ITB Kenai Vault.pdf
PDF 6 MB Posted
- Attached to
- ITB Keani Armory Vault build
- Solicitation number
- Not on record
- Issued by
- Kenai Peninsula Borough, Ketchikan City, Alaska
About this file
This document is an Invitation to Bid (ITB) issued by the State of Alaska, Department of Military and Veterans Affairs (DMVA) for the Kenai Armory Vault construction project. The project involves the design, remodeling, and build-out of a new weapons vault and cleaning room inside the existing National Guard building in Kenai, Alaska. The contractor shall provide all construction documents, labor, equipment, materials, licenses, insurance, and any travel expenses to complete the work. The Engineer's Estimate for this project is $500,000 - $770,000, and the work must be substantially completed by June 29, 2025. Bidders are highly recommended to attend a pre-bid walkthrough scheduled for July 17, 2024 at 10:00 am to understand the existing site conditions.
The ITB requires the apparent low bidder to submit a Subcontractor List, Summary of Good Faith Effort Documentation, DBE Utilization Report, and Prime Contractor's Written DBE Commitment within 5 working days of notification. The successful contractor must also provide Payment and Performance Bonds, a Contractor's Questionnaire, and Certification Regarding Tax Delinquency and Felony Convictions prior to award. This is a wholly state-funded project, so Alaska Bidder, Alaska Veteran, and Alaska Product preferences will be applied to determine the lowest responsible and responsive bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
Project No.
State of Alaska Department of Military and Veterans Affairs Facilities Management Office PO Box 5169, JBER, Alaska 99505
Bids Due: @ 1:00 P.M. Alaska time
02B6023031
Kenai 99611
July 25, 2024
Kenai Armory Vault
July 3, 2024ITB Issue Date
STATE OF ALASKA
DEPARTMENT OF AND
INVITATION TO BID
for Construction Contract
Date
Project Name and Number The Department invites bidders to submit bids for furnishing all labor, equipment, and materials and performing all work for the project described below. The Department will only consider bids received before :00 PM local time (per the Department’s time source) on the _
Location of Project:
Contracting Officer:
Issuing Office:
State Funded Federal Aid Description of Work:
The Engineer’s Estimate is
All work shall be completed in ________ Calendar Days, or by ____________________________________.
The Department will identify interim completion dates, if any, in the Special Provisions.
The apparent successful bidder must furnish a payment bond in the amount of 0% of the contract and a performance bond in the amount of 0% of the contract as security conditioned for the full, complete and faithful performance of the contract. The apparent successful bidder must execute the said contract and bonds within fifteen calendar days, or such further time as may be allowed in writing by the Contracting Officer, after receiving notification of the acceptance of their bid.
Submission of Bidding Documents Bidders may submit bidding documents electronically via the Department’s approved online bidding service, through the mail or hand delivered. For mailed or hand delivered bids and for electronically submitted bids with a paper bid guaranty, documents shall be submitted in a sealed envelope marked as follows:
Bidding Documents for Project: ATTN:
It is incumbent upon the bidder to ensure its bid, any amendments, and/or withdrawal arrive, in its entirety, at the location and before the deadline stated above. A bidder sending a bid amendment or withdrawal via email must transmit its documentation to the Department at this email address:
July 3, 2024
Kenai Armory Vault
105 South Forest Dr. Kenai, AK 99611
Jim Manco Facilities Management Office (FMO), DMVA
$500,000 - $770,000.00
06/29/2025
This ITB is intended to result in the build-out of a new weapons vault and cleaning room inside of the existing structure at the State of Alaska Army National Guard building in Kenai, Alaska. The Contractor shall provide complete Design Build services and shall supply all construction documents, labor, equipment, materials, licenses, insurance and any travel expenses to complete the work outlined in this ITB. Maintain the current floor type, adequate lighting, heat, ventilation as required in the Unified Facilities Criteria (UFC) and Army National Guard DG 415-5 General Facilities Information Design Guide.
57024 Roosevelt Rd.
JBER, AK 99505
02B6023031
Jim Manco
July 25, 2024
105 South Forest Dr. Kenai, AK 99611
02B6023031
NOTICE TO BIDDERS
The following data may assist a bidder in preparing its bid:
A bidder may direct questions concerning bidding procedures and requirements to:
Email: _____________________ Phone: _______________
Other Information:
A bidder requesting assistance in viewing the project site must make arrangements at least 48 hours in advance.
The point of contract for inquiries for this project is ____________________________________________.
