ITB S-63500-00017967_11-17-26.pdf
PDF 1 MB Posted
- Attached to
- Umatilla Hatchery Generator Replacements
- Solicitation number
- S-63500-00017967
- Issued by
- Oregon
About this file
This is an Invitation to Bid (ITB) issued by the State of South Dakota for desktop and laptop computer equipment. The solicitation requests quotes for the purchase of approximately 100 desktop computers, 50 laptop computers, and associated peripherals including monitors, keyboards, mice, and docking stations. Bids are due by November 17, 2026, at 2:00 PM Central Time. No site visit or bidder's conference is specified in the document. The contract will be awarded to the lowest responsive and responsible bidder and is anticipated to have an initial term of one year with potential renewal options for up to two additional one-year periods at the discretion of the State.
Pricing should be provided on an item-by-item basis with unit costs clearly identified. No specific set-asides are indicated in this solicitation. The State of South Dakota intends to use this contract for replacement and expansion of its information technology infrastructure across multiple state agencies. Funding will be provided through the State's general operating budget and information technology capital funds. Interested vendors must be registered in the South Dakota vendor database and provide proof of ability to meet delivery timelines within 30 days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB S-63500-00017967 Addendum No. 1_11-17-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAS State Procurement Services, Version 2.0 – July, 2025 1
STATE OF OREGON
Oregon Department of Fish and Wildlife issues
Invitation to Bid (“ITB”) under OregonBuys® Bid Number
S-63500-00017967 for
Umatilla Hatchery Generator Replacements
Date of Issue: 11/13/2026
Bid Opening Date and Time: 12/29/2026 12/17/2026, Time 3:00 PM (Pacific Time)
Single Point of Contact (“SPC”): Claire Duvall, Procurement and Contract Specialist III
Address: 4034 Fairview Industrial Drive SE
City, State, Zip: Salem, OR 97302
Phone (voice): (971) 372-8721
E-mail: Claire.j.duvall@odfw.oregon.gov mailto:Claire.j.duvall@odfw.oregon.gov
ITB S-63500-00017967 Umatilla Hatchery Generator Replacements
DAS State Procurement Services, Version 2.0 – July, 2025 2
Table of Contents
SECTION 1: GENERAL OVERVIEW
1.1 Summary Overview
1.2 Schedule of Events
1.3 Minimum Requirements
1.4 Submission Requirements
1.5 Single Point of Contact
SECTION 2: GOODS AND SERVICES
2.1 Project Description
2.2 Tasks
2.3 Deliverables and Schedule
2.4 Payment Methodology
2.5 Deliverable Review and Acceptance Process
SECTION 3: PROCUREMENT PROCESS
3.1 Procurement Authority and Method
3.2 Defined Terms
3.3 E-Procurement System: OregonBuys®
3.4 Reserved
3.5 Pre-Bid Conference
3.6 Build America, Buy America Compliance
3.7 Service Contract Act
3.8 Questions and Requests for Clarification
3.9 Protest of ITB
3.10 Amendments
3.11 Protest of Amendments
3.12 Bid Submission
3.13 Bid Delivery
3.14 Bid Modification or Withdrawal
3.15 Late Bids
3.16 Opening and Bid Review
3.17 Firm Offer
3.18 Reserved
SECTION 4: BID REVIEW
DAS State Procurement Services, Version 2.0 – July, 2025 3
4.1 Responsiveness Determination
4.2 Responsibility Determination
4.3 References
4.4 Preferences
4.5 Price Comparison (including application of preferences) and Ranking
SECTION 5: AWARD
5.1 Notice of Intent to Award
5.2 Protest of Notice of Intent to Award
5.3 Method of Award
5.4 Contract Execution
5.5 Reserved
SECTION 6: ADDITIONAL INFORMATION
6.1 Applicable Statutes and Rules
6.2 Statement of Values
6.3 Government Bodies
6.4 Electronic Signatures
6.5 Cancellation and/or Rejection of Bids; Damages
6.6 Cost of Submitting a Bid
6.7 Ownership/Permission to Use Materials
6.8 Confidential or Proprietary Information; Public Records
6.9 Recycled Products
6.10 Reserved
6.11 COBID
ATTACHMENT A Sample Contract
ATTACHMENT B Bid Cover Sheet
ATTACHMENT C Reference Check Form
ATTACHMENT D Bid Pricing Form
ATTACHMENT E Responsibility Inquiry
ATTACHMENT F Certified Disadvantaged Business Outreach Plan
ATTACHMENT G Defined Terms
ATTACHMENT H Disclosure Exemption Affidavit
DAS State Procurement Services, Version 2.0 – July, 2025 4
SECTION 1: GENERAL OVERVIEW
1.1 Summary Overview
The State of Oregon, acting by and through its Department of Fish and Wildlife (“Agency” or
“ODFW”), is issuing this Invitation to Bid (ITB) to establish one Contract for the replacement and installation of two generators at the Umatilla Fish Hatchery. This procurement involves a base bid for two generator replacements, generator installation, testing, and existing generator removal (see bid items 1-5 of Attachment D). This procurement also involves one bid alternate to add annual maintenance of the two new generators (see bid item BA1 of
Attachment D). This work may also be subject to a future procurement.
The Umatilla Hatchery supports recreational, commercial, and tribal fisheries across Oregon, Washington, and coastal ocean fisheries. Umatilla Hatchery relies entirely on ground water for fish rearing operations. Water is supplied by one Ranney collector well and four vertical wells. Each well is equipped with a pump to route water from the well to the Hatchery.
The Hatchery is equipped with two emergency generators. The first is installed at the well pump station to ensure the wells operate during a power failure. The second is installed in the Hatchery mechanical building. This generator supplies power to pumps that supply water to the incubation and tank room, as well as supplying power to the feeders for the ponds and the supplemental oxygen system.
Both generators are critical to operations at Umatilla Hatchery. In the event of a power failure without these generators, there would likely be large fish losses, with a potential loss of the entire salmon return to the Umatilla River. Such losses would prevent the facility from meeting mitigation and production goals.
Due to the age of these two emergency generators, the Hatchery is seeking to have them replaced to continue operations in the event of power loss at the facility.
This purchase is funded with 100% federal funds. A Contract resulting from this ITB will incorporate the terms and conditions set forth in the ITB, including without limitation the federal contract provisions for non-federal entity contracts under federal awards set forth in
Attachment A – Exhibit C.
The Agency anticipates the award of one Contract resulting from this ITB. Generators must be obtained and installed no later than July 30, 2027.
If the Agency moves forward with annual generator maintenance (bid alternate 1), the
Contract will extend for a total of three (3) years with the option to extend for two (2) additional years.
1.2 Schedule of Events
DAS State Procurement Services, Version 2.0 – July, 2025 5
The table below represents a tentative schedule of events. Agency may modify these dates at any time, with appropriate notice. All times are Pacific Standard Time.
EVENT DATE AND TIME (IF APPLICABLE)
Issue Date November 13, 2026
Mandatory Pre-Bid 1:00 PM, December 3, 2026
ITB Questions/Clarifications Deadline 3:00 PM, December 9, 2026
ITB Protests Period Deadline 3:00 PM, December 15, 2026
Bid Opening Date
(Due Date and time to submit Bids) 3:00 PM, December 29, 2026
Public Bid Opening 3:05 PM, December 29, 2026
Issuance of Notice of Intent to Award
(approximate) January 5, 2026
Agency operating hours are Monday through Friday 8:00 AM to 5:00 PM, Pacific Standard
Time, except for State holidays and State-approved closures, including those for inclement weather.
1.3 Minimum Requirements
In order to be considered for an award under this ITB, Bidder must meet or exceed the following minimum requirements:
1.3.1 Possession of an active commercial contractor license with the Construction
Contractors Board (CCB).
1.3.2 Three (3) years of experience specializing in the installation, commissioning, and maintenance of automatic standby generator systems.
1.4 Submission Requirements
The Bid must include the following mandatory forms in its submittal:
1.4.1 Attachment B – Bid Cover Sheet
1.4.2 Attachment C – Reference Check Form
1.4.3 Attachment D – Bid Pricing Form
1.4.4 Attachment E – Responsibility Inquiry
1.4.5 Attachment F – Certified Disadvantaged Business Outreach Plan
1.4.6 Attachment G – Defined Terms
DAS State Procurement Services, Version 2.0 – July, 2025 6
1.4.7 Attachment H – Public Records Exemption Statement
1.5 Single Point of Contact
All questions, requests for clarification, protests about any component of this ITB, including technical requirements, contractual requirements, and the procurement process must be directed to the SPC identified on the cover page of this ITB.
SECTION 2: GOODS AND SERVICES
2.1 Project Description
Bidder will provide and install two (2) replacement generators at the pump station and the mechanical building meeting the specifications set forth below at the Umatilla Hatchery located at 73959 Riverview Ln, Irrigon, Oregon 97844. Bidder will dispose of the two existing generators. Replacement generators must be comparable to the current generators.
Replacement generators must also be compatible with current transfer switches. Agency may also select Bid Alternate 1 for Bidder to provide annual maintenance of the two new generators.
2.2 Tasks
Contractor will:
1. Pump Station Generator (see Figure 1 below for reference)
a. Replace existing pump station generator. Replacement shall be comparable to the existing generator.
i. Existing generator specifications
1. Model: D400FRX 1 Detroit Diesel
2. 60 HZ, 1800 RPM, 400 KW/ 500 KVA, 3 phase, 277/480 volts
b. Install replacement generator. Generator will need to be installed in the building where the current generator sits.
c. Connect generator to existing automatic transfer switch, ASCO 7000 series ATS.
d. Connect generator to the existing fuel system. The fuel tank is located inside the pump station building next to the generator.
e. Dispose of existing generator.
f. Test newly installed generator to ensure meets hatchery demands.
g. Bid Alternate 1 - Perform annual maintenance on replacement generator.
DAS State Procurement Services, Version 2.0 – July, 2025 7
2. Mechanical Building Generator (see Figure 2 below for reference)
a. Replace existing mechanical building generator. Replacement shall be comparable to the existing generator.
i. Existing generator specifications
1. Model: 350R07D71 Kohler Power Systems
2. 60 HZ, 1800 RPM, 315/350 KW, 394/438 KVA, 3 phase, 277/480 volts
b. Install replacement generator. Generator to be installed outside of the mechanical building.
c. Connect generator to existing automatic transfer switch, ASCO 7000 series ATS.
d. Connect generator to the existing fuel system. The fuel tank is located outside of the north side of the building.
e. Dispose of existing generator.
f. Test newly installed generator to ensure meets hatchery demands.
g. Bid Alternate 1 - Perform annual maintenance on replacement generator.
ODFW will:
1. Provide access to the project site and associated infrastructure as required to complete the work.
2. Coordinate with hatchery staff to support the generator replacement activities.
3. Provide reasonable scheduling coordination to minimize disruption to hatchery operations.
2.3 Deliverables and Schedule
Two replacement generators shall be delivered and installed no later than July 30, 2027.
2.4 Payment Methodology
Payment shall be made via the following schedule:
DAS State Procurement Services, Version 2.0 – July, 2025 8
Generator Payment Trigger Value
Pump Station Generator Delivery TBD
Pump Station Generator Installation and Testing TBD
Mechanical Building Generator Delivery TBD
Mechanical Building Generator Installation and Testing TBD
Pump Station & Mechanical Building
Existing Generator Removal TBD
Pump Station & Mechanical Building
Bid Alternate 1 - Annual Generator Maintenance
TBD
2.5 Deliverable Review and Acceptance Process
All work and deliverables will be reviewed by ODFW facility staff to verify compliance with the agreed-upon scope, quality standards, and operational requirements. Final acceptance will be based on confirmation that the generators meet hatchery operational needs.
Figure 1 Pump Station Mechanical Plans
DAS State Procurement Services, Version 2.0 – July, 2025 9
Figure 2 Mechanical Building Mechanical Plans
SECTION 3: PROCUREMENT PROCESS
3.1 Procurement Authority and Method
Agency is conducting this ITB pursuant to ORS 496.146(11) and ORS 279B.050(6)(o). Agency is using the Competitive Sealed Bidding method, pursuant to ORS 279B.055 and OAR 125-
247-0255.
3.2 Defined Terms
Defined terms applicable to this ITB and the resulting Contract are found in OAR 125-246-
0110, and set forth in Attachment G or elsewhere in this ITB or its Attachments. For ease of reference, a link to the crosswalk of terms used in OregonBuys® to terms defined in Oregon
Administrative Rules is included in Attachment G.
3.3 E-Procurement System: OregonBuys®
3.3.1 OregonBuys® posting.
DAS State Procurement Services, Version 2.0 – July, 2025 10
This ITB, including all Amendments, attachments and exhibits is posted in the State’s e-procurement system, OregonBuys®. ITB documents will not be mailed or otherwise delivered.
3.3.2 OregonBuys® Registration Information.
Bidder must be registered in OregonBuys® to do business with the State. Registration is free. To create a vendor account, click the blue “Supplier Registration” button in the top right corner of the OregonBuys® website: https://oregonbuys.gov/bso. For registration assistance, see vendor registration guidance:
https://www.oregon.gov/das/ORBuys/Documents/SupplierRegistrationGuide.pdf.
BIDDER IS SOLELY RESPONSIBLE FOR ENSURING ITS VENDOR INFORMATION IS
CURRENT AND CORRECT IN OREGONBUYS®. AGENCY WILL ACCEPT NO
RESPONSIBILITY FOR MISSING OR INCORRECT VENDOR INFORMATION.
3.3.3 OregonBuys® Assistance.
Parties needing assistance with OregonBuys® may contact the OregonBuys® Helpdesk by telephone at (855) 800-5046 or by email at support.oregonbuys@oregon.gov.
3.3.4 Failure of Electronic Procurement System.
In the event of a failure of an Electronic Procurement System that interferes with the ability of a Person to submit Electronic Submittals, to protest or to otherwise participate in the procurement, Agency may cancel the procurement or may extend the date and time of receipt of Electronic Submittals by providing notice of the extension immediately after the Electronic Procurement System becomes available.
3.4 Reserved
3.5 Pre-Bid Conference
A mandatory pre-bid conference will be held on December 3, 2026 at 1:00 PM (PST), located at 73959 Riverview Ln, Irrigon, OR 97844.
Any statements made at this conference will not change the Contract Documents or other provisions/requirements of this ITB unless an Addendum has been issued from Agency and advertised on the OregonBuys System.
BIDDERS ARE REQUIRED TO BE ON TIME AND ATTEND THE ENTIRETY OF THE MANDATORY
PRE-BID CONFERENCE IN PERSON, DIRECTLY OR THROUGH AN AUTHORIZED
REPRESENTATIVE. BIDS FROM BIDDERS WHO DO NOT COMPLY WITH THESE ATTENDANCE
REQUIREMENTS WILL BE REJECTED AS NONRESPONSIVE.
3.6 Build America, Buy America Compliance
https://oregonbuys.gov/bso https://www.oregon.gov/das/ORBuys/Documents/SupplierRegistrationGuide.pdf mailto:support.oregonbuys@oregon.gov
DAS State Procurement Services, Version 2.0 – July, 2025 11
This ITB and the resulting contract is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L 177-58. All iron, steel, manufactured projects, and construction materials used in this project must be produced in the United States.
3.7 Service Contract Act
This ITB and the resulting Contract are subject to McNamara-O’Hara Service Contract Act
(SCA) requirements. Bidders may obtain the applicable federal wage rates through the following System for Award Management website: https://sam.gov/content/wage-determinations.
3.8 Questions and Requests for Clarification
All questions and requests for clarification, related to this solicitation must be in Writing. The preferred method of submission is via email to the SPC. The submitted question or request must reference the OregonBuys® ITB number, section number, and passage. Questions or requests for clarification will not be accepted by telephone.
3.9 Protest of ITB
Prospective Bidders may submit a Written protest of the ITB, including the specifications and requirements, the terms and conditions of the sample Contract, or the procurement process described in this ITB.
Prospective Bidder must submit the protest to the SPC via email. The protest must:
1. Include prospective Bidder’s name and contact information;
2. Reference the ITB number;
3. Identify the reason for the protest, including the grounds demonstrating how the procurement process is:
o Contrary to law, and/or o Unnecessarily restrictive, and/or o Legally flawed, and/or o Improperly specifies a brand name;
4. Provide evidence and documentation supporting the grounds on which the protest is based;
5. Identify any proposed changes to the ITB provisions or other relief sought.
Agency will address all protests meeting the requirements within a reasonable time and will issue a written decision. Agency will not consider protests that do no not meet these requirements.
3.10 Amendments
Agency may change this ITB by written Amendment, posted to OregonBuys®. Clarifications, corrections or changes to this ITB made in any other manner are not binding on the State.
https://sam.gov/content/wage-determinations https://sam.gov/content/wage-determinations
DAS State Procurement Services, Version 2.0 – July, 2025 12
Prospective Bidder is solely responsible for checking OregonBuy®s to determine whether or not any Amendment(s) have been issued. Amendment(s) are incorporated into the ITB by this reference.
3.11 Protest of Amendments
A prospective Bidder may submit a protest of an Amendment by the date set forth in the
Amendment, or if no date is set forth, then by the close of the next Business Day after the issuance of the Amendment, whichever is later. Unless otherwise specified in the
Amendment, a protest to an Amendment must be submitted in the same manner as a protest of the ITB under Section 3.7 above.
3.12 Bid Submission
The Bid must include all submission requirements, follow the ITB sequence, reference the
ITB section numbers and include:
3.12.1 Bidder shall complete and submit the Bid Cover Sheet (Attachment B). Attachment
B must be signed by Bidder’s authorized representative.
3.12.2 Bidder shall complete and submit the Reference Check Form (Attachment C).
Bidder shall provide three (3) references from project(s) of similar size and scope performed for any clients within the last five (5) years. Forms must be completed by a reference, returned to Bidder, and submitted with the Bid. References should include references from state or federal entities that currently utilize, or within the last five years have utilized, the proposed Solution.
3.12.3 Bidder shall complete and submit the Bid Pricing Form (Attachment D).
3.12.4 Bidder shall complete and submit the Responsibility Inquiry (Attachment E).
Attachment E must be signed by Bidder’s authorized representative.
3.12.5 Bidder shall complete and submit a Certified Disadvantaged Business Outreach Plan
(Attachment F).
3.12.6 Public Records Exemption. If Bidder believes any portion of its Bid is exempt from disclosure under the Oregon Public Records Law (ORS 192.311 to 192.478), Bidder must identify in Attachment H the portions that are exempt and the statutory authority for the exemption, along with both an unredacted and a redacted version of its Bid. Please refer to section 6.8 for more in-depth information.
3.13 Bid Delivery
Bidder is solely responsible for ensuring its Bid is received by the Bid Opening Date. Agency is not responsible for any delays in delivery. Prospective Bidders may deliver Bids to Agency through OregonBuys® at: https://OregonBuys.gov .
https://oregonbuys.gov/
DAS State Procurement Services, Version 2.0 – July, 2025 13
Detailed instructions on how to submit a Bid can be found at:
https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20So licitation%20Response.pdf
Technical Difficulties: Larger files may take additional time to upload to OregonBuys®.
Bidders are responsible for allowing sufficient time to navigate the OregonBuys® system, upload files, and finalize and submit Bids via OregonBuys® prior to the Bid Opening Date.
If technical difficulties that are no fault of Bidder prevent submission of a Bid via
OregonBuys®, Bidder must immediately notify the SPC in writing, via email, to describe the difficulties encountered and to seek SPC approval of an alternative submission method.
As circumstances warrant, SPC may, at the SPC’s sole discretion, allow for an alternative Bid submission method.
3.14 Bid Modification or Withdrawal
A Bidder wishing to make modifications to a Bid already received by Agency must withdraw its Bid in order to make modifications and resubmit the Bid. If a Bidder wishes to withdraw its Bid, Bidder must submit to the SPC a written notice withdrawing the Bid. The notice must identify the ITB number, be signed by the authorized representative and be received by the
SPC prior to the Bid Opening Date. For assistance with making modifications or withdrawing a Bid submitted through OregonBuys®, please contact the OregonBuys® Supplier Helpdesk at support.oregonbuys@das.oregon.gov or 1-855-800-5046.
3.15 Late Bids
Agency will not accept late Bids. Bids submitted on or before the Bid Opening Date will be accepted.
3.16 Opening and Bid Review
Agency will hold the public Bid Opening through electronic means. Interested parties may attend the public Bid Opening for this solicitation electronically as follows (It is attendee’s choice to use video or audio only):
A Microsoft Teams meeting will be held at 3:05 PM for the Bid Opening following the Closing.
Be sure to have Microsoft Teams access available on your computer or mobile phone and follow the following link:
JOIN THE MEETING NOW
MEETING ID: 272 159 724 889 086 7
PASSCODE: CQ2TR3PR
DIAL-IN BY PHONE: 503-446-4951
Phone conference ID: 919395775
3.17 Firm Offer
https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20Solicitation%20Response.pdf https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20Solicitation%20Response.pdf mailto:support.oregonbuys@das.oregon.gov https://teams.microsoft.com/meet/2721597248890867?p=ElT4AkX1aaYKjAF0XQ
DAS State Procurement Services, Version 2.0 – July, 2025 14
A Bid is a firm offer for 60 calendar days following the Opening.
3.18 Reserved
SECTION 4: BID REVIEW
4.1 Responsiveness Determination
Agency will review all Bids received prior to the Bid Opening Date. Agency will review to determine if a Bid is Responsive to all ITB requirements. If the Bid is unclear, the SPC may request clarification from Bidder. However, clarifications may not be used to rehabilitate a non-Responsive Bid. Agency may waive mistakes in accordance with OAR 125-247-0470. If the SPC finds the Bid non-Responsive, the Bid may be rejected.
4.2 Responsibility Determination
Agency will review the Responsibility Inquiry (Attachment E), Bid Pricing Form (Attachment
D), references and other information to determine if an apparent Successful Bidder is
Responsible prior to award and execution of the Contract per agreement ORS 279B.110 or
ORS 279C.375.
At any time prior to award, Agency may reject a Bidder found to be not Responsible.
4.3 References
Agency will review the Reference Check Form (Attachment C) submitted by Bidder. Agency may check to determine if references provided support Bidder’s ability to comply with the requirements of this ITB. Agency may conduct other reference checks with persons whose names have not been provided by Bidder, but for whom Agency has knowledge. Agency may use references to obtain additional information, break ties, or verify any information needed.
4.4 Preferences
Agency will apply the following preferences to the Bid Cost:
4.4.1 Oregon Supplies and Services. The State prefers that contract awards are for Oregon goods and services. For bid calculation purposes, per ORS 279A.128, Agency shall subtract 5% from the price for any Bidder proposing all Goods fabricated or processed or all Services performed entirely in Oregon before the comparison.
4.4.2 Reciprocal Preference. Pursuant to OAR 125-246-0310, Agency shall add a percent increase to each out-of-state Bidder’s Bid price that is equal to the percent preference, if any, given to a Resident Bidder in Bidder's state.
