:00 a.m. Mountain Time. The initial contract term is anticipated to be three years, from March 1, 2025, to February 29, 2028, with potential extensions for a total contract term not exceeding five years. Award will be made to the responsive responsible bidder with the lowest total cost.
This is a fixed unit cost, indefinite quantity plus cost reimbursement contract. The bidder must provide a fully-burdened rate including overhead, salaries, administrative expenses, profit, supplies, travel, and safety equipment. All costs must remain firm throughout the contract life unless otherwise agreed to by the Department. Invoices must be submitted monthly within 30 calendar days after the billing period ends and must include itemized expenditures and service logs. The contractor must demonstrate proficiency in building direct digital controllers and employ at least one field technician within a 50-mile radius trained on Allerton Direct Digital Control systems. Required insurance includes Commercial General Liability with limits of $1,000,000 per occurrence and $2,000,000 aggregate, plus Workers Compensation Insurance. The contractor must be properly licensed and bonded, maintain as-built drawings and manuals on-site, and follow all applicable codes including the 2018 Uniform Mechanical Code and 2023 NFPA-70 National Electrical Code. No set-asides are identified in this solicitation. The contract is subject to Idaho state procurement regulations and the State of Idaho standard contract terms and conditions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
IDAHO DEPARTMENT OF HEALTH & WELFARE
Invitation to Bid (ITB) ITB 748
Heating, Ventilation and Air Conditioning (HVAC) Services in Orofino, Idaho
Date of Issuance: 01/15/2025
TABLE OF CONTENTS
| ITB Administrative Information | 1 | |
| 1 | PURPOSE | 2 |
| 2 | GENERAL INFORMATION, solicitation instructions, standard terms and conditions AND SPECIAL TERMS AND CONDITIONS | 2 |
| 3 | INQUIRIES | 2 |
| 4 | BACKGROUND | 3 |
| 5 | SPECIFICATIONS / scope of work | 3 |
| 6 | COST AND BILLING PROCEDURE | 13 |
| 7 | SUBMISSION REQUIREMENTS | 14 |
| 11 | AWARD | 15 |
| 12 | Reporting requirements | 16 |
| 13 | Subcontractors | 16 |
| 14 | Insurance Requirements | 16 |
| ATTACHMENT 1-BIDDER QUESTIONS | 18 | |
| Attachment 2-STATE OF IDAHO CONTRACT TERMS AND CONDITIONS WITH ARTICLE 6 | 20 | |
| Attachment 3-STATE SIGNATURE PAGE | 36 | |
| ATTACHMENT 4-MODIFICATION AND EXCEPTION FORM | 37 | |
| ATTACHMENT 5-COVER FORM | 38 | |
| ATTACHMENT A-State Hospital North HVAC Equipment | 40 | |
| ATTACHMENT B-State Hospital North Campus Map 1 | 41 | |
| ATTACHMENT C-State Hospital North Campus Map 2 | 42 | |
| Attachment D-Idaho State Hospital North - Contractor Standards of Conduct | 43 | |
| Attachment E-Sample Service Log | 51 |
ITB Administrative Information
| ITB Title: |
| Heating, Ventilating, and Air Conditioning |
(HVAC) Services in Orofino, Idaho
| ITB Project Description: |
| The Idaho Department of Health and Welfare (Department) is seeking bids for Heating, Ventilating, and Air Conditioning services at State Hospital North in Orofino, Idaho. |
ITB Lead:
Cassandre DiBonaventura Grants/Contracts Officer Cassandre.DiBonaventura@dhw.idaho.gov Phone: 208-334-6543
Submit sealed Bid to:
Submit electronically via IPRO
Electronic Submission:
IPRO LOGIN
| Deadline To Receive Questions: |
| Wednesday, January 22, 2025,11:59:59 p.m. Mountain Time |
| ITB Closing Date: |
| Wednesday, February 12, 2025, 5:00 p.m. Mountain Time |
| ITB Opening Date: |
| Thursday, February 13, 2025, 11:00 a.m. |
Mountain Time
The Department conducts Virtual Electronic Bid Openings only.
| Initial Term of Contract and Renewals: |
| The initial term is anticipated to be three (3) |
years, 03/01/2025 to 02/29/2028. Upon mutual, written agreement, the Contract may be amended or extended. The total Contract term, including all extensions, is not anticipated to exceed five (5) years.
PURPOSE
The purpose of this ITB is to seek bids for heating, ventilation, and air conditioning (HVAC) maintenance and repair services at the Department’s State Hospital North (SHN) located at 300 Hospital Dr, Orofino, Idaho, including the sixty (60) bed hospital, supply and maintenance outbuildings, and three (3) cottages. In early 2024, approximately fifty-five percent (55%) of the HVAC equipment was replaced. The remaining forty-five percent (45%) of equipment varies in age.
GENERAL INFORMATION, solicitation instructions, standard terms and conditions AND SPECIAL TERMS AND CONDITIONS This Solicitation is issued by the state of Idaho (the “State”) via IPRO:
(https://purchasing.idaho.gov/information-for-vendors/). The ITB Lead is the only contact for this Solicitation. All correspondence regarding this ITB shall be in writing. In the event that it becomes necessary to revise any part of this ITB, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this ITB shall not be relied upon. All changes to this ITB must be in writing and posted at IPRO to be valid. Alternate Bids are not allowed.
