This is an Invitation to Bid (ITB) document issued by the State of Idaho Division of Purchasing on behalf of the Idaho Transportation Department (ITD) for janitorial services at the ITD District 2 Administration Building Compound in Lewiston, Idaho. The solicitation requests comprehensive janitorial services for seven buildings totaling approximately 63,912 square feet, including the Main Office Building (17,499 sq. ft.), Supply/Shop Building (20,400 sq. ft.), Maintenance Building (6,642 sq. ft.), Materials Lab (5,300 sq. ft.), Traffic Services/Utilities Crafts Building (9,700 sq. ft.), Service Station (2,400 sq. ft.), and two Port of Entry facilities (1,260 sq. ft. and 711 sq. ft.). Services include daily cleaning tasks such as trash removal, vacuuming, restroom sanitization, floor cleaning, and dusting; weekly tasks including deep cleaning of lobbies, stairways, and restrooms; monthly tasks such as window blind dusting and trash receptacle disinfection; semi-annual tasks including light fixture cleaning and carpet shampooing; quarterly waxing and refinishing; and annual floor scrubbing and refinishing. The pre-bid site inspection is scheduled for April 23, 2025, at 10:00 a.m. Pacific Time at 2600 Frontage Road, Lewiston, Idaho, with a maximum of three representatives per vendor permitted to attend. The ITB closing date and question deadline are specified in the IPRO system header document. The initial contract term is two years, with two optional two-year renewals available for an anticipated total term of six years, commencing in 2025.
The contractor must provide all labor, materials, chemicals, supplies, equipment, and personal protective items to perform services at the fully burdened cost. Monthly payment will be made in accordance with Idaho's Prompt Payment Act upon receipt of detailed invoices, with potential reductions based on monthly performance inspections using a rating scale where payments are reduced 30 percent for ratings of 0.00-2.10, 25 percent for 2.11-2.25, 15 percent for 2.26-2.55, 10 percent for 2.56-2.70, and 5 percent for 2.71-2.79. No set-aside is designated for this solicitation. The contractor must maintain worker's compensation insurance as required by Idaho law, pay employees at least the federal minimum wage, provide background checks for Port of Entry employees at the contractor's expense, and comply with ITD policies regarding harassment, alcohol and drug use, workplace violence, and computer use. Contractor employees must wear uniforms and identification badges, receive ITD-issued access badges, and cannot accept gratuities or operate competing commercial enterprises on ITD premises. The contractor is responsible for property damage caused by negligence and must report maintenance issues and emergencies within specified timeframes. ITD will provide access badges, on-site storage space, and consumables including toilet tissue, paper towels, waste liners, and hand soap. The award will be issued by line item to the lowest responsive, responsible bidder, and bids must be submitted electronically via the IPRO system by the deadline specified in the ITB header document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
DIVISION OF PURCHASING
FOR
IDAHO TRANSPORTATION DEPARTMENT
Invitation to Bid (ITB) # 740
ITD DISTRICT 2 ADMINISTRATION BUILDING COMPOUND JANITORIAL SERVICES
ITB Administrative Information
| ITB Title: |
| ITD DISTRICT 2 ADMINISTRATION BUILDING COMPOUND JANITORIAL SERVICES |
| ITB Project Description: |
| The State of Idaho Transportation Department (“ITD”) is requesting Bids from qualified Vendors for Janitorial Services of ITD District 2 Admin Buildings |
ITB Lead:
Kevin Chambers, Senior Buyer Idaho Transportation Department 3311 W State Street, Boise ID, 83707 Kevin.Chambers@itd.idaho.gov
208-332-8768
| Submit sealed Bid electronically via IPRO: |
| Electronic Submission |
IPRO LOGIN
| Deadline To Receive Questions: |
| See IPRO Header Document |
| ITB Closing Date: |
| See IPRO Header Document |
| ITB Opening Date: |
| The following business day after closing. |
| Term |
| The initial term of the contract will be two (2) years. Upon mutual, written agreement, the Contract may be extended for two (2) additional periods of two (2) year increments, with an anticipated total Contract term of six (6) years. |
The Administrative Fee detailed in section 5.2 of the State’s Standard Contract Terms and Conditions will not apply to the Contract(s) that result from this Solicitation.
PURPOSE
GENERAL INFORMATION, SOLICITATION INSTRUCTIONS AND STANDARD TERMS AND CONDITIONS
INQUIRIES
BACKGROUND
SUBMISSION REQUIREMENTS
AWARD
PRE-BID SITE INSPECTION
KICK OFF & PERFORMANCE REVIEW MEETINGS
GENERAL INFORMATION
ITD CONTRACT MONITOR and MANAGER
DISTRICT 2 FACILITIES COMPLEX
CONTRACTORS EMPLOYEE(S)
SUBCONTRACTING
PROPERTY DAMAGE
SERVICE ADJUSTMENTS
WORK SCHEDULE
MATERIALS, EQUIPMENT, AND SUPPLIES
ITD RESPONSIBILITIES
BACKGROUND CHECKS FOR PORT OF ENTRY CONTRACTOR EMPLOYEES
SCOPE OF WORK
CHANGES TO SCOPE OF WORK
NOTIFICATION OF MAINTENANCE ISSUES OR DAMAGE
QUANTITY
KEY MONITORING METRICS
INSPECTIONS
REPORTING REQUIREMENTS
REMEDIAL ACTION
TRANSITION
INVOICING AND PAYMENT
SAFETY DATA SHEET
COMPLIANCE WITH FEDERAL AND STATE LAW, AND ITD POLICIES FEDERAL and STATE LAW
ITD POLICIES
PRICE ADJUSTMENT CLAUSE
TERMINATION AND CURE
WORKPLACE ENVIRNOMENT
REPLACEMENT OF CONTRACTOR EMPLOYEE
PRICE ADJUSTMENT
TERM AND RENEWALS
RECORDS MAINTENANCE
AUDIT RIGHTS
22ATTACHMENT 1-BIDDER QUESTIONS
24ATTACHMENT 2 – PRE-BID SITE INSPECTION REGISTRATION FORM
25ATTACHMENT 3 – BID SCHEDULE – SEE ATTACHED
26EXHIBIT 1 – DISTRICT 2 COMPLEX AND POE INVENTORY
29EXHIBIT 2 – DISTRICT 2 BUILDINGS
32EXHIBIT 3 – JANITORIAL TASKS AND REPORTS
35EXHIBIT 3a - JANITORIAL INSPECTION REPORT
36EXHIBIT 3b - JANITORIAL INSPECTION REPORT
37EXHIBIT 4 - WEEKLY LOGS
37EXHIBIT 4a - WEEKLY LOG OF FACILITY CLEANING
38EXHIBIT 4b - WEEKLY LOG OF FACILITY CLEANING
39EXHIBIT 5 – LOCATION DUTIES
ITB740
ITD DISTRICT 2 ADMINISTRATION BUILDING COMPOUND JANITORIAL SERVICES
1 PURPOSE
The Idaho Transportation Department (ITD) is requesting bids from qualified Vendors for janitorial services for ITD’s District 2 Headquarters facilities buildings. Services are anticipated to begin 2025, in accordance with the specifications provided within this Invitation to Bid (ITB).
