ITB20261468_Exhibit_2_Bid_Price_Schedule_Workbook_7.16.26.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
PW 2516 Gee Creek Erosion Control Projects
Solicitation number
ITB-2026-1468
Issued by
Seminole County, Florida

About this file

This is a Bid Price Schedule Workbook for ITB 2026-1468 issued by the City of Casselberry, Florida for PW 2516 Gee Creek Erosion Control Projects. The project comprises two separate erosion control and drainage reconstruction sites: the Golf Course location at 190 S. Triplet Lake Drive and The Palms at Casselberry on Sandpiper Lane/280 N. Oxford Road. Both projects are post-hurricane erosion repair initiatives designed to reconstruct and reinforce existing drainage assets within the city. The workbook contains detailed line-item bid schedules with 23 pay items for the Golf Course project and 19 pay items for The Palms project, covering work including clearing and grubbing, sheet piling installation, concrete structures, erosion control, sod installation, drainage infrastructure, and site restoration. Quantities are specified for each item, ranging from lump-sum work to measured quantities such as 159 linear feet of steel sheet piling and 279 square yards of riprap installation at the Golf Course, and 118 cubic yards of channel excavation and 46 square yards of articulating concrete block revetment at The Palms.

The bid schedule provides a template for contractors to input unit costs and extended costs, with all line items initially populated at $1.00 unit cost and $0 extended cost pending bidder submissions. Both sections include comprehensive pay item notes defining the scope of work, materials, labor, and equipment requirements for each line item in accordance with FDOT standards and city specifications. The base bid totals are calculated from the extended costs once bidders input their pricing. Bidders must submit financial data, evidence of qualifications, previous experience with references, and proof of authority to conduct business in Florida as part of their bid response. The file serves as the pricing instrument for determining the lowest, responsible, and responsive bidder.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Golf Course Bid Schedule

ITB-2026-1468 PW 2516 Golf Course at 190 S. Triplet Lake Drive Bid Price Schedule
ItemPay Item No.DescriptionUnitQuantityUnit CostExtended Cost
1101-1MOBILIZATION (PRECONSTRUCTION VIDEO, LAY DOWN YARD, LOCATES, EXPLORATORY DIGGING, ETC.) (5% OF SUBTOTAL)LS1$ 1.00$ - 0
2102-1MAINTENANCE OF TRAFFICLS1$ 1.00$ - 0
3104-1PREVENTION, CONTROL & ABATEMENT OF EROSION & WATER POLLUTIONLS1$ 1.00$ - 0
4108-1MONITOR EXISITNG STRUCTURES - INSPECTION, SETTLEMENT, AND VIBRATION MONITORINGLS1$ 1.00$ - 0
5110-2CLEARING AND GRUBBINGLS1$ 1.00$ - 0
6120-12.7EMBANKMENTLS1$ 1.00$ - 0
7430-2.1FURNISH AND INSTALL 12"ADS PIPELF16$ 1.00$ - 0
80425-1541FURNISH AND INSTALL FDOT TYPE D INLETLS1$ 1.00$ - 0
9455-133-CFURNISH AND INSTALL STEEL SHEET PILINGLF159$ 1.00$ - 0
10CPC-1INSTALL REINFORCED CONCRETE CAPLF170$ 1.00$ - 0
11CFS-1INSTALL 8" REINFORCED CONCRETE FLUME SLABLS1$ 1.00$ - 0
12SPCC-1INSTALL SHEET PILE WALL DRAINAGE PIPE COLLAREA2$ 1.00$ - 0
13400-011INSTALL 4 FT TALL FDOT GRAVITY WALL (SCHEME 1)LF24$ 1.00$ - 0
14515-062INSTALL FDOT PED/BICYCLE RAILING PER FDOT INDEXLF23$ 1.00$ - 0
15520-001REMOVAL, DISPOSAL, AND INSTALLATION OF CONCRETE CURBLF44$ 1.00$ - 0
16522-001REMOVAL, DISPOSAL, AND INSTALLATION OF CONCRETE SIDEWALK (6"), DRIVEWAY, TRANSITIONS, AND APPROACHESSY57$ 1.00$ - 0
17530-3-4FURNISH AND INSTALL RIP-RAP, RUBBLE (DITCH LINING) (20" DEEP MINIMUM)SY279$ 1.00$ - 0
18145-72FURNISH AND INSTALL GEOWEB WITH GEOTEXTILE - CELLULAR CONFINEMENTSY279$ 1.00$ - 0
19570-1-2FURNISH AND INSTALL SOD (ST AUGUSTINE)SY108$ 1.00$ - 0
20570-1-2FURNISH AND INSTALL SOD (BAHIA)SY239$ 1.00$ - 0
21570-1-2FURNISH AND INSTALL SOD (BERMUDA)SY499$ 1.00$ - 0
225000-1CONSTRUCTION DEWATERING, BYPASS AND ACCOMMODATION OF SURFACE FLOWSLS1$ 1.00$ - 0
23CR-1THE GOLF COURSE, 190 S. TRIPLET LAKE DRIVE RESTORATION, 180 S. TRIPLET LAKE DRIVE RESTORATION AND OFFSITE RESTORATIONLS1$ 1.00$ - 0
Total Base Bid (Only the Base Bid will be utilized in the determination of the lowest, responsible and responsive Bidder)$ - 0
Note: Input values within the Yellow highlighted Cells. Extended Cost column will auto populate

FIRM NAME:

PROPOSER:

PRINT NAME and SIGNATURE
ADDRESS
CITY/STATE/ZIP:
TELEPHONE:,
FAX NUMBER:
E-MAIL:

Golf Course Pay Item Notes

PAY ITEM NOTES

101-1INCLUDES COSTS ASSOCIATED WITH BUT NOT LIMITED TO SURVEY, PRE-CONSTRUCTION VIDEO, UTILITY COORDINATION,
EXPLORATORY DIGGING/UTILITY VERIFICATION, CONSTRUCTING AND DISMANTLING A TEMPORARY STAGING AREA, INSURANCES,
BONDS, PERMITS AND ALL ADMINISTRATIVE COSTS ASSOCIATED WITH ACQUIRING AND MAINTAINING NECESSARY COVERAGES AS
DESCRIBED IN THE CONTRACT DOCUMENTS. SEE GENERAL NOTES AND CONTRACT DOCUMENTS FOR ADDITIONAL ITEMS
INCLUDED UNDER THIS PAY ITEM.
102-1INCLUDES ALL NECESSARY TRAFFIC CONTROL DEVICES INCLUDING FLAGMEN, PILOT CARS AND VARIABLE MESSAGE BOARDS, IN
ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (LATEST EDITION).
CONTRACTOR SHALL SECURE CONSTRUCTION SITE (I.E. TEMPORARY PEDESTRIAN SAFETY FENCING, BARRICADES, SIGNS, ETC.) IN
ORDER TO PREVENT PEDESTRIANS FROM ACCESSING THE PROJECT AREA. SEE GENERAL NOTES FOR ADDITIONAL ITEMS
INCLUDED UNDER THIS PAY ITEM.
104-1INCLUDES THE COST OF ALL ITEMS REQUIRED FOR EROSION CONTROL INCLUDING, BUT NOT LIMITED TO, FLOCC LOGS, SYNTHETIC
BALES, TURBIDITY BARRIERS, SILT FENCE, AND TEMPORARY GRASSING AND INLET PROTECTION. AS SHOWN IN THE PLANS OR AS
DIRECTED BY THE CITY IN ORDER TO MEET THE REQUIREMENTS OF SJRWMD, ACOE, OR ANY OTHER APPLICABLE EROSION
CONTROL REQUIREMENTS OR REGULATIONS.
108-1INCLUDES ALL MONITORING REQUIREMENTS ON THE PROJECT INCLUDING DESIGN, LABOR, DEVICES, MATERIALS, AND
DOCUMENTATION TO INSPECT EXISTING STRUCTURES (BEFORE AND AFTER) FOR POSSIBLE EFFECTS OF THE SHEET PILING
INSTALLATION.
110-1-1INCLUDES, BUT IS NOT LIMITED TO, THE TRIMMING AND REMOVAL OF TREES AND VEGETATION. ANY TREES LARGER THAN 6" AND
IDENTIFIED TO BE REMOVED SHALL BE CONFIRMED IN THE FIELD BY THE CITY AND/OR THE CITY'S REPRESENTATIVE PRIOR TO
REMOVAL. INCLUDES REMOVAL OF EXISTING SLOPE STABILIZATION, GROUND PROTECTION AND OR GROUND COVER AND DISPOSE
ALL MATERIAL AT THE CONTRACTORS COST DRAINAGE STRUCTURES, CULVERTS AND PIPES AT CONTRACTORS COST.
120-5INCLUDES THE COST OF ALL LABOR, EQUIPMENT, MATERIALS, AND ANY OTHER ITEMS NECESSARY FOR THE EXCAVATION ALONG
THE CHANNEL BED AND BANKS ASSOCIATED WITH INSTALLATION OF SHEET PILE, RIP-RAP RUBBLE, AND GRAVITY WALL.
120-6INCLUDES THE COST OF ALL LABOR, EQUIPMENT, MATERIALS, AND ANY OTHER ITEMS NECESSARY FOR PLACING FILL AND / OR
WASHED AGGREGATE ALONG THE TOE OF THE GABION WALL, CHANNEL BED AND BANKS, INCLUDING MEETING COMPACTION
REQUIREMENTS.
430174130FURNISH AND INSTALL PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 12" SD PER FDOT STANDARD SPECIFICATION FOR ROAD AND
BRIDGE CONSTRUCTION SECTION 430-4.
0425-1541FURNISH AND INSTALL FDOT TYPE D INLET PER FDOT INDEX 232.
455-133-CINCLUDES ALL DESIGN, LABOR, DEVICES, AND MATERIALS FOR THE INSTALLATION OF THE SHEET PILING (TEMPORARY AND
BURIED). INCLUDES CHANNEL BYPASS PLAN AND SITE FLOODING RECOVERY/RESTORATION.
CPC-1CONCRETE PILE CAP PER FDOT STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION INDEX NO. 640.
CFS-1INSTALL 12" REINFORCED CONCRETE FLUME SLAB. THIS INCLUDING ALL SITE PREPARATION, COMPACTION, CONCRETE, REBAR,
DRILL, DOWEL, EPOXY, FORM WORK, FINISHING, EXPANSION JOINT, CLEANUP AND DISPOSAL.
400-011INSTALL 4 FT. TALL FDOT GRAVITY WALL (SCHEME 1).
515-062INSTALL FDOT PED/BICYCLE RAILING PER FDOT INDEX 515-062
OSR-1THIS INCLUDES THE COST FOR THE HANDRAIL MODIFICATIONS, EXISTING CONCRETE REMOVAL AND DISPOSAL, REGRADING, ALL
CONCRETE FORMING AND INSTALLATION REQUIRED TO RECONSTRUCT THE RIGHT OF WAY AND DRIVEWAY APRON PER SHEET C-4.
DOES NOT INCLUDE SIDEWALK.
520-001INSTALL CONCRETE CURB PER FDOT STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION SECTION 520. THIS
INCLUDES CURB REMOVAL AND REPLACEMENT, CLEANUP AND DISPOSAL.
522-001CONCRETE SIDEWALK (6" THICK), DRIVEWAYS, TRANSITIONS, AND APPROACHES PER FDOT STANDARD SPECIFICATION FOR ROAD
AND BRIDGE CONSTRUCTION SECTION 522.
530-3-4INCLUDES THE COST OF ALL LABOR, EQUIPMENT, MATERIALS, AND ANY OTHER ITEMS NECESSARY FOR INSTALLATION OF RUBBLE
RIP-RAP RUBBLE WITHIN GEOWEBB AS SHOWN IN THE PLANS. INCLUDES THE COST OF GEOTEXTILE MATERIAL, UNDERLAYMENT,
AND GEOTEXTILE ANCHOR TRENCHES (WITH NO. 4 STONE). GEOTEXTILES SHALL MEET FDOT INDEX 199 / SECTION 985.
145-72GEOWEB WITH GEOTEXTILE - CELLULAR CONFINEMENT PER GENERAL NOTES SECTION.
570-1-2INCLUDES ALL DESIGN, LABOR, DEVICES, AND MATERIALS FOR THE INSTALLATION OF SOD.
5000-1INCLUDES ALL LABOR, EQUIPMENT, MATERIALS, AND ANY OTHER ITEMS NECESSARY TO CREATE A DRY CONSTRUCTION ZONE
INCLUDING, BUT NOT LIMITED TO, TEMPORARY CHECK DAMS, PUMPS, STONE MATERIAL, GEOTEXTILE FABRIC AND PIPING. THE
CONTRACTOR SHALL ACCOMMODATE CHANNEL FLOWS AND STORM EVENTS THROUGH THE SYSTEM IN ACCORDANCE WITH
RECOMMENDATIONS PROVIDED IN THE CHANNEL BYPASS CONCEPT PLAN. THE CONTRACTOR SHALL PREPARE A CHANNEL
BYPASS PLAN TO BE REVIEWED AND APPROVED BY THE CITY AT LEAST 1 WEEK PRIOR TO MOBILIZATION. THE CONTENTS OF THE
CHANNEL BYPASS PLAN SHALL BE DESCRIBED BY THE CITY AT THE PRE-CONSTRUCTION MEETING. ANY COSTS ASSOCIATED WITH
SITE FLOODING AND RECOVERY/RESTORATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE
INCORPORATED INTO THIS PAY ITEM.
CR-1THIS BID ITEM SHALL INCLUDE BUT NOT LIMITED TO THE FOLLOWING RESTORATION ACTIVITIES:
REGRADING OF ALL DISTURBED AREAS.
REPLACEMENT OF ANY DAMAGED IRRIGATION, ROOF DRAIN DOWNSPOUTS, ASPHALT PAVEMENT, LANDSCAPING, ETC.
REMOVAL AND DISPOSAL OF ANY TEMPORARY ACCESS ROADWAY OR EROSION PREVENTION DEVICES.
ALL ACTIVITIES ASSOCIATED TO ANY TEMPORARY RELOCATION (SUCH AS BUT NOT LIMITED TO HANDRAIL, DECORATIVE BENCHES,
SIGNAGE, MAILBOX, EXT.) WORK THAT IS REQUIRED FOR THE PROPOSED WORK AND NEGOTIATED WITH THE GOLF COURSE, CITY,
AND RESIDENTS.
DRIVEWAY REPLACEMENT FOR 180 S. TRIPLET LAKE

The Palms Bid Schedule

ITB-2026-1468 PW 2516 The Palms at Casselberry on Sandpiper Lane Bid Price Schedule
ItemPay Item No.DescriptionUnitQuantityUnit CostExtended Cost
1101-1MOBILIZATION (PRECONSTRUCTION VIDEO, LAY DOWN YARD, LOCATES, EXPLORATORY DIGGING, ETC.) (5% OF SUBTOTAL)LS1$ - 0$ - 0
2102-1MAINTENANCE OF TRAFFICLS1$ - 0$ - 0
3104-1PREVENTION, CONTROL & ABATEMENT OF EROSION & WATER POLLUTIONLS1$ - 0$ - 0
5110-2CLEARING AND GRUBBINGLS1$ - 0$ - 0
6120-2CHANNEL EXCAVATION, SEDIMENT REMOVAL AND DISPOSAL FROM LINED DITCHCY118$ - 0$ - 0
7120-12.7EMBANKMENTLS1$ - 0$ - 0
8530-3.5ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM (6" MINIMUM)SY46$ - 0$ - 0
9CFS-1REMOVAL, DISPOSAL, AND INSTALLATION OF CONCRETE FLUMEEA1$ - 0$ - 0
10430-4.6.3REMOVAL, DISPOSAL, AND INSTALLATION OF FDOT 30" MITERED END SECTIONEA1$ - 0$ - 0
11550-002REMOVAL, DISPOSAL, AND INSTALLATION OF CHAIN LINK FENCE (FDOT TYPE B)LF75$ - 0$ - 0
12520-001REMOVAL, DISPOSAL, AND INSTALLATION OF CONCRETE CURBLF30$ - 0$ - 0
13522-001REMOVAL, DISPOSAL, AND INSTALLATION OF CONCRETE SIDEWALK (6")LF20$ - 0$ - 0
14570-1-2FURNISH AND INSTALL SOD (BAHIA)SY433$ - 0$ - 0
15570-1-2FURNISH AND INSTALL SOD (ST AUGUSTINE)SY435$ - 0$ - 0
185000-1CONSTRUCTION DEWATERING, BYPASS AND ACCOMMODATION OF SURFACE FLOWSLS1$ - 0$ - 0
19CR-1THE PALMS AT CASSELBERRY RESTORATIONLS1$ - 0$ - 0
Total Base Bid (Only the Base Bid will be utilized in the determination of the lowest, responsible and responsive Bidder)$ - 0
Note: Input values within the Yellow highlighted Cells. Extended Cost column will auto populate

FIRM NAME:

PROPOSER:

PRINT NAME and SIGNATURE
ADDRESS
CITY/STATE/ZIP:
TELEPHONE:,
FAX NUMBER:
E-MAIL:

The Palms Pay Item Notes

PAY ITEM NOTES

101-1INCLUDES COSTS ASSOCIATED WITH BUT NOT LIMITED TO SURVEY, PRE-CONSTRUCTION VIDEO, UTILITY COORDINATION,
EXPLORATORY DIGGING/UTILITY VERIFICATION, CONSTRUCTING AND DISMANTLING A TEMPORARY STAGING AREA,
INSURANCES, BONDS, PERMITS AND ALL ADMINISTRATIVE COSTS ASSOCIATED WITH ACQUIRING AND MAINTAINING
NECESSARY COVERAGES AS DESCRIBED IN THE CONTRACT DOCUMENTS. SEE GENERAL NOTES AND CONTRACT
DOCUMENTS FOR ADDITIONAL ITEMS INCLUDED UNDER THIS PAY ITEM.
102-1INCLUDES ALL NECESSARY TRAFFIC CONTROL DEVICES INCLUDING FLAGMEN, PILOT CARS AND VARIABLE MESSAGE
BOARDS, IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS
(LATEST EDITION). CONTRACTOR SHALL SECURE CONSTRUCTION SITE (I.E. TEMPORARY PEDESTRIAN SAFETY FENCING,
BARRICADES, SIGNS, ETC.) IN ORDER TO PREVENT PEDESTRIANS FROM ACCESSING THE PROJECT AREA. SEE GENERAL
NOTES FOR ADDITIONAL ITEMS INCLUDED UNDER THIS PAY ITEM.
104-1INCLUDES THE COST OF ALL ITEMS REQUIRED FOR EROSION CONTROL INCLUDING, BUT NOT LIMITED TO, FLOCC LOGS,
SYNTHETIC BALES, TURBIDITY BARRIERS, SILT FENCE, AND TEMPORARY GRASSING AND INLET PROTECTION. AS SHOWN
IN THE PLANS OR AS DIRECTED BY THE CITY IN ORDER TO MEET THE REQUIREMENTS OF SJRWMD, ACOE, OR ANY OTHER
APPLICABLE EROSION CONTROL REQUIREMENTS OR REGULATIONS.
110-1-1INCLUDES, BUT IS NOT LIMITED TO, THE TRIMMING AND REMOVAL OF TREES AND VEGETATION. ANY TREES LARGER THAN
6" AND IDENTIFIED TO BE REMOVED SHALL BE CONFIRMED IN THE FIELD BY THE CITY AND/OR THE CITY'S
REPRESENTATIVE PRIOR TO REMOVAL. INCLUDES REMOVAL OF EXISTING SLOPE STABILIZATION, GROUND PROTECTION
AND OR GROUND COVER, DRAINAGE STRUCTURES (SUCH AS FLUMES, CURBING, MES, FENCING, ETC.) AND DISPOSE ALL
MATERIAL AT THE CONTRACTORS COST.
120-5INCLUDES THE COST OF ALL LABOR, EQUIPMENT, MATERIALS, AND ANY OTHER ITEMS NECESSARY FOR THE EXCAVATION
ALONG THE CHANNEL BED AND BANKS. ACB MATS AS IT IS INCLUDED FOR EACH UNDER THE RESPECTIVE PAY ITEM
ASSOCIATED WITH CONCRETE FLUME, AND SEDIMENT REMOVAL.
530-4-6FURNISH AND INSTALL AN ARTICULATING CONCRETE BLOCK (ACB) REVETMENT SYSTEM IN ACCORDANCE WITH THIS
SECTION AND INCONFORMANCE WITH THE LINES, GRADES, DESIGN, AND DIMENSIONS SHOWN IN THE PLANS. THIS
INCLUDES THE COST OF ALL LABOR, EQUIPMENT, MATERIALS, AND ANY OTHER ITEMS NECESSARY FOR THE
INSTALLATION OF THE ACB MAT, WASHED AGGREGATE (FDOT #57 STONE), CONCRETE HEADER ANCHOR AND GEOTEXTILE
UNDERLAYMENT MATERIAL AS SHOWN IN THE PLANS. INCLUDES THE COST OF THE AGGREGATE, GEOTEXTILE
UNDERLAYMENT MATERIAL(PER FDOT INDEX 199/SECTION 985), FORMS, CONCRETE,REBAR,UNDERLAYMENT, AND SITE
PREPARATION NECESSARY TO INSTALL THE APPROVED ACB SLOPE REINFORCEMENT SYSTEM AS SHOWN ON THE PLANS.
CFS-1INSTALL REINFORCED CONCRETE FLUME. THIS INCLUDING ALL SITE PREPARATION, COMPACTION, CONCRETE, REBAR,
DRILL, DOWEL, EPOXY, FORM WORK, FINISHING, EXPANSION JOINT, CURB REMOVAL AND REPLACEMENT, CLEANUP AND
DISPOSAL.
550-002INSTALL FDOT TYPE B BLACK VINYL FENCE PER FDOT SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION SECTION
550
520-001INSTALL CONCRETE CURB PER FDOT STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION SECTION 520.
THIS INCLUDES CURB REMOVAL AND REPLACEMENT, CLEANUP AND DISPOSAL.
522-001CONCRETE SIDEWALK (6" THICK) PER FDOT STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION SECTION
522
570-1-2INCLUDES ALL LABOR, DEVICES, AND MATERIALS FOR THE INSTALLATION OF SOD.
5000-1INCLUDES ALL LABOR, EQUIPMENT, MATERIALS, AND ANY OTHER ITEMS NECESSARY TO CREATE A DRY CONSTRUCTION
ZONE INCLUDING, BUT NOT LIMITED TO, TEMPORARY CHECK DAMS, PUMPS, STONE MATERIAL, GEOTEXTILE FABRIC AND
PIPING. THE CONTRACTOR SHALL ACCOMMODATE CHANNEL FLOWS AND STORM EVENTS THROUGH THE SYSTEM IN
ACCORDANCE WITH RECOMMENDATIONS PROVIDED IN THE CHANNEL BYPASS CONCEPT PLAN. THE CONTRACTOR SHALL
PREPARE A CHANNEL BYPASS PLAN TO BE REVIEWED AND APPROVED BY THE CITY AT LEAST 1 WEEK PRIOR TO
MOBILIZATION. THE CONTENTS OF THE CHANNEL BYPASS PLAN SHALL BE DESCRIBED BY THE CITY AT THE
PRE-CONSTRUCTION MEETING. ANY COSTS ASSOCIATED WITH SITE FLOODING AND RECOVERY/RESTORATION SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE INCORPORATED INTO THIS PAY ITEM.
CR-1THIS BID ITEM SHALL INCLUDE BUT NOT LIMITED TO THE FOLLOWING RESTORATION ACTIVITIES:
REGRADING OF ALL DISTURBED AREAS.
REPLACEMENT OF ANY DAMAGED IRRIGATION, ROOF DRAIN DOWNSPOUTS, ASPHALT PAVEMENT, LANDSCAPING, ETC.
REMOVAL AND DISPOSAL OF ANY TEMPORARY ACCESS ROADWAY OR EROSION PREVENTION DEVICES.
ALL ACTIVITIES ASSOCIATED TO ANY TEMPORARY RELOCATION (SUCH AS BUT NOT LIMITED TO DUMPSTERS,
ENCLOSURES, SIGNAGE, MAILBOX, EXT.) WORK THAT IS REQUIRED FOR THE PROPOSED WORK AND NEGOTIATED WITH
THE PALMS AT CASSELBERRY MANAGEMENT COMPANY.