ITB # 805 Highway Plywood Admin Doc.docx
DOCX document 77 KB Posted
- Attached to
- High Density Overlay (HDO) Plywood
- Solicitation number
- 805
- Issued by
- Ada County, Idaho
About this file
This Invitation to Bid (ITB) #825 is issued by the Idaho Transportation Department (ITD) through the Idaho Division of Purchasing (DOP) for the procurement of high density overlay (HDO) plywood for highway sign applications. The solicitation requires qualified vendors to supply exterior-type grade Highway HDO plywood (B-B or better rating) that meets APA product standard PS 1-09, featuring a phenolic resin-based overlay system with specific resin content and weight requirements. The ITB does not specify fixed quantities, as estimated annual quantities may vary during the contract term; however, minimum order quantities shall not exceed one bundle. The question deadline and bid closing date are referenced in the IPRO header document, with electronic submission via IPRO required by the specified closing time. No site visits, bidders' conferences, or pre-bid meetings are mentioned in the documentation. The resulting contract will have an initial two-year term with the option for renewal, extension, or amendment upon mutual written agreement, with an anticipated total contract term of five years.
Bidders must submit fully burdened total costs on the provided Bid Schedule and must be authorized distributors of the HDO plywood manufacturer, requiring proof of authorization with their bid submission. Pricing must remain firm for three months from the contract's effective date, with price adjustments permitted thereafter upon thirty days' notice and supporting documentation of industry-wide increases. No set-asides for disadvantaged business enterprises or other special designations are identified in the solicitation. The contract does not specify a budget ceiling or award value. Deliveries must be made within thirty calendar days of order receipt, FOB destination with freight prepaid to the ITD SSL Shop in Boise, Idaho. The awarded vendor must provide a minimum one-year warranty covering manufacturing defects with replacement at no cost to ITD, and must maintain records for three years following contract termination. Either party may terminate for convenience with ninety days' written notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 805 - Attachment 2 - Bid Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
TRANSPORTATION DEPARTMENT
Invitation to Bid (ITB) # 825
Highway High Density Overlay Plywood
TABLE OF CONTENTS
| ITB Administrative Information | 3 | |
| 1 | PURPOSE | 4 |
| 2 | GENERAL INFORMATION, solicitation instructions and standard terms and conditions | 4 |
| 3 | INQUIRIES | 4 |
| 4 | BACKGROUND | 4 |
| 5 | SPECIFICATIONS | 5 |
| 6 | SAMPLE | 5 |
| 7 | QUANTITY | 5 |
| 8 | COST | 6 |
| 9 | BILLING PROCEDURE | 6 |
| 10 | SUBMISSION REQUIREMENTS | 6 |
| 11 | AWARD | 8 |
| 12 | ORDERS AND DELIVERY | 8 |
| 13 | PACKAGING | 8 |
| 14 | ACCEPTANCE | 8 |
| 15 | WARRANTY | 8 |
| 16 | AUTHORIZED DISTRIBUTOR | 9 |
| 17 | DISPUTE RESOLUTION | 9 |
| 18 | NON-COMPLIANCE | 9 |
| 19 | INSURANCE REQUIREMENTS | 9 |
| 20 | RECORDS MAINTENANCE | 9 |
| 21 | AUDIT RIGHTS | 9 |
| 22 | PRICE ADJUSTMENT | 10 |
| 23 | TERMINATION FOR CONVENIENCE | 10 |
| ATTACHMENT 1-BIDDER QUESTIONS | 11 |
ITB Administrative Information
| ITB Title: |
| Highway High Density Overlay Plywood |
| ITB Project Description: |
| The Idaho Transportation Department (“ITD”), through the Idaho Division of Purchasing (“DOP”), is requesting Bids from qualified Vendors for the purchase and delivery of high density overlay plywood (HDO Plywood) for highway sign applications. |
ITB Lead:
Michael Piccono, Purchasing Officer Division of Purchasing 650 W State St, RM 100, Boise ID, 83720 Michael.Piccono@adm.idaho.gov 208-332-1612
| Submit electronically via IPRO: |
| Electronic Submission |
IPRO LOGIN
| Deadline to Receive Questions: |
| See IPRO Header |
| ITB Closing Date: |
| See IPRO Header |
| ITB Opening Date: |
| See IPRO Header |
| TERM |
| Initial Term (2) years. Upon mutual, written agreement, the Contract may be renewed, extended or amended. The anticipated total Contract term is five (5) years. |
Note* Section 5.2 Administrative Fee of Idaho Standard Terms and Conditions does not apply to the resulting Contract
PURPOSE
The Idaho Transportation Department (“ITD”), through the Idaho Division of Purchasing (“DOP”), is requesting Bids from qualified Vendors for the purchase and delivery of high density overlay plywood (HDO Plywood) for highway sign applications, in accordance with the specifications provided below.