2 GENERAL INFORMATION, SOLICITATION INSTRUCTIONS AND STANDARD TERMS AND CONDITIONS This Solicitation is issued by the state of Idaho (the “State”) via IPRO Powered by LUMA: IPRO LOGIN The ITB Lead is the only contact for this Solicitation. All correspondence regarding this ITB shall be in writing. In the event that it becomes necessary to revise any part of this ITB, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this ITB shall not be relied upon. All changes to this ITB must be in writing and posted at IPRO to be valid. Alternate Bids are not allowed.
3 INQUIRIES
Questions or other correspondence must be submitted in writing to the ITB Lead listed below. QUESTIONS MUST BE RECEIVED BY 11:59:59 P.M. Pacific Time ON THE DATE LISTED IN THE ITB ADMINISTRATIVE INFORMATION. Written questions must be submitted using Attachment 1, Bidder Questions. Official answers to all written questions will be posted on IPRO as an amendment to this ITB.
ITB Lead: Kevin Chambers Phone: 208-334-8768 E-mail: kevin.chambers@itd.idaho.gov Any questions regarding the State of Idaho Standard Contract Terms and Conditions found at the event in LUMA must also be submitted in writing, using Attachment 1, Bidder Questions, by the deadline identified in the ITB Administrative Information. The State will not consider proposed modifications to these requirements after the date and time set for receiving questions. Questions regarding these requirements must contain the following:
1. The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency).
2. Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.
3. Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.
Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, or which take exception to the State’s terms and conditions, will be found non-responsive, and no further consideration of the Bid will be given.
4 BACKGROUND
The District 2 Facilities Complex consists of seven (7)) buildings that contain office and workspace for employees in numerous areas within ITD:
Main Office Building, with a staff of approximately fifty (50) employees;
Maintenance Building with a staff of approximately thirteen (13) employees;
Supply Office and Shop Building, with a staff of approximately eleven (11) employees;
Materials Lab, with a staff of two (2) employees;
Traffic Services/ Utility Crafts Building with a staff of eight (8) employees;
Port of Entry, Base Location, with a staff of 6;
Port of Entry, Satellite/ Hill Location, with a staff of 2.
ITD will clearly indicate each building location during the pre-bid site inspection to ensure Bidders understanding of the scope of work.
5 SUBMISSION REQUIREMENTS
5.1 Required Bid Submission Items
Your Bid Submission must consist of the following:
5.1.1. Bid Schedule
Provide your cost information on Attachment 3, Bid Schedule, attached in IPRO. Do not submit your Bid on any other form. Submitting your Bid on a form different than the Bid Schedule may cause your Bid to be rejected as non-responsive.
5.1.2. State of Idaho Signature Page
The State of Idaho Signature Page must be completed and submitted as part of your Bid. The State of Idaho Signature Page is attached in IPRO.
5.1.3. Supporting documentation of equal offered items. (See Section 5).
5.2 Bid Submission Methods
Bids must be submitted electronically via IPRO. Do not fax or e-mail your Bid. Your Bid must be received at the Division of Purchasing by the date and time specified on the IPRO header document. The official time, for bid closing purposes, is the Division of Purchasing’s time clock.
5.2.1. Electronic Submission via IPRO
When submitting electronically via IPRO, upload all of the Required Bid Submission Items (See Section 5.1) and enter your cost in IPRO for each line item; as the “Total Cost” on the Bid Schedule OR $0.01 as your cost in IPRO.
Upload all Required Bid Submission Items using Microsoft products such as Word and Excel. Do not submit items in .pdf format, unless provided otherwise in this ITB.
When submitting via IPRO, be advised that that the Bidder for Bid evaluation and award purposes is the entity profile under which submit in IPRO, which must be the same legal entity presented in your uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Bid in IPRO, the information provided on the Signature Page prevails.
It is mandatory to submit your Bid electronically via IPRO, all Bidders participating in a Solicitation issued through IPRO must establish an account in the IPRO system as it is necessary in order to process and/or award the resulting Contract(s). It is free to establish an account and only takes a few minutes.
Bidders are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows the State to efficiently navigate the Bidder’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO.
6 AWARD
Award will be issued by line item, to the lowest responsive, responsible Bidder, whichever is in the best interest of the State.
7 PRE-BID SITE INSPECTION
All interested parties are strongly encouraged to attend the optional pre-bid site inspection, at their expense. See Attachment 2 – Pre-Bid Site Inspection Registration Form. Parties interested in attending these inspections should notify the ITD contact no later than one (1) business day prior to the date of the pre-bid site inspection. The written request should specify the name and title of each person who will be attending. A maximum of three (3) persons for each party interested will be allowed to attend.
Failure to attend the optional pre-bid inspections will not relieve the Bidder of meeting the requirements of this ITB.
The pre-bid site inspections will be held April 23, 2025 at 10:00AM Pacific Time at the ITD District 2 HQ Main Office building located at 2600 Frontage Rd, Lewiston, ID. Questions regarding the Port of Entry (POE) buildings will be taken during this site visit. Potential Bidders must meet at the front desk reception area of the Main Office building, 2202 (see Exhibit 2, DISTRICT 2 BUILDINGS).
8 KICK OFF & PERFORMANCE REVIEW MEETINGS
1.1. The Contractor must attend a contract kick-off meeting located at ITD’s District 2 HQ facility (2600 Frontage Road, Lewiston, ID) within two (2) weeks after contract award. This meeting will consist of an overview of the contract requirements.
1.2. The kick-off meeting will occur after Contractors staffs approved background checks have been completed;
1.3. The Contractor and Contractor’s employee(s) contact information must be provided to the ITD Contract Monitor at the kick-off meeting. Contract Monitor contact information will be provided at the time of Contract award.
1.4. ITD may require the contractor’s contract monitor to attend performance review meetings. These meetings are typically held when the contractor continues to fail to meet the requirements of the contract. This is a way for ITD and the contractor to meet in person or over the phone (at ITD’s discretion) to discuss discrepancies together in a constructive environment. The contractor’s attendance is mandatory when required by ITD, and are at no additional cost to ITD when they are required.
9 GENERAL INFORMATION
Overview
ITD’s goal is to provide cost effective, safe, and well-maintained office buildings for its employees by hiring a Contractor to provide janitorial services. Services will generally include cleaning and sanitizing restrooms, break rooms, offices and conference rooms; removing trash; sweeping and vacuuming floors; dusting and sanitizing office areas, including the equipment and furniture in these areas; and cleaning glass/windows. ITD is seeking a green cleaning contract, intended to reduce the introduction of Volatile Organic Compounds (VOCs) in the building and to maintain a high level of air quality. The successful contractor must employ methods, procedures and equipment that facilitate a green cleaning initiative by using less energy and water, and thereby reducing the buildings’ overall carbon footprint by utilizing micro-fiber cloth technology, as well as utilizing bio-cleansers or plant based organic cleansers whenever and wherever possible.
10 ITD CONTRACT MONITOR and MANAGER
1.1. Contract Monitor contact information will be provided at the time of Contract award. The Contract Monitor is responsible for managing the performance of the contract.
1.2. Contract Manager contact information will be provided at the time of contract award. The Contract Manager is responsible for managing the Contract and remedial action.
1.3. The Contractor and Contractor’s employee(s) contact information must be provided to the ITD Contract Monitor at the kick-off meeting.
11 DISTRICT 2 FACILITIES COMPLEX
The contractor will be responsible for all aspects of the janitorial services for the ITD District 2 facilities located at 2600 Frontage Road, Lewiston, ID 83501, Port of Entry Scale House at FX6M+MF, Lewiston, ID 83832 and Port of Entry Checkpoint at 33443 US-95, Lewiston, ID 83501. District 2 site includes 7 separate facilities each having their own scope of work of tasks to be performed.
1.1. Building names and approximate square footages are as follows (See Exhibit 2, Buildings).
| BUILDING NAMES |
| Number |
| APPROXIMATE SQUARE FOOTAGE |
| District 2 Main Building |
| 2202 |
| 17,499 Sq. ft. |
| District 2 Lewiston Service Station |
| 2204 |
| 2400 Sq. ft. |
| District 2 Supply/ Shop Building |
| 2205 |
| 20,400 Sq. ft. |
| District 2 Materials Lab Building |
| 2221 |
| 5300 Sq. ft. |
| District 2 Lewiston Maintenance Building |
| 2224 |
| 6642 Sq. ft |
District 2 Traffic Services & Utilities Crafts
Building
| 2201 |
| 9700 Sq. ft. |
| District 2 Port of Entry Base Location Building |
| 2801 |
| 1260 Sq. ft. |
| District 2 Port of Entry Satellite/ Hill Building |
| 2802 |
| 711 Sq. ft. |
All square footage figures listed are approximate; it is the Bidder’s responsibility to verify these numbers at the pre-bid inspection prior to bidding.
1.2. Inventory
See Exhibit 1, District 2 Complex and POE Inventory
11.1. Description of Physical Areas
11.3.1. The following terms are used to describe general locations within the ITD D2 complex where tasks shall be completed. Exhibit 1, Vicinity Map shows the specific building locations of ITD complex. The Vicinity Map is provided for general information and reference and should not be relied on as absolute delineations of areas or scope of work. ITD will clearly indicate each of these locations during the pre-bid site inspections to ensure Bidders understand the scope of work as it pertains to each area;
11.3.2. Facility: The entire ITD facility, and the entrance and exit ramps leading to and from the parking lot. The core area includes all buildings, parking lots, sidewalks, and other outdoor areas accessible to the public, as well as utility rooms, trash receptacles, or other areas off limits to the public, but located within the described area and;
11.3.3. Restrooms: All bathroom facilities inside the ITD buildings, including men’s, women’s, family, and/or handicap restrooms.
12 CONTRACTORS EMPLOYEE(S)
1.1. The Contractor must provide the ITD Contract Monitor, or designee, with the names and telephone numbers of all employees who will be utilized in the performance of the Contract. This information must be updated if personnel changes occur during the term of the Contract and be provided in writing via email to ITD as quickly as possible, with a maximum of twenty-four (24) hours.
1.2. Uniforms and Name Tags must be worn by employees while on duty at the ITD D2 Administration Buildings. Uniforms and Name Tags must be presented to ITD Contract Monitor or designee for written approval seven (7) calendar days prior to contract start date or as authorized by ITD. Employees must display easily read identification badges, either attached to or printed on the uniforms, which identify the employee name and the Contractor. Employee’s attire must be clean and presentable during their entire shift.
