This is an Addendum #1 to Invitation to Bid (ITB) 8190 issued by the City of Waterbury, Connecticut Department of Public Works for the Hitchcock Road Water Storage Tank Replacement project. The addendum, dated December 19, 2025, provides clarifications and answers to contractor inquiries regarding the replacement of an existing 1.5 MG standpipe welded steel water storage tank with a new 0.75 MG capacity glass-fused-to-steel (GFTS) composite elevated water storage tank. Key project clarifications include: demolition of the existing tank is not included in the scope of work and will be bid separately in future years; the project does not require compliance with Buy American Iron and Steel (BABA) requirements; DAS Construction Contractor Prequalification is required for projects exceeding $1,000,000; the Good Job Ordinance applies with coordination during the preconstruction meeting; survey control points will be provided by the city with additional survey being contractor responsibility; and Uniformed Traffic Control costs are capped at $5,000 in the base bid. The bid opening is scheduled for January 6, 2026, with Notice of Award anticipated within a few weeks and project construction targeted for spring 2026 with a substantial completion duration of 365 calendar days, though this may be adjusted during contract finalization.
Pricing and project requirements indicate that all bidders must use a fixed allowance value of $105,000 for SCADA control panel, programming, OIT/HMI programming, and Radio Telemetry System work; pavement density cores are not required but tack coats must be applied between asphalt lifts per Connecticut DOT Form 818 specifications; and the contractor is responsible for establishing permanent electrical power with no additional allowance provided by the owner. MBE/WBE participation goals apply to the entire contract value as specified in the ITB project package; proposals over $50,000 must include a 10 percent proposal security via certified check or bid bond. Soil analytical data from November 29, 2021, indicates all soil samples tested below Connecticut DEEP Remedial Standard Regulations for direct exposure and pollutant mobility criteria, with the site located within a Sole Source Aquifer and showing evidence of historical trespassing and solid waste disposal. The project is DWSRF-funded and will coordinate with the City of Waterbury Legal Department regarding final contract terms including potential adjustment to the 365-day substantial completion timeline.
Text of this file
CONNECTICUT
ADDENDUM #1
December 19, 2025
ITB 8190 Hitchcock Road Water Storage Tank Replacement
Please Be Advised:
All proposals of the above captioned project are hereby notified that the Contract Documents for the above referenced project are amended as noted in this Addendum No. 1.
This Addendum shall be part of the Contract Documents for the above referenced project as provided in the Invitation to Bid.
Please refer to the questions and answers below.
Question: We request that there be a second opportunity to ask questions after the addendum is issued as we may have more questions from the answers looking for clarification.
Answer: No, is not going to be second opportunity.
Question: Can we receive the plan holders list for this project? / Is there a plan holders list available?
Answer: The plan holders list is attached.
Question: Per Page C-2C-3-- demo is not part of the scope -- In Work summary it lists the demo as part of the project. Please clarify?
Answer: There is no demolition listed in Specification Section 01010. Scope of work section 1.3B states ‘demolition of the existing tank is not included in the scope of work for this project’.
Question: Is there an inspection report available on the existing tank? / Is there a paint analysis available on the existing tank? / Per OSHA regulations we are allowed to cut through paint coatings containing lead. Will this be allowed? Are you requiring paint abatement? / Will tipping of the tank be allowed if we dem that there is enough room to safely do so? / Are the surrounding property owners aware of the project? Due to the closeness of their homes, we may need to place fire retardant tarp on the roofs for protection from sparks and slag.
Answer: Not applicable. Existing Tank demo is not part of this project scope.
OFFICE OF THE DIRECTOR OF PURCHASING
MAUREEN McCAULEY
ASSISTANT DIRECTOR OF PURCHASING
235 GRAND STREET • WATERBURY, CONNECTICUT 06702 • PHONE: (203) 574-6749 • FAX: (203) 597-3437
Question: If the existing tank is not in the project, when do you anticipate it will be out for bid?
Answer: As soon as funds are available in the next few years.
Question: We did not see any indication that the Material of Construction had to be American Iron and Steel (BABA), or whether Imported materials are allowed. Therefore, can you please clarify as to what the correct Product Material Requirement is supposed to be?
Answer: The Hitchcock Tank DWSRF funded project will not have to comply with BABA requirements. Please see AMERICAN IRON AND STEEL (AIS) GUIDANCE DOCUMENT; ITB project package, page 660.
Question: Please confirm the extent of the BABA waiver that has been granted for the project.
Answer: The Hitchcock Tank DWSRF funded project will not have to comply with BABA requirements.
Question: Please verify which designated DAS Classification the contractor is required to have.
Answer: DAS Construction Contractor Prequalification Program project costing over $1,000,000 link: Contractor Prequalification
Question: Please verify if the MBE/WBE goals apply to the entire contract value or just a portion of the contract value. / Please confirm the percentage values of the MBE/WBE participation goals.
Answer: See ITB project package, 3.16 _page 571.
Question: Please confirm if the contractor / subcontractors will be required to adhere to the requirements of the Good Job Ordinance. Due to the technical nature of the project, it will be extremely difficult to satisfy the ordinance in a safe and cost-effective manner. Specifically, does the ordinance only apply to New Hires?
Answer: Yes, the Good Job Ordinance is necessary and will be coordinated during the project preconstruction meeting, which will be attended by a representative of Good Jobs.
Similar projects in the past have been quickly and effectively coordinated with Good Job officials.
Question: Will survey control points be provided to the contractor as only benchmarks are provided on the plans. This is information is required for the contractor to be able to price the construction layout and to be able to utilize the feature point coordinates provided in the plans.
Answer: Control points associated with the benchmarks are as follows:
https://portal.ct.gov/das/procurement-programs-and-services/contractor--prequalification?language=en_US
Any additional survey that is required to perform the work is the responsibility of the Contractor.
The Engineer will provide the Contractor with the design AutoCAD drawings to assist with construction layout.
Question: Can an expanded detail be issued for the cut and cap of the existing tank water service that connects to the main?
Answer: No additional detail will be provided for this location. The intent of the work is to disconnect the existing tank once the new tank is online. The City will provide a shutdown of the cut and cap area. Connection of the spool piece to the existing main on Hitchcock Road shall be via solid sleeves. The cap for the existing tank line shall be mechanical joint.
Question: Will dresser style couplings be acceptable to connect the new ductile iron to the existing cast iron?
Answer: Romac dresser style couplings or equally approved.
Question: Is there a defined full depth pavement restoration detail/limits that the contractor should account for within the base bid?
Answer: Refer to the Trench Detail shown on CD-1 for restoration of disturbed roadway pavement.
Question: Please confirm if the Owner/Police Department has determined which activities for the project would require the use of Uniformed Traffic Control (Waterbury PD) as the contractor would need to account for this cost within the base bid.
Answer: Under the LS Proposal Item 1 - Hitchcock Road Water Storage Tanks and Appurtenant Work, the Contractor shall be responsible for up to $5,000.00 in Uniformed Traffic Control for work required by the Contract in the public right-of-way where the Waterbury Police Department deems it necessary.
Question: Please confirm if the contractor is required to adhere to the full CT DOT Form 818 paving specification for the driveway.
Answer: Yes.
Question: Will the contractor need a MTV, density cores and tack coat between the lifts of asphalt?
Answer: Pavement density cores are not required. A tack coat shall be applied between asphalt lifts where the driveway connects to Hitchcock Road, and on contact surfaces of trench paving in Hitchcock Road, in accordance with Section 02576. Paving shall be installed in accordance with Section 02576 – 3.3A.2and Section 4.06 of the CTDOT Form 818.