GENERAL INFORMATION, solicitation instructions and standard terms and conditions This Solicitation is issued by the state of Idaho (the “State”) via IPRO Powered by LUMA: IPRO LOGIN The ITB Lead is the only contact for this Solicitation. All correspondence regarding this ITB shall be in writing. In the event that it becomes necessary to revise any part of this ITB, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this ITB shall not be relied upon. All changes to this ITB must be in writing and posted at IPRO to be valid. Alternate Bids are not allowed.
INQUIRIES
Questions or other correspondence must be submitted in writing to the ITB Lead listed below. QUESTIONS MUST BE RECEIVED BY 11:59:59 P.M. Mountain Time ON THE DATE LISTED IN THE ITB ADMINISTRATIVE INFORMATION. Written questions must be submitted using Attachment 1, Bidder Questions. Official answers to all written questions will be posted on IPRO as an amendment to this ITB.
ITB Lead: Michael Piccono Phone: 208-3332-1612 E-mail: Michael.Piccono@adm.idaho.gov.
Any questions regarding the State of Idaho Standard Contract Terms and Conditions found at the event in LUMA must also be submitted in writing, using Attachment 1, Bidder Questions, by the deadline identified in the ITB Administrative Information. The State will not consider proposed modifications to these requirements after the date and time set for receiving questions. Questions regarding these requirements must contain the following:
1. The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency).
2. Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.
3. Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.
Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, or which take exception to the State’s terms and conditions, will be found non-responsive, and no further consideration of the Bid will be given.
BACKGROUND
The Idaho Transportation Department (ITD) is committed to maintaining high-quality roadway signage across the state to ensure the safety and efficiency of transportation systems. Signage plays a crucial role in providing clear and durable guidance to motorists, and as such, the materials used in sign fabrication must meet rigorous standards of durability, visibility, and weather resistance.
SPECIFICATIONS
These specifications are the minimum mandatory specifications that your Bid must meet in order for the State to consider your Bid for award. Restate each specification listed in this section in which your bid deviates, followed by your response demonstrating that your Bid meets or exceeds the required specifications; provide model, part #, or description, as appropriate.
In addition to the specifications provided below, all plywood must meet the product standard PS 1-09 Signs of the most current APA voluntary product standard for Highway HDO plywood located at https://www.apawood.org/publication-search?q=b360&tid=1
The Highway HDO Plywood must meet the following minimum specifications in order to be considered for award:
The plywood shall be "Exterior" Type Grade with a Highway HDO (B-B or better both sides) natural in color.
Each panel must be edge branded with the APA trademark, certifying that it meets the specifications outlined in this solicitation.
The phenolic resin based overlay system shall consist of cellulose fiber sheets containing not less than forty-five (45) percent resin solids, based on the volatile free weight of fiber and resin exclusive of glue line. The total resin-impregnated materials for each face, exclusive of glue lines, shall be not less than twelve hundredth (0.012) in. thick before pressing and shall weigh not less than sixty (60) pounds per one thousand (1,000) square feet in the ready-to-use condition. The bond of overlay system to the plywood shall be continuous and without voids or blisters.
The overlay on both faces must be prepared at the time of manufacturing so that special surface preparation (sanding and solvent wiping) is not required prior to application of reflective sheeting.
The plywood finished surface shall be hard, smooth, unbroken and of such character that further finishing by paint or protective coating is not necessary.
The plywood face, back and all inner plies shall be limited to Group 1 species.
The plywood inner plies shall be B or C (plugged) with joint core.
Core gaps between pieces of inner plies shall not exceed three eighth (3/8) in., and the average of all gaps occurring in a panel shall not exceed three sixteenth (3/16) in.
There shall not be more than four (4) core gaps and edge splits per eight (8) ft. of cross band ply.
Scarfed panels will not be accepted unless otherwise specified.
SAMPLE
ITD reserves the right to request an eight (8) in. by eight (8) in. sample of the Highway HDO Plywood prior to award at no cost to ITD that will not be returned to the submitting vendor.
QUANTITY
The quantities provided in the solicitation are annual estimates. Actual quantities ordered may vary during the term of the contract. No minimum or maximum quantity is guaranteed.
ITD intends to establish minimum order quantities to ensure cost efficiency and product quality. Bidders are required to specify the quantity of sheets for their products per Bunks or bundles (to be further defined as Bundles). Minimum order quantities shall not exceed one bundle.
COST
Provide your fully burdened Total Cost on the Attachment 2 - Bid Schedule.
BILLING PROCEDURE
Upon ITD’s acceptance of the HDO Plywood, the Contractor must provide an invoice to the billing contact provided on the Purchase Order. The invoice must be submitted no later than thirty (30) calendar days after acceptance. Invoices submitted prior to acceptance will be returned to the Contractor for resubmission.
The Contractor must provide the following information with each invoice:
· LUMA contract number (provided at award)
· Agency Purchase Order number
· Detailed description of the products provided and associated amounts, as appropriate
· Name of authorized individual and contact information for Contractor
Invoices and reports are to be submitted to:
ITD SSL Shop – HQAP@ITD.IDAHO.GOV
SUBMISSION REQUIREMENTS
Required Bid Submission Items Your Bid Submission must consist of the following:
Bid Schedule Provide your cost information on Attachment 2, Bid Schedule, below. Do not submit your Bid on any other form. Submitting your Bid on a form different than the Bid Schedule may cause your Bid to be rejected as non-responsive.
State of Idaho Signature Page The State of Idaho Signature Page must be completed and submitted as part of your Bid. The State of Idaho Signature Page is attached in IPRO.
Proof of Authorized Distributor Provide proof that you are an authorized distributor of the manufacturer for the products being bid (see section 16).
Bid Submission Methods Bids must be submitted electronically via IPRO. Do not fax or e-mail your Bid. Your Bid must be received at the Division of Purchasing by the date and time specified on the IPRO header document. The official time, for bid closing purposes, is the Division of Purchasing’s time clock.
Electronic Submission via IPRO Submitting electronically via IPRO, upload all of the Required Bid Submission Items (See Section 10.1) and enter your cost in IPRO for each line item; as the “Total Cost” on the Bid Schedule OR $0.01 as your cost in IPRO.
Upload all Required Bid Submission Items using Microsoft products such as Word and Excel. Do not submit items in .pdf format, unless provided otherwise in this ITB.
Submitting via IPRO, be advised that that the Bidder for Bid evaluation and award purposes is the entity profile under which you submit in IPRO, which must be the same legal entity presented in your uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Bid in IPRO, the information provided on the Signature Page prevails.
It is mandatory to submit your Bid electronically via IPRO, all Bidders participating in a Solicitation issued through IPRO must establish an account in the IPRO system as it is necessary in order to process and/or award the resulting Contract(s). It is free to establish an account and only takes a few minutes.
Bidders are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows the State to efficiently navigate the Bidder’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO.
Trade Secrets If your Bid contains trade secret information which you have identified, you must also submit a redacted copy of the Bid (in electronic format, with the word “redacted” in the file name) with all trade secret information removed or blacked out; as well as a separate document containing a complete list (per the instructions in the three (3) paragraphs directly below) of all trade secret information which was removed or blacked out in the redacted copy.
Paragraph 28 of the Solicitation Instructions to Vendors describes trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” In addition to marking each page of the document with a trade secret notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:
Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret.”
Provide a separate document entitled “List of Redacted Trade Secret Information” which provides a succinct list of all trade secret information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure.
AWARD
Award will be made to the responsive responsible vendor(s) with the lowest cost, as provided on Attachment 2 - Bid Schedule. Submitting vendors must provide a bid on all line items. Failure to provide a bid on all line items may result in a non-responsive bid.
ORDERS AND DELIVERY
Orders shall be placed on an as needed basis by each ITD District via an ITD purchase/delivery order (Order).
Deliveries must be made within thirty (30) calendar days after receipt of order (ARO). Deliveries must be FOB Destination freight pre-paid and added to the location provided below as indicated on each order when placed. The Contractor must confirm with the ordering ITD District if delivery cannot be made within the required timeframe.
ITD shall be responsible for unloading the HDO Plywood.
Deliveries must be made Monday through Friday between the hours of 8:00 AM and 4:00 PM Mountain Time. No deliveries shall be accepted on weekends or State recognized holidays (unless otherwise coordinated and approved by the ITD Location placing the order. https://sos.idaho.gov/state-holidays/
Delivery Location
ITD SSL SHOP
8150 Chinden Blvd.
Coffey Gate 3 Boise, ID 83707 Packing Slip Deliveries must include a packing slip with the following information:
· IPRO Contract Number
· ITD Purchase Order Number
· Delivery Location
· Product Description
PACKAGING
The HDO plywood must be secured during transport to prevent it from movement and damage during transport.
ACCEPTANCE
See Section 2.2 Idaho Standard Terms and Conditions.
WARRANTY
HDO Plywood must be warranted against manufacturing defects for a minimum period of one (1) year from the date of manufacture. During the warranty period, pieces that are found to be defective will be replaced at no additional cost to ITD. Warranty must include all costs to replace the defective warranted item. All warranty pieces must be delivered to ITD FOB Destination, freight prepaid and allowed within thirty (30) calendar days after receipt of notice from ITD.
Awarded vendor is responsible for all warranty requirements. No third-party warranties shall be allowed.
AUTHORIZED DISTRIBUTOR
Submitting vendors must be an authorized distributor for the manufacturer of the HDO Plywood offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products. Bids from Contractors who are not an authorized distributor by the manufacturer will not be considered. Bidders who are purchasing from or through an authorized distributor SHALL NOT meet this requirement and will not be considered for award. Bidder must provide proof of being and authorized distributor must be provided with your bid.
DISPUTE RESOLUTION
During the performance of the Contract, the parties agree that it is in their mutual interest to resolve disputes informally. Any claims by the Vendor shall be submitted in writing to ITD’s Contract Manager for resolution. Any claims by the State shall be submitted in writing to the Vendor’s Project Manager for resolution. The Parties shall agree to negotiate in good faith and use all reasonable efforts to resolve such dispute(s). During the time the Parties are attempting to resolve any dispute, each shall proceed diligently to perform their respective duties and responsibilities under this Contract. The Parties will agree on a reasonable amount of time to resolve a dispute. If a dispute cannot be resolved between the Parties within the agreed upon period, either Party may elect to exercise any other remedies available under the Contract, or at law. This provision, when agreed in the Contract, shall not constitute an agreement by either party to mediate or arbitrate any dispute.
NON-COMPLIANCE
ITD’s Contract Manager will be responsible for documenting non-compliance, in writing, via email. This notice will include the details of each discrepancy that require corrective action. Invoicing shall not occur until non-compliance has been corrected.
1.1 Correcting Non-Compliance - After receipt of written notice from ITD, the Contractor must respond, in writing, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within fourteen (14) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further remedial action.
INSURANCE REQUIREMENTS
See Insurance Requirements on Attachment tab in IPRO powered by Luma.
RECORDS MAINTENANCE
Contractor shall maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records shall be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
AUDIT RIGHTS
The Contractor agrees to allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
PRICE ADJUSTMENT
Prices must be firm for three (3) months from the effective date of the Contract. A price adjustment may be considered after three (3) months of the initial term of the Contract, and every three (3) months thereafter. If a price increase is requested, it will be the responsibility of the Contractor to notify DOP and ITD thirty (30) calendar days in advance of the desired effective date and provide supporting documentation showing industry wide increases justifying the request. DOP will notify Contractor whether the request is approved within ten (10) calendar days of receipt of the request.
If there is an industry wide price decrease, Contractor must notify DOP and ITD immediately of the decrease; and make the price decrease effective for ITD on the same day it becomes effective for the Contractor. If the State is not properly notified of price decreases, the pricing at the time of order will be used for invoice payment and the Contractor will provide refunds or credits as necessary.
TERMINATION FOR CONVENIENCE
Either party may terminate this Contract for its convenience at any time upon written notification provided with at least ninety (90) calendar days prior to the desired termination date. The Contractor’s sole obligation shall be to complete the delivery of any Orders placed prior to receiving (or providing) a written notice of termination. ITD’s sole responsibility shall be to pay for Orders placed prior to receiving (or providing) a written notice of termination that have been satisfactorily delivered and accepted.
ATTACHMENT 1-BIDDER QUESTIONS
ITB # 805
Highway High Density Overlay Plywood
PLEASE DO NOT IDENTIFY YOUR NAME OR YOUR COMPANY’S NAME OR PRODUCT NAMES OF INTELLECTUAL PROPERTY IN YOUR QUESTIONS.
ADD ROWS BY HITTING THE TAB KEY WHILE WITHIN THE TABLE AND WITHIN THE FINAL ROW.
The following instructions must be followed when submitting questions using the question format on the following page.
1. DO NOT CHANGE THE FORMAT OR FONT. Do not bold your questions or change the color of the font.
2. Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2. If the question is in regard to a State Term or Condition or a Special Term or Condition, state the clause number in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment A”) in the “ITB Section” (column 2), and the attachment page number in the “ITB page” field (column 3).
3. Do not enter text in the “Response” field (column 5). This is for the State’s use only.
4. Once completed, this form is to be e-mailed per the instructions in the ITB. The e-mail subject line is to state the ITB number followed by “Questions.”
ITB # 805 Highway High Density Overlay Plywood
ITB # 805 Highway High Density Overlay Plywood
| ITB Section |
| ITB Page |
| Question |
| Response |
image1.png
File details come from the government source that posted it. Updated .