1.3. The Contractor and employees must treat the public in a friendly, courteous manner. Employees must be able to communicate effectively with the public in English.
1.4. Tips or other gratuities must not be accepted by the Contractor or employees for any services performed in the ITD D2 Administration Buildings.
1.5. Guests or immediate family of the Contractor or employees will not be allowed to accompany or assist with janitorial services unless they are also employees. Pets will not be allowed to accompany Contractor or employees while performing duties in the ITD D2 Administration Buildings without written approval from ITD.
1.6. Contractor and employees are prohibited from operating or advertising any commercial enterprise or activity on any part of the ITD D2 Administration Buildings premises.
1.7. Contractor and employees are prohibited from having firearms in their possession while on duty.
1.8. Contractors employees must be properly classified as employees and be on the Contractors payroll and NOT be treated as Independent Contractors.
1.9. It is distinctly and particularly understood and agreed between the parties to the Contract that the State is in no way associated or otherwise connected with the performance of any service under the Contract on the part of the Contractor or with the employment of labor or the incurring of expenses by the Contractor. Said Contractor is an independent contractor in the performance of each and every part of the Contract, and solely and personally liable for all labor, taxes, insurance, required bonding and other expenses, except as specifically stated herein, and for any and all damages in connection with the operation of the Contract, whether it may be for personal injuries or damages of any other kind. The Contractor shall exonerate, defend, indemnify and hold the State harmless from and against and assume full responsibility for payment of all federal, state and local taxes or contributions imposed or required under unemployment insurance, social security, worker’s compensation and income tax laws with respect to the Contractor or Contractor’s employees engaged in performance under the Contract. The Contractor will maintain any applicable worker’s compensation insurance as required by law and will provide certificate of same if requested. There will be no exceptions made to this requirement and failure to provide a certificate of worker’s compensation insurance may, at the State’s option, result in cancellation of the Contract or in a contract price adjustment to cover the State’s cost of providing any necessary worker’s compensation insurance. The Contractor must provide either a certificate of worker’s compensation insurance issued by a surety licensed to write worker’s compensation insurance in the state of Idaho, as evidence that the Contractor has in effect a current Idaho worker’s compensation insurance policy, or an extraterritorial certificate approved by the Idaho Industrial Commission from a state that has a current reciprocity agreement with the Idaho Industrial Commission. The State does not assume liability as an employer. (See Idaho Standard Terms and Conditions)
1.10. Contractors employees must be paid the federal minimum wage provisions as contained in the Fair Labor Standards Act (FLSA) https://www.dol.gov/general/topic/wages/minimumwage. In cases where an employee is subject to both the state and federal minimum wage laws, the employee is entitled to the higher of the two minimum wages.
13 SUBCONTRACTING
See section 1.13 of Idaho Standard Terms and Conditions for Subcontracting rules.
14 PROPERTY DAMAGE
1.1. In the event ITD property is damaged by the Contractor, the Contractor must:
1.1.1. Take immediate corrective action to prevent further damage.
1.1.2. Prevent pedestrians from coming in contact or harming themselves as a result of the damage.
1.1.3. Take photographs and notify ITD, via phone and in writing, within the same business day.
1.1.4. Provide ITD with a corrective action plan to repair damages within twenty-four (24) hours of the damage.
1.1.5. Repairs must be approved by ITD prior to work taking place and be complete within seven (7) business days after approval by ITD.
1.1. In the event repairs are not made within seven (7) business days, ITD will have the right to have repairs made or to make repairs and deduct this amount from any invoices due to the Contractor.
1.2. The property must be repaired to restore the damaged area(s) back to the original condition at no additional cost to ITD.
1.3. Special Instructions for Performing Maintenance: If ITD determines that any damage is the result of a negligent act by the Contractor or employees, repairs will be the Contractor’s responsibility. If the Contractor or employees do not complete the repairs within fourteen (14) calendar days, ITD will make repairs and deduct costs from the Contractor’s payment.
15 SERVICE ADJUSTMENTS
1.1. In the event that ITD needs to add or remove a location from this contract, it is expected that the Contractor will be able to expand or eliminate services without other locations being affected.
1.2. Any new locations must receive pricing that is equal to or less than the pricing offered to similar locations currently being serviced as part of the resulting Contract.
1.3. In addition, if a location is removed from this contract, the pricing for the other locations currently being serviced as part of this contract will not be altered unless mutually agreed to by both parties.
16 WORK SCHEDULE
Employees are not required to work specific hours; however, the following minimum shifts and parameters apply:
1.1. Main Office Building 2202: Regular shifts: Janitorial services must be provided three (3) days a week, every Monday, Wednesday and Friday, with the exception of holidays as identified in Idaho Code 73-108, as amended, available at https://legislature.idaho.gov/statutesrules/idstat/title73/t73ch1/sect73-108/. Cleaning must occur during nighttime hours (4:00 pm PT – 6:00 am PT) If a regular shift falls on a holiday no cleaning will be required for that day and work will resume on the next scheduled work day.
1.2. Weekend shifts: Employees may complete cleaning tasks (such as special semi-annual, annual tasks) during weekend hours (8:00 am PT Saturday through 6:00 am PT Monday) with prior ITD approval.
1.3. Shop Building 2205 and Maintenance & Crafts Building 2224, 2201, Service Station Building 2204, Lewiston Maintenance Building and the Materials Lab Building 2221: Cleaning must occur between the hours of 7:00 am PT – 3:00 pm PT once weekly on Wednesday with the exception of holidays as identified in Idaho Code 73-108, as amended, available at https://legislature.idaho.gov/statutesrules/idstat/title73/t73ch1/sect73-108/. Employees may complete cleaning tasks (such as special semi-annual, annual tasks) during weekend hours (8:00 am PT Saturday through 5:00 am PT Monday) with prior ITD approval and supervised by ITD personnel.
1.4. Port of Entry, Base Location, and Satellite/ Hill Locations: Regular shifts: Janitorial services must be provided one (1) day a week, Wednesday, with the exception of holidays as identified in Idaho Code 73-108, as amended, available at https://legislature.idaho.gov/statutesrules/idstat/title73/t73ch1/sect73-108/. Cleaning must occur during nighttime hours (2:00 pm PT – 5:00 am PT). If a regular shift falls on a holiday no cleaning will be required for that day and work will resume on the next scheduled workday.
1.5. Weekend shifts: Employees may complete cleaning tasks (such as special semi-annual, annual tasks) during weekend hours (8:00 am PT Saturday through 5:00 am PT Monday) with prior ITD approval.
17 MATERIALS, EQUIPMENT, AND SUPPLIES
1.1. General
The Contractor must provide all labor, materials, chemicals, supplies, tools, equipment, and personal protective items (e.g. gloves, protective eye wear, masks, hazmat kits, etc.) to perform the required janitorial services as specified below. It will be the Contractor's responsibility to maintain the storage/janitorial rooms in a state of order and cleanliness as directed by the ITD Contract Monitor. All equipment used in performance of this Contract must be of industrial/commercial grade and Contractor must maintain all equipment in clean, safe and good operational condition at all times.
1.1. Chemicals
Employees must use chemicals that are intended for the specific cleaning task being completed (e.g. glass cleaner for glass, bathroom cleaner for restrooms, furniture cleaner for furniture, etc.). All chemicals and cleaning products must be maintained in clearly labeled product containers and must be stored and used in a safe manner as describe in each product Safety Data Sheet (SDS).
1.1. Tools and Equipment
All cleaning tools must be kept in good repair. Cleaning cloths must be color coded for use in specific areas to avoid cross contamination (e.g. blue cloth for toilets and urinals, green cloth for sinks and partitions, tan cloth for furniture, etc.). At a minimum, mops must be laundered weekly or replaced monthly.
18 ITD RESPONSIBILITIES
1.6. ITD will issue access badges to all Contractor personnel who will provide services under this Contract. The Contractor must arrange for issuance of ID/access badges with the District’s Human Resource Associate five (5) days prior to the start of service.
1.7. ITD will provide the Contractor with an on-site dedicated storage space for supplies and equipment.
1.8. ITD will provide the Contractor with the following consumables: toilet tissue, feminine hygiene product disposal bags, paper towels, waste basket liners and hand soap for all office, restroom and common area receptacles. The Contractor will be responsible for inventory control, storage, and distribution of all consumables and must coordinate with ITD Business Operations Manager to insure adequate supply levels and timely re-order.
19 BACKGROUND CHECKS FOR PORT OF ENTRY CONTRACTOR EMPLOYEES
Only Contractors’ employees who have undergone and passed the ITD-required background check may enter and provide janitorial services for this area. Background Checks must be completed at Contractors cost. No additional charges to ITD will be allowed.
Required Background Checks:
1.1. FBI Fingerprint Based Criminal Background Checks must be completed by the Idaho State Police (ISP) for any employee who will work in the secure area, at the Contractor’s expense. The ISP form requesting the background check is available at https://isp.idaho.gov/bci/background-checks/. ITD will only provide access cards (see Section 18) for employees once the Contractor has provided documentation of the background checks demonstrating that the employees have none of the following on their records:
19.1.1. Any felony convictions;
19.1.2. Misdemeanor sex crimes;
19.1.3. Misdemeanor crimes of deceit;
19.1.4. Misdemeanor offenses within two (2) years immediately preceding this contract;
19.1.5. Two or more Misdemeanor DUI offenses withing five (5) years immediately preceding this contract;
19.1.6. Outstanding warrants (Local or National); and
19.1.7. The documentation must also verify that the employees are U.S. citizens or have appropriate work visas and have no known ties to terrorist groups.
1.1. Compliance Plan
1.1.1. Contractor must have a minimum of two (2) employees with the required security clearance. It is the Contractor’s responsibility to ensure that there is someone who has passed the required background check available to clean the secure area in the DMV for every required shift. Provide your plan for ensuring compliance with this policy; specifically, discuss your plan for addressing potential turnover, vacation, illness, or no-shows.
20 SCOPE OF WORK
General
The services must consist of daily services, weekly services, monthly services, quarterly (every 3 months) services, semi-annual and annual services; along with special scheduled services as described in the Exhibit 3, Janitorial Tasks and Reports. All services in the Exhibit 3, Janitorial Tasks and Reports must include all areas in the building, unless specifically noted otherwise. All work that is scheduled for the semi-annual period must be serviced the initial time during the first one-hundred-twenty (120) days of the contract.
1.1. Floors
1.1.1. Mop water must be changed frequently to prevent dirt from spreading from one area to the next. Cleaning utensils (brushes, rags, etc.) that are used to clean toilets and urinals must not be used to clean other items or areas.
1.1.2. Thoroughly clean all vinyl or hard surfaced floors in ALL stairwells, lobbies and hallways as scheduled. Wax and dirt must not build-up under baseboard heaters, corners, floor edges or around fixtures such as toilets and lavatory vanities. Special care must be taken to remove splash marks and build-ups throughout the facility.
1.1. Dusting
1.1.1. Only exposed/cleared areas of desks, tables or shelf surfaces are to be cleaned. Employees are NOT to clear or move desk items.
1.1.2. Computer equipment must not be cleaned or moved to accommodate cleaning.
1.1.3. Shelves with items such as knick-knacks or other personal items are NOT to be touched. The owner of those items will be responsible for cleaning those shelves.
21 CHANGES TO SCOPE OF WORK
The State reserves the right to revise the Scope of Work and Buildings as may be deemed to be in the best interest of the State. Any changes to the Scope of Work, including changes in Contract price resulting from revisions to the Scope of Work by adding additional cleaning duties of rooms/offices must be documented by a formal Amendment to the Contract, which will not be valid until signed by DOP and the Contractor.
22 NOTIFICATION OF MAINTENANCE ISSUES OR DAMAGE
1.1. Contractor’s employees must advise the ITD Contract Monitor or designated staff if there are any maintenance problems in any of the facilities on the premises.
1.2. Emergency maintenance issues, which are maintenance issues that present a likelihood of safety concerns or additional damage if not addressed quickly, must be reported immediately upon observing the issue. ITD will give the Contractor an emergency number to be used to report emergency maintenance issues. This number is intended to allow employees to reach ITD twenty-four (24) hours per day. Emergency maintenance issues include, but are not limited to, serious leaks, broken windows, and electrical hazards.
1.3. Non-emergency maintenance issues must be reported by the end of the shift during which the issues are observed. ITD will provide an ITD office number to call, which will allow ITD employees to receive the message during the following workday. Non-emergency maintenance issues include, but are not limited to, damaged furniture, minor leaks, damaged plumbing components, damaged or broken office accessories, broken or cracked glass, or any other maintenance or repair concerns that do not pose an immediate threat to persons or property.
1.4. The Contractor must report to the ITD Contract Manager any damage to state or ITD personnel property caused by Contractor’s employees by the end of the shift during which the damage was caused. Within twenty-four (24) hours, the Contractor must notify ITD of its plans to repair or replace the damaged property as quickly as possible.
23 QUANTITY
1.1. ITD reserves the right to change items, quantities, and/or frequency of tasks at any time during the life of the Contract upon written notification to the Contractor.
1.2. If circumstances require extended closure of the ITD D2 Administration Buildings, the Contractor’s duties and compensation may be suspended for the closure period
24 KEY MONITORING METRICS
Below is a list of requirements within the scope of the Contract that ITD will be monitoring. This is not an exhaustive list; ITD will be monitoring all requirements and will take remedial action as necessary. The key metrics below have payments associated with them, thus are called out in this separate section.
ITD will determine acceptance of service by performing monthly, random, and public inspections as detailed below. These inspections will determine if the service being provided is in compliance with the Contract and to assess price adjustments for Substandard Performance. Failure of the Contractor to perform any of the requirements will be defined as a “Discrepancy(ies)”. Discrepancies include, but are not limited to:
· Failure to comply with all requirements of the Contract
· Failure to complete tasks as described in Exhibit 3, Janitorial Tasks and Reports.
· Failure to notify ITD of any needed repairs, replacements, or non-functioning items within twenty-four (24) hours
· Failure to notify ITD of emergencies or incidents within the required time frame
· Assignment of the Contract without prior approval of the State
· Replacement of a Contractor without prior notice to ITD
· Receipt of excessive or serious complaints from public citizens or ITD Staff. Ongoing or repeated complaints regarding the same or similar problems will be considered excessive. Complaints related to issues of the public safety or criminal activity will be considered serious.
25 INSPECTIONS
1.1. Monthly Inspections – ITD will perform monthly inspections to verify the Contractor’s compliance with the Contract. ITD will provide a schedule for the monthly inspections at the kickoff meeting. ITD reserves the right to modify the scheduled monthly inspection, and it will provide the update to the Contractor at least one (1) week in advance of the modification. The Contractor must be present during every scheduled monthly inspection. If the Contractor is not present for the scheduled inspection, the inspection will be conducted, and the Contractor will be subject to all findings in their absence. If monthly inspections continue to show Substandard Performance, the Contractor’s Contract Manager will be required to attend the scheduled inspections, at no additional cost to ITD.
1.2. ITD will assign a representative to conduct each monthly inspection. The ITD representative will complete the Exhibit 3 (a/b), Janitorial Inspection Report and email it to the Contractor’s Contract Manager within twenty-four hours (24) after completion of the inspection. This Report will document all items inspected, rating for each item, and comments as needed. All Discrepancies found will be noted in the “comments” field of the Report and photographs may be attached as needed.
1.3. The Contractor’s Contract Manager must confirm receipt of the Report, and provide a written response explaining how and when each Discrepancy will be corrected. All Discrepancies must be corrected and brought back into compliance with the Contract within twenty-four (24) hours after receipt of the Report from ITD.
1.4. Random Inspections – ITD may perform random inspections at any time during the Contract. No notice will be given prior to random inspections. The Contractor may accompany ITD’s representative during each inspection, but it is not required. The ITD representative will complete the Report and email it to the Contractor’s Contract Manager within twenty-four hours (24) after completion of the inspection. This Report will document all items inspected, rating for each item, and comments as needed. All Discrepancies found will be noted in the “comments” field of the Report and photographs may be attached as needed.
1.5. The Contractor’s Contract Manager must confirm receipt of the Report, and provide a written response explaining how and when each Discrepancy will be corrected. All Discrepancies must be corrected and brought back into compliance with the Contract within twenty-four (24) hours after receipt of the Report from ITD.
1.6. Public Inspections – ITD will review all notifications made by public citizens and ITD staff that relate to the Contractor’s performance. ITD may conduct a random inspection or forward a copy of the notification to the Contractor. If a random inspection is performed by ITD, the same conditions apply per the above section for “Random Inspections”. If a copy of the notification is provided to the Contractor, all Discrepancies must be corrected and brought back into compliance with the Contract within twenty-four (24) hours after receipt of the notification from ITD. Price Adjustments (see below) will not apply to forwarded public notifications; price adjustments will only apply if ITD performs a random inspection.
26 REPORTING REQUIREMENTS
The following records must be maintained carefully and accurately.
1.7. Weekly Log (See Exhibit, 4)
1.8. The Contractor or employees must keep a Weekly Log (see Exhibit 4, Weekly Log), detailing tasks completed; times of completion; details of unusual activities, including, but not limited to, accidents; vandalism and other incidents; lost and found articles; if applicable.
1.9. ITD will supply one (1) master weekly log sheet for the Contractor. The Contractor must make enough copies to have at least one (1) Weekly Log available at each ITD D2 Administration Building for each week of the Contract term. Weekly Log sheets must be digitized and e-mailed by the Contractor to the Contract Monitor weekly.
27 REMEDIAL ACTION
In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to the State, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) withhold and reduce payment pursuant to Section 33, Price Adjustment Clause) terminate the Contract pursuant to Section 30, Termination for Non-Compliance, in addition to any remedies imposed by the State.
If ITD must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, ITD may withhold the actual cost to ITD from the Contractor’s payment(s).
28 TRANSITION
Prior to the end of the Contract term (including any extensions), the Contractor must provide all reasonable transition assistance to ITD to ensure the orderly transfer of service to another service provider. In the event that there may be a potential gap in service, when transitioning to a new service provider, the Contractor must continue to provide service for a period up to ninety (90) calendar days, or such lesser time as the parties may agree to in writing. The Contractor will be compensated for all services extended in writing beyond original contract term, at the Unit Price as outlined in ATTACHMENT 3, Bid Schedule.
29 INVOICING AND PAYMENT
29.1 Provide your fully burdened Total Cost on the ATTACHMENT 3, Bid Schedule. Your price must be a fully burdened to complete the required janitorial services, to include all operating and personnel expenses including, but not limited to: overhead, salaries, administrative expenses, profit, insurance, equipment, supplies, and any other expenses related to providing the service/performing the work.
29.2 Payment will be made monthly, in accordance to Idaho’s Prompt Payment act (Idaho Code 67-2302) for the previous month’s service, upon receipt of a detailed invoice. Invoices must include the contract number, current contact information for the Contractor, the dates of work, the employees performing the work, and the corresponding fixed fee for the work performed. Payment may be reduced based on monthly inspections, as specified in Section 28.
29.3 The Contractor must provide the following information with each invoice:
29.3.1. IPRO Contract number;
29.3.1. ITD Order number;
29.3.2. Delivery location;
29.3.3. Service description;
29.3.4. Quantity;
29.3.5. Unit and total price and;
29.3.6. Name of authorized individual/contact information for the Contractor
29.4 Invoices are to be submitted to:
Idaho Transportation Department, District 2 Attn: Accounts Payable
2600 Frontage Road
Lewiston, ID 83501 Electronic submission: D2AP@itd.idaho.gov
30 SAFETY DATA SHEET
1.1. The Contractor must provide a binder at the ITD D2 Administration Buildings containing current Safety Data Sheets (SDS) and inventory list of all materials used at the ITD D2 Administration Buildings. The SDS binder must always be kept updated with all the chemicals being applied on ITD property. The binder must be stored at the associated ITD D2 Administration Buildings at all times and made available when requested by ITD or if needed in an emergency.
1.2. The Contractor must make ITD aware of the location of this notebook so that ITD can access it quickly if necessary. A copy of the associated SDS must be provided to the ITD Contract Monitor within twenty-four (24) hours after each application.
31 COMPLIANCE WITH FEDERAL AND STATE LAW, AND ITD POLICIES FEDERAL and STATE LAW
The Contractor must comply with the Federal Highway Administration (FHWA) guidelines, available at: https://www.fhwa.dot.gov/ and state law regarding the use of service animals under the Americans with Disabilities Act (ADA), Idaho Code § 18-5812A, available at https://legislature.idaho.gov/statutesrules/idstat/title18/t18ch58/sect18-5812a/.
1.1. The Contractor must comply with Guide to Compliance with the ADA – Service Animals and provide copies to all employees who will perform tasks at the ITD D2 Administration Buildings. The Contractor must provide training to all employees who will perform tasks at the ITD D2 Administration Buildings regarding the Service Animal guidelines and compliance.
1.2. The Contractor must provide written documentation stating the following: that ALL EMPLOYEES employed at the ITD D2 Administration Buildings have read and understand the ‘Guide to Compliance with the ADA – Service Animals’ the date training was offered and completed; the signature of each employee. Training documentation must be provided to the ITD Contract Monitor Representative within fifteen (15) calendar days after effective date of the Contract. Failure to comply with this statute will result in the termination of the Contract.
Additional information can be found at http://www.usdoj.gov/crt/ada/adahom1.htm.
32 ITD POLICIES
The following ITD policies apply when the Contractor is performing work at an ITD facility or when using ITD equipment or other property. These policies will remain in force for the duration of the Contract:
A-18-10
Harassment in the Workplace policy
Alcohol and Drug-free Workplace policy
Computer, E-Mail, and Internet Usage policy
Workplace Violence Policy https://itd.idaho.gov/wp-content/uploads/ITD-Policy-Compliance-Dec-2015.pdf
The Contractor must read, understand and comply with these policies: 100% compliance is mandatory. Furthermore, the Contractor must ensure that all employees and Subcontractors adhere to these policies. ITD reserves the right to remove from its premises, at any time, any Contractor or its employee or subcontractor that fails to follow these policies.
33 PRICE ADJUSTMENT CLAUSE
The Contractor’s monthly payment may be adjusted under the following circumstances and according to the following methods:
Monthly payment will be reduced for sub-standard performance, based on the janitorial Inspection Report Exhibit 3 (a/b), Janitorial Inspection Report which will be completed by an ITD Contract Monitor at each monthly inspection. The reduction will be as follows:
Average Rating from Exhibit 3 (a/b) Percent (%)
Reduction in Pay
| 0.00 – 2.10 |
| 30% |
| 2.11 – 2.25 |
| 25% |
| 2.26 – 2.55 |
| 15% |
| 2.56 – 2.70 |
| 10% |
| 2.71 – 2.79 |
| 5% |
| 2.80 – 5.00 |
| 0% |
If ITD determines that the Contractor has failed to perform the daily jobs or duties specified in this Contract on one or more days during the month, the Department may withhold, as a penalty, the daily pro-rated share from that month’s payment.
If ITD must perform or hire a firm or individual(s) to perform emergency, safety, or health-related tasks which are the responsibility of the Contractor under the terms of this Contract, ITD may withhold the costs associated with that emergency, safety, or health-related work from the Contractor’s monthly payment. Such costs will be itemized as to labor, materials, equipment, and travel costs.
34 TERMINATION AND CURE
See Idaho Contract Terms and Conditions located on the Questions Tab IPRO powered by LUMA.
35 WORKPLACE ENVIRNOMENT
While providing services for ITD under this Contract at ITD locations, the Contractor must maintain a workplace free of harassment, alcohol, drugs, and violence. Further, the Contractor must treat public citizens and ITD employees with kindness and respect. All Contractor employees and subcontractors are required to dress in professional manner consistent with the general industry for the scope of work performed in this Contract, and they must wear identification badges at all times while on ITD’s property.
36 REPLACEMENT OF CONTRACTOR EMPLOYEE
If ITD receives excessive or serious complaints regarding Contractor employees, or if ITD has determined that the Contractor employee continues to fail to meet the requirements of the Contract, ITD reserves the right, after having consulted with the Contractor, to require the Contractor to remove the Contractor employee from the Contract. The Contractor must replace the non-compliant employee with a compliant employee of equal or greater abilities within forty-eight (48) hours after removal of the non-compliant employee. ITD will not be responsible for any costs incurred by the Contractor in replacing the employee. Employees replaced multiple times for non-compliance may result in termination of the Contract.
37 PRICE ADJUSTMENT
A price adjustment may be considered after the first twelve (12) months of the initial term of the Contract, and every twelve (12) months thereafter. If a price increase is requested, it will be the responsibility of the Contractor to notify ITD in writing at least sixty (60) calendar days in advance of the desired effective date and provide supporting documentation showing industry wide increases justifying the request. ITD will notify Contractor whether the request is approved within thirty (30) calendar days of receipt of the request.
37.1. If there is an industry wide price decrease, Contractor must notify ITD immediately of the decrease; and make the price decrease effective for ITD on the same day it becomes effective for the Contractor. If the State is not properly notified of price decreases, the pricing at the time of order will be used for invoice payment and the Contractor will provide refunds or credits as necessary.
38 TERM AND RENEWALS
The initial term of the contract will be Two (2) years. Upon mutual, written agreement, the Contract may be renewed, extended, or amended. The anticipated total Contract term is Six (6) years.
39 RECORDS MAINTENANCE
The Contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records must be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
40 AUDIT RIGHTS
The Contractor must allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
ATTACHMENT 1-BIDDER QUESTIONS TC "ATTACHMENT 1--OFFEROR QUESTIONS" \f C \l "1" PLEASE DO NOT IDENTIFY YOUR NAME OR YOUR COMPANY’S NAME OR PRODUCT NAMES OF INTELLECTUAL PROPERTY IN YOUR QUESTIONS.
ADD ROWS BY HITTING THE TAB KEY WHILE WITHIN THE TABLE AND WITHIN THE FINAL ROW.
The following instructions must be followed when submitting questions using the question format on the following page.
1. DO NOT CHANGE THE FORMAT OR FONT. Do not bold your questions or change the color of the font.
2. Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2. If the question is in regards to a State Term or Condition or a Special Term or Condition, state the clause number in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment A”) in the “ITB Section” (column 2), and the attachment page number in the “ITB page” field (column 3).
3. Do not enter text in the “Response” field (column 5). This is for the State’s use only.
4. Once completed, this form is to be e-mailed per the instructions in the ITB. The e-mail subject line is to state the ITB number followed by “Questions.”
ITB #740 – ITD DISTRICT 2 ADMINISTRATION BUILDING COMPOUND JANITORIAL SERVICES
| ITB Section |
| ITB Page |
| Question |
| Response |
ATTACHMENT 2 – PRE-BID SITE INSPECTION REGISTRATION FORM
ITB740 ITD DISTRICT 2 ADMINISTRATION BUILDING COMPOUND JANITORIAL SERVICES
| Pre-Bid Site Location: |
| Title: |
2600 Frontage Rd Lewiston, ID 83501 Supply Services Building
ITD DISTRICT 2 ADMINISTRATION BUILDING COMPOUND JANITORIAL SERVICES
Oral Information: Questions concerning an ITB must be directed in writing to the ITB Lead in the time period prescribed in the ITB document. Vendors are cautioned against relying on any verbal information and do so at the Vendor’s sole risk. The ITB may only be amended by written documentation posted to the state’s eProcurement System, IPRO.
A Pre-Bid tour of all ITD locations outlined in this ITB will be on April 23, 2025 at 10:00AM Pacific Time. Only Three (3) people per vendor will be allowed. We respectfully ask that anyone showing symptoms of cold, flu, or Covid, that they do not attend. The vendors will be required to register with Attachment 2 –Pre-Bid Registration Form.
Potential bidders choosing to participate in the Pre-Bid must pre-register by submitting this completed form, via e-mail, to the ITB Lead at Kevin.chambers@itd.idaho.gov. After the ITB Lead receives your form and the registration deadline passes, you will be provided with Meeting details. Attendees are asked to register for the Pre-Bid no later than April 22, 2025 at 3:00PM Pacific Time.
PLEASE PRINT:
| Name |
| Company |
| Phone Number |
ATTACHMENT 3 – BID SCHEDULE – SEE ATTACHED
EXHIBIT 1 – DISTRICT 2 COMPLEX AND POE INVENTORY
ITB740 Janitorial Services for ITD District 2 Complex and POE Main Office Building 2202
| QUANTITY |
| ITEM |
| 86 |
| Interior/Exterior Trash Receptacles |
| 3 |
| Exterior ash trays/urns |
| 6 |