Question: Please provide any analytical data that is available for the existing soil on the site.
This information will be needed for the contractor to price the disposal of excess soil from the site.
Answer: See attached memorandum dated November 29, 2021.
Question: EO #3 http://www.cslib.orglexeorder3.htm This site can’t be reached. Please advise.
Answer: See ITB project package, page 701.
Question: EO #17http://www.cslib.orglexeorder17.htm. This site can’t be reached. Please advise.
Answer: See ITB project package, page 706.
Question: EO #16 http://www.ct.gov/governorrowlandlcwp/view.asp? A= 1328&Q=255942&pp= 12&n= 1 The URL is invalid or the pointer does not exist. Please advise.
Answer: See ITB project package, page 709.
Question: Article 16.2 Does Not Apply – Please confirm CHRO requirements do not apply.
Answer: That is correct. CHRO requirements do not apply.
Question: Is it allowable for Electrical Conduit to be run under the slab inside the base of the structure?
Answer: Running electrical conduit under the foundation slab is acceptable. Under slab conduit shall be made of schedule 40 PVC as indicated in section 16130-1.5A.
Question: Are Supports to be welded onto the structure for vertical conduit runs, lighting supports to the side of tank by Welding Contractor Answer: Tank builder shall provide mounting plates on the tank sidewall and/or concrete pedestal as required for vertical conduit runs.
Question: Please change the voltage on the drawings for panel schedule on LP-1 from 120/208 to 120/240 Volt.
Answer: Acknowledged. This will be updated in the final conformed documents.
http://www.cslib.orglexeorder3.htm/ http://www.cslib.orglexeorder17.htm/
Question: Is the Electrical Equipment to be Wall Mounted or Rack Mounted from floor supported stanchion and post base?
Answer: Wall mounting is acceptable. Contractors must avoid drilling through rebar in the pedestal walls.
Question: Please Identify what type of Electrical conduit is to be utilized at exterior locations?
Answer: Rigid galvanized steel conduit should be used where concealed conduits rise up through concrete slabs and exterior grade.
Question: Please clarify if the “Application Engineer” can be a qualified I&C bidder on this project and can provide quotes on furnishing (1) SCADA control panel & programming, OIT/HMI programming and the Radio Telemetry System as shown in the B.I.S. Group Scope of Work. If so, Knapp Engineering would like to be added as the “System Supplier” and can provide the required recommendations. Please advise.
Answer: It is acceptable for the City’s Application Engineer to provide services under this Contract in addition to the scope of work defined in Appendix C.
Question: Please provide the allowance(s) for the (1) SCADA control panel & programming, OIT/HMI programming and the Radio Telemetry System.
Answer: The allowance value for the work included under Appendix C shall be $105,000. All bidders shall use this value in their final bid.
Question: Please confirm there will only be (1) SCADA control panel similar to the Blackman Rd Water Storage Tank project.
Answer: SCADA panel configuration shall be per the Contract Drawings and Specifications.
Question: On the Blackman Rd. WST project, (1) Temperature Indicating Transmitter & (1) Smoke Alarm was provided; however, neither instrument is shown on the Hitchcock Rd. project.
Do you want us to include this in scope of work? Please advise.
Answer: Instrumentation shall be per the Contract Drawings and Specifications.
Question: Article 2.5 of Section 13210 calls for a concrete tank floor with an embedded starter ring. At this tank size we would recommend a steel floor tank to separate the liquid containing structure from the concrete support structure below. Please confirm that is acceptable.
Answer: Bids should be based on a concrete tank floor with an embedded starter ring as called for in the Bid Documents. The Contractor may propose changes to the tank floor after receiving a notice to proceed.
Question: Article 2.2.F of Section 13210 requires a minimum freeboard of 33 inches. Changing to a steel floor will impact the tank height. Please confirm it is acceptable to reduce the freeboard as long as it exceeds the design sloshing wave height while providing a usable capacity of 809,000 gallons at a liquid depth of 44 feet?
Answer: Bids should be based on a concrete tank floor with an embedded starter ring as called for in the Bid Documents. The Contractor may propose changes to the tank floor after receiving a notice to proceed.
Question: Can you confirm the budget amount for this project?
Answer: No.
Question: What is planned Notice of Award date for the project?
Answer: A few weeks after bid opening, the Water Department in coordination with City of Waterbury officials shall review and issue Notice of Award to the selected vendor.
Question: What is the planned Notice to Proceed date for the project?
Answer: The Notice to Proceed date will be coordinated with the project selected vendor.
Question: Construction Contract, Item 5 states the substantial completion duration is 365 calendar days. Given the scope of the work of this project, substantial completion is needed to be 400 calendar days. Can you confirm that 400 days for substantial completion is acceptable?
Answer: The selected vendor and the City officials will work together to address the issue before the City of Waterbury Legal finalizing the construction contract.
Question: Can you describe the process or events (i.e. approval by council, board of directors, etc.) that must occur and anticipated dates and durations that must occur in order to award this project?
Answer: After the January 6th, 2026 opening proposals, all proposals will be assessed by City of Waterbury officials within the next few weeks. The winning proposal will then be recommended to the purchasing office, which will then issue an award letter to the qualified vendor. The goal is to have project ready for construction during the spring of 2026.
Question: Will the city waive the permit fees?
Answer: No.
Question: If a Building Permit is required will the associated permit and review fees be waived?
Answer: No.
Question: Please confirm which applicable regulatory construction permits the contractor will be required to prepare and submit prior to beginning construction.
Answer: Permit Information: https://waterburyct.org/services/department-of-inspections
Question: Is a Building Permit required for the project or for just the elevated tank?
Answer: Permit Information: https://waterburyct.org/services/department-of-inspections
Question: If a Building Permit is required and the Contractor is to pay all associated fees, can a fee schedule be provided so Bidders can include the appropriate costs within the bid pricing?
Answer: Permit Information: https://waterburyct.org/services/department-of-inspections
Question: Can you confirm that the Owner has obtained the necessary approvals and permits required to start construction?
Answer: Confirmed.
Question: Are there any governing agencies (federal/state/local agencies other than the building permit department) that must review and approve the project drawings prior to the start of construction? If so, who are these agencies and what is the anticipated duration for their review period?
Answer: No additional review of the drawings is required.
Question: Can you confirm that the Owner currently owns the property (or properties) where work is to be performed? If not, can you provide information on the timing in which ownership will be obtained?
Answer: The project shall take place on City of Waterbury’s own property.
Question: Can you confirm that the Owner currently owns and/or otherwise possess all required easements or permissions to work on or access the property (or properties) where the work is to be performed? If not, can you provide information on the timing in which these easement or permissions will be obtained?
Answer: The project shall take place on City of Waterbury’s own property but any easements or permissions to work related to this project shall be contractor’s coordination and responsibility.
Question: General Conditions – Article 92 states the Contractor shall pay to the City the extra cost incurred by the City when work is performed on a Saturday or Sunday. Can you confirm the City will not incur extra cost if only non-inspectable work is performed on a Saturday or Sunday?
Answer: No extra cost shall be applied for any work performed on a Saturday or Sunday.
Question: Can you confirm the Owner will pay all Electrical Utility Company costs and fees required to establish permanent power to the Project Site? If no, can a cash allowance be https://waterburyct.org/services/department-of-inspections https://waterburyct.org/services/department-of-inspections https://waterburyct.org/services/department-of-inspections established to ensure all Bidders include the same Scope of Work and the Owner pays only the cost of the Work?
Answer: Cost for establishing permanent power shall be the responsibility of the Contractor.
No additional allowance shall be included for electrical utility company costs for establishing permanent power to the project site.
Question: Section 13210 describes the piping material for the inlet/outlet riser inside the concrete pedestal to be ductile iron. We recommend stainless steel pipe material be utilized for all piping within the concrete support structure, as it is a superior product that requires less ongoing maintenance and is provided at a more economical cost to ductile iron. Can you confirm the pipe material within the concrete support structure can be either ductile iron or stainless steel?
Answer: Pipe material within the concrete pedestal shall be ductile iron. It shall be coated with epoxy paint and include both heat tracing and insulation.
Question: Section 13210 Item 2.5.A.3 calls for epoxy-coated rebar in the tank floor. This is non-standard requirement that will increase the cost of construction. Can you confirm that the rebar does NOT have to be epoxy-coated?
Answer: Epoxy coated rebar shall be used in the tank floor.
Question: In the General Conditions, Article 37.02 requires the General Contractor to be on site to supervise all subcontract work. Elevated Storage Tank construction involves multiple specialized contractors that mobilize on and off a job to perform specific tasks. The supervision of the specialized subcontracted work is typically performed by the specific Subcontractor who is performing the work. A General Contractor Superintendent who remains on a project for the entire duration of a job, while not actively performing work, is uncommon due to the added project cost. Can you confirm that the work onsite can be complete under the supervision of the specific Subcontractor who is performing the work?
Answer: The work onsite can be coordinated in advance between the City and the Contractor and should be complete under the supervision of the specific Subcontractor who is performing the work and owners site inspector.
Question: Section 13210 Item 1.2.A - Can the experience requirement be opened up to include tanks equal or greater to 0.6 MG and include the similar geographies/climatic conditions such as the province of Ontario?
Answer: No, experience requirements shall remain as specified.
Question: Instructions to Bidders, Item 6.5 is requiring a flash drive be submitted along with the original paper copy of the Bid. This will be difficult to accomplish seeing as we do not get pricing in until the last minute. A flash drive can be provided after the bid is submitted. Can you confirm a flash drive is not required to be submitted with the Bid?
Answer: The flash drive should be included and submitted along with the original and paper copy of the Bid.
NOTE: Each Proposal over $50,000.00 submitted shall be accompanied by a Proposal Security (a Certified Check or Bid Bond) in the amount of ten (10) percent of the Total Proposal Price.
Thank you.
Maureen McCauley
Assistant Director of Purchasing – City of Waterbury envpartners.com
Attachment A
R M
ZO
N
E
IP ZO
N
E
00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SNET
#10772
SNET
#10160
SNET
#9387
N/F
MAP ID 0333-0154-0001
CITY OF WATERBURY
HITCHCOCK RD
VOL. 8398 PG. 331
N/F
MAP ID 0358-0154-0001
CITY OF WATERBURY
HITCHCOCK RD
VOL. 905 PG. 613
N/F
MAP ID 0358-0154-0012
MONAMAKER TIMOTHY
380 HITCHCOCK RD
N/F
MAP ID 0359-0154-0013
MONTANEZ JOSE M &
SUZETTE M SURV
380 HITCHCOCK RD
N/F
MAP ID 0334-0413-0051
DONMAR DEVELOPMENT CORP
357 HITCHCOCK RD
VOL. 6908 PG. 242
O O
O O
O O
O
O O
O
X
X
X
DIRT DRIVE
BIT. DRIVE
BIT. CURB
BIT. CURB
BIT. CURB
BIT. CURB
BIT. GRND.
BIT. CURB
691.0
691.2
691.1
690.3
690.4
690.2 689.1
689.1
688.0
684.4 686.3
687.5
686.9
687.0
687.2
690.4
690.5
686.7
684.7 688.8
690.3
BENCHMARK #3
SPIKE IN 26" OAK TREE
ELEV.=690.83'
678.5
687.6 688.6
690.2
689.5
687.4
690.0
681.6
MH
TF=687.74'
BIT. PARKING
STONE WALL
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
12"(WP)W
12"(W P)W
12"(W P)W
LOT AREA
318,581.48 S.F., 7.31± AC.
SNET
WOOD
FENCE
14" OAK
24" OAK
18" OAK
20" OAK
16" OAK
16" OAK
18" OAK
30" PINE
22" OAK
60" TULIP
18" OAK
22" HICKORY
18" MAPLE
18" MAPLE
24"
MAPLE
20" MAPLE
24" MAPLE
24" MAPLE
20" MAPLE
24" MAPLE
24" MAPLE
24"
MAPLE
12"
BIRCH
12"
OAK
12" OAK
12" OAK
22" HICKORY
20"
HICKORY
W O
O D
F
EN
C E
14" MAPLE
12" BIRCH
18" FERN
12" OAK
14"
BIRCH
26" OAK
22" PINE
24"
COTTON-
WOOD
GATE
H
IT
C H
C O
C K
R O
AD
CONC. PAD
CHAINLINK
FENCE
BM#3
DIRT
DECK
RM ZONE
6 67
9 66
EASE
EASE
EASE
EASE
EASE
EASE
EASE
EASE
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
MH
TF=687.78'
L=
.4 0'
R =4
.0
0'
7°
6'
9"
.7 1'
, S
°5 1'
"E
154.44', N68°59'05"E 100.00', S21°00'55"E
100.00', N21°00'55"W
68.39', N68°59'05"E 98.19', N66°12'05"E
L=408.41' (TOTAL )
R=400.00'
=58° 30' 00"
20' RIGHT OF WAY & EASEMENT
FOR ACCESS CONSTRUCTION,
MAINTENANCE & UTILITIES.
VOL. 905 PG. 54
BIT. CURB
100.00', S68°59'05"W
REBAR
FND.
27.1
19.7
18.0
1.7'
0.2'
CITY OF WATERBURY CONNECTICUT
HITCHCOCK ROAD TANK REPLACEMENT
BORING LOCATION PLAN
SCALE: 1"=40'
B-1A / GW-1
I:\ W
AT
ER
BU
R
Y C
T\
5-
S
TO
R
AG
E
TA
N
K R
EP
LA
C
EM
EN
TS
\0
TA
N
K D
ES
IG
N \0
H
IT
C
H C
O C
K R
O
AD
T
AN
K\ D
R
AW
IN
G
S\ C
AD
\F
IG
U
R
ES
\H
IT
C H
C O
C K
R D
B O
R
IN
G L
O C
AT
IO
N P
LA
N
.D W
G
JUNE 2022
345-2103
B-1B
B-1D
B-1E
B-1C
Attachment B
BORING LOG
Project: Storage Tank Replacements
Location: Hitchcock Road Boring No: B-1A Client: Town of Waterbury, CT Location: See Plan Driller: New England Boring Approx. Ground Elevation: 691.1' Drilling Methods: Hollow Stem Auger/Drive and Wash Approx. Groundwater Elevation: NA
Weather: Sunny, 75°F Date/Time of Groundwater Elev: NA
Performed By: SJG Date: 5/11/2022 Datum: NGVD29 Boring Locus Map Project No. 345-2103
Stratum Depth Sample Blows per SPT Pen./ Soil Description Change (feet) No. 6-inch Value Rec. Depth
(feet)
1 2
2 6
3 21
50/3"
5 28
50/3" 1 6 Split Spoon Refusal @ 5'3"
S4 50/3" 3"/0" Weathered Rock in tip
11 Split Spoon Refusal @ 10'3"
NOTES: LEGEND
S - Split Spoon Sample O/A - Sample Collected Off the Augers
UT - Undisturbed Tube Sample
Trace - Approximately 0 to 10% Some - Approximately 20 to 35%
Little - Approximately 10 to 20% And - Approximately 35 to 50%
0-10 Coarse Soil N Value - Loose 30-50 Coarse Soil N Value - Dense
10-30 Coarse Soil N Value - Medium Dense >50 Coarse Soil N Value - Very Dense
0-4 Fine Soil N Value - Soft 8-15 Fine Soil N Value - Stiff il N Value - Hard
4-8 Fine Soil N Value - Medium Stiff 15-30 Fine Soil N Value - Very Stiff
ENVIRONMENTAL PARTNERS Page 1 of 2
1. S1 through S3 were conducted with 4 1/4" (inside diameter) auger. Rock cores collected with 4" HW drive and wash.
2. Suspected boulder from approximately 5'3" to 9'.
3. Boring terminated at planned depth of 25'.
4. Groundwater was not encountered.
15"/14"
24"/8"
S2 15"/6"
S3
S1
S5 60"/56.5"
SAND
Note No.
Rock Core #1
RQD = 87.5%
ROCK
Dark brown, TOPSOIL, dry
Roller Bit through hard material from 5'3' to 10' below grade
SAND
TOPSOIL
Brown, SAND with trace gravel and cobble fragments, dry
Brown, SAND with trace gravel, dry
Roller Bit into rock from 10'3" to 15' below grade
Location: Hitchcock Road Boring No: B-1A Client: Town of Waterbury, CT Location: See Plan Driller: New England Boring Approx. Ground Elevation: 691.1' Drilling Methods: Hollow Stem Auger/Drive and Wash Approx. Groundwater Elevation: NA
Weather: Sunny, 75°F Date/Time of Groundwater Elev: NA
Performed By: SJG Date: 5/11/2022 Datum: NGVD29 Boring Locus Map Project No. 345-2103
Stratum Depth Sample Blows per SPT Pen./ Soil Description Change (feet) No. 6-inch Value Rec. Depth
(feet)
25 3,4
NOTES: LEGEND
S - Split Spoon Sample O/A - Sample Collected Off the Augers
UT - Undisturbed Tube Sample
Trace - Approximately 0 to 10% Some - Approximately 20 to 35%
Little - Approximately 10 to 20% And - Approximately 35 to 50%
0-10 Coarse Soil N Value - Loose 30-50 Coarse Soil N Value - Dense
10-30 Coarse Soil N Value - Medium Dense >50 Coarse Soil N Value - Very Dense
0-4 Fine Soil N Value - Soft 8-15 Fine Soil N Value - Stiff il N Value - Hard
4-8 Fine Soil N Value - Medium Stiff 15-30 Fine Soil N Value - Very Stiff
ENVIRONMENTAL PARTNERS Page 2 of 2
Note No.
ROCK
1. S1 through S3 were conducted with 4 1/4" (inside diameter) auger. Rock cores collected with 4" HW drive and wash.
2. Suspected boulder from approximately 5'3" to 9'.
3. Boring terminated at planned depth of 25'.
4. Groundwater was not encountered.
60"/60"S6 Rock Core #2
RQD = 63.33%
Boring Terminated @ 25' Below Grade
Location: Hitchcock Road Boring No: B-1B Client: Town of Waterbury, CT Location: See Plan Driller: New England Boring Approx. Ground Elevation: 690.8' Drilling Methods: Hollow Stem Auger Approx. Groundwater Elevation: NA
Weather: Sunny, 75°F Date/Time of Groundwater Elev: NA
Performed By: SJG Date: 5/11/2022 Datum: NGVD29 Boring Locus Map Project No. 345-2103
Stratum Depth Sample Blows per SPT Pen./ Soil Description Change (feet) No. 6-inch Value Rec. Depth
(feet)
1 3
2 3
3 14
4 9
5 50
6 50
S4 50/3" 3"/0" Weathered Rock in tip 7 Split Spoon Refusal @ 6'3"
S5 50/3" 3"/0" Weathered rock in tip
9 Split Spoon Refusal @ 8'3"
10 1,2
NOTES: LEGEND
S - Split Spoon Sample O/A - Sample Collected Off the Augers
UT - Undisturbed Tube Sample
Trace - Approximately 0 to 10% Some - Approximately 20 to 35%
Little - Approximately 10 to 20% And - Approximately 35 to 50%
0-10 Coarse Soil N Value - Loose 30-50 Coarse Soil N Value - Dense
10-30 Coarse Soil N Value - Medium Dense >50 Coarse Soil N Value - Very Dense
0-4 Fine Soil N Value - Soft 8-15 Fine Soil N Value - Stiff il N Value - Hard
4-8 Fine Soil N Value - Medium Stiff 15-30 Fine Soil N Value - Very Stiff
ENVIRONMENTAL PARTNERS Page 1 of 1
Note No.
S1 7 24"/11" 6" Dark brown, TOPSOIL, dry
5" Brown, silty SAND, dry
TOPSOIL
SAND
1. Boring terminated after auger refusal at 10' below grade.
2. Groundwater was not encountered.
S2
S3
24"/12"
24"/24" TILL
Augered to 8'
Augered to 10'
Boring Terminated After Auger Refusal @ 10' Below Grade
Brown, silty SAND with trace gravel, dry
Tan, TILL, cored cobble in tip
ROCK
Location: Hitchcock Road Boring No: B-1C Client: Town of Waterbury, CT Location: See Plan Driller: New England Boring Approx. Ground Elevation: 691.1' Drilling Methods: Hollow Stem Auger Approx. Groundwater Elevation: NA
Weather: Sunny, 75°F Date/Time of Groundwater Elev: NA
Performed By: SJG Date: 5/11/2022 Datum: NGVD29 Boring Locus Map Project No. 345-2103
Stratum Depth Sample Blows per SPT Pen./ Soil Description Change (feet) No. 6-inch Value Rec. Depth
(feet)
2 6" Dark Brown, TOPSOIL, dry 1 2
2 3
3 9
4 16
5 35
6 41
S4 50/6" 6"/6" Weathered Rock in tip 7 Split Spoon Refusal @ 6'6"
9 31
10 29 1,2
NOTES: LEGEND
S - Split Spoon Sample O/A - Sample Collected Off the Augers
UT - Undisturbed Tube Sample
Trace - Approximately 0 to 10% Some - Approximately 20 to 35%
Little - Approximately 10 to 20% And - Approximately 35 to 50%
0-10 Coarse Soil N Value - Loose 30-50 Coarse Soil N Value - Dense
10-30 Coarse Soil N Value - Medium Dense >50 Coarse Soil N Value - Very Dense
0-4 Fine Soil N Value - Soft 8-15 Fine Soil N Value - Stiff oil N Value - Hard
4-8 Fine Soil N Value - Medium Stiff 15-30 Fine Soil N Value - Very Stiff
ENVIRONMENTAL PARTNERS Page 1 of 1
Note No.
S1 4 24"/15"
TOPSOIL
9" Brown, silty SAND, dry
SAND
S2 23 24"/12" Brown, silty SAND with trace gravel, dry
S3 68 24"/20" 5" crushed ROCK 10" Tan, TILL, dry 5" crushed ROCK
TILL
Augered to 8'
Boring Terminated @ 10' Below Grade
1. Boring terminated after auger refusal at 10' below grade.
2. Groundwater was not encountered.
S5 64 24"/21" 10" Tan, TILL, dry 4" crushed ROCK 7" Tan, TILL, dry
TILL
TILL
COBBLE
COBBLE
Location: Hitchcock Road Boring No: B-1D Client: Town of Waterbury, CT Location: See Plan Driller: New England Boring Approx. Ground Elevation: 691.1' Drilling Methods: Hollow Stem Auger Approx. Groundwater Elevation: NA
Weather: Sunny, 75°F Date/Time of Groundwater Elev: NA
Performed By: SJG Date: 5/11/2022 Datum: NGVD29 Boring Locus Map Project No. 345-2103
Stratum Depth Sample Blows per SPT Pen./ Soil Description Change (feet) No. 6-inch Value Rec. Depth
(feet)
1 2
2 3
3 8
4 35
5 50
50/0" Split Spoon Refusal @ 5' below grade 1 6 Augeed from 5' to 6' below grade
7 40
8 40
9 35
10 35
11 2
12 25 25 3,4
13 50/0"
NOTES: LEGEND
S - Split Spoon Sample O/A - Sample Collected Off the Augers
UT - Undisturbed Tube Sample
Trace - Approximately 0 to 10% Some - Approximately 20 to 35%
Little - Approximately 10 to 20% And - Approximately 35 to 50%
0-10 Coarse Soil N Value - Loose 30-50 Coarse Soil N Value - Dense
10-30 Coarse Soil N Value - Medium Dense >50 Coarse Soil N Value - Very Dense
0-4 Fine Soil N Value - Soft 8-15 Fine Soil N Value - Stiff il N Value - Hard
4-8 Fine Soil N Value - Medium Stiff 15-30 Fine Soil N Value - Very Stiff
ENVIRONMENTAL PARTNERS Page 1 of 1
S2 42 24"/16" Brown, silty SAND, dry
Note No.
S1 4 24"/8" 6" Dark Brown, TOPSOIL, dry 2" Brown, silty SAND, dry
TOPSOIL
SAND
1. Cobble encountered from 5' to 6' below grade.
2. Cobble encountered from 10' to 12' below grade.
3. Boring terminated after auger refusal at 10' below grade.
4. Moisture encountered around 12' below grade is believed to be perched groundwater
S3 12"/12"
S4 82 24"/22"
S6
S5 70 24"/20"
Boring Terminated after Split Spoon Refusal @ 13' below grade
12"/12" TILLBrown, TILL, wet
TILL
COBBLE
Augered from 10' to 12' below grade COBBLE
Brown, TILL with cobble fragments, dry TILL
Brown, TILL with cobble fragments, dry
Brown, TILL with cobble fragments, dry
Location: Hitchcock Road Boring No: B-1E Client: Town of Waterbury, CT Location: See Plan Driller: New England Boring Approx. Ground Elevation: 690.5' Drilling Methods: Hollow Stem Auger Approx. Groundwater Elevation: NA
Weather: Sunny, 75°F Date/Time of Groundwater Elev: NA
Performed By: SJG Date: 5/11/2022 Datum: NGVD29 Boring Locus Map Project No. 345-2103
Stratum Depth Sample Blows per SPT Pen./ Soil Description Change (feet) No. 6-inch Value Rec. Depth
(feet)
1 2
2 2
3 7
4 20
5 26
6 31
7 27
8 25
9 20
10 18
S6 100/5" 5"/5" Brown, TILL, wet 1 11 Augered to 11' Below Grade 2
NOTES: LEGEND
S - Split Spoon Sample O/A - Sample Collected Off the Augers
UT - Undisturbed Tube Sample
Trace - Approximately 0 to 10% Some - Approximately 20 to 35%
Little - Approximately 10 to 20% And - Approximately 35 to 50%
0-10 Coarse Soil N Value - Loose 30-50 Coarse Soil N Value - Dense
10-30 Coarse Soil N Value - Medium Dense >50 Coarse Soil N Value - Very Dense
0-4 Fine Soil N Value - Soft 8-15 Fine Soil N Value - Stiff il N Value - Hard
4-8 Fine Soil N Value - Medium Stiff 15-30 Fine Soil N Value - Very Stiff
ENVIRONMENTAL PARTNERS Page 1 of 1
Note No.
S1 4 24"/11" 6" Brown, TOPSOIL, dry 5" Brown, silty SAND, dry
TOPSOIL
SAND
S2 21 24"/16" Brown, silty SAND with trace gravel and fractured cobble, dry
Boring Terminated After Auger Refusal @ 11' Below Grade
1. Moisture encountered at approximately 10.5' below grade is believed to be perched groundwater.
2. Boring Terminated after Auger Refusal @ 11' below grade.
S4 56 24"/20" Brown, TILL, DRY
S5 36 24"/19" Brown, TILL, DRY
TILL
S3 57 24"/22" Brown, TILL, DRY
ROCK
Attachment C
06.09.22
As
Received
Moisture
Content
LL
PL
Gravel
Sand
Fines
Org.
pH
Dry unit wt.
(pcf)
Test
Moisture
Content % gd
MAX (pcf)
Wopt (%) gd
MAX (pcf)
Wopt (%)
(Corr.)
Target
Test Setup as % of
Proctor
CBR @
0.1"
CBR @
0.2"
Permeability cm/sec
D2216 D2974 D4792
B-1B S3 4-6 22-S-B386 20.6 61.8 17.6 Light Brown silty sand with gravel
B-1C S3 4-8 22-S-B387 11.0 64.2 24.8 Light Brown silty sand
B-1D S2 2-4 22-S-B388 0.0 68.5 31.5 Light Brown silty sand
B-1D S3 8-10 22-S-B389 19.4 67.0 13.6 Light Brown silty sand with gravel
Date Reviewed: 06.09.22
D1557D4318
Sample No.
EPG Project Number: 345-2103 thielsch.com Assigned By: Stephen Gabriel
Reviewed By:05.31.22
Depth
(ft)
LABORATORY TESTING DATA SHEET, Report No.: 7422-E-B025
Identification Tests Proctor / CBR / Permeability Tests
Date Received:
Laboratory
No.
Boring No.
Laboratory Log and
Soil Description
D6913
Project Information:
Cranston RI, 02910 Environmental Partners Hitchcock Rd Water Tank Phone: (401)-467-6454 Quincy, MA
195 Frances Avenue Client Information:
Let's Build a Solid Foundation Collected By: SJG Report Date:
Waterbury, CT
Summary Page:
Fax: (401)-467-2398 PM: Stephen Gabriel
This report only relates to items inspect and/or tested. No warranty, expressed or implied, is made.
This report shall not be reproduced, except in full, without prior written approval from the Agency, as defined in ASTM E329.
http://www.thielsch.com/ http://www.thielsch.com/ http://www.thielsch.com/ http://www.thielsch.com/ http://www.thielsch.com/
Th es e re su lt s ar e fo r th e ex cl u si ve u se o f th e cl ie n t fo r w h o m t h ey w er e o b ta in ed . T h e y ap p ly o n ly t o t h e s am p le s te st ed a n d a re n o t in d ic at iv e o f ap p ar e n tl y id e n ti ca l s am p le s.
Tested By: DN Checked By: Rebecca Roth
Particle Size Distribution Report
ASTM D6913
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 20.6 6.4 24.5 30.9 17.6 in in in
½ in in
¾ in
½ in
/8 in
Test Results (ASTM D6913) Material Description
Atterberg Limits
Coefficients
Classification
Test Remarks
Sample Date:
Source of Sample: Borings Depth: 4-6' Sample Number: B-1B / S3
Client:
Project:
Project No: Figure
Sieve Size or
Diam. (mm.)
Finer
Spec.*
Out of Spec.
Pct.
of
Fines
Light Brown silty sand with gravel
3/4" 1/2" 3/8" #4 #10 #20 #40 #60
#100 #200
100.0 90.6 87.5 79.4 73.0 61.3 48.5 36.3 25.6 17.6
NP NV NP
12.2021 7.7043 0.7851
0.4579 0.1886
SM A-1-b
06.08.22
Environmental Partners Group
Hitchcock Rd Water Tower Waterbury, CT
345-2103
PL= LL= PI=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
* (no specification provided)
Thielsch Engineering Inc.
Cranston, RI 22-S-B386 e re su lt s ar e fo r th e ex cl u si ve u se o f th e cl ie n t fo r w h o m t h ey w er e o b ta in ed . T h e y ap p ly o n ly t o t h e s am p le s te st ed a n d a re n o t in d ic at iv e o f ap p ar e n tl y id e n ti ca l s am p le s.
Tested By: DN Checked By: Rebecca Roth
Particle Size Distribution Report
ASTM D6913
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 11.0 7.5 22.7 34.0 24.8 in in in
½ in in
¾ in
½ in
/8 in
Test Results (ASTM D6913) Material Description
Atterberg Limits
Coefficients
Classification
Test Remarks
Sample Date:
Source of Sample: Borings Depth: 4-8' Sample Number: B-1C / S3
Client:
Project:
Project No: Figure
Sieve Size or
Diam. (mm.)
Finer
Spec.*
Out of Spec.
Pct.
of
Fines
Light Brown silty sand
1/2" 3/8" #4 #10 #20 #40 #60
#100 #200
100.0 96.7 89.0 81.5 71.4 58.8 47.2 35.1 24.8
NP NV NP
5.2201 2.9549 0.4521
0.2832 0.1093
SM A-2-4(0)
06.08.22
Environmental Partners Group
Hitchcock Rd Water Tower Waterbury, CT
345-2103
PL= LL= PI=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
* (no specification provided)
Cranston, RI 22-S-B387 e re su lt s ar e fo r th e ex cl u si ve u se o f th e cl ie n t fo r w h o m t h ey w er e o b ta in ed . T h e y ap p ly o n ly t o t h e s am p le s te st ed a n d a re n o t in d ic at iv e o f ap p ar e n tl y id e n ti ca l s am p le s.
Tested By: DN Checked By: Rebecca Roth
Particle Size Distribution Report
ASTM D6913
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 0.0 11.0 19.6 37.9 31.5 in in in
½ in in
¾ in
½ in
/8 in
Test Results (ASTM D6913) Material Description
Atterberg Limits
Coefficients
Classification
Test Remarks
Sample Date:
Source of Sample: Borings Depth: 2-4' Sample Number: B-1D / S2
Client:
Project:
Project No: Figure
Sieve Size or
Diam. (mm.)
Finer
Spec.*
Out of Spec.
Pct.
of
Fines
Light Brown silty sand
#4 #10 #20 #40 #60
#100 #200
100.0 89.0 80.1 69.4 56.9 44.1 31.5
NP NV NP
2.1752 1.3493 0.2831 0.1910
SM A-2-4(0)
Sample visually classified as non-plastic.
06.08.22
Environmental Partners Group
Hitchcock Rd Water Tower Waterbury, CT
345-2103
PL= LL= PI=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
* (no specification provided)
Cranston, RI 22-S-B388 e re su lt s ar e fo r th e ex cl u si ve u se o f th e cl ie n t fo r w h o m t h ey w er e o b ta in ed . T h e y ap p ly o n ly t o t h e s am p le s te st ed a n d a re n o t in d ic at iv e o f ap p ar e n tl y id e n ti ca l s am p le s.
Tested By: DN Checked By: Rebecca Roth
Particle Size Distribution Report
ASTM D6913
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 19.4 11.8 28.0 27.2 13.6 in in in
½ in in
¾ in
½ in
/8 in
Test Results (ASTM D6913) Material Description
Atterberg Limits
Coefficients
Classification
Test Remarks
Sample Date:
Source of Sample: Borings Depth: 8-10' Sample Number: B-1D / S5
Client:
Project:
Project No: Figure
Sieve Size or
Diam. (mm.)
Finer
Spec.*
Out of Spec.
Pct.
of
Fines
Light Brown silty sand with gravel
3/4" 1/2" 3/8" #4 #10 #20 #40 #60
#100 #200
100.0 96.5 91.7 80.6 68.8 55.1 40.8 30.5 21.1 13.6
NP NV NP
8.6124 6.3194 1.1273
0.6572 0.2431 0.0862
SM A-1-b
06.08.22
Environmental Partners Group
Hitchcock Rd Water Tower Waterbury, CT
345-2103
PL= LL= PI=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
* (no specification provided)
Cranston, RI 22-S-B389
06.09.22
(1) Unit
Weight
(PCF)
Bulk
Gs
(3)
Other
Tests
(4)
Strength
PSI
(5)
Strain %
(6) E sec
PSI
EE+06
(7)
Poisson's
Ratio st
PSI
Is50
PSI
(8) sc
PSI
B-1A S5 16.10-
18.1 22-S-2066 4.551 177.1 3161 Grey Schist
06.09.2205.31.22 Reviewed By:
Let's Build a Solid Foundation Collected By: SJG
(1) Volume Determined By Measuring Dimensions
N o te s
(3) PLD=Point Load (diametrical),
(8) Estimated UCS from Table 1 of ASTM D5731 for NX cores (Is x 24)
Boring No.
1.971
Compressive Strength Tests
LABORATORY TESTING DATA SHEET, Report No.: 7422-F-107 thielsch.com Assigned By: Stephen Gabriel
Environmental Partners Hitchcock Rd Water Tank Phone: (401)-467-6454 Quincy, MA Waterbury, CT
Specimen Data
195 Frances Avenue Client Information: Project Information:
Cranston RI, 02910
Sample No.
Depth
(ft)
Laboratory
No.
(2) Wet
Density
(PCF)
Report Date:
Fax: (401)-467-2398 PM: Stephen Gabriel EPG Project Number: 345-2103
Summary Page:
Date Reviewed:
Rock Formation or
Description or Remarks
Mohs
Hard-ness
Diameter
(in)
Length
(in)
N o te s
(5) Strain at Peak Deviator Stress
(2) Determined by Measuring Dimensions and PLA= Point Load (Axial) ST= Splitting Tensile (6) Represents Secant Modulus at 50% of Total Failure Stress
Weight of Saturated Sample U= Unconfined Compressive Strength (7) Represents Secant Poisson's Ratio at 50% of Total Failure Stress
(4) Taken at Peak Deviator Stress
Date Received:
Fresh break along foliation
This report only relates to items inspect and/or tested. No warranty, expressed or implied, is made.
This report shall not be reproduced, except in full, without prior written approval from the Agency, as defined in ASTM E329.
http://www.thielsch.com/ http://www.thielsch.com/ http://www.thielsch.com/ http://www.thielsch.com/
Boring ID: B-1A Unit Weight (pcf): 177.1
Sample No.: S5 Failure Stress (psi): 3,161
Depth (ft): 16.10-18.1 Failure Mode: Fresh
Tested Depth (ft): Time to Failure (min): 1.50
Rock Type:
Features:
Diameter, D (in): 1.971 Poisson's Ratio @ 50%: NA
Length, L (in): 4.551 Strain %: NA
L:D Ratio: 2.31 E sec PSI @ 50%: NA
Testing Notes:
195 Frances Avenue Client Information: Project Information:
Cranston, Rhode Island 02910 Envornmental Partners Hitchcock Rd Water Tank
Phone: (401) 467-6454 Quincy MA Waterbury, CT
Fax: (401) 467-2398 PM: Stephan Gabriel Project Number: 345-2103 www.thielsch.com Assigned by: Stephan Gabriel Technician: AV / AF
Let's Build a Solid Foundation Collected by: SJG 06.09.22
Fresh break
ASTM D7012 Compressive Strength and Elastic Moduli of Intact Rock Core Specimens
Broke along foliation
Test Specimen Information Elastic Moduli Test Information
Sample Information Compressive Test Information
Grey Schist
0 0.5 1 1.5 2
St re ss (p si
Time (min)
CABLE/CONDUIT SCHEDULE NOTES:
1. CONDUIT AND CONDUCTOR SIZES ARE TO BE PER THE ABOVE SCHEDULES UNLESS OTHERWISE
NOTED.
CONDUIT SIZE
S
S2
S3
S1
SYMBOL
VENDER PROVIDED1"
3/4"
1"
3/4"
2-2/C#16 TSP
3-2/C#16 TSP
1-2/C#16 TSP
CONDUCTORS
SIGNAL CABLE/CONDUIT SCHEDULE
S13 3/4" 1-3/C#16 TSP
S33 1" 3-3/C#16 TSP
S23 3/4" 2-3/C#16 TSP
7#143/4"
9#14 10#14
8#14
C10 C9 C8
3/4" 3/4" 3/4"
2#14
CONDUCTORS
5#14 4#14
6#14
C2
C5 C6 C7
C4
SYMBOL
3/4"
3/4" 3/4"
3/4"
CONDUIT SIZE
CONTROL CABLE/CONDUIT SCHEDULEP64
P104 P103 P84 P83
P63 P54
(3)#123/4"
GND*
(2)#12
CONDUCTORS*
3/4"P22 P23
SYMBOL CONDUIT SIZE*
P32
P53 P33
POWER CABLE/CONDUIT SCHEDULE
(1)#12
(1)#12
(2)#103/4" (1)#10 (3)#103/4" (1)#10 (3)#83/4" (1)#10
(3)#61" (1)#8 (4)#83/4" (1)#10
(4)#61" (1)#8 (3)#4 (1)#8 (4)#41 1/4" (1)#8
1 1/4"
(3)#3 (1)#6 (4)#31 1/2" (1)#6
1 1/2"
(6)#123/4"P26 (1)#12
TANK LIGHTING SCADA CONTROL PANEL #1
TANK INTERIOR RECEPTACLES
EXTERIOR RECEPTACLES
LIGHTING FIXTURE SCHEDULE NOTES:
1. THE CATALOG NUMBERS LISTED ARE GIVEN AS A GUIDE TO THE DESIGN AND QUALITY OF FIXTURE DESIRED. EQUIVALENT DESIGNS, MATERIALS, DIMENSIONS, COEFFICIENT OF UTILIZATIONS AND EQUAL QUALITY FIXTURES OF OTHER MANUFACTURERS WILL BE ACCEPTABLE.
SCADA
PANEL #1
2"C, LMR-900
ANTENNA CABLE
GENERATOR
ENCLOSURE
ATS
OVERHEAD DOOR
TOP OF TANK RECEPTACLE
SELF REGULATING HEATING CABLE
ANTENNA
F1
W1
LUMENS
DESCRIPTIONTYPE CATALOG SERIES
MANUFACTURER &
TYPE
LAMPS
VOLTS
LIGHTING FIXTURE SCHEDULE
REMARKS
TYPE
MOUNTING
HEIGHT
WATTS
SURFACE
48" LED VAPOR TIGHT
INDUSTRIAL LIGHTING
FIXTURE WITH
EMERGENCY BATTERY
PACK
49LED 120
LITHONIA
VAP-6000LM-FST-WD-
MVOLT-GZ10-40K-90CRI-
BSL722C
4000K 6000lm -
BATTERY PACK TO BE
RATED FOR -20°C
8' AFG
EXTERIOR BUILDING
MOUNTED LED DUAL
HEAD FLOOD LIGHT
FIXTURE
25LED
4000K
2160lm 120
LITHONIA
OFL-2RH-40K-120-PE-DDB
INTEGRAL PHOTOCELLL
CONTROLLEDSURFACE
SCALE:
BLOCK WIRING DIAGRAM
N.T.S.
OVERHEAD DOOR
CONTROL PANEL
OS
OPERATOR
STATION
OEMMS
MOTION
SENSOR AT
BASE OF DOOR
OEM ZS
POSITION
SWITCH AT
BASE OF DOOR
OEM ZS
POSITION
SWITCH AT
TOP OF DOOR
OEM
NOTES:
1. COORDINATE WITH ELECTRIC DOOR OPERATOR AS
SPECIFIED IN SECTION 13210.
SCALE:
OVERHEAD DOOR
CONTROL BLOCK WIRING DIAGRAM
N.T.S.
0.75
0.50
SUB-TOTAL CONNECTED
DESCRIPTION OF LOAD
V, C
IR
C U
IT
120/240
KVA L2 =
KVA = TOTAL CONNECTED
SUB-TOTAL CONNECTED
5.60
2.50
KVA L1 =
LOAD (KVA)
POLE
BREAKERLOAD (KVA)
L2 TRIP
BREAKER
POLE TRIP L1 L2
SUB-TOTAL CONNECTED
SUB-TOTAL CONNECTED
DESCRIPTION OF LOAD
3.10
C
IR
C U
IT
L1
1.200.65
PH,1 W,3 A MAINS100 A SOLID NEUTRAL;100 A MCB100
A MLO-AIC AT10,000 V GROUND BUS100 MOUNTINGSURFACE
PANELBOARD SCHEDULE
LOCATION: HITCHCOCK WATER TANKNO. LP1
1.301.45
0.60
20 1
20 1
20 1
1 20
1 20
1 20
1 20
1 20
1 20
1 20
1 20
30 2
20 1
20 1
* PROVIDE GFCI BREAKER
20 1
20 1 1 20
1 20
1 20
0.20
SPD
20 1
20 1
0.50
0.20
SPARE
SPARE
SPARE
- SPARE
SPARE
SPARE
0.60
0.20
1 20
1 20
SCADA CONTROL PANEL #220 1
20 1
20 1
20 10.45
0.60 1 20
1 20
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
GENERATOR BLOCK HEATER
GENERATOR BATTERY CHARGER & ALTERNATOR HEATER
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
120/240V
LP1
PANEL
BOARD
30A MCB
LOAD
NORM.
EMERG.
AUTOMATIC
TRANSFER SWITCH
(ATS)
100A, 120/240V, 2-POLE, 3-WIRE
WALL MOUNTED
ENCLOSED CIRCUIT
BREAKER (MCB)
100A, 120/240V, 10KAIC
LP1 (28)
LP1 (30)
15KW RATED FOR DIESEL
ENGINE GENERATOR
WITH SUB-BASED TANK
AND SOUND ATTENUATED
OUTDOOR ENCLOSURE
120/240V 1-PHASE,
3 WIRE.
UTILITY
METER
UNDERGROUND
UTILITY SERVICE
FROM UTILITY POLE
1-PHASE, 3-WIRE
120/240V
ONE LINE DIAGRAM
SCALE: N.T.S.
SCADA
PANEL #2
2"C, LMR-900
ANTENNA CABLE
ANTENNA
NOTES:
1. SIGNAL/CONTROL WIRING TO SCADA PANEL #1 SHALL RUN
THROUGH THE PANEL AND TERMINATE IN SCADA PANEL #2.
C22 1" 26#14
THIS LINE IS ONE INCH
LONG WHEN PLOTTED AT
FULL SCALE ON A 22" X
34" DRAWING
Sheet No.
D ra w in g fil e:
W
:\Y ea r -
2\
9.
W at er bu ry
C T
W at er S to ra ge T an ks
\E le ct ric al D ep ar tm en t\2
.0
El ec tri ca l H itc hc oc kW at er
T an ks P la n.
dw g
Pl ot
D at e:
D ec
7, -1
:4 2p m
DATEMARK DESCRIPTION Approved by
Checked by
Job No.
Scale
Date
Designed by
Drawn by
ENGINEERING, INC.
Mechanical/Electrical Engineers 150 Grossman Drive, Suite 309 Braintree, Massachusetts 02184 617 221-9220 web: www.sar.com
FOR CONSTRUCTION
345-2103
DECEMBER 2025
WATERBURY, CONNECTICUT
HITCHCOCK ROAD WATER STORAGE TANK REPLACEMENT
E-3MJC
RLB
MJC
AS NOTED
CONTROL BLOCK WIRING DIAGRAMS, & SCHEDULES
ELECTRICAL ONE LINE DIAGRAM,
MJC
MEMORANDUM
Date: November 29, 2021
To Rob Langenauer
From William Murphy and Ann Marie Petricca
CC Sarah Bucci
Subject Limited Environmental Assessment of Hitchcock Road Property Waterbury, CT
Dear Mr. Langenauer, Introduction As requested by the City of Waterbury, CT Department of Public Works (the City), Environmental Partners CT, Inc. (EP) conducted a limited environmental assessment of the 7.44 acre parcel of land identified as Parcel 1 on Hitchcock Road in Waterbury, CT (subject Property). The subject Property is shown in Figure 1 below:
Figure 1 – Subject Property
D
AFT
As requested by the City, this scope of work includes a limited database review, limited site walkover and collection of soil samples for laboratory analysis, and preparation of a technical memorandum.
This scope of work is not intended to and does not meet all the requirements and limitations of American Society for Testing and Materials (ASTM) Standard E1527-13 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process.
The environmental assessment included the following three tasks.
1. Conduct Database Search and Records Review
2. Conduct Limited Site Walkover and Limited Collection of Soil Samples
3. Prepare Environmental Technical Memorandum
The results from this assessment are presented below.
Site Description The site is a predominately wooded parcel with a small clearing in the southeast quadrant that has dense grass. Cleared paths/trails are observed in the southeast portion of the site and an east-west partially overgrown path running through the approximate middle of the Site. Site topography generally slopes from east to west towards Beaver Pond Brook, which is located approximately 400 feet to the west of the subject Property.
Limited Database Search and Records Review Environmental Data Resources, Inc. (EDR) was contracted to conduct a review of environmental regulatory databases. This review was in accordance with the databases and radius required under ASTM E1527-13. The purpose of this database search was to identify businesses or facilities located on, adjacent to, or near the subject Property that would be subject to the Environmental Protection Agency (EPA) or state regulation and to identify potential hazardous waste sites located on or in the vicinity of the subject Property that may impact the subject Property.
A summary of the results of the EDR database search is provided in Attachment A. This review included the following standard environmental record sources:
• Federal NPL Site list
• Federal CERCLIS list
• Federal RCRA TSD facilities list
• Federal RCRA generators list
• Federal ERNS list
• State Department of Energy and Environmental Protection sites list
• State landfill/solid waste disposal sites list
• State leaking UST list
• State registered UST list
D
EP also reviewed the following additional documents for the subject Property:
• Current and historical USGS 7.5 Minute Topographic Maps;
• Historical aerial photographs; and
• Sanborn Fire Insurance Maps.
Potential Releases Three potential releases were reported at 380 Hitchcock Road, adjacent to the subject Property, as follows:
Potential Release No. 1 No database information was available for the first release other than it was listed as a CT Department of Energy and Environmental Protection (CT DEEP) SPILL at the address of 380 Hitchcock Road, Apartment 161, Site ID 9802112. The Site Status is CLOSED and the Contact is Charles Zieminski. No additional information is reported.
Database information regarding the two other reported releases is summarized in the Table on the next page.
Potential Release No. 2 As summarized on the next page, on September 15, 2008 a resident reported to CT DEEP that a person placing mothballs on the ground surface and in the soil outside. The release status is listed as CLOSED.
Potential Release No. 3 A CT DEEP SPILL was reported on May 20, 2013, in which a landscape company dumped approximately 25 pounds of rock salt into the woods. The release status is listed as CLOSED.
Potential Release No. 2 Potential Release No. 3
These two releases indicate that localize dumping potentially has occurred on the subject Property because of the wooded nature of the parcel.
Historical Aerial Photographs Historic aerial photographs of the subject Property were reviewed for the following years: 1934, 1944, 1957, 1963, 1966, 1970, 1972, 1980, 1985, 1992, 1995, 2005, 2006, 2008, 2010, and annual photographs from 2012 through 2020. These aerial photographs show extensive clearing and open space on the subject Property from 1944 through 1970, especially on the south and east portions of the parcel. The east portion of the subject Property remained mostly cleared through 1995. From approximately 1985 to present, there appears to be progressive filling in of the open space on the subject Property with trees, with the exception of the southeast corner of the parcel. Cleared areas and dirt roadways are visible on the east-southeast portions of the subject Property between 1985 through 2020.
Figures 2 and 3 below show images from 1934 and 2016, respectively.
Figure 2 - Property in 1934 Figure 3 - Property in 2016
From approximately 1992 to present a partially cleared pathway is observed running east to west through the middle of the parcel. The pathway begins approximately where Hitchcock Road turns from north to east-northeast along the eastern side of the parcel and at the north end of the cleared area on the southeast portion of the parcel.
D
Information from Site Walkover Ms. Sarah Bucci of EP conducted a walkover of the subject Property on October 28, 2021. At the time of the site visit, the weather was partly cloudy and approximately 40°F. The purpose of the site walkover was to identify, to the extent possible, adverse recognized environmental conditions, i.e., the presence, or likely presence, of any hazardous substances or petroleum products (OHM) on the subject Property, and conditions that could indicate an existing release, past release, or material threat of release of OHM to the ground or groundwater of the subject Property. The majority of the site consists of wooded forest. No interviews with the past or present owners, occupants, or with state or local government officials were conducted as part of this assessment.
Photographs of representative views of the subject Property taken at the time of the site walkovers are provided in Attachment B. There are 81 photographs in the attachment. Some photos have been labeled for clarity. Photos are included from Sample Sites A, B, C, and E.
During the site walkover, potential areas of environmental concern were photographed. The following list summarizes site observations and features identified during the site walkover.
Photographs of most of these features are included in Attachment B.
Primary observations throughout the subject Property included domestic refuse, such as:
• Tarps
• Tires
• Pressed wooden boards
• Mattresses
• Bedframes
• Plastic bottles
• Food wrappers
• Plastic cups
• Straws
• Lids
• Broken glass
• Carpet
• Pipes
• Chairs
• Metal…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| ITB 8190 Addendum 1.pdf | ||
| ITB 8190- Wtby_Jan_27_26_solicitation_doc.pdf | ||
| 788 Portable Toilet specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .