ITB 872 - Fresh Produce Administrative Document.docx

DOCX document 666 KB Posted

Attached to
ITB #872 Fresh Produce
Solicitation number
872
Issued by
Bonner County, Idaho

About this file

This Invitation to Bid (ITB) #872 is issued by the State of Idaho Division of Purchasing on behalf of state agencies and political subdivisions to establish up to three regional fresh produce supply contracts (North, South, and East regions). The solicitation seeks qualified vendors with a minimum of five years' experience supplying fresh produce to governmental and institutional clients, including correctional facilities and hospitals. Approximately 100 state facilities and political subdivisions will utilize the contract, including the Idaho Department of Correction (15 facilities with 7,299 beds), Idaho Department of Juvenile Corrections (3 facilities with 248 beds), Department of Health and Welfare State Hospitals (170 beds), and Idaho Division of Veterans Services (430 beds across four facilities). The estimated annual volume is approximately 496,555 pounds with an estimated annual spend of $5 million to $10 million. The deadline for submitting questions is October 10, 2025 at 11:59 p.m. MT, with bids due October 30, 2025 at 5:00 p.m. MT. Public bid opening will occur October 31, 2025 at 10:30 a.m. MT via Microsoft Teams, with anticipated award by the week of November 3, 2025. The initial contract term is one year, with an anticipated total term of five years subject to mutual written agreement for renewal or extension.

Award will be made to the lowest responsive and responsible bidder for each region based on normalized Grand Total pricing from Submittal Form B. Bidders may submit bids for one, some, or all regions and must provide region-specific pricing schedules. The contractor must maintain a 95 percent minimum fill rate per quarter, comply with USDA FSIS and HACCP standards, adhere to stringent security protocols for correctional facilities including background checks and fingerprinting, and meet specific delivery schedules (minimum weekly for IDOC, twice-weekly for IDJC, and varying frequencies for State Hospitals and Veterans Services). The contractor may request quarterly price adjustments based on USDA AMS Fresh Fruit and Vegetable Market News, with cumulative increases capped at 5 percent annually unless approved by the Division of Purchasing. For IDJC facilities, the contractor must comply with USDA National School Lunch Program and School Breakfast Program requirements, including Buy American thresholds limiting non-domestic food purchases to 10 percent of expenditures with documented exceptions. No incumbent vendor information or specific set-asides are identified in this solicitation. All bids must be submitted electronically through the IPRO eProcurement system; late bids will not be accepted.

View the file

Other files

File Type Posted
Submittal Form B - Pricing ITB 872.xlsx XLSX spreadsheet
Solicitation_Instructions-July-2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF IDAHO

DIVISION OF PURCHASING

FOR

THE STATE OF IDAHO

Invitation To Bid

Fresh Produce

ITB Number: 872

Table of Contents

ITB Section 1 - Administrative Information & Overview
Page 3
ITB Section 2 - Format & Submission Requirements
Page 5
ITB Section 3 - Evaluation & Award Procedures
Page 7
Exhibit 1 - Background Information
Page 9
Exhibit 2 - Scope of Work (SOW)
Page 11
Exhibit 3 - Pre-Bid Conference Registration Form
Page 15
Exhibit 4 - Questions
Page 16
Exhibit 5 - Contract Modifications and Exceptions
Page 18
Exhibit 6 - Contract
Page 22
Exhibit 7 – IDOC Security Requirements
Page 23
Exhibit 8 – IDJC Purchasing Practices & Needs
Page 25
Exhibit 9 – State Agency Institution Delivery Locations
Page 27
Exhibit 10 – Zone and Area Listings with Map
Page 30
Exhibit 11 – Buy American Accommodation Process
Page 31
Exhibit 12 – Buy American Threshold FFVP
Page 34
Submittal Form A - Background, Declarations, and Certifications
Page 35
Submittal Form B – Pricing
Page 38

Section 1 Administrative Information and Overview

1.1 Purpose

The State of Idaho’s (“State”) Division of Purchasing (“DOP”), is issuing this Invitation To Bid (“ITB”) to solicit Bids from qualified and experienced firms (“Bidders”), to establish a statewide Contract for Fresh Produce for State Agencies and Political Subdivisions. Background information is provided in Exhibit 1. The complete scope of work is provided in Exhibit 2.

1.2 Procurement Schedule

Deadline to submit questions:

Closing Date (deadline to submit Bid):

Public Opening Date:

Anticipated Award Date:

The State will make every effort to adhere to the schedule below, but reserves the right, at its sole discretion, to adjust the schedule.

October 10, 2025 @ 11:59 pm MT October 30, 2025 @ 5:00 pm MT (Note: in the event of a conflict between this document and the State’s ERP system, the closing date in the ERP system takes precedence.)

October 31, 2025 @ 10:30 am MT Week of November 3, 2025

1.3 ITB Lead

Name:

Title & Agency:

Email:

The individual listed below (referred to as “ITB Lead”) is responsible for the conduct of this procurement. From the issue date of this ITB, until a contract is awarded, or the ITB is cancelled, Bidders are prohibited from communicating with any State employee, Official, or Evaluators regarding this ITB or procurement.

Erik Schmidt Buyer, Division of Purchasing Erik.Schmidt@adm.idaho.gov

1.4 IPRO eProcurement System

This Solicitation is issued by the State via the State’s eProcurement system, IPRO. It is the Bidder’s responsibility to monitor IPRO for any updates or amendments.

Link: IPRO POWERED BY LUMA

1.5 Bid Opening

Link:

Dial-In:

ID:

Passcode:

A public bid opening will be made available via Microsoft Teams. Below is the information needed to access the call.

ITB 872 - Fresh Produce Public Bid Opening | Meeting-Join | Microsoft Teams 1-208-985-2810 249 547 133 694 4 oK3X2jk3

1.6 Questions

The Bidder SHALL review this entire ITB solicitation, including associated documents. All questions, requests for clarification, or other correspondence must be submitted in writing via email to the ITB Lead. See Exhibit 4 for additional instructions. Questions must be submitted using the table provided within Exhibit 4.

1.7 Modifications and Exceptions to Requirements, Terms, and Conditions The Bidder SHALL review the Contract requirements, terms, and conditions. The Bidder is strongly encouraged to submit any proposed modifications, or exceptions to the Contract requirements, terms, or conditions to the ITB Lead prior to the deadline for submitting questions. See Exhibit 5 for additional instructions. Modifications and exceptions must be submitted using the table provided within Exhibit 5. The Contract requirements, terms, and conditions are provided in Exhibit 6.

Any modifications or exceptions that are raised after the Bid has been submitted may be rejected by the State without further discussion. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period. Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, will be found non-responsive, and no further consideration will be given.

1.8 Amendments

The State may issue amendments to make changes to the ITB, or to respond to any questions. Amendments will be posted on IPRO. Bidders are responsible for monitoring IPRO for updates and amendments. All published amendments SHALL become part of this ITB, and must be considered by the Bidder in its Bid. Oral interpretations or clarifications of this ITB are not binding and should not be relied upon. Any verbal responses provided by the State during the pre-Bid conference are considered unofficial, and will not be binding.

1.9 Authority

This procurement is conducted in accordance with IDAPA 38.05.01 and pursuant to Title 67, Chapter 92 of the Idaho Code.

Section 2 Format & Submission Requirements

2.1 Adherence to Requirements

The Bid SHALL be submitted in accordance with the requirements set forth in this document. Any Bid that does not adhere to the requirements may be deemed non-responsive and rejected. The State reserves the right, in its sole discretion, to overlook any minor informalities that may be non-compliant.

2.2 Deadline to Submit

All Bids are due at the date and time specified in the Procurement Schedule (Section 1.2). Late Bids SHALL NOT be accepted or considered. The State SHALL not be responsible for any technical issues, difficulties, or delays. Bidders are strongly encouraged to begin the process of submitting the Bid response far enough in advance of the Closing Date/Time to allow for resolution of any technical difficulties.

2.3 General Format Requirements

The Bid response must meet the following requirements:

· Be made on standard 8.5” x 11” paper size.

· Use a minimum font size of ten (10) (images, figures, graphs, charts, are excluded from this font size).

· Use a font style such as: Calibri, Arial, New Times Roman, or similar.

· The Bidder SHALL NOT embed information, embed files, or embed any links within the Submittals.

· The Bidder SHALL NOT attach additional information to any Submittal Form (unless it has been explicitly requested). Any additional attachments submitted will not be considered in the evaluation process.

2.4 Electronic Submission Instructions

The Bidder SHALL submit the Bid as follows:

· The Bid SHALL be submitted electronically through IPRO POWERED BY LUMA. The State will not accept Bids in any other manner (i.e. facsimile, email, or hardcopy submissions). All Bidders participating in this Solicitation must establish an account in the IPRO system, as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free.

· Bidders may submit bids for one, some, or all regions (North, South, East). Bidders must indicate in Submittal Form A which region(s) they are bidding on and provide region-specific pricing schedules in Submittal Form B for each region bid.

Link: Luma IPRO Supplier Portal Registration link

Please make sure that the entity profile under which the Bid is submitted in IPRO, is the same legal entity presented in the uploaded response materials. If there are any discrepancies, the entity information provided within Submittal Form A prevails.

· The Bid must be submitted in the following packages:

No
Contents
File Format
How To Name The Files
1
Submittal Form A
MS Word
1 <Insert Bidder Name> Form A
2
Submittal Form B
MS Excel
2 <Insert Bidder Name> Form B
3*
Redacted Submittal Forms*
PDF
3 <Insert Bidder Name> REDACTED

* If applicable. Applies to Bids with trade secrets as discussed below.

· All electronic files must be in Adobe PDF, Microsoft Word, or Microsoft Excel format as noted in the table above.

· The Bid file(s) SHALL NOT be password protected or locked in any way.

· All submission materials must be submitted at the same time. If multiple submissions are received, only the latest timely submission will be considered.

· Alternate Bids are not allowed.

· Note: When submitting through IPRO, enter your Cost in IPRO as “$0.01”.

· Package 3: If your Bid contains trade secrets (see next Section), submit an additional redacted version. This should be labeled as Package 3 and include 'Redacted' in the file name.

2.5 Trade Secrets and Non-Public Information

The Idaho Public Records Act, Idaho Code title 74, chapter 1 (the “Act”) defines trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” The Act also defines other records that may be exempt from public disclosure.

In addition to marking each page of the document with a trade secret or other exemption notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:

· Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” or “exempt from disclosure” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” or “exempt” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret” or “exempt from disclosure.”

· Provide a separate document entitled “List of Redacted Trade Secret and Exempt Information” which provides a succinct list of all trade secret and exempt information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure and how the exempting the material complies with the Act.

· Submit a redacted copy of any Bid response document (e.g. Scope of Work Response) with all trade secret and exempt information removed or blacked out. The redacted copy must be submitted electronically in the Supplier Attachments section of IPRO, with the word “redacted” in the file name.

Section 3 Evaluation & Award Procedures

Bids will be evaluated independently for each region (North, South, East). Bidders must meet all mandatory submission and responsibility requirements (Sections 3.1 and 3.2) for each region bid. The State may conduct clarification discussions (Section 3.3) and Best-and-Final-Offer (BAFO) negotiations (Section 3.4) separately for each region to verify bidder responsiveness and responsibility.

3.1 Mandatory Submission Requirements

All Bids will be reviewed on a "pass" or "fail" basis to ensure compliance with all mandatory submission requirements. Bids determined by the State, at its sole discretion, to be responsive in this regard will proceed to the evaluation process outlined in this Section. Bids that do not meet the mandatory submission requirements will be deemed non-responsive. Mandatory submission requirements include, but are not limited to, the following:

· The Bid was submitted prior to the specified Closing Date and Time.

· The Bid complies with the submission instructions detailed in Section 2.4.

· The Bid includes a fully completed and signed Submittal Form A.

· The Bid includes all required Submittal Forms.

3.2 Mandatory Responsibility Requirements

The Bidder shall meet the following requirements to be eligible for award:

· Proven experience (minimum 5 years) supplying fresh produce to governmental or institutional clients, including corrections facilities and hospitals.

· Capability to deliver to all facilities within the region(s) bid, including secure facilities (e.g., IDOC, IDJC) and medical facilities, per schedules in Exhibit 2.

· Compliance with HACCP, USDA FSIS, cold chain management, and IDOC security protocols (Exhibit 6).

· Financial stability to perform a 5-year contract.

3.3 Clarification Discussions

The ITB Lead may, in the State’s sole discretion, perform clarification discussions with the Bidder(s) to verify and validate that the Bid will meet the needs of the Agency. At any time during this period, if it is discovered that the Bidder has not met a mandatory requirement, or has failed to adequately respond to an item below, the State may find the Bidder non-responsive, and disqualify the Bid.

The Bidder(s) may be requested to address the following items:

3.3.1 Responsibility Assessment: The Bidder may be required to provide documentation to demonstrate its responsibility. Failure to provide the requested documentation may result in the Bidder being deemed non-responsible.

3.3.2 Agency Concerns: The Bidder will address or resolve any major risks, issues, concerns, obstacles, or deal-breakers that have been identified by the Agency.

3.3.3 Verify the Fee/Cost Bid: The Bidder will clarify and validate the fee/cost schedule. The Bidder will submit any additional financial data, supporting data, or substantiation requested by the Agency.

3.3.4 Provide a Project Schedule: The Bidder will provide a detailed schedule of the project (with major milestones or tasks). This should include milestones, task and proposed start and completion dates.

3.3.5 Key Assumptions: The Bidder will provide a summary of the major assumptions that have been made in preparing the Bid. This should include items/tasks that the Bidder has assumed the Agency will perform, items/tasks required from the Agency, and items/tasks that have not been included in the Bid (items that the Bidder feels are outside the scope of work). This should also include any critical expectations or responsibilities that the Bidder has of the Agency, Agency personnel, or other parties/organizations that are not contracted to by the Bidder.

3.3.6 Technical Reviews: The Bidder will comprehensively describe the approach for meeting all of the requirements in the Scope of Work to confirm depth and breadth of technical and/or industry knowledge, with any efforts required from the Agency should addressed.

3.3.7 Reference Verification: If requested, provide a list of references for the firm and each key personnel.

3.3.8 Additional Requested Documentation: If requested, provide any additional documentation that may be requested, which may include a detailed project/work plan, testing and commissioning plan, training, change management plan, safety plan, staffing plan, operational plan, maintenance plans, warranties, bonding and insurance, background checks, etc.

The clarification discussion cannot materially alter the Bid. The State does not expect to negotiate any terms or conditions requested by the Bidder, unless they were submitted by the Bidder prior to the deadline for submitting questions (see Section 1.7), or they provide the State an opportunity to secure more advantageous terms or pricing.

3.4 Best-And-Final-Offer (BAFO)

The ITB Lead, in the State’s sole discretion, may conduct discussions and negotiations with multiple Bidders. The ITB Lead may request that these Bidders provide a Best-And-Final-Offer (BAFO) cost Bid. The State reserves the right to conduct one (1) or more rounds of a BAFO with these Bidders. The revised BAFO cost Bids, along with the additional evaluation criteria and weighting outlined in Section 4.2, will be utilized to prioritize and rank the Bidders. If the State anticipates the possibility of awarding multiple contracts from this ITB, the State may engage in concurrent negotiations with apparently successful Bidders as deemed appropriate.

3.5 Award

The State intends to award up to three contracts, one for each region (North, South, East), to the lowest responsive and responsible bidder for each region based on the normalized Grand Total for that region from Submittal Form B. A single bidder may be awarded one, some, or all regions if they submit the lowest responsive and responsible bid for each region. The State reserves the right to reject bids for any region if no responsive and responsible bids are received.

The State reserves the right to make “Multiple Awards” within the same Area if in the best interest of the State, as determined by the Administrator of the Division of Purchasing in accordance with Idaho Code 67-9211. Per Idaho Code 67-9211 (3), when a contract for property has been awarded to two (2) or more bidders in accordance with this section, a state agency shall make purchases from the Contractor whose terms and conditions regarding price, availability, support services and delivery are most advantageous to the Ordering Agencies.

3.6 Resulting Contract

If the State awards Contract(s) from this solicitation, it will do so by issuing Contract document(s) from Luma, the State’s ERP system. The State anticipates issuing a single contract document for each awarded Contractor, incorporating the Terms and Conditions, Scope of Work, Appendices, and some or all of the Bidder’s Technical Bid; however, the State reserves the right to determine the form of the resulting Contract(s). A sample contract is provided in Exhibit 6. At its option, the State may memorialize the agreement between the State and each Contractor in one (1) or more final Contract documents.

Important Note: Any modifications or exceptions to the Contract may be rejected by the State. Therefore, the Bidder is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period (see Section 1.7).

EXHIBIT 1

Background Information

1. About The Department / Agency The Division of Purchasing (DOP) serves as the centralized procurement arm for the State of Idaho, facilitating purchases on behalf of state agencies, political subdivisions, and other eligible entities to ensure efficient, cost-effective, and compliant acquisition of goods and services.

2. Background Information The State of Idaho currently contracts with one vendor to supply fresh produce to state agencies, including the Idaho Department of Correction (IDOC), Idaho Department of Juvenile Corrections (IDJC), Department of Health and Welfare (DHW) for State Hospitals, and Idaho Division of Veterans Services (IDVS). This Invitation to Bid (ITB) aims to establish up to three regional contracts (North, South, East, per Section 3.5 and Exhibit 10) for fresh produce, available to all eligible State of Idaho entities, including state agencies, political subdivisions, and other authorized public entities. The existing contract expires in November 2025, necessitating this solicitation to secure reliable suppliers to meet the diverse fresh produce needs of these entities under a new contract term per Exhibit 2, Section 3.

3. Existing Data

3.1 Number of users

Approximately one hundred (~100) state facilities and political subdivisions, including:

3.1.1 IDOC: Fifteen (15) facilities, approximately seven-thousand two-hundred ninety-nine (7,299) beds.

3.1.2 IDJC: Three (3) facilities, approximately two-hundred forty-eight (248) beds.

3.1.3 DHW: State hospitals – roughly one-hundred seventy (170) beds.

3.1.4 IDVS: Veterans homes: Lewiston: sixty-six (66) beds, Post Falls: sixty-two (62) beds, Pocatello: one-hundred thirty-five (135) beds, Boise: one-hundred sixty-seven (167). Facilities are grouped into North, South, and East regions (Exhibit 10) for bidding and delivery purposes.

3.2 Annual Spend

Estimated at five to ten million dollars ($5M–$10M). These are estimates only; no minimum or maximum order, spend, or volume is guaranteed or implied.

3.3 Estimated Quantities

Estimated annual four-hundred ninety-six thousand five hundred fifty-five pounds (~496,555 lb) are derived from IDJC, DHW (state hospitals), IDVS, and IDOC data, allocated by region (Exhibit 10). Actual usage may vary. Estimates are for bid evaluation only and not guaranteed. Submittal Form B provides region-specific estimates and unit conversions. Regional estimates include North, South, and East, per Submittal Form B.

3.4 Locations

The State reserves the right to add or remove locations within all regions during the contract term.

4. Current Challenges

4.1 IDOC: Strict security protocols due to large inmate populations. High-volume, frequent deliveries and potential lockdowns requiring re-delivery within twenty-four to forty-eight (24–48) hours.

4.2 IDJC: Compliance with USDA National School Lunch Program (NSLP) and School Breakfast Program (SBP) standards, including Buy American requirements. Frequent, small orders due to limited storage, requiring full-case deliveries where specified (Section 5.4).

4.3 State Hospitals: Rapid delivery and cold chain management (Exhibit 2, Section 2.4) for patient care, with full-case deliveries placed in refrigerators (Section 5.4). Coordination with dietary staff for special needs and flexible order adjustments due to fluctuating patient census.

4.4 IDVS: Diverse delivery schedules (e.g., weekly for Lewiston/Pocatello, bi-weekly for Post Falls). Conservative budgets ($1,000–$2,000/month per facility) requiring cost-effective pricing.

5. References:

5.1 Idaho Food Code

5.2 USDA National School Lunch Program Meal Pattern

5.3 USDA School Breakfast Program Meal Pattern

5.4 USDA NSLP/SBP Code (7 CFR § 210.21)

5.5 USDA Food Safety and Inspection Service (FSIS)

5.6 USDA Hazard Analysis Critical Control Point (HACCP)

5.7 Idaho Statute 67-2327

EXHIBIT 2

Scope of Work

1. Summary of Scope The Contractor must supply fresh produce through a statewide contract for use by state agencies and political subdivisions, including specialized requirements for certain agencies (e.g., IDOC, IDJC, DHW, IDVS). The Contractor must make the contract available to all eligible State of Idaho entities, including state agencies, political subdivisions, and other authorized public entities as defined in Idaho Statute § 67-5717.

2. Objectives and Expectations The Contractor must meet the following objectives:

2.1 Reliable Supply: The Contractor must ensure a reliable, high-quality supply of fresh produce meeting USDA standards for IDJC (aligned with National School Lunch Program requirements, see Exhibit 8), dietary needs for State Hospitals, and IDVS preferences.

2.2 Cost-Effectiveness: The Contractor must provide competitive pricing through fully burdened unit prices, with flexibility for quarterly adjustments to reflect market conditions, while maintaining transparency via supplier invoice audits as requested by the State.

2.3 Timely Delivery: Guarantee delivery schedules tailored to agency needs, including accommodations for emergency orders and lockdown re-deliveries.

2.4 Food Safety and Quality: The Contractor must maintain strict compliance with USDA FSIS, HACCP, and cold chain standards for all produce, ensuring freshness, freedom from contaminants, and institutional quality thresholds.

2.5 Security Compliance: The Contractor must adhere to stringent security protocols for corrections facilities (Exhibit 7), including tamper-proof packaging, background-checked personnel, and rapid response to rejections or recalls.

2.6 Nutritional Standards: The Contractor must support IDJC’s USDA school nutrition requirements and State Hospitals’ dietary needs (e.g., low-sodium options).

3. Schedule & Term Expectations The initial term is one (1) year. Upon mutual, written agreement, the Contract may be renewed, extended, or amended. The anticipated total Contract term is five (5) years.

4. General Requirements The Contractor must meet the following minimum mandatory specifications:

4.1. The Contractor must demonstrate proven experience (minimum 5 years) with large-scale produce distribution to governmental or institutional clients, including corrections facilities and hospitals.

4.2. The Contractor must have the capacity to supply approximately 496,555 units annually (estimated; no minimum volume guaranteed) and deliver to all facilities within the awarded region(s) (North, South, and/or East, per Exhibit 10).

4.3. The Contractor must adapt to evolving needs, including new items or facilities added by institutions, without minimum order mandates.

5. Agency Specific Requirements The Contractor must comply with the following agency-specific considerations:

5.1. Correctional Facilities (IDOC/IDJC): The Contractor must provide large volumes for IDOC and diverse produce for IDJC to meet USDA subtype minimums (e.g., dark green vegetables, per Exhibit 8), considering limited storage at IDJC. Deliveries must include palletized, labeled, tamper-proof packaging compliant with security protocols (Exhibit 7).

5.2. State Hospitals (DHW): The Contractor must ensure rapid, reliable deliveries with cold chain integrity, placing full-case deliveries in designated refrigerators. The Contractor must accommodate special dietary needs (e.g., low-sodium) and fluctuating patient censuses.

5.3. Statewide Logistics for All Agencies: The Contractor must maintain robust warehouse and fleet capabilities, with uniform pricing across zones except for approved special services (e.g., expedited deliveries, unique packaging).

6. Operational Requirements The Contractor must comply with the following provisions, which take precedence in the event of conflict with the State’s Standard Terms and Conditions or other ITB requirements:

6.1. Delivery

The Contractor must coordinate with agencies within the awarded region(s) (North, South, East) within thirty (30) days of contract award to finalize packaging sizes, delivery schedules, and frequencies. Deliveries must occur within two (2) days after receipt of order (ARO) unless specified otherwise by agencies, using refrigerated transport compliant with USDA FSIS cold chain standards. Minimum delivery frequencies include:

6.1.1. IDOC: Minimum once-weekly for all facilities; twice-weekly for facilities with over 500 inmates (e.g., ISCC, ISCI, SICI, ICIO, IMSI, per Exhibit 9) if requested.

6.1.2. IDJC: Minimum twice-weekly to Juvenile Corrections Centers (e.g., St. Anthony, Lewiston, Nampa, per Exhibit 9), aligned with NSLP/SBP requirements (Exhibit 8).

6.1.3. DHW: At least twice-weekly for State Hospital North; five (5) days per week for State Hospital South (primary days Tuesday/Friday, with holiday adjustments); minimum twice-weekly for Southwest Idaho Treatment Center.

6.1.4. IDVS: Five (5) days per week for Lewiston, Post Falls, and Pocatello Veterans Homes (primary days Tuesday/Friday, with holiday adjustments); bi-weekly for Boise Veterans Home.

6.1.5. Other Eligible Entities: Minimum once-weekly unless otherwise specified in the purchase order.

For IDOC and IDJC, the Contractor must provide re-delivery within twenty-four to forty-eight (24-48) hours post-lockdown at no extra cost. Failure to meet schedules may result in penalties or termination, as assessed during quarterly reviews.

6.2. Packaging and Labeling

The Contractor must ensure all bulk-packaged and processed produce is labeled on each shipping container with the item name, number, net weight, Contractor/supplier name and address, pack date, and best used by/expiration date. For IDOC/IDJC, packaging must be tamper-proof (per Exhibit 7). Labels must be legible, secure, and resistant to environmental conditions. The Contractor must confirm packaging sizes with agencies within thirty (30) days of award. Non-compliant packaging may result in rejection at the Contractor’s expense, with replacements or credits within twenty-four (24) hours (Boise area) or forty-eight (48 hours) (elsewhere).

6.3. Quality and Food Safety

The Contractor must maintain a ninety-five percent (95%) minimum fill rate per quarter per account, with produce compliant with USDA FSIS, HACCP, and cold chain standards. The State will inspect and accept produce within twenty-four (24) hours (general), five (5) days (slow-degrading), or one (1) day pre-expiration (bagged items), notifying the Contractor of rejections immediately. In the event of non-compliance:

6.3.1. The Contractor must replace non-compliant produce at no cost within twenty-four to forty-eight (24-48) hours.

6.3.2. The Contractor must submit a corrective action plan within five (5) business days.

6.3.3. For repeated instances (two or more in 30 days), the State may impose invoice reductions up to five percent (5%) of the affected delivery’s value.

6.3.4. Persistent non-compliance may result in termination.

All remedial costs must be borne by the Contractor. These remedies are specific to food safety and quality but align with standard contract remedies (Exhibit 6).

6.4. Security

The Contractor must comply with security protocols for IDOC/IDJC facilities, including background checks, fingerprinting, drug-free policies, and vehicle searches for personnel (per Exhibit 7). Training on these protocols, if required, must be provided at no additional cost, included in fully burdened prices.

6.5. Price Adjustments

After the initial thirty (30) days, the Contractor may request quarterly price adjustments based on USDA AMS Fresh Fruit and Vegetable Market News (or equivalent). Cumulative increases per item must not exceed 5% annually of the original bid price unless approved by DOP, considering factors like tariffs or inflation. Requests must include documentation (e.g., index changes, transportation costs, market rates compliant with Buy American, Exhibit 11). DOP must review within seven (7) business days. Price decreases must be passed on within fourteen (14) business days. For IDJC, adjustments must comply with 7 CFR § 210.21, using the same process as other agencies. Non-compliance may result in invoice reductions or termination.

If increases exceed the cap or affect fill rates, agencies may source externally with DOP approval, providing written notification and market quotes. External sourcing must be temporary, with Contractor cooperation required.

6.6. Post-Award Catalog Submission

The Contractor must submit a comprehensive catalog of all available fresh produce items, including pricing, within thirty (30) days of award. Pricing for non-bid items must comply with ITB terms and are subject to State approval.

6.7. Reporting and Monitoring

The State reserves the right to conduct quarterly performance reviews assessing fill rates, delivery timeliness, and quality standards using Contractor reports. The Contractor must submit reports via email to: purchasing@adm.idaho.gov

6.7.1. Monthly usage reports by region (product, quantity, delivery date) to DOP within ten (10) business days following the end of the reporting month.

6.7.1.1. Example: Reporting month ends Tuesday, March 31, 2026 = reports due by Tuesday, April 14, 2026;

6.7.2. Quarterly fill rate reports to DOP and agencies within ten (10) business days, including total orders received/delivered, non-deliveries/substitutions, and reasons (e.g., item name, order number, quantity ordered/delivered, reason for non-delivery).

6.7.2.1. Reporting months:Reports Due within ten (10) business days of following month:
Q1: Jan-MarApril
Q2: Apr-JunJuly
Q3: Jul-SepOctober
Q4: Oct-DecJanuary

6.8. Compliance with Laws and Regulations

The Contractor must comply with USDA FSIS, HACCP, Idaho Code Title 67 Chapter 92, IDOC security (Exhibit 7), and Buy American for IDJC (NSLP/SBP, per 7 CFR 210.21(d)(5) and Exhibit 11; non-domestic limited to 10% of expenditures, with exceptions if unavailable/cost-prohibitive).

6.9. Records Maintenance and Audit Rights

The Contractor must maintain all payment and performance records for three (3) years post-termination or until audits are complete. The Contractor must allow State/Federal auditors and purchasing staff access during normal hours, acknowledging requests within forty-eight (48) hours and providing records within ten (10) business days (or sooner for urgent audits). Non-compliance may result in invoice reductions.

6.10. Website/Ordering Requirements

If providing a website for orders, any terms waiving sovereign immunity, subjecting the State to other jurisdictions, limiting claim times below Idaho law, imposing unfavorable payments (per Idaho Code § 67-2302), or requiring indemnification (per Idaho Code §§ 67-9215, 59-1016) are void. Click-through terms contradicting this contract are not binding. Third-party websites must comply.

6.11. Use of State Purchasing Card

Use of State Purchasing Cards (P-Cards) is prohibited with the resulting contract.

6.12. Subcontractors

The Contractor must ensure any subcontractors comply with all contract requirements, including security and quality standards.

7. Additional Requirements Upon contract award, the selected Contractor(s) must submit a comprehensive catalog of all fresh produce items available for purchase under this contract within thirty (30) days of contract award, including associated pricing. The pricing for items not listed in Submittal Form B must adhere to the terms and conditions, including price adjustment mechanisms, outlined in this ITB. The State reserves the right to review and approve pricing for non-bid items to ensure compliance with the contract.

8. Invoicing All invoices must be sent to the Agency in which the Property was Provided. The Contract number must be listed on all invoices. Unless otherwise directed, invoices must not be sent to the Division of Purchasing.

The Contractor must provide a minimum of one invoice with each delivery. Each invoice must contain, at a minimum:

8.1 Delivery Driver’s Name

8.2 Purchase Order Number

8.3 Ship to Address

8.4 Product Description

8.5 Price per Line

8.6 Quantity Ordered

8.7 Quantity Shipped

8.8 Quantity Backordered

8.9 Invoice Total Cost

EXHIBIT 3

Pre-Bid Conference Registration Form - RESERVED

NOTE: There will be no pre-bid conference meeting for ITB #872.

EXHIBIT 4

Questions

General Instructions

· The ITB Lead is the sole point of contact for this solicitation.

· All questions, clarification, or other correspondence must be submitted in writing via email to the ITB Lead.

· The e-mail subject line should include the “ITB Number”, followed by “Questions” (i.e. ITB 12345 Questions).

· Questions must NOT be submitted through IPRO.

· Questions must be received by the deadline specified in the Procurement Schedule.

· The Bidder must use the table on the following page, to submit all questions or clarifications. The Bidder must adhere to the instructions below.

Instructions Regarding The Table

· Do NOT change the format, font, font style, or font colors.

· Do NOT submit any questions related to the State’s Contract Terms or Conditions. Those must be submitted using Exhibit 5.

· Do NOT identify your name, your company’s name, or product names of intellectual property in your questions.

· Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment 1”) in the “ITB Section” (column 2), and the attachment page number in the “ITB page” field (column 3).

· Add additional rows by hitting the “Tab” key while within the table, and within the final row.

· Do not enter text in the “Response” field (column 5). This is for the State’s use only.

Bidder Questions ITB #872 – Fresh Produce

No
ITB Section
ITB Page
Question
Response

EXHIBIT 5

Contract Modifications and Exceptions Before requesting modifications or exceptions to the Contract requirements, terms, and conditions, please review this document for greater context and reasoning behind key items.

1. Idaho Terms and Conditions – Background The Division of Purchasing issues solicitations on behalf of State of Idaho agencies. As public entities, the Division and the agencies it serves are subject to statutes, rules and policies that result in terms and conditions unlike those common in contracts between private parties. The Division of Purchasing does not have authority to vary many of these terms and in some instances variations are void under Idaho law. See IDAPA 38.05.01.112.

Idaho is not unique. Many of the terms in the State of Idaho Standard Terms and Conditions are similar to terms offered by most federal, state, and local government agencies. Vendors who seek to work with government agencies should become familiar with these terms. The discussion below is provided to assist you in becoming familiar with the legal and policy basis for the terms and to provide information for you to evaluate the risks and benefits of working with public entities.

2. Termination – Costs of Re-procurement The State of Idaho Standard Terms and Conditions provision concerning termination specifically identifies the costs of re-procurement as a damage arising from a breach of the contract by a vendor. This damage is identified because of the public agency budgeting process and the competitive solicitation process required by Idaho’s purchasing laws. The Idaho purchasing laws provide a preference for open, competitive procurements. These procurements come at a cost to the agency, which is generally included in the agency budget requested from the Idaho Legislature more than twelve months prior to incurring the expense. Unlike a private business, public agencies cannot independently pass through the costs of re-procurement to Idaho taxpayers, who are the customers of government. Instead, Idaho agencies must submit a request for the costs to the Idaho Legislature in a subsequent budget year, which is usually after the need to secure a replacement vendor for the breaching contractor arises. As a matter of public policy, the contractor whose breach caused the damage of requiring re-procurement must pay those costs at the time of breach so that the public can receive the benefit of the contract made on its behalf through re-procurement of a new contract. This policy is reflected in the State of Idaho Standard Terms and Conditions provision concerning termination and the Division of Purchasing does not generally vary this requirement.

3. Termination – Fiscal Necessity Idaho Constitution Article VII, section 11 prohibits an expenditure in excess of a legislative appropriation. Idaho Code section 59-1015 prohibits state agencies and officers from entering into contracts that create any expense or liability in excess of an appropriation. Idaho Code section 59-1016 provides that any such contract is void. IDAPA 38.05.01.112 contains the same provisions. An appropriation can be reduced under Idaho law through “give backs” and “hold backs” issued by the executive branch. When the Division of Purchasing enters into a contract, it must contain the term allowing for termination for fiscal necessity to comply with these provisions. Variation of this term is not offered.

4. Anti-Discrimination/Equal Employment Opportunity Many of the Idaho agencies served by the Division of Purchasing receive federal funding that is subject to a requirement concerning a pass-through to vendors of the obligation to comply with federal civil rights and anti-discrimination laws. The pass-through obligation may extend beyond the specific federal funds to all agency contracts. Variation of this term is not offered to prevent a breach of the State of Idaho’s obligations under its agreements with the United States.

5. Taxes The State of Idaho Standard Terms and Conditions provision concerning taxes identifies that Idaho agencies are exempt from the payment of taxes and provides that the contractor is responsible for all taxes assessed against the contractor as a result of doing business with the State of Idaho. State agencies are not granted an appropriation to pay taxes due to the exemptions that apply to government agencies. As discussed above under the heading Termination – Fiscal Necessity, terms in excess of appropriation are void under Idaho law. Variation of this term is not offered.

6. Indemnification Many vendors request the State of Idaho offer an indemnification of the vendor. An indemnification is a promise to pay funds that have not been appropriated in the current budget year or that may occur in a future budget year that has not yet been appropriated by the Idaho Legislature. Idaho Constitution Article VII, section 11 prohibits an expenditure in excess of a legislative appropriation. Idaho Code section 59-1015 prohibits state agencies and officers from entering into contracts that create any expense or liability in excess of an appropriation. Idaho Code section 59-1016 provides that any such contract is void. IDAPA 38.05.01.112 contains the same provisions. Variation of this term is not offered.

In assessing the risk of doing business with the State of Idaho, vendors should consider the following. The State of Idaho has waived its sovereign immunity for torts as described in the Idaho Tort Claims Act, Idaho Code title 6 chapter 9. To the extent that the State or its employees have committed a tort, contractors have legal remedies available through that act. Tort liability is funded by the Idaho Legislature through an appropriation to the Retained Risk Program and appropriation issues do not arise in actions under the act. In addition, under existing Idaho court decisions, the State does not have sovereign immunity for contract claims arising from a properly entered contract. If the State is in breach of its contract obligations, contractors have the legal remedies available under any contract. Lastly, States are generally prohibited from the benefits of the federal bankruptcy laws. Unlike private companies, an indemnification clause is not required to preserve a remedy through the company’s insurer should the company declare bankruptcy.

7. Public Records All Idaho agencies are subject to the Idaho Public Records Act, Idaho Code title 74, chapter 1. State agencies cannot by contract vary the requirements of the Act or agree to violate the Act by withholding records properly subject to release under the Act. The State of Idaho Standard Terms and Conditions provision concerning disclosure of public records has been drafted to allow contractors to designate records as exempt under the provision of the Act if the contractor agrees to defend that designation and to indemnify the State of Idaho for any costs and penalties imposed under the Act. Variation of this term is not offered.

8. Assignments Idaho code section 67-9230 prohibits the transfer of a contract issued by the Division of Purchasing without written approval by the Administrator and the Idaho Board of Examiners. At the option of the Administrator, a contract transferred in violation of this provision can be annulled. Idaho Code section 67-1027 provides that the Idaho Controller shall not pay an assignee of a contract if the assignment has not been approved by the Idaho Board of Examiners. The State of Idaho Standard Terms and Conditions provision concerning assignment cannot be varied in a way that allows assignment without approval of the Administrator and the Idaho Board of Examiners.

9. Governing Law, Jurisdiction and Venue, Arbitration, Waiver of Jury Trial As a sovereign state, the State of Idaho is not subject to the jurisdiction of the courts of its sister states. The Idaho legislature has not consented to the waiver of this limitation by state agencies. The 11th amendment to the United States Constitution provides limitations on the jurisdiction of federal courts over claims against the State of Idaho. IDAPA 38.05.01.112, approved by the Idaho Legislature in 2015, provides that terms subjecting the State of Idaho to the jurisdiction of the courts of other states are void.

Agencies of the State of Idaho are subject to Idaho law and cannot vary the legal provisions governing the agency by contract. Based on this limitation, the Division of Purchasing will not consent to the application of laws other than the laws of the State of Idaho to all of a contract. Unless the agency certifies to the Division of Purchasing that it has consulted with the Office of the Attorney General and considered its advice, the Division of Purchasing will not consent to the application of laws other than the laws of the State of Idaho to a portion of the contract.

Idaho Code section 29-110 provides that any term of a contract subjecting a party to arbitration conducted outside the State of Idaho is void. IDAPA 38.05.01.112 requires that any agency must consult with the Office of the Attorney General prior to consenting to arbitration. At this time, the Office of the Attorney General does not generally advise agencies to consent to arbitration. Unless the agency certifies to the Division of Purchasing that it has consulted with the Office of the Attorney General and considered its advice, the Division of Purchasing will not consent to an arbitration provision.

IDAPA 38.05.01.112 requires that any agency must consult with the Office of the Attorney General prior to consenting to wavier of the right to a jury trial. At this time, the Office of the Attorney General does not generally advise agencies to consent to waiver of the right to a jury trial. Unless the agency certifies to the Division of Purchasing that it has consulted with the Office of the Attorney General and considered its advice, the Division of Purchasing will not consent to waiver of the right to a jury trial.

10. Payment Terms Idaho Code section 67-2302 establishes the general legal requirements for payments by Idaho agencies. Among other things, this section prohibits full payment on partial deliveries and establishes a statutory rate of interest and penalties on late payments. Idaho agencies cannot vary these terms by contract.

11. Limitations of Liability As a public entity representing Idahoans, requests to limit the liability of a contractor are considered as matters of public policy. Limitations of liability are authorized only when it is appropriate for the taxpayers of Idaho to bear the risk of the contractor’s breach or where the limitation is in excess of any reasonable contractor liability under the contract. In general, it is the policy of the Division of Purchasing to expect contractors to secure insurance to provide for the reasonable risks of operating the contractor’s business. As representatives of all Idahoans and a matter of public policy, the Division of Purchasing will not approve limitations of liability for death or personal injury or damage to real property.

General Instructions

· The ITB Lead is the sole point of contact for this solicitation.

· All modifications and exceptions to the State’s Contract Terms and Conditions must be submitted in writing via email to the ITB Lead.

· The e-mail subject line should include the “ITB Number”, followed by “Questions” (i.e. ITB 12345 Questions).

· Questions must NOT be submitted through IPRO.

· Questions must be received by the deadline specified in the Procurement Schedule.

· The Bidder must use the table on the following page, to submit all modifications and exceptions. The Bidder must adhere to the instructions below.

Instructions Regarding The Table

· Do NOT change the format, font, font style, or font colors.

· Do NOT identify your name, your company’s name, or product names of intellectual property in your questions.

· Blanket requests to negotiate requirements, terms, or conditions will NOT be considered.

· Identify the section number, and title of the section containing the language being questioned.

· Provide the rationale for the specific requirement being unacceptable (define the deficiency).

· Provide alternative or suggested language for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.

· Add additional rows by hitting the “Tab” key while within the table, and within the final row.

· Do not enter text in the “Response” field (column 5). This is for the State’s use only.

Modification & Exception Form ITB #872 – Fresh Produce

Section Number
Section Title
Rationale Why Language Is Unacceptable
Proposed Modification, Alternative, or Exception
Response

EXHIBIT 6

Contract

The Contract resulting from this solicitation is subject to the terms and conditions set forth in the document titled “State of Idaho Contract Terms and Conditions” attached within the Questions tab in IPRO Powered by LUMA. By executing a Contract resulting from this solicitation, the parties acknowledge and agree to be bound by all such terms and conditions as if fully set forth herein.

The Contract incorporates by reference all attachments, exhibits, and documents included in the original solicitation, as well as all attachments, exhibits, and materials submitted by the Contractor in response to the solicitation. Such documents form an integral part of the Contract and shall have the same force and effect as if set forth in full herein.

A sample of the Contract document is provided below.

EXHIBIT 7

IDOC Security Requirements

Background Checks: The Contractor must submit a list of all staff that will be providing services on location at any IDOC institution (including, but not limited to product deliveries, software training for staff, and contract site visits and meetings) upon notification of contract award. These individuals must pass a background check and fingerprinting assessment no later than the latter of forty-five (45) calendar days prior to commencement of the contract or upon notification of contract award.

Once the background check has been completed, IDOC Contract Services or the IDOC Statewide Food and Nutrition Services Manager (SFNSM) will notify the Contractor of each clearance or denial. All individuals who receive a background check approval must submit to a fingerprint check (completed by the IDOC and sent to Idaho State Police for a more thorough criminal history investigation) within two (2) weeks after notification of the background check approval.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .