ITB Addendum #2..doc
DOC document 52 KB Posted
- Attached to
- ACCESSIBILITY HOME MODIFICATION – NEW SMYRNA
- Solicitation number
- ITB-16155
- Issued by
- Leon County, Florida
About this file
This is Addendum #2 to an Invitation to Bid (ITB) issued by the Florida Department of Education Bureau of Contracts, Grants and Procurement Management Services for ITB 2026-037, Accessibility Home Modification – New Smyrna. The addendum revises specifications for deliverables and general specifications for accessibility modifications to a modular residential structure. The project scope includes modifications to a back entrance (demolition and reconstruction of deck and ramp with specific dimensions and ADA compliance requirements), bathroom modifications (toilet replacement and potential flooring replacement), and home office modifications (threshold ramp installation and door hinge replacement). All work must comply with ADA Accessibility Guidelines and state and local building codes. The contractor is responsible for obtaining all permits, inspections, and necessary drawings. The contract term is six months, with bids originally due July 6, 2026. Attendance at a mandatory site inspection is required for bid eligibility, with the address and time provided to registered bidders.
The addendum specifies that all surfaces must be finished to match existing colors, textures, and patterns, with cement board required for shower surrounds and "green board" for other walls and ceilings. The contractor must provide a minimum one-year warranty on workmanship and manufactured parts and is responsible for cleanup, debris disposal, and sealing off work areas to minimize dust. Any scope changes beyond minor dimension adjustments require written approval from the VR Counselor and Rehabilitation Engineer prior to implementation. No contract value, pricing terms, set-asides, or incumbent information is provided in this addendum. Potential proposers have 72 hours from the addendum posting to file protests against the requirements, with failure to protest constituting a waiver of proceedings under Chapter 120, Florida Statutes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT G.pdf | ||
| ITB 2026-037 Home Modification Tallahassee.pdf | ||
| ITB Addendum #2 Specifications..pdf | ||
| ITB Addendum #1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA DEPARTMENT OF EDUCATION
BUREAU OF CONTRACTS, GRANTS AND PROCUREMENT
MANAGEMENT SERVICES
325 West Gaines Street 344 Turlington Building
Tallahassee, Florida 32399-0400
Addendum #2
BID NO.: ITB 2026-037 ACCESSIBILITY HOME MODIFICATION – NEW SMYRNA
This addendum is being issued to revise the specifications for 6.1 Deliverables, General Specifications.
6.1 DELIVERABLES
GENERAL SPECIFICATIONS:
• All work must meet A.D.A. Accessibility Guidelines where applicable.
• All work must meet state and local building codes. Contractor is responsible for all permits and inspections. as well as all necessary drawings. It is the responsibility of the contractor to inspect the work and verify the conditions before bidding on the project. Any problems with the design or conditions of the home are to be reported to the Rehabilitation Engineer for resolution.
• Paint all unfinished surfaces with two coats of paint to match existing colors, textures and patterns.
· Cement board must be used for all shower surrounds and "green board" on all other walls and the ceiling.
• Finish remaining floors and walls to match existing colors, textures, and finishes.
• Contractor is responsible for cleanup and disposal of all construction materials and debris.
• It is the responsibility of the General Contractor to inspect the work and verify the conditions, before bidding on the project. Any problems with the design or the conditions of the home are to be reported to the Rehabilitation Engineer for resolution.
• Changes affecting the scope of the project, other than minor dimension changes, are to be approved in writing by VR Counselor and Rehabilitation Engineer before implementation. Failure to do so may result in rejection of completed project and delay payment until corrected.
• Contractor is responsible for sealing off work area to minimize dust in remainder of home.
• General Contractor shall provide a minimum of one-year warranty on workmanship and manufactured parts. General Contractor shall submit all operational manuals/instructions to the designated Rehab
Engineer.
Specifications:
Back Entrance (See Appendix A-D)
1. Demo existing wooden deck and ramp.
2. Build a new wooden deck and ramp for leveled access to the back door. (The height of the door is approximately 15-in measured from the ground.)
a. Use pressure treated wood.
b. Build a 12 ½-ft by 5-ft deck level with the back door entrance.
c. The ramp shall have one (1) 15-ft run.
i. The ramp shall have a minimum inside clearance of 34-in.
ii. The change in level between the ramp and the concrete sidewalk shall be equal or less than 0.25-in. Use a transition plate if needed.
d. Railings shall be installed on the exposed sides of ramp and around the deck.
i. The railings shall be 34-38 inches in height from the finished floor.
e. Construct three steps on the side of the deck leading to the outdoor shower.
Bathroom (See Appendix A)
1. Replace existing toilet.
a. Provide and install one (1) new comfort height rounded toilet equal or similar to Glacier Bay 2-piece Single Flush Round Toilet in White, Model # 340-995.
i. The bowl height shall be 16 ½-inch.
2. If the flooring is damaged during the bathroom modifications, replace existing bathroom flooring with tiles of client's choice. Max allowable cost: $3.00/sq-ft.
Home Office (See Appendix A)
1. Provide and install one (1) threshold ramp equal or similar to VEVOR 1.2" Rise Cuttable Threshold
Ramp, 35.4" Wide for the inside threshold of the office door.
a. The threshold is approximately 1 ¼ -in height.
b. The door to enter the office is 30-in wide.
c. Trim the ramp as needed.
2. Replace the current office door hinges with swing clear hinges.
a. Provide and install the two (2) swing clear hinges Potential proposers have 72 hours from posting of addenda to protest the requirements of each addendum. Failure to file a protest within the time prescribed in Section 120.57(3), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
Your Bid will not be complete without this document signed and included!
Company Name:
Vendor Name – written:
Authorized Signature:
Mailing Address:
City, State & Zip Code:
Telephone:
E-Mail Address:
ITB 2026-037 ACCESSIBILITY HOME MODIFICATION – SMYRNA
File details come from the government source that posted it. Updated .