This is an Invitation to Bid (ITB) issued by the State of Idaho Division of Purchasing on behalf of the Idaho Transportation Department (ITD) for four-wheeled, self-propelled mid-mount street sweeper brooms. The ITB seeks qualified manufacturers or authorized distributors to supply new street sweeping equipment for use on Idaho State Highways and ITD yard maintenance. The State anticipates ordering four sweepers upon contract award and approximately one sweeper per year thereafter, with no minimum or maximum order quantities guaranteed. The deadline for submitting questions is February 9, 2026, at 11:59 PM Mountain Time, and bids must be submitted electronically through the IPRO eProcurement system by March 2, 2026, at 5:00 PM Mountain Time. A non-mandatory pre-bid conference will be held on February 5, 2026, at 2:00 PM Mountain Time via Microsoft Teams. The public bid opening is scheduled for March 9, 2026, at 5:00 PM Mountain Time, with an anticipated award date of March 10, 2026. The initial contract term is one year, with an anticipated total contract term of five years upon mutual written agreement for renewal, extension, or amendment. Sweepers must be fully assembled, adjusted, and delivered within 180 days of order receipt to one of six ITD district yards throughout Idaho (Coeur d'Alene, Lewiston, Boise, Shoshone, Pocatello, and Rigby). Deliveries must occur Monday through Thursday, 8:00 AM to 4:00 PM local time, excluding state holidays.
Bids shall be submitted on a firm and binding basis for ninety days from the opening date and must include completed Submittal Forms A, B, and C along with manufacturer authorization letters confirming distributor or manufacturer status. The State will award to the lowest responsive and responsible bidder per line total, with the possibility of multiple awards. Pricing is submitted through the IPRO system on Submittal Form B, with bidders instructed to enter costs as "$0.01" initially. The contract incorporates the State of Idaho's standard terms and conditions, which are not subject to material modification. Comprehensive specifications are provided, including mandatory requirements for engine horsepower (minimum 70 HP diesel), transmission (infinitely variable hydrostatic), hydraulic system (minimum 22-gallon pressurized reservoir), brush specifications (minimum 76 inches sweeping width at 30-degree angle), and safety features including ROPS, LED lighting systems, backup camera, and fire extinguisher. The manufacturer must provide a three-year warranty covering all parts, labor, and freight, with warranty work to be completed within thirty calendar days. Contractors must provide two operator manuals, two parts manuals, and two service manuals per sweeper and furnish authorized technician training at each delivery location within thirty days of acceptance. No set-asides are identified in this solicitation. The specific contract value or budget allocation has not been disclosed. Bidders must submit an authorized letter from the manufacturer on official letterhead confirming their status as a current authorized distributor or manufacturer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Submittal Form B - Bid Schedule ITB 1162.xlsx | XLSX spreadsheet | |
| Solicitation_Instructions-July-2025.pdf | ||
| State-of-Idaho-Contract-Terms-and-Conditions_ITB_1162.pdf | ||
| Insurance Requirements 2025 ITB 1162.pdf | ||
| ITB 1162 Amendment One (1) Letter.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
DIVISION OF PURCHASING
FOR
IDAHO TRANSPORTATION DEPARTMENT
Invitation To Bid Self-Propelled Street Sweeper Brooms
ITB Number 1162 – Amendment One (1)
Table of Contents
| ITB Section 1 – Administrative Information & Overview |
| Page 3 |
| ITB Section 2 – Format & Submission Requirements |
| Page 5 |
| ITB Section 3 – Evaluation & Award Procedures |
| Page 7 |
| Exhibit 1 – Background Information |
| Page 9 |
| Exhibit 2 – Scope of Work (SOW) |
| Page 10 |
| Exhibit 3 – Pre-Bid Conference Registration Form |
| Page 17 |
| Exhibit 4 – Questions |
| Page 18 |
| Exhibit 5 – Contract Modifications and Exceptions |
| Page 20 |
| Exhibit 6 – The Contract |
| Page 24 |
| Exhibit 7 – Acronym Definitions List |
| Page 25 |
| Submittal Form A – Background, Declarations, and Certifications |
| Page 26 |
| Submittal Form B – Bid Schedule |
| Page 29 |
| Submittal Form C – Product Information Sheet |
| Page 30 |
Section 1 Administrative Information and Overview
1.1 Purpose
The State of Idaho’s (“State”) Division of Purchasing (“DOP”), on behalf of the Idaho Transportation Department (“ITD”) is issuing this Invitation To Bid (“ITB”) to solicit Bids from qualified and experienced firms (“Bidders”), that can provide Four (4) Wheeled, Self-Propelled Mid-Mount Street Sweeper Brooms (“Sweeper”). Background information is provided in Exhibit 1. The complete scope of work is provided in Exhibit 2.
1.2 Procurement Schedule
Deadline to submit questions:
Closing Date (deadline to submit Bid):
Public Opening Date:
Public Opening Link:
Anticipated Award Date:
The State will make every effort to adhere to the schedule below, but reserves the right, at its sole discretion, to adjust the schedule.
February 9, 2026 @ 11:59PM MT March 2, 2026 @ 5:00 pm MT March 9, 2026 @ 5:00 pm MT March 3, 2026 @ 10:30 am MT March 10, 2026 @ 10:30 pm MT Public Bid Opening for ITB 1162 - Self Propelled Street Brooms | Meeting-Join | Microsoft Teams Week of March 9, 2026 March 16, 2026
1.3 ITB Lead
Name:
Title & Agency:
Email:
The individual listed below (referred to as “ITB Lead”) is responsible for the conduct of this procurement. From the issue date of this ITB, until a contract is awarded, or the ITB is cancelled, Bidders are prohibited from communicating with any State employee, Official, or Evaluators regarding this ITB or procurement.
Mack DeYoung Buyer, Idaho Division of Purchasing Mack.DeYoung@adm.Idaho.gov
1.4 Pre-Bid Conference
A non-mandatory pre-bid conference will be held on Thursday, February 5, 2026 @ 2:00 pm MT to provide an overview of the ITB process, the scope of work, and submission requirements. While attendance is highly encouraged, it is not mandatory. The meeting will be conducted virtually, with the access link provided to all interest participants who submit Exhibit 3 to the ITB Lead.
To inform the State of your planned interest and attendance, please complete and submit Exhibit 3 to the ITB Lead no later than 5:00 PM, Mountain Time, Tuesday, February 3, 2026.
1.5 IPRO eProcurement System
This Solicitation is issued by the State via the State’s eProcurement system, IPRO. It is the Bidder’s responsibility to monitor IPRO for any updates or amendments.
Link: IPRO POWERED BY LUMA
| 1.6 Anticipated Initial Term |
| The term of this Contract will be for one (1) year. Upon mutual, written agreement, the Contract may be renewed, extended or amended. The anticipated total Contract term is five (5) years. |
1.7 Questions
The Bidder SHALL review this entire ITB solicitation, including associated documents. All questions, requests for clarification, or other correspondence must be submitted in writing via email to the ITB Lead. See Exhibit 4 for additional instructions. Questions must be submitted using the table provided within Exhibit 4.
1.8 Modifications and Exceptions to Requirements, Terms, and Conditions The Bidder SHALL review the Contract requirements, terms, and conditions. The Bidder is strongly encouraged to submit any proposed modifications, or exceptions to the Contract requirements, terms, or conditions to the ITB Lead prior to the deadline for submitting questions. See Exhibit 5 for additional instructions. Modifications and exceptions must be submitted using the table provided within Exhibit 5. The Contract requirements, terms, and conditions are provided in Exhibit 6 the Attachments Tab in LUMA.
Any modifications or exceptions that are raised after the Bid has been submitted, may be rejected by the State without further discussion. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period. Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, will be found non-responsive, and no further consideration will be given.
1.9 Amendments
The State may issue amendments to make changes to the ITB, or to respond to any questions. Amendments will be posted on IPRO. Bidders are responsible for monitoring IPRO for updates and amendments. All published amendments SHALL become part of this ITB, and must be considered by the Bidder in its Bid. Oral interpretations or clarifications of this ITB are not binding and should not be relied upon. Any verbal responses provided by the State during the pre-Bid conference are considered unofficial, and will not be binding.
1.10 Authority
This procurement is conducted in accordance with IDAPA 38.05.01 and pursuant to Title 67, Chapter 92 of the Idaho Code.
Section 2 Format & Submission Requirements
2.1 Adherence to Requirements
The Bid SHALL be submitted in accordance with the requirements set forth in this document. Any Bid that does not adhere to the requirements may be deemed non-responsive and rejected. The State reserves the right, in its sole discretion, to overlook any minor informalities that may be non-compliant.
2.2 Deadline to Submit
All Bids are due at the date and time specified in the Procurement Schedule (Section 1.2). Late Bids SHALL NOT be accepted or considered. The State SHALL not be responsible for any technical issues, difficulties, or delays. Bidders are strongly encouraged to begin the process of submitting the Bid response far enough in advance of the Closing Date/Time to allow for resolution of any technical difficulties.
2.3 General Format Requirements
The Bid response must meet the following requirements:
· Be made on standard 8.5” x 11” paper size.
· Use a minimum font size of ten (10) (images, figures, graphs, charts, are excluded from this font size).
· Use a font style such as: Calibri, Arial, New Times Roman, or similar.
· The Bidder SHALL NOT embed information, embed files, or embed any links within the Submittals.
· The Bidder SHALL NOT attach additional information to any Submittal Form (unless it has been explicitly requested). Any additional attachments submitted will not be considered in the evaluation process.
2.4 Electronic Submission Instructions
The Bidder SHALL submit the Bid as follows:
· The Bid SHALL be submitted electronically through IPRO POWERED BY LUMA. The State will not accept Bids in any other manner (i.e. facsimile, email, or hardcopy submissions). All Bidders participating in this Solicitation must establish an account in the IPRO system, as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free. Use the link provide here:
https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA
Please make sure that the entity profile under which the Bid is submitted in IPRO, is the same legal entity presented in the uploaded response materials. If there are any discrepancies, the entity information provided within Submittal Form A prevails.
· The Bid must be submitted in the following packages:
| No. |
| Contents |
| File Format |
| File Naming Conventions |
| 1 |
| Submittal Form A |
| MS Word |
| Form A – Insert Bidder Name |
| 2 |
| Submittal Form B |
| MS Excel |
| Form B – Insert Bidder Name |
| 3 |
| Submittal Form C |
| MS Word |
| Product Info Sheet – Insert Bidder Name |
| 4* |
| Redacted Submittal Forms* |
| Form A/B REDACTED – Insert Bidder Name |
* If applicable. Applies to Bids with trade secrets as discussed below.
· All electronic files must be in Adobe PDF, Microsoft Word, or Microsoft Excel format as noted in the table above. Bids containing contents in any other format, may deem the Offeror non-responsive.
· The Bid file(s) SHALL NOT be password protected or locked in any way. Bids must be accessible on the day of the bid opening.
· All submission materials must be submitted at the same time. If multiple submissions are received, only the latest timely submission will be considered.
· Alternate Bids are not allowed.
· Note: When submitting through IPRO, enter your Cost in IPRO as “$0.01,”
· Package No. 4: If your Bid contains trade secrets (see next Section), submit an additional redacted version. This should be labeled as Package 4 and include 'Redacted' in the file name.
2.5 Trade Secrets and Non-Public Information
The Idaho Public Records Act, Idaho Code title 74, chapter 1 (the “Act”) defines trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” The Act also defines other records that may be exempt from public disclosure.
In addition to marking each page of the document with a trade secret or other exemption notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:
· Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” or “exempt from disclosure” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” or “exempt” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret” or “exempt from disclosure.”
· Provide a separate document entitled “List of Redacted Trade Secret and Exempt Information” which provides a succinct list of all trade secret and exempt information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure and how the exempting the material complies with the Act.
· Submit a redacted copy of any Bid response document (e.g. Scope of Work Response) with all trade secret and exempt information removed or blacked out. The redacted copy must be submitted electronically in the Supplier Attachments section of IPRO, with the word “redacted” in the file name.
Section 3 Evaluation & Award Procedures
3.1 Mandatory Submission Requirements
All Bids will be reviewed on a "pass" or "fail" basis to ensure compliance with all mandatory submission requirements. Bids determined by the State, at its sole discretion, to be responsive in this regard will proceed to the evaluation process outlined in this Section. Bids that do not meet the mandatory submission requirements will be deemed non-responsive. Mandatory submission requirements include, but are not limited to, the following:
· The Bid was submitted prior to the specified Closing Date and Time.
· The Bid complies with the submission instructions detailed in Section 2.4.
· The Bid includes a fully completed and signed Submittal Form A.
· The Bid includes a fully completed Submittal Form B.
· The Bid includes a fully completed Submittal Form C.
· The Bid includes all required Submittal Forms.
3.2 Clarification Discussions
The ITB Lead may, in the State’s sole discretion, perform clarification discussions with the Bidder(s) to verify and validate that the Bid will meet the needs of the Agency. At any time during this period, if it is discovered that the Bidder has not met a mandatory requirement, or has failed to adequately respond to an item below, the State may find the Bidder non-responsive, and disqualify the Bid.
The Bidder(s) may be requested to address the following items:
3.2.1 Responsibility Assessment: The Bidder may be required to provide documentation to demonstrate its responsibility. Failure to provide the requested documentation may result in the Bidder being deemed non-responsible.
3.2.2 Agency Concerns: The Bidder will address or resolve any major risks, issues, concerns, obstacles, or deal-breakers that have been identified by the Agency.
3.2.3 Verify the Fee/Cost Bid: The Bidder will clarify and validate the fee/cost schedule. The Bidder will submit any additional financial data, supporting data, or substantiation requested by the Agency.
3.2.4 Provide a Project Schedule: The Bidder will provide a detailed schedule of the project (with major milestones or tasks). This should include milestones, task and proposed start and completion dates.
3.2.5 Key Assumptions: The Bidder will provide a summary of the major assumptions that have been made in preparing the Bid. This should include items/tasks that the Bidder has assumed the Agency will perform, items/tasks required from the Agency, and items/tasks that have not been included in the Bid (items that the Bidder feels are outside the scope of work). This should also include any critical expectations or responsibilities that the Bidder has of the Agency, Agency personnel, or other parties/organizations that are not contracted to by the Bidder.
3.2.6 Reference Verification: If requested, provide a list of references for the firm and each key personnel.
3.2.7 Additional Requested Documentation: If requested, provide any additional documentation that may be requested, which may include a detailed project/work plan, warranties, testing and commissioning plan, training, change management plan, safety plan, staffing plan, operational plan, maintenance plans, bonding and insurance, background checks, etc.
The clarification discussion cannot materially alter the Bid. The State does not expect to negotiate any terms or conditions requested by the Bidder, unless they were submitted by the Bidder prior to the deadline for submitting questions (see Section 1.7), or they provide the State an opportunity to secure more advantageous terms or pricing.
3.3 Best-And-Final-Offer (BAFO)
The ITB Lead, in the State’s sole discretion, may conduct discussions and negotiations with multiple Bidders. The ITB Lead may request that these Bidders provide a Best-And-Final-Offer (BAFO) cost Bid. The State reserves the right to conduct one (1) or more rounds of a BAFO with these Bidders. The revised BAFO cost Bids, along with the additional evaluation criteria and weighting outlined in Section 4.2, will be utilized to prioritize and rank the Bidders. If the State anticipates the possibility of awarding multiple contracts from this ITB, the State may engage in concurrent negotiations with apparently successful Bidders as deemed appropriate.
3.4 Award
An award will be made to the lowest responsive and responsible Bidder per line total. More than one (1) award may be issued from this solicitation. In order for the State to receive adequate coverage on its requirements as specified in the solicitation, the State reserves the right not to evaluate or make an award in the best interest of the State.
The State also reserves the right to make multiple awards in accordance with Section 67-9211 of Idaho Code in the best interest of the State. Award may be made by the line items, groups of the line items, or total line items to the responsive, responsible Bidder providing the lowest total price, as provided on Submittal Form B – Bid Schedule.
3.5 Resulting Contract
If the State awards Contract(s) from this solicitation, it will do so by issuing Contract Blanket Purchase Orders (BPO) (CPO) Contract document(s) from Luma, the State’s ERP system. The State anticipates issuing a single contract document for each awarded Contractor, incorporating the Terms and Conditions, Scope of Work, Appendices, and some or all of the Bidder’s Technical Bid; however, the State reserves the right to determine the form of the resulting Contract(s). A sample contract is provided in Exhibit 6. At its option, the State may memorialize the agreement between the State and each Contractor in one (1) or more final Contract documents.
Any modifications or exceptions to the Contract may be rejected by the State. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period (see Section 1.7).
EXHIBIT 1
Background Information
1. About The Department / Agency The Idaho Transportation Department (ITD) has a vision of enhancing quality of life through transportation. We are committed to improving the quality of life of people in the communities we serve by delivering on our mission of Your Safety. Your Mobility. Your Economic Opportunity.
ITD is responsible for operating and maintaining more than 12,300 lane miles and 1,830 bridges; 2,523 miles of Idaho Byways and 32 state backcountry airstrips. The state highway system includes 34 rest areas and 12 ports of entry. The Division of Motor Vehicles registers more than two million vehicles and trailers and is responsible for the credentials of more than a million drivers.
2. Background Information The Idaho Transportation Department (ITD) is readying their road maintenance equipment needs for the 2026 calendar year. This procurement event addresses the equipment requirements for street sweeping units statewide. Self-Propelled Street Broom (Sweeper) units will be used on the right of way of Idaho State Highways, and ITD yards.
EXHIBIT 2
Scope of Work & Specifications
1. SUMMARY OF SCOPE
This Scope of Work & Specifications section addresses the equipment requirements for street sweeping units statewide. Four-Wheeled, Self-Propelled Street Broom (Sweeper) units will be used in multiple locations throughout the state to ensure clean, safe and uniform right of ways, Idaho State Highways, and ITD yards. These specifications are the minimum mandatory specifications that your Bid must meet in order for the State to consider your Bid for award.
2. OBJECTIVES & EXPECTATIONS
The State of Idaho expects requires the successful bidder to deliver the specified equipment within 180 days after receipt of order to each ITD District. If the Contractor cannot meet the agreed-upon timeline, the Contractor must, upon written mutual agreement with ITD, develop a revised delivery solution that aligns with the State’s best interests. In the event this timeline cannot be met, Contractor must work with ITD on determining a delivery solution that is in the best interest of the state.
3. SCHEDULE & TERM EXPECTATIONS
The term of this Contract will be for one (1) year. Upon mutual, written agreement, the Contract may be renewed, extended or amended. The anticipated total Contract term is five (5) years.
| 4. | ORDERS |
| 4.1 | Orders will be placed on an as needed basis via a Purchase Order; |
| 4.2 | Within seventy-two (72) hours after receiving a Purchase Order from the State, the Contractor must confirm receipt of the order and provide an estimated date of delivery; |
| 4.3 | The State anticipates four (4) Self-Propelled Street Sweeper Brooms to be ordered upon award and one (1) Sweeper per year thereafter, and; |
4.4 Minimum or maximum order quantities are not guaranteed or implied.
5. AUTHORIZED DISTRIBUTOR
5.1 Submitting vendors must be an authorized distributor or manufacturer of the products offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products;
5.2 Bidder must submit a letter from the equipment manufacturer on the equipment manufacturer’s official letterhead, declaring the Bidder (doing business as stated in Submittal Form A) is a current, authorized distributor or manufacturer of the products offered, and;
5.3 Bids from Contractors who are not an authorized distributor by the manufacturer may not be considered.
6. MANUFACTURER BRAND COMPONENTS BRAND NAMES
6.1 Any Manufacturer Brand Components referenced in this solicitation are intended to be descriptive—not restrictive—and serve only to illustrate the quality and characteristics required. Bidders proposing an equivalent Manufacturer Brand Component must provide documentation demonstrating, to the State’s satisfaction, that the offered item(s) meet all minimum requirements outlined in the solicitation. The brand names specified in this solicitation are intended to be descriptive (but not restrictive), indicative of the quality and characteristics of items that meet the minimum requirements. Bidders offering an “equal” must include documentation which demonstrates, to the State’s satisfaction, that the offered item(s) meets the requirement of the solicitation. This documentation must be submitted prior to the closing of the question period as noted in Section 1.2;
6.2 If your product offered does not meet any of the specifications, Bidder must provide an explanation of how the product offered is functionally equivalent to the stated specification as well as descriptive literature that supports the product offered;
6.2.1 This explanation must be declared during the question period of this event as stated in Exhibit 4 – Questions of this ITB. State acceptance will be in the form of an amendment, and;
6.3 In the event documentation is not satisfactory, the State reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to the State may eliminate the Vendor from further consideration.
7. GENERAL REQUIREMENTS
7.1 The Self-Propelled Street Broom (Sweeper units must be new, not used);
7.2 All parts necessary to provide a complete and functional Sweeper must be provided and must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry, and;
7.3 All parts must be the manufacturer’s standard unless otherwise specified in this ITB.
8. TYPE
| 8.1 | Self‑Propelled Mid-Mount Broom; |
| 8.2 | Sweeper must have four (4) wheels with a hydraulically driven brush capable of sweeping at angles to the left and right, and; |
| 8.3 | Three (3) wheeled machines will not be considered. |
9. BODY
| 9.1 | Cab must have Roll Over Protection Structure (“ROPS”) that complies with ISO3471; |
| 9.2 | Cab must be sound suppressed and internal noise level cannot exceed eighty (80) dBA while in normal operation; |
| 9.3 | Heater and Defroster must be factory installed; |
| 9.4 | Minimum of thirty-five thousand (35,000) BTU air conditioner must be factory installed; |
| 9.5 | Cab glass must be tinted safety glass; |
| 9.6 | Windshield wiper system must be two-speed with washer sprayers on both front and rear windows; |
| 9.7 | Mirrors must be west-coast type on both sides and in-cab rearview mirror; |
| 9.8 | Cab must have a door, handrails, and steps with all openings sealed to prohibit dust entry; |
| 9.9 | Operator controls must be reachable from the operator’s normal seated position and must not inhibit the operator’s curb location view on either side of Sweeper; |
| 9.10 | Radio must be AM/FM stereo with at least two (2) speakers and Bluetooth capability; |
| 9.11 | Gauges must be lighted and visible from driver’s operating position and include gauges for: |
9.11.1 Oil pressure, transmission temperature, engine coolant temperature, engine air filter vacuum pressure, fuel gauge, ammeter, tachometer, speedometer (if standard/offered from manufacturer), and hour meter;
9.12 Operator’s seat must be suspension type high‑back cloth seat, adjustable fore and aft without disassembly;
9.13 Body paint color must be manufacturer’s standard base color (e.g.: Orange, Yellow, White), and;
9.13.1 Excessive, non-standard fluorescent, bright type colors will not be accepted (e.g.: pink, green, purple, etc.).
10. RUNNING GEAR
10.1 Front axle must be of fully oscillating, orbital hydraulic power steering, heavy‑duty truck‑type;
10.2 Rear axle must be heavy‑duty 3/4ton, semi‑floating differential with spring suspension;
10.3 Tires must be radial construction sized 225/75R-15 (minimum), load range D;
10.4 Wheels must be steel construction, six (6) lug (front and rear), and;
10.5 Spare tire and wheel of same make/size must be mounted on machine.
11. BRAKES
11.1 Brakes must be four (4) wheel hydraulic with dual master cylinder, and;
11.2 Parking brake must have in-cab indicator light and audible alarm if applied when vehicle is put into gear.
12. ENGINE
12.1 Must be diesel, four‑cycle, liquid‑cooled, turbocharged, replaceable wet‑type cylinder liners, counter‑balanced crankshaft and rear‑mounted;
12.2 Performance must be a minimum seventy (70) horsepower (HP) at two-thousand five hundred (2,500) RPM;
12.3 Must have audible warning device for both low oil pressure and high engine temperature;
12.4 Oil Filter must be spin‑on type;
12.5 Air Cleaner must be heavy‑duty, two‑element dry type with a Turbo 2-type pre‑cleaner mounted on cab top, braced to prevent vibration and not obstruct view;
12.6 Engine must have a fuel filter/water separator;
12.7 Cooling system must be heavy‑duty and designed for one hundred ten degrees Fahrenheit (110°F) ambient temperature and protected to negative thirty degrees Fahrenheit (–30°F) with radiator easily accessible for service and wash‑out;
12.8 Exhaust system must be routed to emit fumes behind operator; with exhaust gasses exit point equipped with elbow to prevent overhead water entry;
12.9 Must have vandalism protection including, but not limited to, lockable compartments and/or components for the engine, hydraulic oil filler, fuel cap, radiator, and;
12.10 Fuel tank must have a minimum thirty (30) gallon capacity.
13. TRANSMISSION
13.1 Must be infinitely variable hydrostatic pump and motor that drives rear differential through a two‑speed gearbox that is shiftable from the operator’s position;
13.2 Speed must have a range of zero (0) to a minimum of twelve (12) MPH for sweeping without a mechanical speed change mechanism;
13.3 Must have foot controls for forward/reverse and dynamic braking, and;
13.4 The hydrostatic control must return to neutral when foot is removed.
14. ELECTRICAL SYSTEM
14.1 Electrical System must be twelve (12) volt;
14.2 Battery must be a minimum 950 Cold Cranking Amps (CCA) located in an enclosed and lockable compartment;
14.3 Alternator must have a minimum output of ninety‑five (95) amps;
14.4 Lights – must be LED type for:
14.4.1 Work lights front and rear facing, and (if factory option), side facing;
14.4.2 Headlights;
14.4.3 Taillights;
14.4.4 Turn signals;
14.5 Sweeper must have the following warning lights that are height restricted to ≤four (4) feet and wired through relays with a single lighted switch in the operator’s cab:
14.5.1 One (1) roof‑mounted Whelen R2PPL or equal LED fifteen (15)‑inch amber light bar;
14.5.2 Two (2) rear- mounted Whelen ION or equal LED amber lights;
14.5.3 Two (2) front‑mounted Whelen ION or equal LED amber lights;
14.5.4 Contractor must use a light mounting system that does NOT require drilling of holes in cab body;
14.6 Must have minimum of one (1), twelve (12)-volt power port, and;
14.7 Backup alarm of self‑adjusting, 300 Series Preco-matic or equal type.
15. STEERING
15.1 Open‑center orbital power steering with power‑beyond and dead‑steer capability; tilt/telescopic wheel, and;
15.2 Steering cylinder must be protected from debris propelled by rotary brush by use of skid plate or guard.
16. HYDRAULIC SYSTEM
16.1 Hydraulic system must be open or closed center type;
16.2 Brush drive must be variable hydraulic with broom RPM independent of travel speed;
16.3 Sweeper hydraulic functions must include:
16.3.1 Two‑spool valves for brush angle and lift/lower;
16.3.2 Joystick controls that allow raising/lowering/angling while operating;
16.3.3 Valve that has float and power‑down;
16.4 Hydraulic reservoir must be a minimum twenty two (22) gallon pressurized reservoir with:
16.4.3 Sight gauge;
16.4.4 Minimum Twenty-eight (28) gallons per minute (GPM) pump with five (5) GPM steering priority;
16.4.5 High capacity oil cooler with bypass;
16.4.6 One hundred (100) mesh suction filter with a twenty (20) micron return filter, and;
16.5 All hydraulic lines must be routed and clamped to minimize chafing.
17. BRUSH
17.1 Brush must be vertically adjustable within all operating limits and mechanically free‑floating with hydraulic raise and lower functionality;
17.2 Must be hydraulically angled from a minimum thirty-five degrees (35°) left and a minimum of thirty-five degrees (35°) right;
17.3 Brush core size must be:
17.3.1 Maximum length of eight (8) feet;
17.3.2 Furnished with a minimum eighty-eight (88) inches of filler;
17.3.3 Must produce a minimum seventy-six (76) inches of sweeping width at a thirty degree (30°) angle;
17.4 Must be replaceable with tube brush or poly/wire wafer brush;
17.5 Must have full‑length curved metal shield(s) covering approximately the top one hundred forty degrees (140°), and;
17.6 Shield(s) must raise and lower with brush and avoid all interference with sweeper parts.
18. SPRINKLER SYSTEM
18.1 Unit must be equipped with spray nozzles for broom;
18.2 Water tank must be a minimum of one hundred fifty (150) gallons with a low profile design protected from corrosion, and capable of being hydrant filled with two and one half inch (2-1/2”) hose fitting;
18.3 Unit must contain a hydrant wrench with filler hoses that are a minimum fifteen (15) feet in length with two and one half inch (2-1/2”) hydrant connections, and;
18.4 Sprinkler operating controls must be able to be activated from the operator's seat.
19. ACCESSORIES
19.1 Unit must have both front and rear bumpers;
19.2 Unit must have both front and rear fenders;
19.3 Must include one (1), two and one half (2-1/2) pound fire extinguisher mounted in cab with metal bracket;
19.4 Must have a Ecco model K700B or equal backup camera with the screen mounted in cab, and;
19.5 Must have a slow‑moving vehicle sign on rear of machine.
20. WARRANTY
20.1 Manufacturer’s standard warranty must cover the entire Self-Propelled Street Sweeper Broom for a minimum period of three (3) years after acceptance of unit by the State. Manufacturer warranty must include all parts, labor, and freight to replace a defective warranted item.
20.2 All warranty work must be completed within thirty (30) calendars days after receipt of written notice from the State. If approved by the State, the Contractor may perform warranty work on-site at the delivery locations identified in Section 22, in lieu of pick-up and return. The Contractor shall be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Sweeper on-site within thirty (30) calendars days, or if the Sweeper continuously malfunctions and causes it to be out of service on multiple occasions, ITD reserves the right to require the Contractor to pick-up, repair, and return the Sweeper at no additional cost to ITD.
21. Operating MANUALS
21.1 The Contractor must provide two (2) operator’s manual, two (2) parts manuals, and two (2) service manuals with each Sweeper at the time of delivery in the following format(s);
21.2 Paper printed manuals (if available) - must be bound or installed in a binder. Loose, unbound papers are not acceptable, and;
| 21.3 | Electronic manuals -must be electronic PDF copies provided via USB, email, or free website download (hyperlink must be provided at or before delivery). |
| 22. | training |
The Contractor must provide an authorized technician, within thirty (30) calendar days upon acceptance, to provide training for operations, maintenance, safety, etc. of the Self-Propelled Street Sweeper Brooms. Training must take place at each delivery location Monday through Thursday, 8:00 am to 5:00 pm local time, excluding state of Idaho recognized holidays, as found in this link: https://idaho.gov/government/state-holidays/ .
The technician must be versed in all aspects of the unit and be able to make any necessary field adjustments to the unit during the training period. Training must be no less than one (1) calendar day, eight (8) hours a day, the Contractor must coordinate training with ITD’s contact for delivery.
| 23. | POST AWARD PRE-BUILD MEETING |
| 23.1 | The Contractor must coordinate and conduct a post award pre-build conference with ITD’s Maintenance Services Manager, or designee, at the ITD Headquarters facility located at 3311 West State Street, Boise, ID 83703. Meeting may also be held via Teams. This conference must be conducted within fourteen (14) calendar days after award of the Contract and prior to beginning the manufacturing process of the Sweepers. The purpose of this conference is to review the requirements of the Contract, detailed specifications, component placement, and drawings. |
23.2 Engineered design Drawing(s) of the Sweepers must be provided to ITD after its approval to proceed with the manufacturing process of the Sweepers. Drawing(s) must show structural design and placement of all installed components. Drawing(s) must be provided at the time of the pre-build conference; Drawing(s) are not required with the bid submittal.
24. DELIVERY
24.1 The Sweeper must be fully assembled and adjusted when delivered;
| 24.1.1 | All equipment, including standard and supplemental equipment, must be installed per the manufacturer’s specifications, and ready for continuous operation at the time of delivery; |
| 24.1.2 | The complete unit (including body, chassis, and all installed equipment) must be cleaned prior to delivery; |
| 24.2 | Deliveries must be made FOB Destination, freight prepaid and allowed, to the ordering districts (listed below) The Contractor will be responsible for off-loading at each location; |
| 24.3 | Delivery Locations: |
ITD District 1 Yard, 600 West Prairie, Coeur d’Alene, ID 83814 ITD District 2 Yard, 2600 Frontage Road, Lewiston, ID 83501 ITD District 3 Yard, 8150 Chinden Boulevard, Boise, ID 83714 ITD District 4 Yard, 63 West Highway 26, Shoshone, ID 83352 ITD District 5 Yard, 5151 South 5th, Pocatello, ID 83204 ITD District 6 Yard, 206 N. Yellowstone, Rigby, ID 83442
24.4 Delivery Times: Delivery must be made Monday through Thursday 8:00 am to 4:00 pm local time. Deliveries will not be accepted outside of this timeframe or during state of Idaho recognized holidays, unless otherwise approved in writing by ITD’s Contract Management Team (CMT);
24.5 All Sweepers must be washed (exterior) and cleaned (interior) prior to delivery. Dirty vehicles will not be accepted, and;
| 24.6 | All units ordered must be delivered to the delivery location noted within one hundred and eighty (180) days after receipt of order (ARO). |
| 25. | Billing Procedure |
25.1 The Contractor must provide a signed invoice upon delivery. The invoice must be submitted no later thirty (30) calendar days after completion of training for each Sweeper..
25.2 The Contractor must provide the following information with each invoice:
25.2.1 Agency PO number;
25.2.2 Identification of billing period;
25.2.3 Total amount billed for the billing period;
25.2.4 Detailed description of products provided;
25.2.5 Contact information for Contractor, and;
25.2.6 Invoices must be submitted to: HQAP@ITD.Idaho.gov and HQFleet@ITD.Idaho.gov
26. TariffS
26.1 If the President of the United States, the United States Congress, Customs and Border Protection, or any other federal entity authorized by law, imposes an import duty or tariff (a “tariff”) on an imported good that results in an increase in Contractor’s costs to a level that renders performance under this Agreement impracticable, Contractor may be permitted to add up to fifty percent (50%) of the actual and verifiable cost it directly incurs due to tariffs to its invoices submitted to the State, subject to the following conditions:
26.1 ITD must have sufficient appropriation to pay any tariff costs.
26.2 Contractor shall promptly notify ITD of the maximum cost of tariffs and obtain ITD’s prior written approval for payment of any tariff costs. ITD shall not be obligated to pay tariff costs for which ITD did not provide prior written approval, for which ITD does not have sufficient appropriation, or which exceed the approved maximum. Contractor may provide notification of maximum tariffs on a case-by-case basis (for each order) or may provide blanket or time-bound notification (e.g., maximum for any orders placed for the next six (6) months).
26.3 Contractor shall take reasonable steps to avoid or minimize incurring tariffs and may be asked to provide a certification confirming its efforts and supporting documentation to ITD.
26.4 Contractor may only invoice for actual approved tariff costs, even if that amount is less than the approved maximum.
26.5 The invoice must be supported by accurate documentation confirming the actual cost and applicability of tariffs, which may include country of origin, order/delivery dates, official tariff rates, declared value, supplier or manufacturer invoices, etc.
26.6 If applicable tariffs are subsequently reduced or eliminated, Contractor will promptly notify Agency and invoices must reflect such change.
26.7 Any material misrepresentation of fact by Contractor relating in any way to an increase in pricing due to tariffs is a default under this Contract and shall be subject to the remedies set forth herein, in addition to any other claim or remedy available to the State. Furthermore, any material misrepresentation of fact by Contractor relating in any way to ITD’s payment of additional sums due to tariffs shall be fraud against the taxpayers of the State and grounds for the Contractor to be deemed non-responsible and/or disqualified from participation in future solicitations administered by the State.
27 Records Maintenance Contractor shall maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records shall be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
28 Audit Rights The Contractor agrees to allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
29 Price Adjustment Clause
29.1 A price adjustment may be considered after the first twelve (12) months of the initial term of the Contract, and every twelve (12) months thereafter. If a price increase is requested, it will be the responsibility of the Contractor to notify DOP and ITD in writing at least sixty (60) calendar days in advance of the desired effective date and provide supporting documentation showing industry wide increases justifying the request. ITD will notify Contractor whether the request is approved within thirty (30) calendar days of receipt of the request; and
29.2 If there is an industry wide price decrease, Contractor must notify ITD immediately of the decrease and make the price decrease effective for ITD on the same day it becomes effective for the Contractor. If the State is not properly notified of price decreases, the pricing at the time of order will be used for invoice payment and the Contractor will provide refunds or credits as necessary.
EXHIBIT 3
Pre-Bid Conference Registration Form
| ITB Number: |
| 1162 |
| ITB Title: |
| Self-Propelled Street Sweeper Brooms |
Pre-Bid Conference Date: Thursday, January 29, 2026 @ 2:00 pm MT
Instructions: Potential Bidders choosing to participate in the Pre-Bid Conference must pre-register by submitting this completed form, via e-mail, to the ITB Lead. Attendees are asked to submit this registration at least three (3) days prior to the Pre-Bid Conference.
A maximum three (3) representatives from each Bidder’s company are allowed to attend.
As a reminder, potential Bidders are cautioned against relying on any verbal information shared during the Conference. The ITB may only be amended by written documentation, posted to the state’s eProcurement System, IPRO POWERED BY LUMA.
| Individual’s Name |
| Company |
| Email Address |
| Phone Number |
EXHIBIT 4
Questions
General Instructions
· The ITB Lead is the sole point of contact for this solicitation.
· All questions, clarification, or other correspondence must be submitted in writing via email to the ITB Lead.
· The e-mail subject line should include the “ITB Number”, followed by “Questions” (i.e. ITB 12345 Questions).
· Questions must NOT be submitted through IPRO.
· Questions must be received by the deadline specified in the Procurement Schedule, Section 1.2.
· The Bidder must use the table on the following page, to submit all questions or clarifications. The Bidder must adhere to the instructions below.
Instructions Regarding The Table
· Do NOT change the format, font, font style, or font colors.
· Do NOT submit any questions related to the State’s Contract Terms or Conditions. Those must be submitted using Exhibit 5.
· Do NOT identify your name, your company’s name, or product names of intellectual property in your questions.
· Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment 1”) in the “ITB Section” (column 2), and the attachment page number in the “ITB page” field (column 3).
· Add additional rows by hitting the “Tab” key while within the table, and within the final row.
· Do not enter text in the “Response” field (column 5). This is for the State’s use only.
Bidder Questions ITB 1162 Self Propelled Street Sweeper Brooms
| No |
| ITB Section |
| ITB Page |
| Question |
| Response |
EXHIBIT 5
Contract Modifications and Exceptions Before requesting modifications or exceptions to the Contract requirements, terms, and conditions, please review this document for greater context and reasoning behind key items.
1. Idaho Terms and Conditions – Background The Division of Purchasing issues solicitations on behalf of State of Idaho agencies. As public entities, the Division and the agencies it serves are subject to statutes, rules and policies that result in terms and conditions unlike those common in contracts between private parties. The Division of Purchasing does not have authority to vary many of these terms and in some instances variations are void under Idaho law. See IDAPA 38.05.01.112.
Idaho is not unique. Many of the terms in the State of Idaho Standard Terms and Conditions are similar to terms offered by most federal, state, and local government agencies. Vendors who seek to work with government agencies should become familiar with these terms. The discussion below is provided to assist you in becoming familiar with the legal and policy basis for the terms and to provide information for you to evaluate the risks and benefits of working with public entities.
2. Termination – Costs of Re-procurement The State of Idaho Standard Terms and Conditions provision concerning termination specifically identifies the costs of re-procurement as a damage arising from a breach of the contract by a vendor. This damage is identified because of the public agency budgeting process and the competitive solicitation process required by Idaho’s purchasing laws. The Idaho purchasing laws provide a preference for open, competitive procurements. These procurements come at a cost to the agency, which is generally included in the agency budget requested from the Idaho Legislature more than twelve months prior to incurring the expense. Unlike a private business, public agencies cannot independently pass through the costs of re-procurement to Idaho taxpayers, who are the customers of government. Instead, Idaho agencies must submit a request for the costs to the Idaho Legislature in a subsequent budget year, which is usually after the need to secure a replacement vendor for the breaching contractor arises. As a matter of public policy, the contractor whose breach caused the damage of requiring re-procurement must pay those costs at the time of breach so that the public can receive the benefit of the contract made on its behalf through re-procurement of a new contract. This policy is reflected in the State of Idaho Standard Terms and Conditions provision concerning termination and the Division of Purchasing does not generally vary this requirement.
3. Termination – Fiscal Necessity Idaho Constitution Article VII, section 11 prohibits an expenditure in excess of a legislative appropriation. Idaho Code section 59-1015 prohibits state agencies and officers from entering into contracts that create any expense or liability in excess of an appropriation. Idaho Code section 59-1016 provides that any such contract is void. IDAPA 38.05.01.112 contains the same provisions. An appropriation can be reduced under Idaho law through “give backs” and “hold backs” issued by the executive branch. When the Division of Purchasing enters into a contract, it must contain the term allowing for termination for fiscal necessity to comply with these provisions. Variation of this term is not offered.
4. Anti-Discrimination/Equal Employment Opportunity Many of the Idaho agencies served by the Division of Purchasing receive federal funding that is subject to a requirement concerning a pass-through to vendors of the obligation to comply with federal civil rights and anti-discrimination laws. The pass-through obligation may extend beyond the specific federal funds to all agency contracts. Variation of this term is not offered to prevent a breach of the State of Idaho’s obligations under its agreements with the United States.
5. Taxes The State of Idaho Standard Terms and Conditions provision concerning taxes identifies that Idaho agencies are exempt from the payment of taxes and provides that the contractor is responsible for all taxes assessed against the contractor as a result of doing business with the State of Idaho. State agencies are not granted an appropriation to pay taxes due to the exemptions that apply to government agencies. As discussed above under the heading Termination – Fiscal Necessity, terms in excess of appropriation are void under Idaho law. Variation of this term is not offered.
6. Indemnification Many vendors request the State of Idaho offer an indemnification of the vendor. An indemnification is a promise to pay funds that have not been appropriated in the current budget year or that may occur in a future budget year that has not yet been appropriated by the Idaho Legislature. Idaho Constitution Article VII, section 11 prohibits an expenditure in excess of a legislative appropriation. Idaho Code section 59-1015 prohibits state agencies and officers from entering into contracts that create any expense or liability in excess of an appropriation. Idaho Code section 59-1016 provides that any such contract is void. IDAPA 38.05.01.112 contains the same provisions. Variation of this term is not offered.
In assessing the risk of doing business with the State of Idaho, vendors should consider the following. The State of Idaho has waived its sovereign immunity for torts as described in the Idaho Tort Claims Act, Idaho Code title 6 chapter 9. To the extent that the State or its employees have committed a tort, contractors have legal remedies available through that act. Tort liability is funded by the Idaho Legislature through an appropriation to the Retained Risk Program and appropriation issues do not arise in actions under the act. In addition, under existing Idaho court decisions, the State does not have sovereign immunity for contract claims arising from a properly entered contract. If the State is in breach of its contract obligations, contractors have the legal remedies available under any contract. Lastly, States are generally prohibited from the benefits of the federal bankruptcy laws. Unlike private companies, an indemnification clause is not required to preserve a remedy through the company’s insurer should the company declare bankruptcy.
7. Public Records All Idaho agencies are subject to the Idaho Public Records Act, Idaho Code title 74, chapter 1. State agencies cannot by contract vary the requirements of the Act or agree to violate the Act by withholding records properly subject to release under the Act. The State of Idaho Standard Terms and Conditions provision concerning disclosure of public records has been drafted to allow contractors to designate records as exempt under the provision of the Act if the contractor agrees to defend that designation and to indemnify the State of Idaho for any costs and penalties imposed under the Act. Variation of this term is not offered.
8. Assignments Idaho code section 67-9230 prohibits the transfer of a contract issued by the Division of Purchasing without written approval by the Administrator and the Idaho Board of Examiners. At the option of the Administrator, a contract transferred in violation of this provision can be annulled. Idaho Code section 67-1027 provides that the Idaho Controller shall not pay an assignee of a contract if the assignment has not been approved by the Idaho Board of Examiners. The State of Idaho Standard Terms and Conditions provision concerning assignment cannot be varied in a way that allows assignment without approval of the Administrator and the Idaho Board of Examiners.
9. Governing Law, Jurisdiction and Venue, Arbitration, Waiver of Jury Trial As a sovereign state, the State of Idaho is not subject to the jurisdiction of the…