This Invitation to Bid (ITB 992) is issued by the State of Idaho Division of Purchasing on behalf of the Idaho Transportation Department (ITD) for the procurement of motor graders equipped with snowplows through a direct purchase or buy-back option. The solicitation requests eight (8) motor graders with eight (8) snowplow attachments to be delivered to various ITD district locations across Idaho. Bids must be submitted electronically through the IPRO eProcurement system by July 21, 2025, at 5:00 PM MT, with a public bid opening scheduled for July 22, 2025, at 10:30 AM MST via Microsoft Teams. The deadline for submitting questions is July 14, 2025, at 11:59 PM MST. All motor graders must be delivered by November 1, 2025, with no exceptions allowed; contractors unable to meet this deadline may provide loaner equipment. The anticipated award date is July 31, 2025. The contract term extends through the buy-back date specified in the buy-back option agreement, with warranty coverage of five (5) years or 5,000 hours of operation for direct purchase awards, or for the entire buy-back period for buy-back awards.

The solicitation specifies detailed technical requirements for motor graders, including articulated frame steer with all-wheel drive, diesel turbo-charged engines rated at 210-265 horsepower, and comprehensive cab and plow attachment specifications (Henke hydraulic wing, V-plow, and folding V-plow options). Pricing is determined using straight-line depreciation for direct purchase options (20% salvage value over 12 years) or a buy-back cost calculation incorporating the buy-back price, ownership duration, and loss of interest at 5% annually. Bidders must be authorized distributors or manufacturers and may submit bids for direct purchase, direct purchase with buy-back, or both options; however, each bid line item must include all requested quantities. The State reserves the right to award multiple contracts to multiple manufacturers and to make awards by line item as determined in the best interest of the State. Contractors must provide a five-year extended warranty covering 100% parts and labor (excluding routine maintenance items), four hours of operational training at delivery, authorized distributor documentation upon request, and compliance with all Idaho purchasing statutes and regulations. For buy-back awards, contractors must provide a surety payment bond registered with the Idaho Department of Insurance, arrange pre-return inspections two weeks prior to the buy-back date, supply all fluid filters per manufacturer maintenance intervals, and assume responsibility for the 250-hour brake system test and adjustment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF IDAHO

DIVISION OF PURCHASING

FOR

IDAHO TRANSPORTATION DEPARTMENT

Invitation To Bid

Motor Graders with Snowplows – Buy Back

ITB Number: 992

AMENDED 7/15/2025

Table of Contents

ITB Sect ion 1 - Administrative Information & Overview Page 3 ITB Sect ion 2 - Format & Submission Requirements Page 5 ITB Sect ion 3 - Evaluat ion & Award Procedures Page 7

Exhibit 1 - Background Information Page 10 Exhibit 2 - Scope of Work (SOW) Page 11 Exhibit 3 - Questions Page 20 Exhibit 4 - Contract Modifications and Exceptions Page 22 Exhibit 5 - The State Contract and Terms & Condit ions Page 26

Exhibit 6 - Buy Back Contract

Exhibit 7 - Contract Discrepancy Notice Page 42

Exhibit 8 - Surety Payment Bond Page 44

Submittal Form A – Background, Declarat ions, and Cert if ications Page 47 Submittal Form B – Bid Schedule (attached in IPRO) Page 50

Submittal Form C – Product Information Sheet Page 51

Section 1 Administrative Information and Overview

1.1 Purpose

The State of Idaho’s (“State”) Division of Purchasing (“DOP”), on behalf of Idaho Transportation Department (“ITD”) is issuing this Invitation To Bid (“ITB”) to solicit Bids from qualified and experienced firms (“Bidders”), that can supply Motor Graders with ss. Background information is provided in Exhibit 1. The complete scope of work is provided in Exhibit 2.

1.2 Procurement Schedule

Deadline to submit questions:

Closing Date (deadline to submit Bid):

Public Opening Date:

Bid Opening TEAMS Link:

Anticipated Award Date:

The State will make every effort to adhere to the schedule below, but reserves the right, at its sole discretion, to adjust the schedule.

July 14, 2025 @ 11:59 PM MST July 21, 2025 @ 5:00 pm MT (Note: in the event of a conflict between this document and the State’s ERP system, the closing date in the ERP system takes precedence.)

July 22, 2025 @ 10:30 am MST ITB 992 Graders with Snowplows Bid Opening | Meeting-Join | Microsoft Teams July 31, 2025

1.3 ITB Lead

Name Title & Agency

Email

The individual listed below (referred to as “ITB Lead”) is responsible for the conduct of this procurement. From the issue date of this ITB, until a contract is awarded, or the ITB is cancelled, Bidders are prohibited from communicating with any State employee, Official, or Evaluators regarding this ITB or procurement.

Mack DeYoung Buyer, Idaho Division of Purchasing Mack.DeYoung@adm.Idaho.gov

1.4 IPRO eProcurement System

This Solicitation is issued by the State via the State’s eProcurement system, IPRO. It is the Bidder’s responsibility to monitor IPRO for any updates or amendments.

https://teams.microsoft.com/meet/2807021453026?p=25d2ZD9PrTpOpm5xAC https://teams.microsoft.com/meet/2807021453026?p=25d2ZD9PrTpOpm5xAC

1.5 Questions

The Bidder SHALL review this entire ITB solicitation, including associated documents. All questions, requests for clarification, or other correspondence must be submitted in writing via email to the ITB Lead. See Exhibit 4 for additional instructions. Questions must be submitted using the table provided within Exhibit 4.

1.6 Modifications and Exceptions to Requirements, Terms, and Conditions The Bidder SHALL review the Contract requirements, terms, and conditions. The Bidder is strongly encouraged to submit any proposed modifications, or exceptions to the Contract requirements, terms, or conditions to the ITB Lead prior to the deadline for submitting questions. See Exhibit 4 for additional instructions. Modifications and exceptions must be submitted using the table provided within Exhibit 4. The Contract requirements, terms, and conditions are provided in Exhibit 5.

Any modifications or exceptions that are raised after the Bid has been submitted may be rejected by the State without further discussion. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period. Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, will be found non-responsive, and no further consideration of the Bid will be given.

1.7 Amendments

The State may issue amendments to make changes to the ITB, or to respond to any questions. Amendments will be posted on IPRO. Bidders are responsible for monitoring IPRO for updates and amendments. All published amendments SHALL become part of this ITB, and must be considered by the Bidder in its Bid. Oral interpretations or clarifications of this ITB are not binding and should not be relied upon. Any verbal responses provided by the State during the pre-Bid conference are considered unofficial, and will not be binding.

1.8 Authority

This procurement is conducted in accordance with IDAPA 38.05.01 and pursuant to Title 67, Chapter 92 of the Idaho Code.

Section 2 Format & Submission Requirements

2.1 Adherence to Requirements

The Bid SHALL be submitted in accordance with the requirements set forth in this document. Any Bid that does not adhere to the requirements may be deemed non-responsive and rejected. The State reserves the right, in its sole discretion, to overlook any minor informalities that may be non-compliant.

2.2 Deadline to Submit

All Bids are due at the date and time specified in the Procurement Schedule (Section 1.2). Late Bids SHALL NOT be accepted or considered. The State SHALL not be responsible for any technical issues, difficulties, or delays. Bidders are strongly encouraged to begin the process of submitting the Bid response far enough in advance of the Closing Date/Time to allow for resolution of any technical difficulties.

2.3 General Format Requirements

The Bid response must meet the following requirements:

□ Be made on standard 8.5” x 11” paper size.

□ Use a minimum font size of ten (10) (images, figures, graphs, charts, are excluded from this font size).

□ Use a font style such as: Calibri, Arial, New Times Roman, or similar.

□ The Bidder SHALL NOT embed information, embed files, or embed any links within the Submittals.

□ The Bidder SHALL NOT attach additional information to any Submittal Form (unless it has been explicitly requested). Any additional attachments submitted will not be considered in the evaluation process.

2.4 Electronic Submission Instructions

The Bidder SHALL submit the Bid as follows:

□ The Bid SHALL be submitted electronically through IPRO POWERED BY LUMA. The State will not accept Bids in any other manner (i.e. facsimile, email, or hardcopy submissions). All Bidders participating in this Solicitation must establish an account in the IPRO system, as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free.

Link: https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=StateofIdaho

Please make sure that the entity profile under which the Bid is submitted in IPRO, is the same legal entity presented in the uploaded response materials. If there are any discrepancies, the entity information provided within Submittal Form A prevails.

□ The Bid must be submitted in the following packages:

No Contents File Format How To Name The Files 1 Submittal Form A MS Word 1 <Insert Bidder Name> 2 Submittal Form B MS Excel 2 <Insert Bidder Name> 3 Submittal Form C PDF 3 <Insert Bidder Name>

4* Redacted Submittal Forms* PDF 4 <Insert Bidder Name> REDACTED

* If applicable. Applies to Bids with trade secrets as discussed below.

□ All electronic files must be in Adobe PDF, Microsoft Word, or Microsoft Excel format as noted in the table above.

□ The Bid file(s) SHALL NOT be password protected or locked in any way.

□ All submission materials must be submitted at the same time. If multiple submissions are received, only the latest timely submission will be considered.

https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=StateofIdaho

□ Alternate Bids are not allowed.

□ Note: When submitting through IPRO, enter your Cost in IPRO as “$0.01”.

□ Package 3: If your Bid contains trade secrets (see next Section), submit an additional redacted version. This should be labeled as Package 3 and include 'Redacted' in the file name.

2.5 Trade Secrets and Non-Public Information

The Idaho Public Records Act, Idaho Code title 74, chapter 1 (the “Act”) defines trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.”

The Act also defines other records that may be exempt from public disclosure.

In addition to marking each page of the document with a trade secret or other exemption notation (as applicable;

and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:

□ Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” or “exempt from disclosure” (it is not sufficient to simply mark the entire page).

The specific information you deem “trade secret” or “exempt” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret” or “exempt from disclosure.”

□ Provide a separate document entitled “List of Redacted Trade Secret and Exempt Information” which provides a succinct list of all trade secret and exempt information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation.

Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure and how the exempting the material complies with the Act.

□ Submit a redacted copy of any Bid response document (e.g. Scope of Work Response) with all trade secret and exempt information removed or blacked out. The redacted copy must be submitted electronically in the Supplier Attachments section of IPRO, with the word “redacted” in the file name.

Section 3 Evaluation & Award Procedures

3.1 Mandatory Submission Requirements

All Bids will be reviewed on a "pass" or "fail" basis to ensure compliance with all mandatory submission requirements. Bids determined by the State, at its sole discretion, to be responsive in this regard will proceed to the evaluation process outlined in this Section. Bids that do not meet the mandatory submission requirements will be deemed non-responsive. Mandatory submission requirements include, but are not limited to, the following:

□ The Bid was submitted prior to the specified Closing Date and Time.

□ The Bid complies with the submission instructions detailed in Section 2.4.

□ The Bid includes a fully completed and signed Submittal Form A.

□ The Bid includes all required Submittal Forms.

3.2 Clarification Discussions

The ITB Lead may, in the State’s sole discretion, perform clarification discussions with the Bidder(s) to verify and validate that the Bid will meet the needs of the Agency. At any time during this period, if it is discovered that the Bidder has not met a mandatory requirement, or has failed to adequately respond to an item below, the State may find the Bidder non-responsive, and disqualify the Bid.

The Bidder(s) may be requested to address the following items:

a) Responsibility Assessment: The Bidder may be required to provide documentation to demonstrate its responsibility. Failure to provide the requested documentation may result in the Bidder being deemed non-responsible.

b) Agency Concerns: The Bidder will address or resolve any major risks, issues, concerns, obstacles, or deal-breakers that have been identified by the Agency.

c) Verify the Fee/Cost Bid: The Bidder will clarify and validate the fee/cost schedule. The Bidder will submit any additional financial data, supporting data, or substantiation requested by the Agency.

d) Provide a Project Schedule: The Bidder will provide a detailed schedule of the project (with major milestones or tasks). This should include milestones, task and proposed start and completion dates.

e) Key Assumptions: The Bidder will provide a summary of the major assumptions that have been made in preparing the Bid. This should include items/tasks that the Bidder has assumed the Agency will perform, items/tasks required from the Agency, and items/tasks that have not been included in the Bid (items that the Bidder feels are outside the scope of work). This should also include any critical expectations or responsibilities that the Bidder has of the Agency, Agency personnel, or other parties/organizations that are not contracted to by the Bidder.

f) Technical Reviews: The Bidder will comprehensively describe the approach for meeting all of the requirements in the Scope of Work to confirm depth and breadth of technical and/or industry knowledge, with any efforts required from the Agency should addressed.

g) Reference Verification: If requested, provide a list of references for the firm and each key personnel.

h) Additional Requested Documentation: If requested, provide any additional documentation that may be requested, which may include a warranties, training, maintenance plans, bonding and insurance, etc.

The clarification discussion cannot materially alter the Bid. The State does not expect to negotiate any terms or conditions requested by the Bidder, unless they were submitted by the Bidder prior to the deadline for submitting questions (see Section 1.7), or they provide the State an opportunity to secure more advantageous terms or pricing.

3.3 Best-And-Final-Offer (BAFO)

The ITB Lead, in the State’s sole discretion, may conduct discussions and negotiations with multiple Bidders. The ITB Lead may request that these Bidders provide a Best-And-Final-Offer (BAFO). The State reserves the right to conduct one (1) or more rounds of a BAFO with these Bidders. The revised BAFO cost Bids will be utilized to prioritize and rank the Bidders. If the State anticipates the possibility of awarding multiple contracts from this ITB, the State may engage in concurrent negotiations with apparently successful Bidders as deemed appropriate.

The BAFO does not apply to the Buy Back purchase option.

3.4 Award

More than one (1) award may be issued from this solicitation. In order for the State to receive adequate coverage on its requirements as specified in the solicitation, the State reserves the right to make multiple awards to multiple manufacturers. Award may be made by the line items, groups of the line items, or total line items, whichever is determined to be in the best interest of the state, to the responsive, responsible Bidder providing the lowest total price, as provided on Submittal Form B – Bid Schedule.

The State reserves the right not to evaluate or make an award in the best interest of the State. The State also reserves the right to make multiple awards in accordance with Section 67-9211 of Idaho Code in the best interest of the State.

Pursuant to IDAPA 38.05.01.081, the ITB Lead may, in the State’s sole discretion, require the apparent low-cost Bidder to provide documentation to demonstrate its responsibility. The ITB Lead may request documentation including but not limited to credit or financial reports and customer references. Failure to provide requested documentation may result in the Bid being deemed non-responsive. Nothing herein shall prevent the State from using other means to determine Bidder’s responsibility. Award of contract(s) will be made, by line item or all to one as determined to be in the best interest of the State, either by Direct Purchase or Direct Purchase with Buy- Back, to the lowest responsible Bidder, deemed to be the responsive and responsible Bidder offering the lowest Bid Price. The State reserves the right to award multiple contracts pursuant to Idaho Code section 67-9211.

Note: IDAPA 38.05.01.074.03 and 38.05.01.091.05 allow the designated State official to waive minor informalities as well as minor deviations. The State also reserves the right to seek clarification of Bidder’s responses and to engage in discussions or negotiations as determined to be in the best interest of the State and permitted by IDAPA 38.05.01.084.

The State reserves the right not to award all line items.

The calculation will be based on the monthly ownership cost as outlined below, to determine which Bid(s) is/are in the best interest of the State.

3.5 Direct Purchase Option Cost Determination

The monthly ownership cost will be determined by straight-line depreciation, with the monthly depreciation being the monthly ownership cost. ITD utilizes a twenty percent (20%) salvage value with a useful life of twelve

(12) years.

Example:

Unit Price: $150,000.00 Annual Depreciation: (Unit Price x 0.80) / Useful Life ($150,000 x 0.80) / 12 = $10,000.00 Monthly Depreciation: Annual Depreciation / Useful Life (Monthly Ownership Cost): $10,000.00/ 12 = $833.33

3.6 Direct Purchase With BUY BACK Option Cost Determination

The monthly ownership cost will be determined as follows: Subtract the Buy-Back Price from the Unit Price and divide that amount by the respective number of months of ownership; then, add the loss of interest on the Unit Price to that monthly amount. The loss of interest on the Unit Price will be calculated by the difference in the Unit Price and the lowest Unit Price offered among all Bidders. This will be calculated at a five percent (5%) simple interest annually.

Example:

Bidder A Bidder B Unit Price: $150,000 $155,000 Buy-Back Price: $142,000 $150,000 Buy-Back Date: April 1, 2025

(19 months of ownership) November 1, 2025 (19 months of ownership)

$150,000 - $142,000 19 months $421.05 per month

$155,000 - $150,000 19 months $263.16 per month

Loss of Interest:

($150,000 - $150,000) x .05 12 months $0 per month

($155,000 - $150,000) x .05 12 months $20.83 per month

Monthly Ownership Cost: $421.05 + $0 $421.05 per month

$263.16 + $20.83 $283.99 per month

Evaluating Award Options:

Based on the methods and examples above, the Direct Purchase with Buy-Back from Bidder B offers the State the lowest monthly ownership cost. This would be the bid determined to be in the best interest of the State.

3.6.1 Bidders may offer the direct purchase, the purchase with Buy-Back option, or both. Bidders do not have to bid on all line items to be considered for an award; however, for each line item you bid, you must bid on all quantities requested for that line, for the Direct Purchase or the Direct Purchase with Buy-Back.

3.8 Buy Back Contract

If the Buy-Back option is awarded, the Contractor must complete and submit Exhibit 7 – Buy Back Contract and Exhibit 9 - Surety Payment Bond to the State prior to the delivery of the motor graders with snowplows to ITD.

The Bonding Surety must be registered and licensed with the Idaho Department of Insurance. The Surety Payment Bond will not be accepted if Surety is not registered and licensed in Idaho, and the Contract will not be executed by the State. If the Contractor fails to present an acceptable bond, this failure may be deemed just cause for the cancellation of the award of the Contract. For Buy-Back option warranty and maintenance requirements, please see Exhibit 2 – Scope of Work, Sections 11 and 13.

3.7 Resulting Contract

If the State awards Contract(s) from this solicitation, it will do so by issuing Contract document(s) from Luma, the State’s ERP system. The State anticipates issuing a single contract document for each awarded Contractor, incorporating the Terms and Conditions, Scope of Work, Appendices, and some or all of the Bidder’s Technical Bid;

however, the State reserves the right to determine the form of the resulting Contract(s). A sample contract is provided in Exhibit 6. At its option, the State may memorialize the agreement between the State and each Contractor in one (1) or more final Contract documents.

Important Note: Any modifications or exceptions to the Contract may be rejected by the State. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period (see Section 1.7).

EXHIBIT 1

Background Information

1. About The Department

The Idaho Transportation Department (ITD) has a vision of enhancing quality of life through transportation. We are committed to improving the quality of life of people in the communities we serve by delivering on our mission of Your Safety. Your Mobility. Your Economic Opportunity.

ITD is responsible for operating and maintaining more than 12,300 lane miles and 1,830 bridges; 2,523 miles of Idaho Byways and 32 state backcountry airstrips. The state highway system includes 34 rest areas and 12 ports of entry. The Division of Motor Vehicles registers more than two million vehicles and trailers and is responsible for the credentials of more than a million drivers.

2. Background Information ITD utilizes motor graders and snowplows for construction projects, snow removal and various other State forces projects.

ITD, through DOP, is requesting Bids from Contractors for the purchase and delivery of eight (8) Motor Graders and eight (8) Snowplows delivered to various ITD locations, as further detailed in this Administrative Document.

EXHIBIT 2

Scope of Work

1. Summary of Scope

The Idaho Transportation Department is readying their road maintenance equipment needs for the 2025 winter season. This procurement event addresses the equipment requirements for snow removal and other grading projects statewide.

2. Objectives and Expectations The State of Idaho expects the successful bidder to deliver the specified equipment by the required delivery date to each ITD District as stated in the requirement and Scope of Work sections of this document.

3. Budgetary Expectations

It is expected that all Bidders do, in good faith, bid the equipment required in the ITB event at a reasonable market-based value. For Bidders that partake in both the Direct Purchase and the Direct Purchase with Buy Back options, their bid for both shall not be willfully inflated in a manner that causes the initial purchase cost to be more than reasonable market-based value and, thereby, intentionally reducing the calculated monthly costs. Any bids that are determined to be of this approach will be deemed unresponsive by the State.

4. Schedule & Term Expectations All motor graders must be delivered by the required delivery date of November 1, 2025. No exceptions will be allowed.

If, due to a delay by the equipment manufacturer, the specified motor graders are not available for delivery to any location by the required due date, the Contractor will be allowed to provided loaner motor grader with snowplow.

If the Bidder cannot commit to deliver the specified Motor Graders with Snowplows or unable to supply a loaner(s) by the required delivery date, their bid will be considered unresponsive.

5. Unique Considerations

This service is required in order to provide safe roads and timely grading project completion during adverse winter driving conditions for all travelers across the state of Idaho. Due to the seasonal nature of this need and the unpredictable winter weather Idaho experiences, it is imperative that this equipment need is filled as required by the successful bidder.

6. Specification Requirements

These specifications are the minimum mandatory specifications that your Bid must meet in order for the State to consider your Bid for award.

The brand names specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Vendors offering an “equal” must include documentation, which demonstrates, to ITD’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, ITD reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to ITD may eliminate the Vendor from further consideration.

6.1 Model & Assembly

6.1.1 The Motor Grader must be the latest model of the manufacturer's standard production, as offered to commercial trade, new and unused. Though it is not specifically covered herein, all parts necessary to provide a complete and functional Motor Grader must be provided. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this ITB. The snow attachments must be less than 48 months old and must be in good condition, and within the original manufacturer’s specification, minus normal wear and tear. Each attachment will undergo a thorough inspection to verify its condition and functionality before acceptance and;

6.1.2 The Motor Grader must be assembled with wings, v-plows, and the rear elevated snow wing mast, and the contractor to adjust at time of delivery, (Rippers to be shipped loose), per the manufacturer’s standards, and be ready for operation upon delivery.

6.2 Description

6.2.1 Type - Articulated frame steer with all-wheel drive;

6.2.2 Weight – Forty-four thousand five hundred (44,500) pounds with rippers and accessories specified. (The use of calcium chloride in tires and bolt-on counterweight is not acceptable.);

6.2.3 Paint - Manufacturer's color;

6.2.4 Snowplows - Mounting of wing snowplow and a front plow are required, and;

6.2.5 Unit must be frame ready to accept side wing and front V-plow, all required hydraulic valves and plow controls must be included on all units.

6.3 Engine

6.3.1 Type – Four (4)-cycle diesel, turbo charged, governed at two-thousand one hundred (2100) RPM maximum. Must meet Tier 4i Off-Road Federal Emission Engine Requirements and operate on low sulfur diesel fuel;

6.3.2 Horsepower – Two-Hundred ten (210) (HP) in first (1st) gear, increasing to two-hundred sixty-five (265) (HP) in eighth (8th) gear with the front wheel drive system in the “On” position;

6.3.3 Piston Displacement – Five-hundred forty (540) CI;

6.3.4 Oil Filter - Full-flow vertical replaceable type;

6.3.5 Oil Drain Valve - Environmentally friendly oil drain valve and hose;

6.3.6 Engine Oil Sample fitting – Block-mounted, accessible from ground, Titan Laboratories model OD1014;

6.3.7 Air Cleaner - Heavy-duty, two-stage, dry type with service indicator;

6.3.8 Cold Starting Aid - Designed to start engine in minus thirty-four ( -34° F) ambient temperature;

6.3.9 Block Heater- A one-thousand two-hundred fifty (1,250)-watt electric with stationary receptacle;

6.3.10 Engine Compartment Covers - Lock type;

6.3.11 Exhaust - Muffler and rain cap or self-draining muffler with curved exhaust pipe to prevent water from entering exhaust pipe;

6.3.12 Fuel Filter(s) -Fuel filtration system with water separator;

6.3.13 Fuel Priming Pump -Fuel priming pump to permit refilling of fuel filters (on the machine) and priming of fuel system during service intervals;

6.3.13 Radiator –Mounted at the rear of unit for repair and accessibility. Units with radiator mounted between cab and engine will not acceptable and;

6.3.14 Engine Warning - Audible type for low oil pressure, high water temperature, and low coolant level.

6.4 Transmission

6.4.1 Type - Full power shift, direct drive;

6.4.2 Speeds - Eight (8) forward and four (4) in reverse minimum;

6.4.3 Transmission Control – To control direction and speed selection;

6.4.4 Inching Pedal - Provides precise control of machine movement through full range of pedal travel with hydraulic front wheel drive disengaged or engaged;

6.4.4 Travel Speed – zero to twenty-five (0-25) miles per hour (MPH) forward and;

6.4.6 Transmission Guard.

6.5 Cooling System

6.5.1 Type - Designed to keep engine from overheating while operating at maximum output in one hundred-twenty-two (122° F) ambient temperature and;

6.5.2 Antifreeze - Extended type protected to negative thirty-four (-34) ° F.

6.6 Front Axle

6.6.1 Type - Fully welded steel type;

6.6.2 Steering Range – eighteen degrees (18 °) each direction with power assist;

6.6.3 Oscillation – Thirty-Two degrees (32 °) degrees total oscillation;

6.6.4 Drive - Hydrostatic, effective in gears one through seven (1-7) and capable of eighteen (18) MPH machine speeds;

6.6.5 Front-Wheel Over Speed Sensors - Electronics to sense front and rear wheel speed to prevent front wheels from exceeding rear wheel speed;

6.6.6 Front-Wheel Drive Torque Availability – The minimum theoretical torque must be four thousand five hundred (4,500) lbs. for the unit bid at eleven miles per hour (11 MPH) based on the following formula:

6.6.7 Torque = Pressure x Motor Disp x FWD Torque Ratio x 2 Motors x Motor Efficiency

6.28 x Tire Radius;

6.6.8 Motor Efficiency will be calculated at ninety-five percent (95%) and;

6.6.9 Turning Radius – twenty-five (25) ft. maximum.

6.7 Rear Axle

6.7.1 Type - Full floating tandem drive;

6.7.2 Steering - Hydraulic articulated frame type with cab mounted articulation indicator;

6.7.3 Differential Lock - Operator controlled differential lock / unlock with cab mounted activation indicator.

6.8 Brakes

6.8.1 Service - Sealed self-adjusting wet-disc type, effective on all four tandem wheels. Must meet current SAE J/ISO 3450 requirement;

6.8.2 Emergency/Parking - Internal to transmission, spring applied, pressure released capable of holding grader secure on a fifteen degree (15 °) slope. Must meet current SAE J/ISO 3450 requirement;

6.8.3 Emergency/Parking brake must neutralize transmission and lock brakes when applied or can only be engaged with transmission in neutral and;

6.8.4 Brake Lines – All exposed brakes lines armored or protected to prevent damage from the use of tire chains.

6.9 Tires

6.9.1 Type – All Season Snow/Ice radial type;

6.9.2 Size – 14.00R-24/12, Fourteen point zero-zero (14.00) x twenty-four (24) twelve (12)-ply tires on ten (10) in.

wide rims and;

6.9.3 Goodyear Model AS-3A or Michelin Model X Snow plus M+S only.

6.10 Moldboard

6.10.1 Size – Fourteen (14) ft x twenty-four (24) inches x seven-eighths (7/8) inches with standard end bits and cutting edge;

6.10.2 Side shift - hydraulic-operated;

6.10.3 Tilt - hydraulic-operated;

6.10.4 Float - Independent each side for moldboard;

6.10.5 Lift Accumulators or Crossover Relief;

6.10.6 Bank Slope - Moldboard must be capable of being placed at a ninety degree (90 °) angle on both left and right sides from operator's compartment;

6.10.7 Wear Inserts – Following items must be equipped with replaceable wear inserts;

6.10.8 Draw Bar/Circle Inserts: Located between circle and drawbar and circle and circle shoes. Circle riding on circle shoes is not acceptable. This will eliminate the use of grease fittings;

6.10.9 Moldboard Side Shift Inserts;

6.10.10 Circle Protection Device - hydraulic or mechanical. Must enable circle drive to slip when encountering high impact loads and;

6.10.11 Automatic/Electronic Blade Control – Not required on this bid but unit must be equipped with all brackets, hardware, and wiring for installation at a later date.

6.11 Cab and Accessories

6.11.1 Type - Fully enclosed, weatherproofed;

6.11.2 Glass - Safety type all windows;

6.11.3 Doors - Both sides with locks and access ladders;

6.11.4 ROPS - Roll-over protection. Must meet all current SAE and ISO requirements;

6.11.5 Sound Suppression -To meet current ANSI requirements;

6.11.6 Deluxe Air Suspension Seat - Cloth seat with fold-up arm rests, fore and aft, height, weight, seat back angle, thigh support, and lumbar support adjustments, and three (3)" seat belt;

6.11.7 Gauges or display panel for fuel, oil pressure, water temperature, battery charge rate, transmission pressure, and hour meter. All gauges must be lighted and easily viewed from in cab;

6.11.8 Throttle - Hand or electric type with automotive type decelerator/ accelerator;

6.11.9 Warning Device - For low oil pressure and high engine temperature;

6.11.10 Mirrors - Inside: Convex type. Outside: Left and Right – heated flat type mounted on side of cab.

6.11.11 Control Console;

6.11.12 Floor Mats;

6.11.13 Heater – Twenty-Five thousand (25,000) BTUs;

6.11.14 Air Conditioning - Twenty-Five thousand (25,000) BTU rated for continuous operation in one hundred ten (110) ° F ambient temperatures;

6.11.15 Pressurization – Cab must be pressurized and utilize fresh- air system with filters;

6.11.16 Defroster -Must blow air onto front and rear windows;

6.11.17 Radio - AM/FM stereo;

6.11.18 Front Windows -With wipers;

6.11.19 Interior Lights and;

6.11.20 Horn - Air or electric.

6.12 Electrical

6.12.1 Battery – One-thousand three hundred (1,300) cold cranking amp (CCA) heavy duty low maintenance battery package required for cold weather starting at temperatures below zero (0) ° F;

6.12.2 Alternator – Eighty (80) ampere heavy duty alternator packaged rated for both air conditioning use and cold weather starting at temperatures below zero degrees (0 °) F;

6.12.3 Circuit Protection - Individual blade type fuses / breakers;

6.12.4 Lights - Head, tail, front and rear turn signals, four (4) way flash, stop and work lights for all attached equipment to include:

6.12.4.1 Driving Lights - Two (2) high output Halogen;

6.12.4.2 Work Lights - Two (2) front and two (2) rear;

6.12.4.3 Mold Board Lights - Two (2);

6.12.4.4 Snow Wing Light(s) - Right side;

6.12.4.5 Manual Battery Disconnect Switch;

6.13 Warning Lights

Must consist of the following grader mounted lights and wing plow lights. Additionally, the top cab mount light must have a separate switch from the alternating lights and;

6.13.1 Top Cab Mounted – Factory integrated mini-type beacons or One (1) Whelan R2LPPA Led fifteen (15) in amber mini-light bar;

6.13.2 Alternating Flashing Lights - Six (6) total. Whelen ION Surface Mount Series Super LED ION SMA or Whelen 5G Series Super LED Model 5GA00FAR (Amber) & 5GR00FRR (Red) Two (2) must be mounted above the rear window with the street side light red in color and the curbside light amber in color.

6.13.3 The four (4) remaining lights must be mounted along the rear engine cover. The top left and lower right lights must be Red, and the two (2) remaining lights must be Amber in color.

6.13.4 The wing plow must have two (2) Whelen model WPLOWZ1A (Amber), WPLOWZ1R (Red) for wing end lights and Whelen WPLOW2ZA for Wing top Lights. Two (2) LED alternating flashing lights mounted to the outer most part of wing plow facing rearward. The upper light must be red and lower light must be amber.

6.13.5 Three (3) alternating amber flashing lights must be equally spaced across the top of the wing plow moldboard. The wing plow rear push arms and rear facing edge must have red/white conspicuity striping. Flashing lights must incorporate an “Alternating Flasher Delay System”.

6.13.6 This system is design to momentarily cancel the flashing lights when the brake pedal or turn signal is activated. The system must be comprised of the “Crouzet” – No. OU1R10MV1, 12V adjustable single shot relay and relay base. CO_TM_SL_PLUG-IN_8pin_EN.pdf (crouzet.com);

6.14 Wipers

6.14.1 Electric, equipped with intermittent mode, and washers on both front and rear windows;

6.15 Converter Group

6.15.1 Two (2) 24VDC-12VDC converters for units equipped with 24VDC starting/electrical systems;

6.15.2 One (1) Manufacture standard connection to be dedicated for a State two-way communications radio;

6.15.3 One (1) 10A minimum unit to be dedicated for all additional 12VDC accessories;

6.15.4 A 12VDC power port must be supplied in the cab to accommodate plugging in a laptop computer or cell phone.

6.16 Accessories

6.16.1 Back Up Alarm - self-adjusting type;

6.16.2 Vandalism Protection - For hydraulic oil, radiator, crankcase, and transmission oil;

6.16.3 Slow moving Emblem – Twenty-eight inch (28”) installed, including stationary bracket;

6.16.4 Articulated Frame - Safety locks;

6.16.5 Camera System – Motor grader equipped with the following backup camera system;

6.16.6 Monitor – Minimum seven (7) in LCD high resolution color;

6.16.7 Camera –Minimum nine (9) IR LEDs for high definition night vision, IP sixty-eight (68) rated and;

6.16.8 Mounting locations of both the camera and monitor must be approved by ITD’s Maintenance Services

Manager prior to delivery.

6.17 Hydraulics

6.17.1 Type - Hydraulic system a closed center design with load-sensing capabilities;

6.17.2 Pump – Piston type with a five cubic inch (5.0 CI) displacement;

6.17.3 Equipped with hydraulic pump disconnect and/or lockout for cold weather starting;

6.17.4 Valves - Equipped with auxiliary valves to operate a hydraulic wing attachment and a folding front V-

Plow on all units;

6.17.5 Hydraulic Lock Valves - All hydraulic functions equipped with locking valves to prevent drift of implements;

6.17.6 Plumbing - Auxiliary valves must have hydraulic lines routed and terminated with quick couplers at the front of the grader for a folding V-plow on all units;

6.17.7 Wings - The plumbing must terminate with quick couplers at an accessible location on the right side of the unit that does not require removal of body panels or components and;

6.17.8 Controls - Equipped with all necessary hydraulic controls to operate a hydraulic wing attachment and a front folding V-plow on all units.

6.18 Ripper

6.18.1 Type - Rear mounted and hydraulically operated;

6.18.2 Ripper – Five (5) shanks and teeth and;

6.18.3 Installation - Units must be shipped loose, unless it is a ripper pocket mounted snow wing. ITD will install the rippers if not a pocket mounted snow wing.

6.19 Up-Time Extended Warranty

6.19.1 Duration – Five (5) years or five thousand (5,000) hours of operation for grader only;

6.19.2 Coverage:

https://media.crouzet.com/catalog/_datasheet/pdf/en/CO_TM_SL_PLUG-IN_8pin_EN.pdf

6.19.2.1 One hundred (100%) parts, labor, and freight, for entire unit bid excluding routine lubrication, fuels, oils, tires, antifreeze, batteries, lights, paint, fuses, glass, and auxiliary equipment manufacturer's attachments;

6.19.2.2 Scheduled oil sampling at prescribed intervals;

6.19.2.3 All fluid filters;

6.19.2.4 Annual machine inspections;

6.19.2.5 Travel time and mileage to perform warranty work at ITD location (District 1 and

6 Headquarters) and;

6.19.2.6 Grader and all components must be warranted by the grader manufacturer. A separate warranty for major components constructed by other manufacturers is not acceptable.

6.20 Service Requirements

6.20.1 Four (4) hours of instruction on operation and maintenance at the time of delivery and;

6.20.2 Must be a factory or knowledgeable dealer-employed instructor.

7. PLOW ATTACHMENTS

7.1 Hydraulic wing – “Henke” Model AHW 66 Grader Mount Hydraulic Wing, or equivalent

7.1.1 Type – Right-hand side mount with hydraulic elevating rear push frame;

7.1.2 Moldboard Size – Twelve (12) foot cutting edge with tapered blade of twenty-eight (28) inch height at toe and thirty-five (35) inches at heel or non-tapered with height of thirty five and one half inches (35.5”);

7.1.3 Moldboard Metal – three sixteenth (3/16) inch;

7.1.4 Weight – Between three thousand one hundred (3,100) and three thousand eight hundred (3,800) pounds shipping weight;

7.1.5 Benching Height – minimum fifty-five (55) inches;

7.1.6 Cutting Edge – one half by eight (½ inch x 8 inches) standard highway punched;

7.1.7 Push Beam – Single adjustable type;

7.1.8 Installation – Unit must be installed prior to delivery to ITD;

7.1.9 Requirement – Moldboard must pass underneath the wing mast when cast all the way to the right without contacting mast;

7.1.10 Alternating Flashing Lights – Two (2) total, one (1) each LED amber and one (1) each LED red lights mounted to the outer most part of wing plow facing rearward.

7.1.10.1 The upper light must be red and the lower light must be amber in color.

7.1.10.2 Three (3) alternating amber flashing lights must be equally spaced across the top of the wing plow moldboard.

7.1.10.3 Part numbers must be listed under warning lights;

7.1.11 Switch – Plow alternating lights must operate from same switch as grader mounted alternating lights and;

7.1.12 Conspicuity Striping - The wing plow rear push arms and rear facing edge must have red/white conspicuity striping.

7.2 Fixed V-Plow “Henke” Model V-10 or equivalent

7.2.1 Type – Fixed V-type, quick attach to Parallel Lift Group specified below;

7.2.2 Clearing Width – One hundred two (102) inches;

7.2.3 Nose Height – Fifty-two (52) inches;

7.2.4 Rear Height – Eighty-four (84) inches;

7.2.5 Cutting Edge – Eight (8) in. with carbide insert;

7.2.6 Moldboard – Three-sixteenths (3/16) inch;

7.2.7 Running Gear – Adjustable type, skid shoes with carbide inserts and;

7.2.8 Weight – Two-thousand seven hundred (2,700) pounds.

7.2.9

7.3 Folding V-Plow “Henke” Model FV-12 or Equal.

7.3.1 Type – Center hinge type capable of being an angle blade, V-plow, straight blade, or carry dozer, quick attach to Parallel Lift Group specified below;

7.3.2 Moldboard Length – Between one hundred thirty-five (135) inches and one hundred forty-eight (148) inches;

7.3.3 Height – Between Forty-five (45) inches and fifty-eight (58) inches;

7.3.4 Cutting Edge – Height of Six (6) to Eight (8) inches x five/eights (5/8) inches with carbide insert;

7.3.5 Vertical Ribs – Six (6) one quarter (1/4) inches thick

7.3.6 Plow Width;

7.3.6.1 Straight – Between one hundred thirty-five (135) and one hundred forty-eight (148) inches;

7.3.6.2 V-Plow – Between one hundred twenty (120) and one hundred thirty (130) inches;

7.3.6.3 Angle – one hundred fifteen (115) inches;

7.3.6.4 Scoop – Between one hundred ten (110) and one hundred twenty-eight (128) inches;

7.3.7 Angle Cylinders – Two (2) double-acting bore size between three one-half (3.5) and four (4) inches x rod between two (2) and two one-half (2.5) inches;

7.3.8 Weight – Between Two thousand seven hundred (2,700) and four thousand three hundred (4,300) pounds.

7.4 Parallel Lift Group – “Henke” PLG – 11 or Equal

7.4.1 Cylinder – Four inch bore and two-inch cylinder and;

7.4.2 Mechanical stops– Full up and full down, to prevent damage to hydraulic cylinder.

Additional Requirements

8. Delivery

8.1 The Contractor must deliver and unload the Motor Graders with Snowplows to the Delivery Locations prior to November 1, 2025. The delivery of these units is critical to ITD winter operations. Contractors who are unable to meet this delivery requirement will be declared non-responsive. The Contractor is responsible for providing the necessary labor and equipment to unload the motor graders with snowplows, including any re-assembly of motor grader components that were unassembled for delivery or unloading.

Contractor will be allowed to provide loaner Motor Grader(s) with Snowplow(s) if the delivery of the Motor Grader(s) with Snowplow(s) become delayed by the manufacturer.

8.2 Delivery must be made Monday through Friday, 8:00 am to 3:00 pm local time (per Delivery Location) excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html) unless otherwise approved by ITD.

8.3 Delivery Locations:

ITD District 1 Yard, 600 West Prairie, Coeur d’Alene, ID 83814 ITD District 2 Yard, 2600 Frontage Road, Lewiston, ID 83501 ITD District 3 Yard, 8150 Chinden Boulevard, Boise, ID 83714 ITD District 4 Yard, 63 West Highway 26, Shoshone, ID 83352 ITD District 5 Yard, 5151 South 5th, Pocatello, ID 83204 ITD District 6 Yard, 206 N. Yellowstone, Rigby, ID 83442

9. Equipment Manuals The Contractor must provide one (1) operator’s manual and one (1) service manual with each motor grader at the time of delivery.

The manuals must be electronic PDF copies provided via USB, email, or free website download (hyperlink must be provided).

10. Acceptance https://www.idaho.gov/government/holidays.html

In the event the specifications are not met, the Contractor must pick-up motor graders with snowplows, correct any discrepancies, and re-deliver motor graders with snowplows within thirty (30) calendar days after notification from ITD, at no additional cost to ITD.

11. Warranty, Service and Support, Maintenance

11.1 If the Direct Purchase is awarded: Warranty must be for a minimum period of five (5) years or 5,000 hours, whichever comes first, for the entire motor grader, after ITD’s Acceptance.

11.2 If the Buy Back is awarded: Warranty must be for the entire period of the Buy-Back Contract.

11.3 Warranty must include all parts, labor, and freight to replace a defective warranted item.

11.3.1 Warranty excludes routine lubrication, fuel, oil, tires, antifreeze, lights, paint, fuses, glass, and other manufacturer’s auxiliary attachments.

11.4 Awarded vendor is responsible for all warranty requirements. No third-party warranties will be allowed.

12. Training The Contractor must provide an authorized representative, within thirty (30) calendar days after acceptance, to provide training on the operations, maintenance, and safety of the Motor Graders. The representative must be versed in all aspects of the Motor Grader and Snowplow and able to make any necessary field adjustments during the training period.

13. Preventative Maintenance (Buy Back Only)

13.1 If the Buy-Back is awarded: ITD will be responsible in performing preventative maintenance on the motor graders with snowplows, following the manufacturer’s suggested maintenance intervals for oil changes, fluid changes, and necessary adjustments during the duration of the Buy-Back Contract, except for the two hundred and fifty (250) hr. Brake System Test, which includes the Park Brake Test and Adjustment.

13.2 The Contractor will be responsible for all costs associated with the Test, adjustment. ITD will be responsible in performing all non-expected repairs, not covered under warranty, during the duration of the Buy- Back Contract.

14. Inspections and Returns (Buy Back Only)

14.1 If the Buy-Back is awarded: The Contractor must perform an inspection on each motor grader two (2) weeks prior to the Buy-Back Date at each Delivery Location. The Contractor is responsible for the following:

14.1.1 Travel time, mileage and any other expenses related to performing the inspection.

14.1.2 Suggesting any manufacturer adjustments needed to ensure the Motor Graders with Snowplows are returned as close to original delivery condition as possible.

14.1.3 Report any defects or repairs that need to be corrected to the ITD Maintenance Services Manager or designee.

14.2 Once the Inspection has been completed and the Buy-Back contract has ended, the Contractor must pick up the motor graders with snowplows from each Delivery Location. ITD will ensure the motor graders with snowplows are maintained in as good condition as when received, with any defects or repairs corrected, prior to the Buy-Back Date (ordinary wear, tear, and defects are to be expected).

14.2.1 Once the Inspection has been completed and the Buy-Back contract has ended, the Contractor must pick up the motor graders with snowplows from each Delivery Location. ITD will ensure the motor grader with snowplow are maintained in as good condition as when they were received, with any defects or repairs corrected, prior to the Buy-Back Date (ordinary wear, tear, and defects are to be expected).

15. Fluid Filters (Buy Back Only)

15.1.1 If the Buy Back is awarded; all fluid filters must be supplied to the delivery locations for each motor grader for the duration of the buy-back contract.

15.1.2 All filters must be provided per manufacturer’s scheduled service intervals detailed in operator’s manual.

15.1.3 ITD will average three hundred (300) hours, on each motor grader, in a twelve (12) month period.

16. Authorized Distributor/Manufacturer

16.1.1 Submitting vendors must be an authorized distributor or manufacturer of the Motor Grader with Snowplow offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products. Bids from Contractors who are not an authorized distributor by the manufacturer shall not be considered.

16.1.2 ITD reserves the right to request authorized distributor documentation from the submitting vendors. Failure to provide submitting documentation as requested will result in a non-responsive quote.

17. Billing Procedure

The Contractor must provide a signed waybill upon delivery. The invoice must be submitted no later thirty (30) calendar days after delivery. No invoice will be accepted or paid without receipt of required information listed below. Invoices submitted without the required documentation will be returned to the Contractor for resubmission.

17.1 The Contractor must provide the following information with each invoice:

10.1.1 IPRO contract number (and name of project/product, if appropriate) and Agency PO number Identification of billing period;

10.1.2 Total amount billed for the billing period;

10.1.3 Itemization of Property delivered and accepted – description, quantity, unit of measure, unit price, extended price, and total invoice amount and;

10.1.4 Name of authorized individual and contact information for Contractor.

17.2 Invoices must be submitted to: HQFLEET@ITD.IDAHO.GOV and HQAP@ITD.IDAHO.GOV mailto:HQFLEET@ITD.IDAHO.GOV mailto:HQAP@ITD.IDAHO.GOV

EXHIBIT 3

Questions

General Instructions

□ The ITB Lead is the sole point of contact for this solicitation.

□ All questions, clarification, or other correspondence must be submitted in writing via email to the ITB Lead.

□ The e-mail subject line should include the “ITB Number”, followed by “Questions” (i.e. ITB 12345 Questions).

□ Questions must NOT be submitted through IPRO.

□ Questions must be received by the deadline specified in the Procurement Schedule.

□ The Bidder must use the table on the following page, to submit all questions or clarifications. The Bidder must adhere to the instructions below.

Instructions Regarding The Table

□ Do NOT change the format, font, font style, or font colors.

□ Do NOT submit any questions related to the State’s Contract Terms or Conditions. Those must be submitted using

Exhibit 4.

□ Do NOT…