Email: _____________________ Phone: _______________ bidder
Jim Manco james.manco@alaska.gov 907-428-7170 james.manco@alaska.gov 907-428-7170
Construction Document
SECTION 01
GENERAL REQUIREMENTS
PART 1 – GENERAL
1.01 RELATED REQUIREMENTS
A. All Contract Documents are related to this Section.
1.02 WORK COVERED BY CONTRACT
Work under this Contract includes all design, material, permits, tools, labor and travel, if necessary, to complete the project detailed herein and located
All work must be completed in accordance with the terms and conditions of the Contract Documents.
The work at the National Guard Armory includes providing design, remodeling and build-out as per the attached concept drawing. The contractor shall provide all construction documents, labor, equipment, materials, licenses, insurance, and any travel expenses the scope of this project.
Contractor must comply with all applicable Federal, State, and Local Regulations and Requirements including but not limited to; Unified Facilities Criteria (UFC), OSHA, NEC, and NFPA.
Build-out - Design and build new
Bid Alternate #1 –
Bid Alternate #2 –
1.03 CONTRACT
A. Construct the Work under a single lump sum Contract.
02B6023031
105 South Forest Dr. Kenai, AK 99611
1.04 WORK BY OTHERS
A. Other State projects may be scheduled to be under construction in the vicinity of the project. At this time, there are no known projects scheduled.
B. Cooperate with other Contractors, Department Consultants, and the DEPARTMENT to minimize conflict with construction operations.
1.05 WORK SEQUENCE AND MILESTONES
A. The contractor is highly recommended to perform a pre-bid walkthrough to understand and familiarize with existing site conditions. Arrangements for a tour to be scheduled with the project manager:
Name:
Phone:
Email:
Walk through:
Upon receipt of Notice to Proceed (NTP) the CONTRACTOR will be expected to prepare submittals, a detailed project schedule and obtain required permits.
All work shall be substantially complete by
This is an active facility all work shall be coordinated with the Project Manager to minimize disruption to daily activities and to provide building access.
When applicable, the Contractor shall perform inspections and tests throughout the design and construction process, including:
Design support, such as, existing conditions, needs assessments, etc.;
Construction installation, such as, code compliance, placement, qualification, measurements, etc.;
Final inspections and tests, such as, commissioning, performance certification, etc.
Upon completion of project, contractor must demonstrate complete start up and operation procedures witnessed by the owner’s representative.
1.06 CONTRACTOR’S USE OF PREMISES
Coordinate use of the premises under direction of .
Assume full responsibility for the protection of the facility, roads and grounds in the project vicinity from construction related activities.
02B6023031
Kenai Armory Vault
Jim Manco 907-428-7170 james.manco@alaska.gov
7/17/2024 10:00 am
06/29/2025
C. Obtain permission and pay for use of additional storage, Work or parking areas needed for construction operations.
D. Any outage must be notified to the project manager at least 48hrs prior.
E. The project Site shall be kept clean and organized. Stored materials must always be secured and Foreign Object Debris (FOD) picked up daily.
1.07 SECURITY REQUIREMENTS
A. When Contractor considers Work has reached Final Completion, submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and request Department of Military and Veterans Affairs perform final inspection.
B. In addition to submittals required by the conditions of the Contract, provide submittals required by governing authorities, and submit a Final Statement of Accounting giving total Contract Price and sum due.
PART 2 – PRODUCTS
A. Submit product data to project manager for approval prior to installation for all materials being installed.
PART 3 – EXECUTION
1. All materials and debris removed during project will be the responsibility of the contractor to remove from job site for proper disposal. Arrangement of Dumpster for disposal of debris is the contractor’s responsibility.
2. All materials and debris must be stored and disposed in the designated areas only to ensure safe operations. Continuous policing of debris is mandatory to allow continued safe operative environment.
3. Contractors must comply with OSHA Safety Standards, clean the work area on a daily basis and, provide safety barriers, dust control and access to be maintained during the project.
4. When applicable, the contractor must perform a documented hazardous material survey, and notify the DMVA Environmental Program Specialist, for removal and disposal hazardous material and hazardous waste generated. All hazardous materials must be removed before demolition.
5. Hazardous Material may include:
Lead-based paint;
Asbestos containing materials, such as insulation, ceiling or floor tiles, mastics, grout, roofing or siding, etc.;
Mercury in switches, thermostats, electronics, fluorescent bulbs, and other equipment;
Chlorofluorocarbons (CFCs) or other harmful chemicals in old refrigerators, air conditioners, and aerosol cans;
Polychlorinated biphenyls (PCBs) in transformers, lubricants, paints, and sealants;
Potentially toxic household or agricultural chemicals, including certain paints, cleaning products, and pesticides.
6. Contractors must store any construction equipment holding petroleum, oil, or lubricants on impervious surfaces whenever possible. Spill kits must be accessible during construction and if there is a spill, personnel must follow the DMVA Installation Spill Contingency Plan (ISCP). See enclosed ISCP.
PART 4 – ATTACHMENTS
Proposed Concept.
As built drawings.
Photos.
END OF SECTION
25D-3S (3/19) 00100-1 Page 1 of 10
D
INFORMATION TO BIDDERS
This Information to Bidders outlines requirements that a bidder must follow when submitting a bid. The Department will reject a noncompliant bid.
100.01 BIDDERS QUALIFICATIONS
A bidder shall:
Submit evidence of a valid Department of Commerce, Community, and Economic Development certificate of Contractor Registration (Contractor Registration), under AS 08.18, and submit evidence of a valid Alaska Business License prior to award; and
When requested, submit a completed Contractor’s Questionnaire (Form 25D-8) stating previous experience in performing comparable work, business and technical organization, financial resources, and equipment available to be used in performing the work.
Before a bid is considered for award, the bidder may be requested by the Department to submit a statement of facts, in detail, as to his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the contemplated work.
100.02 CONTENTS OF BID PACKAGE
Upon request, the Department will furnish prospective bidders with a bid package, at the price stated in the Invitation To Bid.
The bid package includes the following:
1) Location and description of the project;
2) Time in which the work must be completed;
3) Amount of the bid guaranty;
4) Date, time, and place when bids are due;
5 Plans and specifications; and
6) Bid forms.
Unless otherwise stated in the bid package, the Plans, Contract Provisions and Specifications, Standard Modifications, Special Provisions, permits, forms and any other documents designated in the bid package are considered a part of the bid whether attached or not.
100.03 EXAMINATION OF CONTRACT REQUIREMENTS
25D-3S (3/19) 00100-2 Page 2 of 10
Bidders are responsible for carefully examining the plans, specifications and all other documents incorporated in the contract to determine the requirements thereof before preparing bids.
Any explanation desired by bidders regarding the meaning or interpretation of drawings and specifications must be requested in writing and with sufficient time allowed for a reply to reach them before the submission of their bids. Oral explanations or instructions given before the award of the contract will not be binding. Any interpretation made will be in the form of an addendum to the specifications or drawings and will be furnished to all bidders and its receipt by the bidder shall be acknowledged.
100.04 CONDITIONS AT SITE OF WORK
Bidders are responsible for visiting the site to ascertain pertinent local conditions such as the location, accessibility and character of the site, labor conditions, the character and extent of the existing work within or adjacent thereto, and any other work being performed thereon.
100.05 PREPARATION OF BIDS
A. A bidder shall prepare its bid using the Department provided bid forms or legible copies of the Department’s forms.
The bid must be signed in ink by the person or persons authorized to sign the Contract for the bidder. If a bidder is a corporation, the bid must be signed by a corporate officer or agent with authority to bind the corporation. If a bidder is a partnership, a partner must sign. If the bidder is a joint venture, each principal member must sign. If a bidder is a sole proprietorship, the owner must sign. Each person signing the bid must initial any changes made to entries on the bid forms.
B. The bid schedule contains empty space(s) that call for the bidder to enter its proposed price for each corresponding item which may include unit price or lump sum items and alternative, optional or supplemental price schedules or a combination thereof which will result in a total bid amount for the proposed construction.
C. The bidder shall specify the price or prices bid in figures. On unit price contracts the bidder shall also show the products of the respective unit prices and quantities written in figures in the column provided for the purpose and the total amount of the proposal obtained by adding the amounts of the several items. All the figures shall be in ink or typed.
D. Neither conditional nor alternative bids will be considered unless called for.
100.06 BID SECURITY
All bids shall be accompanied by a bid security in the amount specified on the Invitation to Bid.
The bid security shall be unconditionally payable to the State of Alaska and shall be in the form of an acceptable Bid Bond (Form 25D-14) made payable to the State of Alaska.
25D-3S (3/19) 00100-3 Page 3 of 10
The surety of a Bid Bond may be any corporation or partnership authorized to do business in Alaska as an insurer under AS 21.09. A legible power of attorney shall be included with each Bid Bond (Form 25D-14).
A Bid Bond must be accompanied by a legible Power of Attorney.
An individual surety will not be accepted as a bid security.
100.07 ADDENDA REQUIREMENTS
The Department will issue addenda if it determines, in its discretion, that clarifications or changes to the Contract documents or bid due date are needed. The Department may send addenda by any reasonable method such as fax, email, or may post the addenda on its website or online bidding service. Unless picked up in person or included with the bid documents, addenda or notice that an addendum has been issued will be addressed to the individual or company to whom bidding documents were issued and sent to the email address or fax number on the plan holders’ list.
Notwithstanding the Department’s efforts to distribute addenda, bidders are responsible for ensuring that they have received all addenda affecting the Invitation To Bid. Bidders must acknowledge all addenda on the Bid Forms, by fax, or by email before the deadline stated in the Invitation to Bid.
100.08 DELIVERY OF BIDS
Bids shall be submitted in a sealed envelope . When bids are submitted in a sealed envelope, the envelope shall clearly indicate its contents and the address of the Department’s designated contracts office, as specified on the Invitation to Bid. Bids for other work may not be included in the envelope.
100.09 WITHDRAWAL OR REVISION OF BIDS
Bids may be withdrawn or revised in writing delivered by mail, fax, or email, provided that the Department’s designated office receives the withdrawal or revision before the deadline stated in the Invitation To Bid. Withdrawal requests must be signed and submitted by the bidder’s duly appointed representative who is legally authorized to bind the bidder. Revisions shall include both the modification of the unit bid price and the total modification of each item modified but shall not reveal the amount of the total original or revised bids.
100.010 PROTEST OF INVITATION TO BID
An interested party, as defined in AS 36.30.699, may protest an Invitation to Bid before the bid opening in accordance with AS 36.30.560 and AS 36.30.565. The interested party must submit a protest to the Contracting Officer.
100.011 RECEIPT AND OPENING OF BIDS
The Department will only consider bids, revisions, and withdrawals received before the deadline stated in the Invitation to Bid.
25D-3S (3/19) 00100-4 Page 4 of 10
The Department will assemble, open, and publicly announce bids at the time and place indicated in the Invitation to Bid, or as soon thereafter as practicable. The Department is not responsible for prematurely opening or for failing to open bids that are improperly addressed or identified.
100.012 NONRESPONSIVE BIDS
1. A bid shall be rejected as nonresponsive if it:
a. Is not properly signed by an authorized representative of the bidder and in a legally binding manner;
b. Contains unauthorized additions, conditional or alternative bids, or other irregularities that make the bid incomplete, indefinite, or ambiguous;
c. Includes a reservation of the right to accept or reject any award, or to enter into a contract pursuant to an award,
d. Fails to include an acceptable bid guaranty with the bid;
e. Is materially unbalanced; or
f. Fails to meet any other material requirement of the Invitation To Bid.
2. A bid may be rejected as nonresponsive, in the Department's discretion, if it:
a. Is not typed or completed in ink;
b. Fails to include an acknowledgement of receipt of each addendum by assigned number and date of issue; or
c. Is missing a bid price for any pay item, except when alternate pay items are authorized.
100.013 BIDDERS INTERESTED IN MORE THAN ONE BID
A party who has quoted prices to a bidder is not thereby disqualified from quoting prices to other bidders or from submitting a bid directly for the work.
100.014 ELECTRONIC MAIL
Within its submitted bid, a bidder must include a current electronic mail (email) address of bidder’s representative who possesses authority to receive, process, and respond to Department emails regarding the advertised project.
The Department may send notices and information to a bidder by using the furnished email address of the bidder’s authorized representative.
A bidder shall notify the Department if the bidder requests the Department to send email notices or information to an address different from the email address initially provided in its bid forms.
The bidder shall notify the Department of such change by sending a request in writing to the Contract’s point of contact identified on the Invitation to Bid that is signed by a representative who is authorized and empowered to legally bind the bidder.
25D-3S (3/19) 00100-5 Page 5 of 10
Delivery of an email sent by the Department is complete upon receipt in the addressee’s email account. An email sent after 4:30 pm shall be deemed to have occurred at the opening of business on the next working day.
If needed, the Department may demonstrate proof of email delivery by affidavit or certification that includes the following:
1. The date and time that the Department sent the email message;
2. The email address from which the Department sent the message;
3. The name and email address to which the Department sent the message;
4. A statement that the Department sent the email message and that the person signing the affidavit or certification believes the transmission to have been complete and without error;
and
5. An attached copy of the subject email.
100.015 CONSIDERATION OF BIDS
Until the Award, the Department may reject any or all bids, waive minor informalities or advertise for new bids without liability to any bidder if the Department, in its discretion, determines that to do so is in the best interests of the State.
A bidder may request withdrawal of a bid after opening and before the Award only in accordance with AS 36.30.160(b) and State procurement regulations. The bidder must submit the request to the Contracting Officer.
An interested party, as defined in AS 36.30.699, may protest a proposed Award of contract as per AS 36.30.560 and AS 36.30.565. The bidder must submit the protest to the Contracting Officer.
WHOLLY STATE-FUNDED PROJECTS. On wholly state-funded projects, determination of the low bidder will include bidder preferences as required under AS 36.30.321, according to subsections 1-3 below. Alaska Bidder Preference, Alaska Veteran Preference, and Alaska Product Preference are not applicable on projects with federal funding.
1. Alaska Bidder Preference: A bidder claiming this preference shall provide with their bid an Alaska Bidder Preference Certification, certifying they qualify as an Alaska bidder eligible for Alaska Bidder Preference according to AS 36.30.
If the bidder qualifies as an Alaska bidder, a five percent (5%) preference will be applied to the price of the bid. "Alaska bidder" means a person who:
a. holds a current Alaska business license;
b. submits a bid for goods, services, or construction under the name as appearing on the person's current Alaska business license;
25D-3S (3/19) 00100-6 Page 6 of 10
c. has maintained a place of business within the state staffed by the bidder or an employee of the bidder for a period of six months immediately preceding the date of the bid;
d. is incorporated or qualified to do business under the laws of the state, is a sole proprietorship and the proprietor is a resident of the state, is a limited liability company organized under AS 10.50 and all members are residents of the state, or is a partnership under former AS 32.05, AS 32.06, or AS 32.11 and all partners are residents of the state; and
e. If a joint venture, is composed entirely of ventures that qualify under (a) through (d), above.
2. Alaska Veteran Preference: A bidder claiming this preference shall provide an Alaska Veteran Preference Certification, certifying they qualify as an Alaska bidder eligible for Alaska Veteran preference according to AS 36.30.
If a bidder qualifies as an Alaska bidder and is a qualifying entity, an Alaska Veteran Preference of 5 percent shall be applied to the bid price. The preference may not exceed $5,000 (AS 36.30.321). A “qualifying entity” means a:
a. sole proprietorship owned by an Alaska veteran;
b. partnership under AS 32.06 or AS 32.11 if a majority of the partners are Alaska veterans;
c. limited liability company organized under AS 10.50 if a majority of the members are Alaska veterans; or
d. corporation that is wholly owned by individuals, and a majority of the individuals are Alaska veterans.
A preference under this section is in addition to any other preference for which the bidder qualifies.
To qualify for this preference, the bidder must add value by the bidder itself actually performing, controlling, managing and supervising a significant part of the services provided or the bidder must have sold supplies of the general nature solicited to other state agencies, governments, or the general public.
An Alaska veteran is a resident of Alaska who:
1) served in the Armed forces of the United States, including a reserve unit of the United States armed forces; or the Alaska Territorial Guard, the Alaska Army National Guard, the Alaska Air National Guard, or the Alaska Naval Militia; and
2) was separated from service under a condition that was not dishonorable.
3. Alaska Product Preference: A bidder claiming this preference shall complete and sign the Alaska Product Preference Worksheet, according to the worksheet instructions, and submit the completed worksheet with their bid.
25D-3S (3/19) 00100-7 Page 7 of 10
Except for timber, lumber and manufactured lumber products used in the construction project under AS 36.30.322(b), an Alaska products preference will be given as required under AS
36.30.326 - 36.30.332 when the bidder designates the use of Alaska products.
If the successful bidder/contractor proposes to use an Alaska product and does not do so, a penalty will be assessed against the successful bidder/contractor according to AS 36.30.330(a).
Each Alaska product declared on the Alaska Product Preference Worksheet must have an “Approval” date on the Alaska Product Preference Program List, that is on or before the bid opening date for this contract, and that does not expire before the bid opening date for this contract.
100.016 RESPONSIBILITY OF BIDDERS
The Department may find a bidder is nonresponsible for any one of the following reasons, but is not limited in its responsibility analysis to the following factors:
1. Evidence of bid rigging or collusion;
2. Fraud or dishonesty in the performance of previous contracts;
3. More than one bid for the same work from an individual, firm, or corporation under the same or different name;
4. Unsatisfactory performance on previous or current contracts;
5. Failure to pay, or satisfactorily settle, all bills due for labor and material on previous contracts;
6. Uncompleted work that, in the judgment of the Department, might hinder or prevent the bidder’s prompt completion of additional work, if awarded;
7. Failure to reimburse the State for monies owed on any previous contracts;
8. Default under previous contracts;
9. Failure to submit evidence of registration and licensing;
10. Failure to comply with any qualification requirements of the Department;
11. Engaging in any activity that constitutes a cause for debarment or suspension under the State Procurement Code (AS 36.30) or submitting a bid during a period of debarment;
12. Failure to satisfy the responsibility standards set out in state regulations;
13. Lack of skill, ability, financial resources, or equipment required to perform the contract;
or
14. Lack of legal capacity to contract.
Nothing contained in this section deprives the Department of its discretion in determining the lowest responsible bidder.
25D-3S (3/19) 00100-8 Page 8 of 10
100.017 SUBCONTRACTOR LIST
The apparent low bidder shall submit a completed Subcontractor List, Form 25D-5, within five working days following receipt of written notification by the Department that it is the low bidder.
An apparent low bidder who fails to submit a completed Subcontractor List form within the time allowed will be declared nonresponsible and may be required to forfeit the bid security. The Department will then consider the next lowest bidder for award of the Contract.
If a bidder fails to list a subcontractor, or lists more than one subcontractor for the same portion of work, and the value of that work is in excess of one-half of one percent of the total bid amount, the bidder agrees to perform that portion of work without a subcontractor and represents that it is qualified to perform that work.
A bidder who lists as a subcontractor another contractor who, in turn, sublets the majority of the work required under the Contract, violates this subsection.
A bidder or Contractor may, without penalty, replace a listed subcontractor who:
1) Fails to comply with licensing and registration requirements of AS 08.18;
2) Fails to obtain a valid Alaska business license;
3) Files for bankruptcy or becomes insolvent;
4) Fails to execute a subcontract for performance of the work for which the subcontractor was listed, and the bidder acted in good faith;
5) Fails to obtain bonding acceptable to the Department;
6) Fails to obtain insurance acceptable to the Department;
7) Fails to perform the subcontract work for which the subcontractor was listed;
8) Must be replaced to meet the bidder's required state or federal affirmative action requirements;
9) Refuses to agree or abide with the bidder's labor agreement; or
10) Is determined by the Department to be not responsible.
In addition to the circumstances described above, a Contractor may in writing request permission from the Department to add a new subcontractor or replace a listed subcontractor. The Department will approve the request if it determines in writing that allowing the addition or replacement is in the best interest of the State.
A bidder or Contractor shall submit a written request to add a new subcontractor or replace a listed subcontractor to the Contracting Officer a minimum of five working days before the date the new subcontractor is scheduled to begin work on the construction site. The request must state the basis for the request and include supporting documentation acceptable to the Contracting Officer.
25D-3S (3/19) 00100-9 Page 9 of 10
If a bidder violates this subsection, the Contracting Officer may:
1) Cancel the Contract after Award without any damages accruing to the Department; or
2) After notice and a hearing, assess a penalty on the bidder in an amount not exceeding 10 percent of the value of the subcontract at issue.
100.018 AWARD OF CONTRACT
The Department will award the Contract to the lowest responsible and responsive bidder unless it rejects all bids. The Department will notify all bidders in writing via email, fax, or U.S. Mail of its intent to award.
In order to establish a clear and definitive basis of award for contracts with additive alternates, the State has established a budgeted amount from which the order of bidders will be determined. The amount will be disclosed when timely received bids are announced. The low bid will be determined by considering the basic bid and additive alternate(s) in the order listed on the Bid Schedule up to a total not to exceed the budgeted amount. The State reserves the right to reject all bids. The State also reserves the right to award the contract above or below the budgeted amount to the low bidder based on any combination of alternate(s) or no alternate(s), providing that the low bidder remains unchanged.
The Department will notify the successful bidder in writing of its intent to award the Contract and request that certain required documents, including the Contract Form, bonds, and insurance be submitted within the time specified. The successful bidder's refusal to sign the Contract and provide the requested documents within the time specified may result in cancellation of the notice of intent to award and forfeiture of the bid security.
If an award is made, it will be made as soon as practicable and usually within 40 days after bid opening. Award may be delayed due to bid irregularities or a bid protest, or if the award date is extended by mutual consent. Bids shall be valid for 120 days after bid opening, and may be extended by mutual consent.
100.019 RETURN OF BID SECURITY
The Department will return bid securities, other than bid bonds:
1. To all except the two lowest responsive and responsible bidders, as soon as practicable after the opening of bids; and
2. To the two lowest responsive and responsible bidders immediately after Contract award.
100.020 PERFORMANCE AND PAYMENT BONDS
The successful bidder shall furnish all required Performance and Payment Bonds on forms provided by the Department for the sums specified in the Contract. If no sum is specified, the successful bidder shall comply with AS 36.25.010. The Surety on each bond may be any corporation or partnership authorized to do business in the state as an insurer under AS 21.09 or two individual sureties approved by the Contracting Officer.
25D-3S (3/19) 00100-10 Page 10 of 10
If individual sureties are used, two individual sureties must each provide the Department with security assets located in Alaska equal to the penal amount of either the performance bond or the payment bond. Any costs incurred by the Contractor and the individual Surety are subsidiary and shall be borne by the Contractor or the individual Surety. In no event will the Department be liable for these costs.
Individual sureties shall provide security by one, or a combination, of the following methods:
1. Escrow Account, with a federally insured financial institution, in the name of the Department. Acceptable securities include, but are not limited to, cash, treasury notes, bearer instruments having a specific value, or money market certificates.
2. Irrevocable letters of credit, from a financial institution approved by the Contracting Officer, with the Department named as beneficiary.
3. Cashier’s or certified check made payable to the State of Alaska issued by financial institutions approved by the Contracting Officer.
These bonds and security assets, as applicable, shall remain in effect for 12 months after the date of final payment or, if longer, until all obligations and liens under this Contract are satisfied, including, but not limited to, obligations under General Conditions, Subsection 12.7.
The Department may, in its discretion, notify the bonding company or Surety of any potential default or liability.
The Contractor shall substitute, within five working days, another bond or surety acceptable to the Department if an individual Surety or the Surety on any bond furnished in connection with the Contract:
1. Becomes insolvent or is declared bankrupt;
2. Loses its right to do business in any state affecting the work;
3. Ceases to meet Contract requirements;
4. Fails to furnish reports of financial condition upon request; or
5. Otherwise becomes unacceptable to the Department.
When approved by the Contracting Officer, the Contractor may replace:
1. An individual surety with a corporate surety; or
2. Posted collateral with substitute collateral.
Failure to maintain the specified bonds or to provide substitute bonds when required under this section may be grounds for withholding contract payments until substitute bonding is obtained, and may, in the Department's discretion, be grounds for declaring the Contractor in default.
DEPARTMENT OF
REQUIRED DOCUMENTS
Federal-Aid Contracts
REQUIRED FOR BID. Bids will not be considered if the following documents are not completely filled out and submitted at the time of bidding:
Bid Forms
Bid Cover Sheet
Bid Schedule
Bid Attachments (as applicable)
Certificate of Buy American Compliance (Form 25D-151 or Form 25D-152)
Addenda
Bidder’s and Certification
REQUIRED FOR BID MODIFICATIONS. Any bid revisions must be submitted by the bidder prior to bid opening. Use the following form to modify Manual (paper) bids:
. Bid Modification (Form 25D-16)
REQUIRED AFTER NOTICE OF APPARENT LOW BIDDER. The apparent low bidder is required to complete and submit the following documents within 5 working days after receipt of written notification:
1. Subcontractor List (Form 25D-5)
2. Summary of Good Faith Effort Documentation (Form 25A-332A), and Contact Reports (Form 25A-321A)
3. DBE Utilization Report (Form 25A-325C)
4. Prime Contractor’s Written DBE Commitment (Form 25A-326) for each DBE to be used on the project.
REQUIRED FOR BUY AMERICAN WAIVER REQUESTS. When Certificate of Buy American Compliance (Form 25D-151 or 25D-
152) indicates the bidder will request a waiver, the bidder is required to complete and submit the following documents within 5 working days after receipt of written notification:
5. Buy American Request for Type 3 Waiver (Form 25D-153)
6. Buy American Percentage (Form 25D-155)
7. Buy American Assembly Questionnaire (Form 25D-156)
REQUIRED FOR AWARD. In order to be awarded the contract, the successful bidder must completely fill out and submit the following documents within the time specified in the intent to award letter:
1. Construction Contract (Form 25D-10A)
2. Payment Bond (Form 25D-12)
3. Performance Bond (Form 25D-13)
4. Contractor's Questionnaire (25D-8)
5. Certificate of Insurance (from carrier)
6. EEO-1 Certification (Form 25A-304)
7. Bidder Registration (Form 25D-6) Bidders must register annually with the Civil Rights Office in order to be eligible for award.
8. Certification Regarding Tax Delinquency and Felony Convictions (Form 25D-159)
DEPARTMENT OF
FEDERAL EEO BID CONDITIONS
Authority and Guidelines.
The Alaska Department of , has authority under 23 U.S.C. 140 and its implementing regulations to conduct a compliance program addressing Equal Employment Opportunity (EEO) and Affirmative Action (AA) in employment on non-exempt federal and federally-assisted construction contracts that are awarded in the State of Alaska. The STA's authority to administer a contract compliance with Nondiscrimination, EEO and AA programs are authorized under 23 U.S.C., 49 U.S.C., Title VI of the Civil Rights Act of 1964, MAP-21 and implementing regulations. The provisions of 23 CFR 200 and 49 CFR 21 provide authority to determine, and where necessary obtain compliance with the nondiscrimination provisions of Title VI. Under the provisions of Title VI 23 USC and related regulations, including 49 CFR 21 and 26, and 23 CFR Part 200, 230 and 633, it is the STA's responsibility to ensure compliance with and to enforce on all projects of Federal-aid contractors and subcontractors, whether a particular contract or work-site involves Federal-aid funds or not.
These citations confirm the requirement for contractors to provide, and States to obtain information that ensure non-discrimination in employment on all of Federal and federally-assisted projects, and through these provisions, provide for EEO for minorities and women in all terms and conditions of their employment at all of their facilities and on all projects.
1. Definitions. As used in these specifications:
a. “Covered area” means the geographical area described in the solicitation from which this contract resulted;
b. “Employer identification number” means the Federal Social Security number used on the Employer’s Quarterly Federal Tax Return, U.S. Treasury Department Form 941.
c. “Minority” includes:
(1) Black (all persons having origins in any of the Black African racial groups not of Hispanic origin);
(2) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or other Spanish culture or origin, regardless of race);
(3) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and
(4) American Indian or Alaska Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).
2. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and which is set forth in the solicitations from which this contract resulted.
3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the DOL in the covered area, either individually or through an association, its affirmative action obligations on all work in the Plan area shall be in accordance with that Plan for those trades that have unions participating in the Plan.
Contractors must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each Contractor or subcontractor participating in an approved Plan is individually required to comply with its obligations under the EEO clause, and to make good faith effort to achieve an equal representation of minority and female employment under the Plan in each trade in which it has employees. The overall good faith performance by other Contractors or subcontractors in an approved Plan does not excuse any covered Contractor’s or subcontractor’s failure to make good faith efforts to achieve the Plan.
4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 5(a) through 5(p) of these specifications.
5. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor’s compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following:
a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the Contractor’s employees are assigned to work. The Contractor shall specifically ensure that all foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor’s obligations to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.
b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations’ responses.
c. Maintain a current file of the names, addresses and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefor, along with whatever additional actions the Contractor may have taken.
d. Provide immediate written notification to the Civil Rights Office’s Contract Compliance Officer when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor’s efforts to meet its obligations.
e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor’s employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 5(b) above.
f. Disseminate the Contractor’s EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed.
Review, at least annually, the company’s EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination or other employment decisions including specific review of these items with on-site supervisory personnel such as Superintendent, general foreman, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and dispositions of the subject matter.
Disseminate the Contractor’s EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the Contractor’s EEO policy with other Contractors and Subcontractors with whom the Contractor does or anticipates doing business.
Direct its recruitment efforts, both oral and written, to minority, female and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the Contractor’s recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.
Encourage present minority and female employees to recruit other minority persons and women and, where reasonable, provide after school, summer and vacation employment to minority and female youth both on the site and in other areas of a Contractor’s workforce.
Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR Part 60-3.
Conduct, at least annually, an inventory and evaluation of all minority and female personnel for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities.
Ensure that seniority practices, job classifications, work assignments and other personnel practices do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the Contractor’s obligations under these specifications are being carried out.
Ensure that all facilities and company activities are nonsegregated except that separate or single-use toilet, necessary changing facilities and necessary sleeping facilities shall be provided to assure privacy between the sexes.
Document and maintain a record of all solicitations of offers for subcontractors from minority and female construction contractors and suppliers, including circulations of solicitations to minority and female contractor associations and other business associations.
Conduct a review, at least annually, of all supervisors’ adherence to and performance under the Contractor’s EEO policies and affirmative action obligations.
6. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one or more of their affirmative action obligations 5(a) through 5(p). The efforts of a contractor association, joint contractor-union, contractor-community, or other similar group of which the Contractor is a member and participant, may be asserted as fulfilling any or more of its obligations under 5(a) through 5(p) of these specifications provided that the Contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the Contractor’s minority and female work force participation, makes a good faith effort to meet its individual EEO obligations, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the Contractor. The obligation to comply, however, is the Contractor’s and failure of such a group to fulfill an obligation shall not be a defense for the Contractor’s noncompliance.
7. The Contractor is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation if a particular group is employed in a substantially disparate manner.
8. The Contractor shall not use the equal employment or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin.
9. The Contractor shall not enter into any subcontract with any person or firm debarred from government contracts.
10. The Contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps, at least as extensive as those standards prescribed in item 5(a-p) above, so as to achieve maximum results from its efforts to ensure equal employment opportunities.
11. The Contractor shall designate a responsible official to monitor all employment related activity to ensure that the company EEO policy is being carried out, to submit reports relating to the provisions hereof as may be required by the Government and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic apprentice, trainees, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that the existing records satisfy this requirement, Contractors shall not be required to maintain separate records.
12. Nothing herein provided shall be construed as a limitation upon the application of other laws that establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Programs).
13. The Bidder’s attention is called to the “Equal Opportunity Clause” and the “Standard Federal Equal Employment Opportunity Construction Contract Specifications” set forth herein.
14. EEO/AA obligations are applicable to all of the Contractor’s construction work (whether or not it is federal or federally-assisted) performed in the covered area. The hours on minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of equalizing minority and female employment percentages shall be a violation of the contract. Compliance with equal minority and female employment utilization will be measured against the total work hours performed.
15. The Contractor shall provide written notification to the…
This is the start of the file's text. The full file is on GovTribe.