The current version of the Solicitation Instructions to Vendors is incorporated by reference into this Solicitation, and attached or referenced in any resulting Contract, as if set forth in their entirety. This document can be downloaded at https://purchasing.idaho.gov/information-for-vendors/; or copies obtained by contacting the Division of Purchasing at 208-327-7465 or purchasing@adm.idaho.gov. Failure by any Bidder to obtain a copy of this document or the State of Idaho Contract Terms and Conditions including the Department’s Article 6 - Attachment 2 shall in no way constitute or be deemed a waiver by the State of any term, condition or requirement contained in the referenced documents; and no liability will be assumed by the Department for an Bidder’s failure to consider the State of Idaho Standard Contract Terms and Conditions and Solicitation Instructions to Vendors in preparing its response to the solicitation.
SPECIAL TERMS PRECEDENCE: The State of Idaho Contract Terms and Conditions have been adapted for use by the Department of Health and Welfare and are included with this Solicitation as Attachment 2.
For the purposes of this Solicitation and the resulting Contract, the term “Bidder” and “Contractor” are used interchangeably. The resulting Contract will refer to “Contractor.”
INQUIRIES
Questions or other correspondence must be submitted in writing to the ITB Lead listed below. QUESTIONS MUST BE RECEIVED BY 11:59:59 P.M. Mountain Time ON THE DATE LISTED IN THE ITB ADMINISTRATIVE INFORMATION. Written questions must be submitted using Attachment 1, Bidder Questions. Official answers to all written questions will be posted on IPRO as an amendment to this ITB.
| ITB Lead: | Cassandre DiBonaventura | |
| Phone: | 208-334-6543 | |
| E-mail: | Cassandre.DiBonaventura@dhw.idaho.gov |
Any questions regarding the State of Idaho Standard Contract Terms and Conditions found in this RFP (Attachment 2) must also be submitted in writing, using Attachment 1, Bidder Questions, by the deadline identified in the ITB Administrative Information. The State will not consider proposed modifications to these requirements after the date and time set for receiving questions. Questions regarding these requirements must contain the following:
1. The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency).
2. Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.
3. Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.
3.1 Vendor Proposed Modifications and Exceptions to Requirements, Terms, and Conditions.
3.1.1 In the event that a Bid contains modifications or exceptions to any Solicitation requirements, terms, or conditions, they must be identified and submitted on (Attachment 4) – Modification and Exception Form, and must contain the following:
1. The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency).
1. Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.
1. Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.
3.1.2 The State will not consider any modifications or exceptions that are not identified specifically on (Attachment 4) – Modification and Exception Form and submitted after the Question deadline.
3.1.3 The State has sole discretion to determine if the modifications or exceptions submitted by a Bidder would result in a material change or otherwise threaten the integrity of the procurement process. Pursuant to IDAPA 38.05.01.084.03.e, the State may only negotiate non-material modifications or exceptions. Modifications or exceptions which the State determines to be material, or which otherwise threaten the integrity of the procurement process, will not be accepted or negotiated.
3.1.4 Except as otherwise provided within the Solicitation, the State will not consider modifications or exceptions to the requirements, terms, or conditions which are proposed after the ITB Question deadline.
3.1.5 Discussions with individual Bidders (including the utilization of one or more rounds of Best and Final Offers (BAFO) and/or Negotiations) solely related to sections 3.1 through 3.1.5 may be conducted in accordance with IDAPA 38.05.01.083 and .084, as determined by the State to be in its best interest. NOTE: Bidders should submit their best Bids initially as there is no guarantee that the State will conduct any discussions.
3.1.6 Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, or which take exception to the State of Idaho Contract Terms and Conditions, will be found non-responsive, and no further consideration of the Bid will be given.
BACKGROUND
State Hospital North is a sixty (60) bed psychiatric hospital that provides treatment for adults in psychiatric crisis. The hospital consists of a sixty (60) bed hospital, supply and maintenance outbuildings, and three (3) cottages.
SPECIFICATIONS / scope of work The Scope of Work is the services the Department requires your company to provide when the Contract is awarded.
GENERAL REQUIREMENTS
| A. | This Contract is intended to provide the Department of Health and Welfare (Department) State Hospital North (SHN) campus facilities in Orofino Idaho with skilled Heating, Ventilating and Air Conditioning (HVAC) service technicians capable of maintaining and servicing HVAC systems and controls. |
| 1. | Work to be performed under this Contract will include scheduled preventive maintenance of all listed building equipment (see Equipment Attachment - A) plus repair maintenance to said equipment on an as-needed basis. |
| a. | Any work in excess of one thousand dollars ($1,000) for any individual repair and associated parts must be fully described in written work orders signed by the Contract Monitor or other authorized Department representative prior to repair. |
| b. | The Department will: |
| i. | Permit access to the buildings; |
ii. Permit use of the building services;
iii. Keep areas adjacent to the equipment clear of extraneous materials; and
iv. Promptly notify the Contractor of any unusual operating conditions or circumstances.
| B. | The Contractor must: |
| 1. | Demonstrate proficiency in the operation of building direct digital controllers. At a minimum, the Contractor must employ one (1) field technician within a fifty (50)-mile radius who has received training on: |
| a. | System operation; and |
| b. | Allerton Direct Digital Control (DDC) thermostat controls. |
| i. | The Contractor must ensure that unit is being properly controlled by DDC, and work with the Allerton service contractor when necessary to confirm proper operation. |
2. Be properly licensed and bonded and have sufficient equipment and qualified personnel to perform the work.
3. Move and relocate building equipment, access systems, office furnishings and equipment, and any other preparatory work necessary to complete authorized projects.
4. Take appropriate steps to protect equipment remaining in spaces where work is being performed.
5. Clean up all scrap, dirt, dust, grease, oil, and any other construction debris generated as a result of the work being done.
6. Return disrupted space to the same condition and layout that existed prior to the work being done.
7. Ensure that all mechanical equipment components, packings, lubricants, oils, and cleaning materials furnished by the Contractor, under this Contract, are of the highest quality and applied or installed according to the equipment manufacturer's recommendations.
8. Warranty all parts, equipment, materials, and labor covered under manufacturer’s warranty when applicable. Original Equipment (OE) parts must be obtained under warranty.
| 9. | Report the presence of all equipment repair needs and other adverse conditions to the Department before performing repairs unless the corrective measure is considered preventive maintenance. |
| a. | If other problems and conditions are identified outside the HVAC systems, as defined in this Contract, the Contractor must notify the Contract Monitor within five (5) business days. |
| 10. | Use diligent care when servicing equipment located on the roof of Department facilities. |
| a. | Any damages to the roof membrane occurring as a result of the Contractor's work must be repaired in compliance with the roof's extended manufacturer and installer warranties. |
| b. | Damage must be reported immediately to the Contract Monitor. |
| i. | The Contract Monitor will immediately arrange for the repairs to be made by the Idaho state authorized roofing repair company. The cost of these repairs must be paid for by the Contractor. |
| 11. | Maintain as-built drawings, maintenance, and operations manuals, which must remain on-site at all times. |
| a. | The lead person of each work crew must check in and out with the Department's Facilities Coordinator daily on all projects and must enter times, dates, and a general description of the work performed in the facility's maintenance log. |
| b. | A detailed mechanical equipment service log for equipment must be completed and provided with each Contracted service invoice (Attachment E Sample Service Log). |
| i. | The response time for reviewing and implementing temporary or permanent repairs in emergency situations must not exceed twenty-four (24) hours after receiving a call from the Department. |
ii. The response time for reviewing non-emergency-related projects must not exceed seventy-two (72) hours as defined under the "Regular Rate" definition below after receiving a call from the Department.
iii. Execution of each work order must commence within twenty-four (24) hours upon review and approval by Department unless otherwise agreed to by both the Department and Contractor.
12. Read, acknowledge, sign, and submit the SHN Contractor Code of Conduct form #0494 (Attachment D) to SHN’s front desk receptionist.
| II. | DEFINITIONS |
| A. | Contract Monitor - The Department employee who oversees the Contract and handles invoicing and payment. |
B. Facilities Coordinator - A Department employee designated by the Contract Monitor to handle facility issues. This will be the on-site Department contact.
C. Journeyman - Any employee of the Contractor with at least five (5)-years' experience in building HVAC operations and who personally performs and/or supervises the actual physical work of maintaining, repairing, and installing HVAC equipment.
D. Apprentice - Any person employed by the Contractor who is learning the trade of Journeyman HVAC Technician and engages in the maintenance, repair, and installation of HVAC Equipment while under the constant on-the-job supervision of a qualified journeyman, as stated above.
E. Regular Rate - The rate of pay for work performed on any Department project or group of Department projects located within any single campus location done at the direction of the Contract Monitor between the hours of 8:00 a.m. and 5:00 p.m. local time, Monday through Friday, excluding state holidays (https://sos.idaho.gov/state-holidays/).
F. Overtime Rate - The rate of pay for work performed on any Department project or group of Department projects located within any single campus single location done at the direction of the Contract Monitor in excess of eight (8) hours per Contractor employee on-site in a twenty-four (24) hour day beginning at 8:00 a.m. local time and ending at 8:00 a.m. local time the following day. This rate must only apply when requested by the Department to expedite the work or to correct emergency situations and it is not practical to provide additional personnel to accomplish the work under "regular" rate time slots.
G. Preventive Maintenance - Scheduled, routine systems checks and replacement and/or replenishment of disposable components. All such work must be bid and detailed in the cost billing and will be paid as specified in the Contract.
H. Repair Maintenance - Call back or service call maintenance to correct adverse or undesirable conditions discovered by the Department through normal, routine building use or equipment inspection or by the Contractor as discovered during preventive maintenance activities in compliance with the Contract. All repair maintenance must be authorized by the Contract Monitor or designated Department representative prior to the initiation of the repair by the Contractor. The Contractor may receive hourly rate compensation for repair maintenance only if such work is pre-authorized by the Department.
I. Disposable Components - Filters, lubricants, belts, gaskets, seals, etc., that are recommended by the manufacturer to be routinely checked and replaced or replenished. All components regulated by local, state, or federal laws and regulations must be collected and disposed of as required by the applicable laws and regulations. Disposable components and costs associated with the collection and disposal of spent components must be considered a part of the Contractor's overhead and must not be included in billings as "materials."
| J. | Materials - Replacement, retrofit or new components of systems other than disposable components that are essential or desirable to the operation or condition of the equipment. Materials must only be installed by the Contractor upon authorization by the Department. If the Contractor installs materials without prior authorization by the Department, the materials will be considered disposable components as described above and the Department will not be obligated to pay the Contractor for them as materials. Materials must be billed to the Department at the Contractor's cost plus the Contractor's bid markup where specified in the Contract. |
| 1. | The Department reserves the right to provide parts and/or materials to the Contractor for installation and/or repair activities. |
| a. | The Department will pay shipping costs for materials, and no percentage mark-up will be allowed by the Contractor. |
b. Department furnished parts that fail must be returned to the Department if they are still under warranty.
| III. | CONTRACT SERVICES AND ACTIVITIES |
| A. | Preventative Maintenance Service Requirements – All service must be performed to the manufacturer requirements or specifications. |
| 1. | The Contractor must: |
| a. | Complete all work in this section monthly, quarterly, biannually, or annually as specified in the detailed mechanical equipment service task descriptions. (see Equipment Attachment A). The specific times and dates for these services must be set and agreed to by both the Department and the Contractor. |
b. Perform all work on Department property in a safe manner. The Contractor must follow guidelines as set forth by the Occupational Safety and Health Administration (OSHA). All mechanical work must comply with the 2018 Uniform Mechanical Code. All electrical work performed must comply with the 2023 NFPA-70 National Electrical Code. In the event that later editions of these codes are adopted by the Division of Building Safety while this Contract is in force, the new codes will supersede those specified above.
| 2. | Ductless Mini-Split Air Conditioners |
| a. | The Contractor must perform the following services biannually, as agreed upon by the Contractor and the Department: |
| i. | Inspect units for proper operation and condition. |
ii. Inspect all mounts for wear and adequate connection. Tighten loose fasteners and report worn parts to Facilities Coordinator within five (5) business days.
iii. Inspect fins on exchange coils for the build-up of chemical residue or dirt that would signify coil leaks, bends in fins, dirt, and other foreign materials obstructing normal unit operation. Clean the unit and straighten the fins as needed. Report leaks and other problems to the Facilities Coordinator within five (5) business days.
iv. Check for proper operation of components on the interior unit. Clean filter and replace regular maintenance or wear items as necessary.
v. Check controls including batteries in the thermostat controllers. Calibrate, if necessary, to ensure proper operation.
vi. Report all defective devices, leaks and necessary repairs to the Facilities Coordinator within five (5) business days.
| 3. | Air Handler Systems |
| a. | The Contractor must perform the following checks biannually, as agreed upon by the Contractor and the Department: |
| i. | Check Air Handler Units (AHUs) for proper operation. Make sure units are being properly controlled by Alerton DDC systems and alert Facilities Coordinator if there are issues with this system. Listen for odd sounds. If odd sounds are noticeable, open the unit, and locate and identify the source. Make adjustments or notify the Facilities Coordinator of needed repairs within five (5) business days. |
ii. Check the filter for proper placement and cleanliness. Report any dirty filters to the Facilities Coordinator within five (5) business days. Filters are typically replaced by facilities maintenance staff every three (3) months.
iii. Check all fittings, mounts and mechanical fasteners for secureness. Tighten and adjust as necessary. Install new fasteners if stripped or otherwise damaged.
iv. Inspect shafts, sheaves and belts for proper mounting, excessive wear, alignment, wobble, and tension. Adjust and/or replace as necessary. Shafts and sheaves are considered materials as described above. If shafts and sheaves need to be replaced, the Contractor must notify the Facilities Coordinator immediately and wait for approval.
v. Listen to bearings and feel for excessive heat build-up and/or vibration. Report adverse conditions or needed repairs and/or replacements to the Facilities Coordinator immediately upon discovery of a problem.
vi. Inspect guards, hatches, inspection covers, doors, etc., for secure mounting and sealing. Tighten, remount and/or adjust as necessary.
vii. Feel the motor for presence of excessive heat and/or vibration and listen to motor to identify uncommon noises. If the motor temperature or vibration is excessive or uncommon noises are present, identify the problems and make adjustments and/or report findings to the Facilities Coordinator immediately.
| b. | The Contractor must perform the following services biannually, as agreed upon by the Contractor and the Department: |
| i. | Inspect exchange coils for leaks, damage, debris, and other obstructions. Remove obstructions, straighten and clean coil fins, and report all leaks or damage to the Facilities Coordinator within five (5) business days. |
ii. Lubricate dampers and actuators as recommended by the manufacturer.
iii. Check the condensate drain pan and drain line by flooding the pan and observing drain characteristics. Unplug if necessary to permit proper drainage.
| c. | The Contractor must perform the following services annually: |
| i. | Open AHU and conduct a detailed inspection of all component parts. |
ii. Open all electrical connection junction boxes and inspect wires and connections for charring or discoloration. Report any adverse conditions to the Facilities Coordinator within five (5) business days.
iii. Check amperage draw on motor and record amperage.
iv. Check and calibrate all controls and control connections including but not limited to thermocouples, pressure sensors, gauges, contacts, etc., to ensure proper operation.
v. Lubricate damper motor shafts with light oil, check motors for proper adjustment and operation, clean motor housings and mounts, and adjust as necessary.
vi. Inspect and sequence dampers through the entire set range. Adjust as necessary to meet code requirements and/or design criteria for circulated air. Lubricate damper pivot points and clean and repair seals as needed.
vii. Deep clean the entire AHU interior by brushing, vacuuming, washing, and/or other mechanical means to remove build-ups of dirt, dust, or obstructions.
viii. Utilize appropriate environmental controls to limit the spread of debris removed during the cleaning process.
4. Make Up Air Unit (MAU)
| a. | The Contractor must perform the following services biannually, as agreed upon by the Contractor and the Department: | |
| i. | Check Make Up Air Unit (MAU) for proper operation and listen for odd sounds. If odd sounds are noticeable, open the unit, locate and identify the source. Make adjustments or notify the Facilities Coordinator of needed repairs within five (5) business days. |
ii. Check the filter for proper placement and cleanliness. Report any dirty filters to the Facilities Coordinator within five (5) business days. Filters are typically replaced by facilities maintenance staff every three (3) months.
iii. Check all fittings, mounts and mechanical fasteners for secureness. Tighten and adjust as necessary. Install new fasteners if stripped or otherwise damaged.
iv. Refer to section III.A.5.a.i-x for maintenance of exhaust fans that are part of the MAU.
v. Inspect shafts, sheaves and belts for proper mounting, excessive wear, alignment, wobble, and tension. Adjust and/or replace as necessary. Shafts and sheaves are considered materials as described above. If shafts and sheaves need to be replaced, the Contractor must notify the Facilities Coordinator immediately and wait for approval.
vi. Listen to bearings and feel for excessive heat build-up and/or vibration. Report adverse conditions or needed repairs and/or replacements to the Facilities Coordinator immediately upon discovery of a problem.
vii. Inspect guards, hatches, inspection covers, doors, etc., for secure mounting and sealing. Tighten, remount and/or adjust as necessary.
viii. Feel the motor for presence of excessive heat and/or vibration and listen to motor to identify uncommon noises. If the motor temperature or vibration is excessive or uncommon noises are present, identify the problems and make adjustments or report findings to the Facilities Coordinator immediately.
ix. Refer to section III.A.6.a-c for maintenance of heat pumps that are part of the MAU.
x. Inspect exchange coils for leaks, damage, debris, and other obstructions. Remove obstructions, straighten, and clean coil fins, and report all leaks or damage to the Facilities Coordinator within five (5) business days.
xi. Lubricate dampers and actuators as recommended by the manufacturer.
| b. | The Contractor must perform the following preventative maintenance annually: |
| i. | Open MAU and conduct a detailed inspection of all component parts. |
ii. Open all electrical connection junction boxes and inspect wires and connections for charring or discoloration. Report any adverse conditions to the Facilities Coordinator within five (5) business days.
iii. Check amp draw on motor and record amperage.
iv. Check and calibrate all controls and control connections including but not limited to thermocouples, pressure sensors, gauges, contacts, etc., to ensure proper operation.
v. Deep clean the entire MUA interior by brushing, vacuuming, washing, and/or other mechanical means to remove build-ups of dirt, dust or obstructions on fan and fan inlet.
vi. Utilize appropriate environmental controls to limit the spread of debris removed during the cleaning process.
5. Exhaust Fans
| a. | The Contractor must perform the following services biannually, as agreed upon by the Contractor and the Department: |
| i. | Remove the cowl on the unit and inspect the fan drive assembly. |
ii. Inspect and test electrical switching devices.
iii. Check the fan belt, sheaves, and fan shaft. Adjust as necessary and replace if needed.
iv. Inspect and lubricate bearings.
v. Inspect fan. Straighten blades and balance as necessary.
vi. Inspect and repair bug screens as necessary.
vii. Inspect and lubricate backdraft damper pivot points as necessary.
viii. Wipe out dirt and grime from within the fan drive assembly housing.
ix. Reassemble and test the unit for proper operation. Adjust as necessary.
x. Check air intakes throughout the building for air movement. If no movement is detected, investigate the cause and repair.
| 6. | Heat Pumps |
| a. | The Contractor must perform the following checks biannually, as agreed upon by the Contractor and the Department: |
| i. | Check all starters, disconnects and other electrical connections for loose connections and burned contacts. Report all identified irregularities to the Facilities Coordinator. |
ii. Test sequence and operation of all controls for proper operation including high- and low-pressure cut-outs.
iii. Check refrigerant lines for corrosion and leaks, check thermal insulation on refrigerant lines for integrity, and report all adverse conditions to the Facilities Coordinator.
| b. | The Contractor must perform the following services biannually, as agreed upon by the Contractor and the Department: |
| i. | Check all operating pressures and temperatures. |
ii. Check unit for excessive noise or vibration.
iii. Check all refrigerant lines for rubbing. Isolate as necessary and report all damage to Facilities Coordinator before initiating repairs.
iv. Inspect exchange coils for leaks, damage, debris, and other obstructions. Remove obstructions, straighten and clean coil fins, and report all leaks or damage to the Facilities Coordinator within five (5) business days.
iv. Check refrigerant level and condition.
v. Check for active refrigerant leaks.
vi. Check refrigerant in site glasses for foreign material and/or low level. Recharge unit as needed. Report all recharges to Facilities Coordinator when recharge is needed and has been completed and tested to ensure there are no leaks.
vii. Check for moisture in refrigerant lines.
viii. Check compressor for abnormal operation.
ix. Measure vibration on main bearings.
x. Inspect all piping connections and insulation materials.
xi. Check bearing and operating surface temperatures.
xii. Check motor for excessive heat.
| c. | The Contractor must perform the following services annually, while the cooling system is operating, typically May through September: |
| i. | The services described in SOW III.A.1.a-b above. |
ii. Check intermediate season readings and note if refrigerant was added.
iii. Check equipment for corrosion and fatigue. Check refrigerant line insulation for placement and integrity.
iv. Check for refrigerant leaks with a leak detector at all possible leak points.
v. Check all mounts for secure fastening and excessive or uneven wear.
7. Kitchen Appliance Associated Compressors
a. The Contractor must perform the following checks annually:
i. Check all starters, disconnects and other electrical connections for loose connections and burned contacts. Report all identified irregularities to the Facilities Coordinator.
ii. Test sequence and operation of all controls for proper operation including high- and low-pressure cut-outs.
iii. Check refrigerant lines for corrosion and leaks, check thermal insulation on refrigerant lines for integrity, and report all adverse conditions to the Facilities Coordinator.
b. The Contractor must perform the following services annually:
i. Check and log all operating pressures and temperatures.
ii. Check unit for excessive noise or vibration.
iii. Check all refrigerant lines for rubbing. Isolate as necessary and report all damage to Facilities Coordinator before initiating repairs.
iv. Inspect exchange coils for leaks, damage, debris, and other obstructions. Remove obstructions, straighten and clean coil fins, and report all leaks or damage to the Facilities Coordinator within five (5) business days.
v. Check refrigerant level and condition.
vi. Check for active refrigerant leaks.
vii. Check refrigerant in site glasses for foreign material and/or low level. Recharge unit as needed. Report all recharges to Facilities Coordinator when recharge is needed and has been completed and tested to ensure there aren’t any leaks.
viii. Check for moisture in refrigerant lines.
ix. Check compressor for abnormal operation.
x. Measure vibration on main bearings.
xi. Inspect all piping connections and insulation materials.
xii. Check bearing and operating surface temperatures.
xiii. Check motor for excessive heat.
c. The Contractor must perform the following services annually.
i. The services described in SOW III.A.1. a-b above.
ii. Check equipment for corrosion and fatigue. Check refrigerant line insulation for placement and integrity.
iii. Check for refrigerant leaks with a leak detector at all possible leak points.
iv. Check all mounts for secure fastening and excessive or uneven wear.
8. Walk-in Cooler / Freezer Evaporator Coils
| a. | The Contractor must perform the following services biannually: |
| i. | Inspect the fan drive assembly. |
ii. Inspect and test electrical switching devices.
iii. Inspect and lubricate bearings.
iv. Inspect fan. Straighten blades and balance as necessary.
v. Wipe out dirt and grime from within the fan drive assembly housing.
vi. Reassemble and test the unit for proper operation. Adjust as necessary.
vii. Inspect exchange coils for leaks, damage, debris, and other obstructions. Remove obstructions, straighten and clean coil fins, and report all leaks or damage to the Facilities Coordinator within five (5) business days.
| 9. | Walk-in Cooler / Freezer Heat Pumps |
| a. | The Contractor must perform the following checks biannually, as agreed upon by the Contractor and the Department: |
| i. | Check all starters, disconnects and other electrical connections for loose connections and burned contacts. Report all identified irregularities to the Facilities Coordinator. |
ii. Test sequence and operation of all controls for proper operation including high- and low-pressure cut-outs.
iii. Check refrigerant lines for corrosion and leaks, check thermal insulation on refrigerant lines for integrity, and report all adverse conditions to the Facilities Coordinator.
| b. | The Contractor must perform the following services biannually, as agreed upon by the Contractor and the Department: |
| i. | Check all operating pressures and temperatures. |
ii. Check unit for excessive noise or vibration.
iii. Check all refrigerant lines for rubbing. Isolate as necessary and report all damage to Facilities Coordinator before initiating repairs.
iv. Inspect exchange coils for leaks, damage, debris, and other obstructions. Remove obstructions, straighten and clean coil fins, and report all leaks or damage to the Facilities Coordinator within five (5) business days.
v. Check refrigerant level and condition.
vi. Check for active refrigerant leaks.
vii. Check refrigerant in site glasses for foreign material and/or low level. Recharge unit as needed. Report all recharges to Facilities Coordinator when recharge is needed and has been completed and tested to ensure there aren’t any leaks.
viii. Check for moisture in refrigerant lines.
ix. Check compressor for abnormal operation.
x. Measure vibration on main bearings.
xi. Inspect all piping connections and insulation materials.
xii. Check bearing and operating surface temperatures.
xiii. Check motor for excessive heat.
| c. | The Contractor must perform the following services annually, while the cooling system is operating, typically May through September: |
| i. | The services described in SOW III.A.1.a-b above. |
ii. Check intermediate season readings and note if refrigerant was added.
iii. Check equipment for corrosion and fatigue. Check refrigerant line insulation for placement and integrity.
iv. Check for refrigerant leaks with a leak detector at all possible leak points.
v. Check all mounts for secure fastening and excessive or uneven wear.
| B. | Repair Services – All services must be performed to the manufacturer requirements or specifications. |
| 1. | The Contractor must perform repair maintenance on listed equipment (Attachment A Equipment list) as directed by the Department. Department direction will be given to the Contractor in the form of work orders. Compensation will be provided to the Contractor for repair maintenance work at the hourly rates for mechanics and technicians as bid by the Contractor and as specified in the Cost/Billing Procedure for completed work. The Contractor will not be compensated for unauthorized, incomplete or inappropriate work. |
| IV. | Communication |
| A. | Regarding Communication |
| 1. | Any misunderstanding regarding services to be provided, should they arise, will be discussed/resolved between the Contractor and the SHN Manager overseeing the HVAC equipment at SHN. |
| V. | Additional Phases/Work Assignments |
| A. | The Department may request that the Contractor provide additional services directly related to the Contracted services. The Department will contact the Contractor if additional services are required. The Contractor must work with the Department to develop a work plan and budget based on the additional services. |
COST AND BILLING PROCEDURE
See IPRO. Download the Excel spreadsheet titled “Bid Schedule” found in the Question Section of the related ITB on IPRO. Complete the spreadsheet, upload it back into the appropriate Question Section on IPRO.
Part 1. COST:
The Contract resulting from this ITB will be a FIXED UNIT COST, INDEFINITE QUANTITY plus COST REIMBURSEMENT Contract.
The cost matrix located on the Bid Schedule includes the Department’s best estimate of number of units for the initial Contract term and is not to be considered a guarantee of actual number of units to be experienced under the Contract. Estimated quantities are for evaluation and award purposes, based on the Department’s best estimate, and are not binding on the Department.
Costs must remain firm throughout the life of the Contract, unless otherwise agreed to by the Department and modifications will only be considered under extenuating circumstances.
The Bidder must provide a fully-burdened rate which must include, but not be limited to, all operating and personnel expenses, such as: overhead, salaries, administrative expenses, profit, supplies, travel and safety equipment.
Part 2. Billing Procedure:
The Contractor must provide a monthly invoice within thirty (30) calendar days after the end of the billing period. Each invoice must be accompanied by an itemization of expenditures broken down by category as identified in the budget above. Program reports required for invoice processing are detailed in the Report section.
Invoices will be processed for payment no later than thirty (30) calendar days after all required documentation is received. Invoices received with errors or without the required documentation will be returned to the Contractor for correction and resubmission. No invoice will be accepted or paid without required documentation.
The Contractor must ensure information provided in the reports aligns with invoices submitted during the reporting time frame.
The Contractor must provide the following information with each invoice:
1. All Contract services delivered during the billing period, identified by each item as reflected in the budget and the total for each.
2. Total amount billed for the billing period
3. Contract number
4. Dates of service
5. Contractor name, address, phone number, and or email address
6. Invoice number
Invoices and reports are to be submitted to: [information will be provided in the resulting Contract]
The final invoice must be submitted to the Department no later than thirty (30) calendar days after Contract expiration. Final invoices received without backup/supporting documentation or with errors will be returned to the Contractor for resubmission.
SUBMISSION REQUIREMENTS
10.1 Required Bid Submission Items
Your Bid Submission must consist of the following:
Bid Schedule See IPRO. Download the Excel spreadsheet titled “Bid Schedule” found in the Question Section of the related ITB on IPRO. Complete the spreadsheet, upload it back into the appropriate Question Section on IPRO. Do not submit your Bid on any other form. Submitting your Bid on a form different than the Bid Schedule may cause your Bid to be rejected as non-responsive.
State Signature Page The State Signature Page must be completed and submitted as part of your Bid. The State Signature Page is Attachment 3.
Cover Form The Cover Form must be completed and submitted as part of your Bid. The Cover Form is Attachment 5.
Acknowledgement of Amendments If the ITB is amended, the Bidder must acknowledge each amendment with a signature on the acknowledgement form provided with each amendment. Failure to return a signed copy of each amendment acknowledgement form with the Bid may result in the Bid being found non-responsive. See IDAPA 38.05.01.52.
10 Bid Submission Methods Bids MUST be through IPRO, at https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA. Do not fax or e-mail your Bid. Your Bid must be received by the date and time specified on the IPRO header document.
All Bidders participating in a Solicitation issued through IPRO must establish an account in the IPRO system as it is necessary in order to process and or award the resulting Contract(s). It is free to establish an account and only takes a few minutes.
10.1 Per IDAPA 38.05.01.072, any bid or proposal, withdrawal, or modification received after the time and date set for closing at the place designated in the solicitation is late. No late bid or proposal, late modification or late withdrawal will be considered.
10.2 Trade Secrets
If your Bid contains trade secret information which you have identified, you must also submit a redacted copy of the Bid (in electronic format, with the word “redacted” in the file name) with all trade secret information removed or blacked out; as well as a separate document containing a complete list (per the instructions in the three (3) paragraphs directly below) of all trade secret information which was removed or blacked out in the redacted copy.
Paragraph 28 of the Solicitation Instructions to Vendors describes trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” In addition to marking each page of the document with a trade secret notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:
Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret.”
Provide a separate document entitled “List of Redacted Trade Secret Information” which provides a succinct list of all trade secret information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure.
1. AWARD
Award will be made to the responsive responsible Bidder with the lowest Total Cost, as provided on the Bid Schedule.
Bidders are required to bid on all items on the Bid Schedule. Bidders that do not bid on all items will not be considered for award and may be found non-responsive.
11.1 As part of the award process the apparent successful Bidder may be contacted and requested to meet with the Department and provide additional information sufficient to determine their responsibility.
11.1.1 Pursuant to IDAPA 38.05.01.081, the ITB Lead may, in the State’s sole discretion, conduct a review to determine if the apparent successful Bidder is responsible. As part of the responsibility review, the ITB Lead may require the apparent successful Bidder to provide financial reports to the satisfaction of the State and may also seek to obtain completed reference questionnaires from Bidder’s references to the satisfaction of the State. Nothing herein shall prevent the State from using other means to determine Bidder’s responsibility.
11.2 The Department reserves the right to require the apparent successful Bidder to demonstrate that its product meets or exceeds the requirements and specifications included in this ITB in order to be considered for award. If the Department chooses to exercise this right, the apparent winning vendor shall have one week, upon notification, to perform an on-site demonstration showing their system can perform the necessary functions to achieve Department requirements of a fully functioning system. The demonstration will be pass/fail and determined solely at the discretion of the Department. If the apparent successful bidder fails the demonstration, they may be found non-responsive and not considered for award and the Department may award to the next lowest responsive responsible bidder.
Reporting requirements Report Description: Semi-Annual Report: This report must contain a list of all units and the condition of each, including recommended repairs.
Report Format: As agreed, upon by Contractor and Department.
Report Due: Within thirty (30) calendar days of each semi-annual service.
Subcontractors The Contractor may subcontract as needed with the Department’s approval.
The Contractor must be responsible for any work or product that is produced and delivered to the Department under the Contract whether produced solely or in part by the Contractor or subcontractor.
The Contractor must be the sole point of contact regarding any and all contractual matters. The Department will only pay the Contractor and will not pay subcontractors directly.
13.1 If the Bidder intends to subcontract all or part of the contracted services:
Describe the extent to which subcontractors will be used to comply with Contract requirements.
Include each position providing service and provide a detailed description of how the subcontractors are anticipated to be involved under the Contract (including requisite qualifications/experience).
If applicable, provide resumes for those subcontractors who will be managing and or directly providing services under the Contract.
Name the location of the subcontractor’s business office and the location(s) of where the actual work will be performed.
Insurance Requirements Within five (5) days of notification of award the apparent successful Bidder shall provide certificates of insurance required herein and shall maintain the insurance during the life of the contract. There are no provisions for exceptions to this requirement. Failure to provide the certificates of insurance within the five (5) business day period may be cause for your Bid to be declared non-responsive or for your contract to be cancelled.
For the term of the Contract and until all services specified in the Contract are completed, the Contractor must maintain in force, at its own expense, the following insurance.
· Commercial General Liability Insurance and, if necessary, Commercial Umbrella Liability Insurance with a limit of not less than one million dollars ($1,000,000) each occurrence and two million dollars ($2,000,000) in general aggregate. Insurance required by this section must name the State of Idaho, Department of Health and Welfare as an additional insured.
· Workers Compensation Insurance and Employer's Liability. The Contractor must maintain Workers Compensation and Employer's Liability. The Employer's Liability must have limits not less than one million dollars ($1,000,000) each accident for bodily insurance by accident, one million dollars ($1,000,000) disease policy limit, and one million dollars ($1,000,000) disease, each employee.
The Contractor must provide either a certificate of workers compensation insurance issued by a surety licensed to write Workers Compensation Insurance in the State of Idaho, as evidence that the Contractor has in effect a current Idaho workers compensation insurance policy, or an extraterritorial certificate approved by the Idaho Industrial Commission from a state that has a current reciprocity agreement with the Idaho Industrial Commission.
If coverage is not available on an occurrence basis, coverage must be provided on a claims-made basis. For claims made policies the retroactive date must be shown and must be before the date of the Contract or the beginning of Contract work; insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Contract of work; if coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective date, the Contractor must purchase “extended reporting” coverage for a minimum of five (5) years after completion of Contract work.
Prior to performing any services, the Contractor must provide certificates of insurance to the Department. The Contractor is also required to maintain current certificates on file with the Department and to provide updated certificates upon request. Failure to provide the required certificates of insurance shall constitute a default under this Contract and upon such failure the Department may, at its option, terminate the Contract. Insurance required by this section must be policies or contracts of insurance issued by insurers approved by the Department. Should any of above described policies be cancelled before the expiration date thereof, notice must be delivered in accordance with the policy provision.
Send updated certificates to: DHWInsurance@dhw.idaho.gov
| Certificate holder should be listed as: | Idaho Department of Health and Welfare | |
| Contracting & Procurement Services Unit -- 9th Floor | ||
| 450 West State Street | ||
| Boise, ID 83702 |
ITB 748 Heating, Ventilating, and Air Conditioning Services in Orofino, Idaho
ATTACHMENT 1-BIDDER QUESTIONS
PLEASE DO NOT IDENTIFY YOUR NAME OR YOUR COMPANY’S NAME OR PRODUCT NAMES OF INTELLECTUAL PROPERTY IN YOUR QUESTIONS.
ADD ROWS BY HITTING THE TAB KEY WHILE WITHIN THE TABLE AND WITHIN THE FINAL ROW.
The following instructions must be followed when submitting questions using the question format on the following page.
1. DO NOT CHANGE THE FORMAT OR FONT. Do not bold your questions or change the color of the font.
2. Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2.
This is the start of the file's text. The full file is on GovTribe.