4.4.3 Recycled Materials. In comparing Goods from two or more Bidders, if at least one
Bidder offers Goods manufactured with Recycled Materials, and at least one Bidder
DAS State Procurement Services, Version 2.0 – July, 2025 15 does not, Agency will select the Bidder offering Goods manufactured from Recycled
Materials if each of the conditions specified in ORS 279A.125 (2) exists following any adjustments made to the cost of the Goods according to any applicable reciprocal preference.
4.4.4 Public Printing. Agency shall, for the purpose of evaluating Bids, apply the public printing preference set forth in ORS 282.210.
4.4.5 Tiebreakers. If Agency receives Bids identical in cost, fitness, availability and quality and chooses to award a Contract, Agency shall award the Contract by drawing lots as outlined in OAR 125-246-0300.
4.5 Price Comparison (including application of preferences) and Ranking
After applying all preferences, Agency will compare the Bid Pricing Forms from all Bidders and rank them from lowest to highest. Bidder’s total price includes both base bid and bid alternate pricing.
Agency intends to award the Contract to the lowest Responsive and Responsible Bidder whose Bid substantially complies with the requirements and criteria set forth in this ITB and that provides the most favorable pricing (apparent successful Bidder).
SECTION 5: AWARD
5.1 Notice of Intent to Award
Agency will issue a notice of Intent to Award to the apparent successful Bidder on
OregonBuys®. Bid files are available for review after issuance of the Notice of Intent to
Award.
5.2 Protest of Notice of Intent to Award
5.2.1 Written Protest. An Affected Person has seven calendar days from the date of issuance of the Notice of Intent to Award to file a Written protest.
A Bidder is an Affected Person, only if Bidder would be eligible for award in the event the protest was successful and is protesting for one or more of the following reasons as specified in ORS 279B.410:
1. All lower Bids are non-Responsive.
2. Agency failed to conduct an evaluation of Bids in accordance with the criteria or process described in the ITB.
3. Agency abused its discretion in rejecting the protestor’s Bid as non-Responsive.
4. Agency’s evaluation of Bid(s) or determination of award otherwise violates ORS Chapter 279A or ORS Chapter 279B.
DAS State Procurement Services, Version 2.0 – July, 2025 16
5.2.2 The Affected Person must submit the protest to the SPC via email or regular mail. The protest must:
1. Include protestor’s name and contact information;
2. Reference the ITB number;
3. Identify the reason for the protest, including the grounds for the protest; and
4. Provide evidence and documentation supporting the grounds on which the protest is based.
5.2.3 Agency will address all timely submitted protests meeting requirements within a reasonable time and will issue a Written decision. Protests that do not include the required information may not be considered by Agency.
5.3 Method of Award
Agency will award a contract to the Responsive and Responsible Bidder submitting the Bid with the lowest price (Apparent Successful Bidder).
5.4 Contract Execution
Agency intends to enter into a Contract based upon the form attached hereto (Attachment
A) with the apparent successful Bidder including without limitation the federal contract provisions for non-federal entity contracts under federal awards set forth in Exhibit C of the
Contract. Prior to execution of the Contract, the apparent successful Bidder must submit the following to Agency:
5.4.1 Pay Equity Certification. If the value of the Contract exceeds $500,000 and Bidder has
50 or more employees, the apparent successful Bidder shall submit to Agency a true and correct copy of an unexpired Pay Equity Compliance Certificate issued to Bidder by the Oregon Department of Administrative Services. See https://www.oregon.gov/das/Procurement/Pages/PayEquity.aspx
5.4.2 Non-Discrimination. As a condition of receiving the award of a Contract under this
ITB, the apparent successful Bidder must certify it has in place a policy and practice of preventing sexual harassment, sexual assault, and discrimination against employees who are members of a protected class. The policy and practice must include giving employees a written notice of a policy that both prohibits, and prescribes disciplinary measures for, conduct constituting sexual harassment, sexual assault, or unlawful discrimination.
5.4.3 Insurance. The apparent successful Bidder shall obtain and provide Agency proof of insurance as required in this ITB. Insurance Requirements are found in Exhibit B of
Attachment A.
5.5 Reserved
https://www.oregon.gov/das/Procurement/Pages/PayEquity.aspx
DAS State Procurement Services, Version 2.0 – July, 2025 17
SECTION 6: ADDITIONAL INFORMATION
6.1 Applicable Statutes and Rules
This ITB is governed by the laws of the State of Oregon, specifically including ORS 279B.055 and OAR 125-247-0255. The venue for any administrative or judicial action relating to this
ITB, evaluation and award is the Circuit Court of Marion County for the State of Oregon;
provided, however, if a proceeding must be brought in a federal forum, then it must be brought and conducted solely and exclusively within the United States District Court for the
District of Oregon. In no event may this section be construed as a waiver by the State of
Oregon of any form of defense or immunity, whether sovereign immunity, governmental immunity, immunity based on the eleventh amendment to the Constitution of the United
States or otherwise, to or from any claim or consent to the jurisdiction of any court.
6.2 Statement of Values
The State of Oregon is committed to taking active steps toward equity and inclusion in procurement processes for minority, women, emerging small, and veteran-owned businesses by reducing barriers to compete for and be awarded state contracts. All interested businesses are encouraged to submit Bids for this opportunity. The State of
Oregon promotes equal opportunity for all individuals without regard to age, color, disability, marital status, national origin, race, religion or creed, sex or gender, sexual orientation, or veteran status.
6.3 Government Bodies
Under ORS Chapter 190, Agency may enter into an agreement with another government body for the Goods or Services that are the subject of this ITB. Intergovernmental agreements are not subject to the Public Contracting Code. If Agency receives an Offer from a government body, Agency will initially review the Offer according to the same criteria set forth in this ITB. Agency, in its sole discretion, may enter into an ORS Chapter 190 agreement with any government body for the Goods or Services, or any portion thereof and cancel this
ITB if it would be in the public interest as determined by Agency.
6.4 Electronic Signatures.
BY SUBMITTING A BID IN RESPONSE TO THIS ITB, BIDDER AGREES WITH AGENCY THAT
SIGNATURES, AND OTHER FORMS OF AUTHORIZED REPRESENTATIVE CERTIFICATION,
SHOWING ON DOCUMENTS SUBMITTED VIA OREGONBUYS® OR EMAIL ARE “ELECTRONIC
SIGNATURES” UNDER ORS CHAPTER 84 AND, BIND THE SIGNING PARTY, AND ARE INTENDED
TO BE AND CAN BE RELIED UPON BY THE PARTIES.
6.5 Cancellation and/or Rejection of Bids; Damages
DAS State Procurement Services, Version 2.0 – July, 2025 18
Pursuant to ORS 279B.100, Agency may reject any or all Bids in whole or in part and may cancel this ITB at any time when the rejection or cancellation is in the best interest of the
State. Agency, the State, and their officers, employees and agents are not liable to any
Bidder for any loss or expense caused by or resulting from the delay, suspension, or cancellation of this ITB, or rejection of any or all Bids. Unless Agency cancels this ITB prior to the Bid Opening Date identified in Section 1.2, all Bids will become part of the public record without obligation to Agency.
6.6 Cost of Submitting a Bid
Bidder must pay all costs of bidding including, but not limited to, the cost to prepare and submit Bids, samples and other supporting materials, or to participate in demonstrations, if required by this ITB.
6.7 Ownership/Permission to Use Materials
Bids submitted in response to this ITB become the property of the State. The submission of a
Bid in response to this ITB grants the State a non-exclusive, perpetual, irrevocable, royalty-free license for the rights to copy, distribute, display, prepare derivative works of and transmit the Bid solely for the purpose of evaluating the Bid, awarding a Contract or as otherwise needed to administer the ITB process, and to fulfill obligations under Oregon
Public Records Laws. Bids, including supporting materials, will not be returned to Bidder.
6.8 Confidential or Proprietary Information; Public Records
Following the Notice of Intent to Award of a Contract, responses to this ITB are subject to public records requests unless the response or specific information contained therein is identified as exempt from public disclosure. Bidder is advised to consult with legal counsel regarding disclosure issues.
If Bidder believes any portion of its Bid contains information considered a trade secret under
ORS Chapter 192.345(2), or otherwise is exempt from disclosure under the Oregon Public
Records Law, ORS 192.311 through 192.478, Bidder must submit a statement claiming the exemption and the statutory reason for the exemption and each page containing such information must identify the exemption provision and include the following:
“This data is exempt from disclosure under the Oregon Public Records Law pursuant to
ORS Chapter 192 and is not to be disclosed except in accordance with the Oregon Public
Records Law, ORS 192.311 through 192.478.”
Identifying the Bid in whole as exempt from disclosure is not acceptable. Cost information submitted in response to an ITB is generally not considered a trade secret under Oregon
Public Records Law.
6.9 Recycled Products
DAS State Procurement Services, Version 2.0 – July, 2025 19
Contractors shall use recyclable products to the maximum extent economically feasible in the performance of the contract services or work set forth in this document and the subsequent Contract. (ORS 279B.055(2)(f), ORS279B.225, and ORS279B.270-279B.280)
6.10 Reserved
6.11 COBID
Pursuant to Oregon Revised Statute (ORS) Chapter 200, Agency encourages the participation of small businesses, certified by the Oregon Certification Office for Business Inclusion and
Diversity (COBID) in all contracting opportunities. This includes certified small businesses in the following categories: minority-owned business, woman-owned business, veteran-owned business, or an emerging small business. Agency also encourages joint ventures or subcontracting with certified small business enterprises. For more information, visit:
https://www.oregon.gov/biz/programs/cobid/pages/default.aspx https://www.oregon.gov/biz/programs/cobid/pages/default.aspx
DAS State Procurement Services, Version 2.0 – July, 2025 20
ATTACHMENT A
SAMPLE CONTRACT
State of Oregon
Oregon Department of Fish and Wildlife
Contract for Services for
Umatilla Hatchery Generator Replacements
This Contract for Services (this “Contract”) is by and between the State of Oregon, acting through its
Oregon Department of Fish and Wildlife, (“Agency)” and TBD , (“Contractor”) a
Corporation and is effective as of the Effective Date.
Contractor’s Contract Administrator for this Contract is:
Name and Title Company Name **Address **City, State ZIP Phone: (xxx) xxx-xxxx anyname@yahoo.com
Agency's Contract Administrator for this Contract is:
Andria Shelton, Hatchery Manager Umatilla Hatchery 73959 Riverview Ln Irrigon, OR 97844 Phone: (541) 667-7448 Andria.shelton@odfw.oregon.gov
Either party may change its Contract Administrator by providing the other notice in compliance with Section 17.6 of this Contract.
1. Contract Term.
The “Effective Date” of this Contract is the date this Contract has been fully executed by each party and, approved as required by applicable law. Unless extended or terminated earlier in accordance with its terms, this Contract terminates on TBD . The termination of this Contract will not extinguish or prejudice Agency’s right to enforce this Contract with respect to any default by
Contractor that has not been cured.
2. Contract Documents. This Contract consists of the following documents, which are listed in descending order of precedence:
2.1. this Contract less all exhibits;
2.2. Exhibit A (Statement of Work);
2.3. Exhibit B (Required Insurance);
2.4. Exhibit C (Federal Terms and Conditions);
mailto:anyname@yahoo.com mailto:Andria.shelton@odfw.oregon.gov
DAS State Procurement Services, Version 2.0 – July, 2025 21
2.5. Exhibit D (Independent Contractor Certification);
2.6. Exhibit E (Debarment and Suspension Form);
2.7. Exhibit F (Administrative Summary);
2.8. Exhibit G (Service Contract Act Wage Determination);
2.9. Exhibit H (ITB #S-63500-00017967) incorporated by reference;
2.10. Exhibit I (Bid Pricing Form for ITB #S-63500-00017967) incorporated by reference.
The foregoing documents and Exhibits are attached hereto and made a part of the Contract by this reference.
3. Services.
3.1. Performance of Services. Contractor shall perform the services (the “Services”) and deliver to agency the deliverables (“Deliverables”) set forth in Exhibit A, the Statement of Work (the “Statement of Work”). The Statement of Work includes the delivery schedule for the Deliverables and Services. Contractor shall perform the Services in accordance with the terms and conditions of this Contract. In the event Contractor provides the Services that do not conform to the Services Warranty during the Services Warranty Period set forth in Section 8.2.1 and Section 8.2.2, respectively, Contractor shall re-perform required Services at no additional cost to Agency.
3.2. Submission and Acceptance of Deliverables. When the Statement of Work requires Contractor to deliver Deliverables to Agency, then Contractor shall deliver Deliverables that comply with the requirements and acceptance criteria set forth in the Statement of Work. Contractor shall provide written notice to Agency upon delivery of a completed Deliverables to Agency. By no later than (i) 15 business days after receipt of such notice, or (ii) the date or period for review set forth in the Statement of Work, Agency will determine whether the Deliverables has the characteristics and otherwise meets the acceptance criteria set forth in the Statement of Work.
If Agency determines that the Deliverables has the characteristics and meets acceptance criteria set forth in the Statement of Work in all material respects, Agency will notify Contractor in writing of Agency’s acceptance of the Deliverables.
3.3. Rejection of Deliverables; Corrections. If Agency determines that a Deliverables does not have the characteristics or otherwise meet the acceptance criteria set forth in the Statement of Work in all material respects, Agency will notify Contractor in writing of Agency’s rejection of the Deliverables, and describe in reasonable detail in such notice the Agency’s basis for rejection of the Deliverables. Upon receipt of notice of non-acceptance, Contractor shall, within a 15 business day period, modify or improve the Deliverables at Contractor’s sole expense so that the Deliverables has the characteristics described in the Statement of Work and meets, in all material respects, the acceptance criteria, and notify the Agency in writing that it has completed such modifications or improvements and re-tender the Deliverables to Agency. Agency will thereafter review the modified or improved Deliverables within 15 business days of receipt of the Contractor's delivery of the Deliverables. Failure of the Deliverables to have the characteristics or meet in all material respects the acceptance criteria set forth in the Statement of Work after the second submission will constitute a default by Contractor. In the event of such default, Agency may either, (i) notify Contractor of such default and instruct Contractor to
DAS State Procurement Services, Version 2.0 – July, 2025 22 modify or improve the Deliverables as set forth in this Section, or (ii) notify Contractor of such default and pursue its remedies for default provided for by law or the terms of this Contract.
4. Compensation.
4.1. Not to Exceed Compensation. The maximum, not-to-exceed compensation payable to Contractor under this Contract, which includes any allowable expenses, is $ TBD .
Agency will not pay Contractor any amount in excess of the not-to-exceed compensation of this Contract, and will not pay for Services performed before the Effective Date or after the expiration or termination of this Contract. If the maximum compensation is increased by amendment of this Contract, the amendment must be fully effective before Contractor performs Services subject to the amendment.
4.2. Payments. Payments, including interim payments, to Contractor are subject to ORS 293.462, will be made only for completed and accepted Deliverables and Services, and will be made in accordance with the payment schedule and requirements set forth in Exhibit A.
4.3. Invoices. Contractor shall submit invoices to Agency as set forth in the Statement of Work or, if not set forth therein, to Agency’s Accounts Payable Unit at the address listed in Exhibit F, Administrative Summary. Contractor may submit invoices in accordance with the payment schedule set forth in the Statement of Work or, if no payment schedule is set forth therein, then no more frequently than once per month for accepted Deliverables and Services The invoices must describe all Services performed with particularity, including the dates Contractor performed the Services for which it is requesting payment, and by whom the Services were performed and shall itemize and explain all expenses that this Contract requires Agency to pay and for which Contractor claims reimbursement. Invoices will contain the ODFW Contract Number, OregonBuys PO Number, Project Title, and the name of the ODFW Project Manager listed on Exhibit F, Administrative Summary.
4.4. Expenses. Agency will not pay or reimburse any expenses incurred by Contractor during the completion of the Services except as authorized in the Statement Work or elsewhere in this Contract. Any such authorized travel expenses must comply with the Oregon Travel Policy available on the Internet at: http://www.oregon.gov/das/cfo/sars/policies/oam/40.10.00.pdf
4.5. Funds Available and Authorized. Contractor will not be compensated for Services performed under this Contract by any agency or department of the State of Oregon other than Agency.
Agency believes it has sufficient funds currently available and authorized for expenditure to make payments under this Contract within Agency’s biennial appropriation or limitation.
Contractor understands and agrees that Agency’s payments under this Contract are contingent on Agency receiving appropriations, limitations, or other expenditure authority sufficient to allow Agency, in the exercise of its reasonable administrative discretion, to continue to make payments under this Contract.
5. Oregon Prevailing Wage Rate Law.
5.1. The prevailing wage rate requirements that may apply to the Project are set forth in ORS 279C.800 through 279C.870 and the administrative rules promulgated thereunder (“PWR”), or, if applicable, 40 U.S.C. 3141 et seq. (“Davis-Bacon Act”). If applicable, Grantee shall:
http://www.oregon.gov/das/cfo/sars/policies/oam/40.10.00.pdf
DAS State Procurement Services, Version 2.0 – July, 2025 23
(a) be responsible for compliance with PWR, require its contractors and subcontractors to pay the applicable PWR or Davis-Bacon Act rates, and to comply with all other Oregon Bureau of
Labor and Industries (“BOLI”) requirements pursuant to the PWR, including on all contracts and subcontracts and in filing separate public works bonds with the Construction Contractors
Board (applicable wage rates are those in effect on the effective date of this Agreement and may be accessed via: BOLI : Prevailing Wage : For Employers : State of Oregon and https://sam.gov/; if a project is subject both to ORS 279C.800 to 279C.870 and to the Davis-
Bacon Act, contractors and subcontractors must be paid not less than the higher of the applicable state or federal prevailing rate of wage); and
(b) pay to BOLI, within the required timeframe and in the appropriate amount, the project fee required by OAR 839-025-0200 to 839-025-0230, including any additional fee that may be owed upon completion of the Project.
If Contractor believes the Project is not subject to PWR, Contractor must obtain and provide
Department with a copy of a coverage determination letter from the BOLI that confirms the
Project is not subject to PWR requirements before Contractor enters into a contract for construction management, contracts with a contractor to act as general manager of the project or proceeds to act as Contractor’s own general contractor.
Contractor represents and warrants that it is not on the BOLI current List of Contractors
Ineligible to Receive Public Works Contracts and that it will not contract with any contractor on this list.
These laws, rules, regulations and orders are incorporated by reference in this Agreement to the extent required by law.
6. State Premises
6.1. Reserved.Reserved.State Premises. Contractor and Contractor staff shall comply with all policies, rules, procedures, and regulations established by Agency and the State for access to and activities in and around premises controlled by Agency or any other agency of the State.
7. Independent Contractor; Responsibility For Taxes And Withholding
7.1. Independent Contractor. Contractor shall perform all Services as an independent contractor.
Agency reserves the right (i) to determine and modify the delivery schedule for the Services and
(ii) to evaluate the quality of the Services; however, Agency may not and will not control the means or manner of Contractor's performance. Contractor is responsible for determining the appropriate means and manner of performing the Services.
7.2. No Conflicts. Contractor, by signature to this Contract, represents and warrants that Contractor’s performance of the Services under this Contract creates no potential or actual conflict of interest as defined by ORS 244; and no statutes, rules or regulations of any State of Oregon or federal agency for which Contractor currently performs work would prohibit Contractor from performing the Services under this Contract.
7.3. Affiliation. Contractor understands and agrees that it is not an "officer," "employee," or "agent" of the State of Oregon, as those terms are used in ORS 30.265 or otherwise.
https://www.oregon.gov/boli/employers/pages/prevailing-wage.aspx https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fsam.gov%2F&data=05%7C02%7CAshley.J.Kallberg%40odfw.oregon.gov%7C1a5cac6f74c84e80681b08ddfb99161c%7Caa3f6932fa7c47b4a0cea598cad161cf%7C0%7C0%7C638943357104747221%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=IfLJLplk%2FN8BepgWDPMM%2FOJLBNXSzKYeTfIDh9UYxr0%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.oregon.gov%2Fboli%2FWHD%2FPWR%2Fdocs%2FDebar_List.pdf&data=05%7C02%7CAshley.J.Kallberg%40odfw.oregon.gov%7C1a5cac6f74c84e80681b08ddfb99161c%7Caa3f6932fa7c47b4a0cea598cad161cf%7C0%7C0%7C638943357104774835%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=sy2JMkchjccusXjuFZ3uZNcZiT1FAvj9et0Qf1lJ9iA%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.oregon.gov%2Fboli%2FWHD%2FPWR%2Fdocs%2FDebar_List.pdf&data=05%7C02%7CAshley.J.Kallberg%40odfw.oregon.gov%7C1a5cac6f74c84e80681b08ddfb99161c%7Caa3f6932fa7c47b4a0cea598cad161cf%7C0%7C0%7C638943357104774835%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=sy2JMkchjccusXjuFZ3uZNcZiT1FAvj9et0Qf1lJ9iA%3D&reserved=0
DAS State Procurement Services, Version 2.0 – July, 2025 24
7.4. Taxes and Benefits. Contractor is responsible for all federal or state taxes applicable to compensation or payments paid to Contractor under this Contract and, unless required by applicable law, Agency will not withhold from such compensation or payments any amount to cover Contractor's federal or state tax obligations. Contractor is not eligible for any social security, unemployment insurance or workers' compensation benefits from compensation or payments paid to Contractor under this Contract, except as a self-employed individual.
8. Subcontracts, Successors, And Assignments
8.1. Subcontracts. Contractor shall not enter into any subcontracts for any of the Services required by this Contract without Agency's prior written consent. In addition to any other provisions Agency may require, Contractor shall include in any permitted subcontract under this Contract provisions to ensure that Agency will receive the benefit of subcontractor’s performance as if the subcontractor were Contractor. Agency’s consent to any subcontract does not relieve Contractor of any of its duties or obligations under this Contract.
8.2. Successors and Assigns. The provisions of this Contract are binding upon and inure to the benefit of the parties to this Contract, their respective successors, and permitted assigns, if any.
8.3. No Assignment. Contractor shall not assign or transfer any of its rights or delegate its obligations under this Contract without Agency’s prior written consent.
9. Representations and Warranties.
9.1. Contractor’s General Representations and Warranties. Contractor represents and warrants to Agency that:
9.1.1. Contractor has the power and authority to enter into and perform this Contract;
9.1.2. This Contract, when executed and delivered, is a valid and binding obligation of Contractor enforceable in accordance with its terms;
9.1.3. Contractor shall, at all times during the term of this Contract, be qualified, professionally competent, and duly licensed to perform the Services;
9.1.4. Contractor prepared its proposal related to this Contract, if any, independently from all other proposers, and without collusion, fraud, or other dishonesty; and
9.1.5. Contractor (to the best of Contractor’s knowledge, after due inquiry), for a period of no fewer than six calendar years preceding the Effective Date, faithfully has complied with:
9.1.5.1. All tax laws of this state, including but not limited to ORS 305.620 and ORS chapters 316, 317, and 318;
9.1.5.2. Any tax provisions imposed by a political subdivision of this state that applied to Contractor, to Contractor’s property, operations, receipts, or income, or to Contractor’s performance of or compensation for any work performed by Contractor;
DAS State Procurement Services, Version 2.0 – July, 2025 25
9.1.5.3. Any tax provisions imposed by a political subdivision of this State that applied to Contractor, or to goods, services, or property, whether…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .