This document is an Invitation to Bid (ITB) issued by the Georgia Department of Transportation (GDOT) to solicit bids from qualified firms to provide demolition, abatement, underground storage tank (UST) removal, and related services. The anticipated scope of work includes the complete demolition and removal of structures identified in the Asbestos Inspection Reports for a project in Morgan County, Georgia. The winning firm will be required to provide a Performance and Payment Bond within 5 business days of receiving the Notice of Award. The contract will remain in effect for 30 days, with the potential for modifications in writing by GDOT.

The bid submittal must include all required exhibits, and the bidding firm or its subcontractors must be prequalified by GDOT in the specified service classes, which include Asbestos Abatement, Demolition, and UST Removal. The award will be made to the lowest, responsive, and responsible bidding firm meeting all requirements. GDOT reserves the right to reject any or all bids and waive technicalities at its discretion.

View the file

Other files

File Type Posted
GPR Bid Tab 409 2.pdf PDF
NOA Bid Tab 413_2.pdf PDF
GPR Bid Tab 413_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB-48400-RWPROPMGMT000413-2

PI#: 0013617

County: Morgan

Revised 10/14/2022 1

Georgia Department of Transportation

Invitation to Bid

To Provide

Demolition, Abatement, Underground Storage Tank (UST), and Removal Services

Bids Due: September 26, 2024 by 2:00PM EST

One Georgia Center

600 West Peachtree Street, NW Atlanta, Georgia 30308

Revised 10/14/2022 2

I. INTRODUCTION:

A. Overview

The Georgia Department of Transportation (GDOT), is soliciting bids from qualified firm(s) to provide Demolition of Improvements, Structures, or other Encumbrances in the Right Of Way and/or Easement Areas.

This solicitation seeks to identify potential firms to provide Demolition of Improvements, Structures, or other Encumbrances in the Right Of Way and/or Easement Areas for the Scope of Services for the project /contract identified in Exhibit I. All respondents to this solicitation are subject to instructions communicated in this document, and are cautioned to completely review the entire solicitation and follow instructions carefully.

GDOT reserves the right to reject any or all bids and to waive technicalities and informalities at the discretion of GDOT.

B. IMPORTANT- A RESTRICTION OF COMMUNICATION IS IN EFFECT FOR THIS PROJECT.

From the advertisement date of this solicitation until successful respondents are selected and the award is made official and announced, firms are not allowed to communicate about this solicitation or scope with any staff of GDOT including the Commissioner and GDOT Board Members, except for the submission of questions as instructed in the solicitation, or with the contact designated in Invitation to Bid, Section V.B., or as provided by any existing work agreement(s). For violation of this provision, GDOT reserves the right to reject the submittal of the offending respondent.

C. Prohibition Against Collusive Bidding

Respondent shall not submit a bid that was made with a prior understanding agreement or connection with any corporation, firm, or individual submitting proposals for the same project. The Respondent shall submit a bid that is fair and made without collusion of fraud. Collusive bidding is a violation of Georgia and Federal Law and such bidding can result in fines, prison sentences, and civil damage awards.

D. Certification

This solicitation is being conducted by the Georgia Department of Transportation under its authority to procure services ancillary to the construction and maintenance of a public road (as defined in O.C.O.G.A 32-1-3 (24) as provided for in O.C.G.A 32-2-61 (c) and (d) (1) (D).

E. Conflict of Interest

The Contractor agrees that all work done as part of the awarded Agreement will comply fully with the provisions of Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated relating to Conflicts of Interest when trading with State of Georgia employees and officials .

F. Americans with Disabilities Act Guidelines

The State of Georgia adheres to the guidelines set forth in the Americans with Disabilities Act. Suppliers should contact the Issuing Officer at least one day in advance if they require special arrangements when attending the Bidders/Offerors’ Conference (if any). The Georgia Relay Center at 1-800-255-0056 (TDD Only) or 1-800-255- 0135 (Voice) will relay messages, in strict confidence, for the speech and hearing impaired.

G. Drug-Free Workplace

GDOT, as policy, operates all facilities as a drug-free workplace, and requires that the labor force of the Bidder be drug-free. The Drug-Free Workplace Certification is attached as EXHIBIT II.

Revised 10/14/2022 3

If the Bidder is an individual, he or she hereby certifies that he or she will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of any contract resulting from this Invitation to Bid.

If the Bidder is an entity other than an individual, it hereby certifies that:

A drug-free workplace will be provided for the Bidder’s employees during the performance of any contract resulting from this Invitation to Bid; and

It will secure from any subcontractor hired to work in a drug-free workplace the following written certification:

"As a part of the subcontracting agreement with (contractor's name, subcontractor's name) certifies to the contractor that a drug-free workplace will be provided for the subcontractor's employees during the performance of this contract pursuant to paragraph 7 of subsection B of Code Section 50-24-3."

The Bidder hereby acknowledges this requirement, and asserts that the organization of the Bidder adheres to such policy and practice. The Bidder acknowledges that it may be required to produce certificates affirming its compliance of these requirements of drug-free workplace for duration of agreement term, at execution, or at any time during the term of the agreement.

The Bidder may be suspended, terminated, or debarred if it is determined that:

1. The Bidder has made false certification hereinabove; or

2. The Bidder has violated such certification by failure to carry out the requirements of Official Code of

Georgia Section 50-24.

H. Small and Minority Business Enterprise

It is the policy of the State of Georgia that small businesses, female-owned businesses and minority businesses have a fair and equal opportunity to participate in the State purchasing process. Therefore, the Department encourages all small businesses, female-owned businesses and minority-owned businesses to compete for contracts to provide services, and encourages consultant to solicit female-owned businesses and minority-owned businesses in procuring sub-providers and suppliers. This desire on the part of the Department is not intended to restrict or limit competitive bidding or to increase the cost of the work. The Department supports a healthy free market system that seeks to include responsible businesses and provides ample opportunity for business growth and development. Consultants and sub-providers who utilize qualified minority sub-providers may qualify for a Georgia state income tax credits for qualified payments made to minority sub-providers. See Official Code of Georgia Annotated (O.C.G.A.) O.C.G.A. Section 48-7-38.

The Georgia Department of Transportation has adopted a 15% overall annual goal for DBE participation on all projects. This goal is not to be considered as a fixed quota, set aside or preference. The DBE goal can be met by prime contracting, sub-contracting, joint venture or mentor/ protégé relationship.

For more information on the GDOT DBE Program please contact:

Equal Opportunity Division

One Georgia Center, Floor 7 600 West Peachtree NW Atlanta, Georgia 30308 Phone: (404) 631-1972

I. Project Requirements and Scope of Services

Under the terms of the resulting contract, the selected contractor will provide services for the GDOT Project identified. The anticipated scope of work for the project/contract is included in Exhibit I. Compliance with all pertinent regulations (State/Federal/Local/Industry) is required. It is the responsibility of the respondent to obtain knowledge of rules and regulations relevant to the Scope of Work identified herein.

Revised 10/14/2022 4

J. Contract Term and Type

GDOT anticipates one (1) award to one (1) firm, for the project/contract identified. GDOT will issue a purchase order contract to the lowest, responsive, and responsible bidding firm. The purchase order will serve as the official Notice to Proceed. It is GDOT’s intention that the contract will remain in effect for thirty (30) days unless modified in writing by GDOT with a purchase change order.

II. Selection Information

A. Selection Process

Once the deadline for bids has passed, all bids will be opened and reviewed to determine all mandatory requirements have been addressed correctly. All bids which are identified as correctly addressing all mandatory requirements will be reviewed and the total amount of the bid will be evaluated. The award will be made to the bid deemed to be the lowest responsive and responsible bid.

B. Bonding Requirements

The winning firm will be notified in writing via email and must provide the required Performance and Payment Bond within five (5) business days of receiving the Notice of Award (NOA). The Performance and Payment Bond shall be provided to the Department in the amount of 100 percent (%) of the total bid price, utilizing the Department’s form, GDOT Form-SP404, Performance and Payment Bonds, effectively securing the Contractor’s obligations to perform the Services hereunder and to ensure that payments owed to subcontractors approved by the Department are made with respect to performance of portions of the services. If the Contractor does not provide the required Performance and Payment Bond form by the deadline, the Contractor may be deemed “non-responsive” and the Department may rescind the award and purchaser order. At that point, the next lowest bidder will be notified via e-mail of the Department’s intent to accept the next lowest bid and the five (5) business day requirement to provide the Performance and Payment Bond will be upheld.

C. Insurance Coverage Requirements

The winning firm will be required to provide a Certificate of Insurance from insurers rated at least A- by A. M.

Best’s and registered to do business in the State of Georgia. The Contractor shall provide the following kinds of insurance in the minimum amount of coverage set forth below, to cover all loss and liability for damages on account of bodily injury, including death therefrom, and injury to or destruction of property caused by or arising from any and all operations carried on and any and all work performed by the Contractor to this project, the Contractor shall maintain liability insurance as follows: Workers Compensation (WC): Statutory coverage shall be maintained for Worker’s Compensation as required by the laws of the State of Georgia.

Bodily injury by Accident – each employee $100,000 Bodily injury by Disease – each employee $100,000 Bodily injury by Disease – policy limit $500,000

Commercial General Liability (CGL):

Each Occurrence Limit $1,000,000 Personal & Aggregate Limit $1,000,000 General Aggregate Limit $3,000,000 Products/Completed Ops. Aggregate Limit $1,000,000

Automobile Liability Combined Single Limit: $1,000,000 To cover vehicles, owned, leased or rented by the Contractor

The Contractor shall require its sub-contractors to maintain Commercial General Liability insurance with business automobile liability coverage with companies and limits as stated above. GDOT shall be named as an additional insured and a copy of the policy endorsement shall be provided with the insurance certificate.

Revised 10/14/2022 5

The Contractor shall procure the insurance policies at the Contractor’s own expense and shall furnish GDOT an insurance certificate listing the agency (GDOT) as the certificate holder. The insurance certificate must be provided within five (5) business days of receiving the purchase order from GDOT.

The insurance certificate must document that the liability coverage purchased by the Contractor includes contractual liability coverage to insure the indemnity agreement as stated. In addition, the insurance certificate must provide the following:

a. Name, address, signature and telephone number of authorized agents.

b. Name and address of insured.

c. Name of Insurance Company.

d. Description of coverage in standard terminology.

e. Policy number, policy period and limits of liability.

f. Name and address of State Agency as certificate holder.

g. Thirty (30) day notice of cancellation.

h. Details of any special policy exclusions.

Excess liability coverage may be used in combination with the base policy to obtain these limits.

D. Method of Communication

All general communication of relevant information regarding this solicitation will be made via the Georgia Procurement Registry (GPR). All firms are responsible for checking the GPR on a regular basis for updates, clarifications, bid tabulation, and announcements. GDOT reserves the right to communicate via electronic-mail with the primary contact listed in the bid response document. Other specific communications will be made as indicated in this solicitation.

E. Award

Lowest, Responsive and Responsible: Any award resulting from this solicitation will be made to the lowest, responsive, and responsible bidding firm meeting all requirements.

F. Award Conditions

This solicitation and any bid submitted in response, regardless of whether the bid is determined to be the lowest cost, is not binding upon GDOT and does not obligate GDOT to procure or contract for any services. Neither GDOT nor any party submitting a bid will be bound unless and until the bid is mutually accepted by both parties.

GDOT will issue a Notice of Award announcing the awarded bidding firm. GDOT will issue a purchase order to the awarded firm which will represent GDOT’s acceptance of the selected Contractor.

III. Schedule of Events

The following Schedule of Events represents GDOT’s best estimate of the Schedule that will be followed. All times indicated are prevailing times in Atlanta, Georgia. GDOT reserves the right to adjust the Schedule as GDOT deems necessary.

DATE TIME

a. GDOT issues public advertisement 9/19/2024

b. Questions due to GDOT 9/23/2024 2:00 PM

c. Deadline for submission of Bid Response 9/26/2024 2:00 PM

d. GDOT completes evaluation and issues notification to winning firm TBD

Revised 10/14/2022 6

IV. Criteria for Evaluation of Bids

The bidding firm must be prequalified in the indicated Right of Way Property Management service class(es) identified in Exhibit I in order to be evaluated and considered. All bid submittals will be pre-screened to verify that the bidding firm is prequalified in the required service class(es) and that the subcontractor(s) is prequalified in the required service class(es). GDOT’s Right of Way Property Management prequalification listing will be utilized to pre-screen the prequalification status of each bidding firm. Any bid submittal in which the bidding firm or the subcontractor(s) prequalification requirements are not met will be disqualified from further evaluation and consideration.

V. Instructions for Submittal of Bids

A. There is one (1) electronic bid submittal required. Bid submittal must include all completed and signed exhibits in their entirety that are identified in Section VII and all completed and signed addenda. The completed and signed bid documents must be legible. Bid submittal must be submitted in a PDF document attached to an e-mail.

The bid submittal email subject line must follow the naming convention for electronic records as follows:

Bidding firm’s full legal name Solicitation number (ITB number)

Bids are to be e-mailed to SpecialProjectsProcurement@dot.ga.gov

No bid submittals will be accepted after the time and date set for receipt.

All expenses for preparing and submitting responses are the sole cost of the bidder submitting the response.

GDOT is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of GDOT. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.

GDOT reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the State.

A public bid opening will not be held by GDOT. A bid tabulation will be posted to the GPR once bid evaluations have been completed.

B. Questions and Requests for Clarification

Questions about any aspect of this solicitation, or the project, shall be submitted in writing via e-mail to Mckenzie Mathison, email mmathiso@dot.ga.gov . The deadline for submission of questions relating to this solicitation is the time and date shown in the (Schedule of Events- Section III above). From the issue date of this solicitation until a successful bidder is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B (above).

VI. GDOT Terms and Conditions

A. Statement of Agreement

With the submission of a bid, the respondent agrees that he/she has carefully examined the solicitation and agrees that it is the respondent’s responsibility to request clarification on any issues in any section of the solicitation with which the respondent disagrees or needs clarified. The respondent also understands that mailto:SpecialProjectsProcurement@dot.ga.gov

Revised 10/14/2022 7 failure to mention these items during the question period will be interpreted to mean that the respondent is in full agreement with the terms, conditions, specifications and requirements in the therein. With submission of a bid, the respondent hereby certifies: (a) that this bid is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that respondent has not directly or indirectly included or solicited any other respondent to put in a false or insincere bid; (c) that respondent has not solicited or induced any person, firm, or corporation to refrain from sending a bid.

The respondent also understands that failure to provide required information may result in disqualification.

Failure to provide administrative information may not result in disqualification. At the Department’s discretion, the Department may notify the respondent that administrative information is not provided or there was an error in the information provided, and the Department will allow a respondent to provide an update to the administrative information. However, the exception to this is the provision of the required GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT, which by Georgia Law requires disqualification of the response. The above changes mentioned to administrative information would be considered allowable as these would be limited to changes which do not affect the information which will be used in the evaluation process.

Failure of a respondent to provide the specific exhibits will result in disqualification. Any respondent who provides changes in addition to the information requested in the notice shall be subject to disqualification.

B. Sub-Contractors

Sub-Contractors shall generally be considered any team member which is performing any service which typically requires prequalification. Sub-Contractor must be listed in the Bid Summary Form and is subject to all terms and conditions in the Agreement.

C. Non-Discrimination

The Georgia Department of Transportation in accordance with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d--42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21, Nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all proposers that it will affirmatively ensure that any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award.

D. Submittal Costs and Confidentiality

All expenses for preparing and submitting responses are the sole cost of the respondent submitting the response. The Department is not obligated to any respondent to reimburse such expenses. All submittals upon receipt become the property of the Department. Labeling information provided in submittals as “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until a final award.

E. Right to Cancel or Change Solicitation

GDOT reserves the right to cancel any solicitations where it is determined to be in the best interest of the Department to do so. GDOT reserves the right to increase, reduce, add, or delete any item in this solicitation as deemed necessary.

It is the responsibility of all firms interested in submitting a bid for this solicitation to routinely check the posting on the Georgia Procurement Registry for any revisions to this solicitation.

F. Substitutions, Alternates, Exceptions, and Extensions

No substitutions or alternates will be accepted for this solicitation. Any respondent submitting substitutions or alternates will be considered non-responsive and will not be considered for award.

Revised 10/14/2022 8

VII. Solicitation Exhibits

The following list of Exhibits apply to this solicitation and must be submitted with the bid, with the exception of Exhibit I, Scope of Work. All information provided on the exhibits must be legible. Failure to complete an submit the required Exhibits with bid will result in disqualification of bid response:

EXHIBIT I – Scope of Services.

EXHIBIT II – Drug-Free Workplace Certification (Complete and return with bid).

EXHIBIT III – Bid Form (Complete and return).

EXHIBIT IV– Bid Summary Form (Complete and return with bid).

EXHIBIT V – Lien Waiver and Release (Complete and return with bid).

EXHIBIT VI - Georgia Security and Immigration Compliance Act Affidavit (Complete and return with bid).

EXHIBIT VII - Scrutinized Company (Complete and return).

EXHIBIT VIII - Performance and Payment Bond Form

Revised 10/14/2022 9

EXHIBIT I

Scope of Services

1. Required Prequalification Service Classes

Prime Contractors are defined as the firm submitting the bid response and the firm with whom GDOT will contract.

The Team is defined as the Prime Contractor and their sub-contractor(s), who are considered team members. The Prime Contractor must be prequalified in the Right of Way Property Management service class (es) identified below in Section 5.A. The Prime Contractor or sub-contractor team members must be prequalified in the Right of Way Property Management service classes identified below in Section 5.B.

FOR DEMOLITION, ABATEMENT, UNDERGROUND STORAGE TANK (UST), AND REMOVAL, USE THE

BELOW AND DELETE THESE INSTRUCTIONS:

A. The Prime Contractor MUST be prequalified by GDOT in either of the service classes listed below:

Service Class Number

Service Class Name

E-2 Asbestos Abatement or

E-3 Demolition

B. The Team (either the Prime Contractor and/or one or more of their sub-contractor team members) MUST be prequalified by GDOT in the service classes listed below:

Service Class Number

Service Class Name

E-2 Asbestos Abatement

E-3 Demolition

E-4 UST Removal

NOTE: The team must include team members, either prime or sub, which are prequalified in both service classes.

If a Prime or Sub-Contractor’s prequalification will expire prior to the due date of this bid or if a firm has not been prequalified by GDOT, documentation must be provided which shows that the firm has submitted its application for prequalification prior to the bid due date.

For Prequalification information visit http://www.dot.ga.gov/PS/Business/Prequalification/SpecialtyServices .

The work consists of the equipment, supervision, and all other services required for the complete demolition of the structures identified and described in the Asbestos Inspection Reports. All improvements must be completely demolished and removed from their present site. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. The work will be completed in strict accordance with the Technical Specifications.

The Georgia Environmental Protection Division (EPD) Project Notification Forms are required to be submitted by the Contractor immediately once the Notice of Award is received. Work shall commence as soon as possible following issuance of the Notice to Proceed. All work must be completed thirty (30) days following the Notice to Proceed unless modified in writing by GDOT with a purchase change order. The EPD Notification filing is included in the thirty (30) day period.

The work shall be completed as noted in the Demolition requirements within the Asbestos Inspection Report.

http://www.dot.ga.gov/PS/Business/Prequalification/SpecialtyServices

Revised 10/14/2022 10

PENALTIES

As the construction schedule is critical for these project/parcel, the Contractor must begin work as soon as the Performance and Payment Bond is provided to GDOT contract officer. If the work on a specific project has not commenced within two (2) weeks providing the Performance and Payment Bond and the State Property Manager deems that the work remaining cannot be completed by the completion date as established for that project, the Department may terminate the contract.

Any citation given to the Contractor by the GA EPD or the US EPA shall be forwarded to the State Property Manager.

The Department may terminate the contract for the Contractor based on the severity or frequency of citations or non-performance and may remove the Contractor from the pre-qualified Contractors list for a period of one year.

The state of Georgia may cancel, terminate, or suspend the contract in whole or in part wherein it is determined by the state that the Contractor is in violation of the contract.

Items remaining inside the structure, ranging from trash/debris to inventory to building materials to furnishings, are considered abandoned and shall be removed under this contract.

Asbestos Inspection Reports and/or PM-10A Reports, for each parcel, are attached with detailed Scope of Work and is a part of Exhibit I.

PI No: Parcel No:

Street Address:

SUMMARY ASBESTOS INSPECTION AND PRE-DEMO REPORT

SR 24/US 441 Widening, Morgan Co.

Project No: 0013617

4150 Athens Hwy MadisonCity: State: 30650Zip Code:

MorganCounty:

Athens Hwy (US 129/441) & Apalachee Rd.

Nearest Major Intersection:

ASBESTOS-CONTAINING MATERIALS

Electric Meter No.:

Electric Supply:

Asbestos Inspector:April 5, 2024Date of Inspection:

Certificate Number:

Inspector Phone No.:

Description of Material/Location: Quantity

(SF/LF/#):

WPG - Four (4) Vertical glass, steel-framed windows.

WFC - Eight (8) Aluminum frame windows.

Floor tile & black mastic - 12”x12” (Gray w/ white specks). Under self-adhesive floor covering on concrete.Residential side: Front left Living Room, left rear bedroom, restroom, and two (2) closets.

Kitchen. Stainless steel sink insulation. Double basin sink.

4±

4±

465±

2±

Building Use: 54±Age of Building: 2445±Size of Building:years SF

Thomas K. Corish, Jr.

19573 Exp 9/12/24 404/312-9037

C. Jay StrangeDOT Contact: Central OfficeOffice: 404/347-0172Phone:

2% Chrysotile

2% Chrysotile

2% Chrysotile FT 3% Chrysotile M

Assumed

Percent Asbestos

Vacant

CMU & wood-framed commercial & residential (2445±SF) building with aluminum siding on partial concrete (912±SF) slab. Front right asphalt/concrete (5610±SF). Concrete (248±SF) porch / pad at building rear. Suspect abandoned USTs at, near, or under raised gas island at front of parcel -see GPR and UST pre-demolition reports.

Brief Structure Description:

01Structure No.

GA

Information provided on quantities of ACM reflects field observations and the condition of the structure and material at the time of the asbestos inspection. Quantities and conditions may change due to vandalism, exposure to weather/climate, or for other unknown conditions. The Abatement Contractor should visit the site to verify quantities and condition of ACM prior to preparing and submitting a bid and should notify the GDOT Contracting Officer and the Asbestos Consultant to report any significant discrepancies.

ASBESTOS INSPECTION AND PRE-DEMO REPORT: PARCEL COMMENTS

SR 24/US 441 Widening, Morgan Co.Project

No: 0013617PI No: 092 Parcel

No: 01 Structure

No.

Additional Site Photographs

View of 2 of 4 vertical steel-frame windows at (S1) building rear. The other two (2) vertical steel-framed windows are at front left and left front of S1. Vertical steel-frame windows WPG is asbestos-containing.

S1 Exterior left side. Photo shows 3 of 8 aluminum-frame windows with asbestos-containing WFC.

S1 Exterior view of CMU construction with wood frame nailers, vapor barrier, cellulose insulation, and aluminum siding.

S1 Interior residential side. Note that non-suspect self-adhesive floor coverings are over 12”x12” FT. Both 12”x12” FT and associated black mastic (465±SF) are positive for asbestos.

Floor tile on concrete.

S1 Interior residential side. Kitchen double stainless steel sink condensate insulation is assumed ACM.

No: 0013617PI No: 092 Parcel

No: 01 Structure

No.

Additional Site Photographs

S1 - Interior view of commercial side of building. Note that building interior is largely emptied of contents.

S1 - Interior view of residential side of building.

Note that building interior is largely emptied of contents.

MI1 - “Equine Consign” metal framed (5’x4”x4’±) sign on 8.25”x3.25”x16’±ht metal wrapped pole set in 18” x18”x8” concrete base/footer. Sign has 6’x5’x3’ metal fabricated roof. Sign is electrified with wiring/conduit.

MI2 - Concrete island (23.75’x4’) at parcel front with two (2) 32”x21”x16” and two (2) 22”x21”x4” concrete blocks/pads. Island has water spigot line and an air hose line at island center.

Electrical outlet box is also present.

MI3 - Two (2) steel light posts at parcel front.

Posts are 2.5”dia.x7’±ht. De-electrify, trace, and remove all associated electrical items from R/W.

Structure

No. 01

Additional Site Photographs

Street Address: 4150 Athens Hwy

MadisonCity: State: 30650Zip Code: MorganCounty:GA

MI4 - Brick/CMU fire-pit (9’x4.5’x2.25’±ht.) with loose adjacent granite blocks.

MI5 - Abandoned concrete (2’4”x2’3”) sign footer (very near MI4) with electric conduit stub within footer. De-electrify, trace, and remove including all associated electrical items from R/W.

092Parcel No.:

No. 01

Additional Site Photographs

Street Address: 4150 Athens Hwy

MadisonCity: State: 30650Zip Code: MorganCounty:GA 092Parcel No.:

MI6 - Abandoned metal framed swing with wood-framed bench and cushion. Swing is 13’ wide and has a 6’6” height. Located at parcel front right..towards S3.

MI7 - Vine trellis consisting of two (2) wood (3.5”dia.x5’±ht.) poles with plastic mesh fencing.

Located 20-25’ to right of S1.

MI9 - 8”±dia x8’±ht. post with bird box and yard arms. Remove post and fill hole with compactible soils. MI9 is adjacent to propane tank shown in front right foreground of photo.

MI8 - Landscape timbers surrounding flower bed. Three (3) courses of 8’ length x4 sides.

ASBESTOS INSPECTION AND PRE-DEMO REPORT: PARCEL COMMENTS

Structure

No. 01

Additional Site Photographs

Street Address: 4150 Athens Hwy

MadisonCity: State: 30650Zip Code: MorganCounty:GA

No. 01

Additional Site Photographs

Street Address: 4150 Athens Hwy

MadisonCity: State: 30650Zip Code: MorganCounty:GA

MI10 - Abandoned 12-14”±dia. concrete (210±LF) pipe just below grade at parcel front. Remove and fill back to grade with compactible soils.

MI10 - Alternate view of abandoned 12-14”±dia. concrete (210±LF) pipe just below grade at parcel front.

Remove and fill back to grade with compactible soils.

No. 01

Additional Site Photographs

Street Address: 4150 Athens Hwy

MadisonCity: State: 30650Zip Code: MorganCounty:GA

MI11 - Trace and remove underground propane gas line from propane tank stand to S1. Also remove remnant CMU blocks that were part of propane tank support stand and additional 5’x1”±dia. steel pole.

Summary of Bulk Sample Analytical Results PI# 0013617 - Morgan Co. - Parcel 92 - S1

Commercial & Residential Bldg.

4150 Athens Hwy

Madison GA 30650 July 2024

Inspector: Thomas K. Corish, Jr Accreditation Certificate No: 19573 Expiration Date: 9/12/24 Date of Inspection:4/15/24

Bulk Sample No. Location Bulk Sample Description Bulk Sample Result 23003-92-1-01 Ext. Roof – front slope. Misc. Shingle, roof. No asbestos detected.

23003-92-1-02 Ext. Roof – front slope. Misc. Felt, roof (Top – 1 of 2 layers). No asbestos detected.

23003-92-1-03 Ext. Roof – front slope. No asbestos detected.

23003-92-1-04 Ext. Roof – rear slope. Misc. Shingle, roof. No asbestos detected.

23003-92-1-05 Ext. Roof – rear slope. Misc. Felt, roof (Top – 1 of 2 layers). No asbestos detected.

23003-92-1-06 Ext. Roof – rear slope. No asbestos detected.

23003-92-1-07 Ext. Roof, screened porch. Right side. Misc. Rolled roofing. No asbestos detected.

23003-92-1-08 Ext. Roof, screened porch. Right side. Misc. Felt, rolled roof. No asbestos detected.

23003-92-1-09 Ext. Roof, screened porch. Left side. Misc. Rolled roofing. No asbestos detected.

23003-92-1-10 Ext. Roof, screened porch. Left side. Misc. Felt, rolled roof. No asbestos detected.

23003-92-1-11 Ext. Roof, screened porch. Flashing. Misc. Caulk, 20± LF. No asbestos detected.

23003-92-1-12 Ext. Roof, screened porch. Flashing. Misc. Caulk, 20± LF. No asbestos detected.

23003-92-1-13 Misc. WPG. No asbestos detected.

23003-92-1-14 Misc. WPG. No asbestos detected.

23003-92-1-15 Misc. WFC. No asbestos detected.

23003-92-1-16 Misc. WFC.

No asbestos detected.

23003-92-1-17 Misc. WPG.

23003-92-1-18 Misc. WFC.

No asbestos detected.

23003-92-1-19 Misc. WPG. No asbestos detected.

23003-92-1-20 Misc. WFC. No asbestos detected.

23003-92-1-21 Misc. WFC.

23003-92-1-22 Ext. 2nd of 8 aluminum frame windows. Left.

Misc. WFC.

23003-92-1-23 Int. Right half (commercial) side of bldg. RR. Misc. DW/JTC. No asbestos detected.

23003-92-1-24 Int. Right half (commercial) side of bldg. Misc. DW/JTC. No asbestos detected.

23003-92-1-25 Int. Commercial side – RR (6.75'x4'). Misc. 12”x12” VFT. Gray. No asbestos detected.

23003-92-1-26 Int. Commercial side – RR (6.75'x4'). Misc. 12”x12” VFT. Gray. No asbestos detected.

23003-92-1-27 Int. Commercial side - RR (6.75'x7.5'). SM. TCM. No asbestos detected.

23003-92-1-28 Int. Commercial side - RR (6.75'x7.5'). SM. TCM. No asbestos detected.

23003-92-1-29 Int. Commercial side - RR (6.75'x7.5'). SM. TCM. No asbestos detected.

23003-92-1-30 Int. Residential side – Kitchen Misc. VSF (yellow/floral). No asbestos detected.

23003-92-1-31 Int. Residential side – Kitchen Misc. VSF (yellow/floral). No asbestos detected.

23003-92-1-32

23003-92-1-33

23003-92-1-34 Int. Residential side – Living Rm. SM. TCM. No asbestos detected.

23003-92-1-35 Int. Residential side – Living Rm. SM. TCM. No asbestos detected.

23003-92-1-36 Int. Residential side – Middle Restroom. SM. TCM. No asbestos detected.

Misc. Felt, roof (Bottom – 2nd of 2 layers).

Misc. Felt, roof (Bottom – 2nd of 2 layers).

Ext. 1 of 2 horizontal, double pane, steel-frame windows. Left of front door.

Ext. 1 of 2 horizontal, double pane, steel-frame windows. Right of front door.

Ext. 1 of 2 horizontal, double pane, steel-frame windows. Right of front door.

Ext. 1 of 2 horizontal, double pane, steel-frame windows. Left of front door.

Ext. 1 of 4 vertical, steel-frame windows.

Front far left.

2% Chrysotile asbestos.

Ext. 1 of 4 vertical, steel-frame windows.

Front far left.

Ext. 2 of 4 vertical, steel-frame windows.

Left.

Ext. 2 of 4 vertical, steel-frame windows.

Left.

Ext. 1 of 8 aluminum frame windows. Front left.

2% Chrysotile asbestos.

2% Chrysotile asbestos.

Int. Residential side – Front left (Liv Rm) room (12'x18.75').

Misc. 12”x12” VFT (gray w/ white specks) on concrete. VFT under self-adhesive floor covering.

VFT - 2% Chrysotile asbestos; Black Mastic – 3% Chrysotile.

Int. Residential side – Restroom, two closets, and rear left bedroom (12'x20').

Misc. 12”x12” VFT (gray w/ white specks) on concrete. VFT under self-adhesive floor covering.

VFT - 2% Chrysotile asbestos; Black Mastic – 3% Chrysotile.

*Materials must have more than (>) 1% asbestos-containing material to be considered as an asbestos-containing building material (ACBM). OSHA defines asbestos-containing material (ACM) as a material with any amount of asbestos, even less than (<) 1 percent.

Abbreviations: Ext. - exterior; Int. - interior; SM - surfacing material; TSI - thermal system insulation; Misc. - miscellaneous material; VFT -vinyl/asphalt floor tile; VSF - vinyl sheet flooring; WPG - window pane glazing; WFC - window frame caulking; DFC - door frame caulking; ACT -acoustical ceiling tile; ACP - acoustical ceiling panel; DW/JTC - drywall/joint tape compound; JTC - joint tape compound; TCM - textured ceiling material; L1 - Layer 1.

Above photo shows a raised suspect gas island at the front of the parcel. A search of GA EPD’s UST Management Program records does not return any information that the parcel contains underground storage tanks (USTs). However, ground penetrating radar (GPR) indicated two potential locations near the raised suspect gas island where USTs may be present and suggests that these areas be included in a search involving the tracking of any product supply lines found upon demolition and removal of the raised suspect gas island and/or direct probes of the “A” and “B” identified areas.

PI No: Parcel No: 092

Street Address:

GROUND PENETRATING RADAR REPORT

SR 24/US 441 Widening, Morgan Co.Project No: 0013617

4150 Athens Hwy MadisonCity: State: 30650Zip Code:

MorganCounty:

Athens Hwy (US 129/441) & Apalachee Rd.Nearest Major Intersection:

GPR Inspector: April 5, 2024Inspection Date:Phone No.:Thomas K. Corish, Jr. 404/312-9037

C. Jay StrangeDOT Contact: Central OfficeOffice: 404/347-0172Phone:

GA

GPS Location: Lat.: 33° 41’ 46.72” N; Long.: 83° 26’ 33.14” W

SITE INSPECTION - GROUND PENETRATING RADAR

Potential locations of UST’s. It is recommended to find fuel supply line(s) at island and trace back to UST(’s).

Potential UST - “A”: 10±LF area left front corner of S1. “B”: 10±LF area at front left of S1 between island area and S1. It is recommended to find fuel supply line(s) at island and trace back to UST(’s).

SR 24/US 441 Widening, Morgan Co.

Project

No: 0013617PI No: 092Parcel No:

Site Location Photographs

Street Address:

SUMMARY ASBESTOS INSPECTION AND PRE-DEMO REPORT

SR 24/US 441 Widening, Morgan Co.

Project No: 0013617

4150 Athens Hwy MadisonCity: State: 30650Zip Code:

MorganCounty:

Athens Hwy (US 129/441) & Apalachee Rd.

Lat.: 33° 41’ 46.72” N; Long.: 83° 26’ 33.14” WNearest Major Intersection:

ASBESTOS-CONTAINING MATERIALS

Electric Meter No.:

Electric Supply:

Asbestos Inspector:April 5, 2024Date of Inspection:

Certificate Number:

Inspector Phone No.:

Description of Material/Location: Quantity

(SF/LF/#):

NONE

Building Use: 54±Age of Building: 594±Size of Building:years SF

Thomas K. Corish, Jr.

19573 Exp 9/12/24 404/312-9037

C. Jay StrangeDOT Contact: Central OfficeOffice: 404/347-0172Phone:

Percent Asbestos

Vacant

Wood-framed (22’x27’) carport with dirt floor. Carport roof is attached to nine (9) 8”±dia.

telephone style poles with varying heights from 9’-11’±ht. Roof is wood-framed with tin panel roofing.

Brief Structure Description:

02Structure No.

GA

Information provided on quantities of ACM reflects field observations and the condition of the structure and material at the time of the asbestos inspection. Quantities and conditions may change due to vandalism, exposure to weather/climate, or for other unknown conditions. The Abatement Contractor should visit the site to verify quantities and condition of ACM prior to preparing and submitting a bid and should notify the GDOT Contracting Officer and the Asbestos Consultant to report any significant discrepancies.

PI# 0013617 - Morgan Co. - Parcel 92 - S2

Carport Shed 4150 Athens Hwy

Madison GA 30650 July 2024

Inspector: Thomas K. Corish, Jr Accreditation Certificate No: 19573 Expiration Date: 9/12/24 Date of Inspection:4/15/24

Bulk Sample No. Location Bulk Sample Description Bulk Sample Result

NONE

*Materials must have more than (>) 1% asbestos-containing material to be considered as an asbestos-containing building material (ACBM). OSHA defines asbestos-containing material (ACM) as a material with any amount of asbestos, even less than (<) 1 percent.

Abbreviations: Ext. - exterior; Int. - interior; SM - surfacing material; TSI - thermal system insulation; Misc. - miscellaneous material; VFT -vinyl/asphalt floor tile; VSF - vinyl sheet flooring; WPG - window pane glazing; WFC - window frame caulking; DFC - door frame caulking; ACT -acoustical ceiling tile; ACP - acoustical ceiling panel; DW/JTC - drywall/joint tape compound; JTC - joint tape compound; TCM - textured ceiling

Street Address:

SUMMARY ASBESTOS INSPECTION AND PRE-DEMO REPORT

SR 24/US 441 Widening, Morgan Co.

Project No: 0013617

4150 Athens Hwy MadisonCity: State: 30650Zip Code:

MorganCounty:

Athens Hwy (US 129/441) & Apalachee Rd.

Lat.: 33° 41’ 46.72” N; Long.: 83° 26’ 33.14” WNearest Major Intersection:

ASBESTOS-CONTAINING MATERIALS

Electric Meter No.:

Electric Supply:

Asbestos Inspector:April 5, 2024Date of Inspection:

Certificate Number:

Inspector Phone No.:

Description of Material/Location: Quantity

(SF/LF/#):

NONE

Building Use: 69±Age of Building: 214±Size of Building:years SF

Thomas K. Corish, Jr.

19573 Exp 9/12/24 404/312-9037

C. Jay StrangeDOT Contact: Central OfficeOffice: 404/347-0172Phone:

Percent Asbestos

Vacant

CMU/brick structure - Abandoned “Election House” - 15.75’x13.5’x8.75’±ht. Roof is 4” concrete slab. Floor is concrete slab. Structure has contents - see pictures.

Brief Structure Description:

03Structure No.

GA

Information provided on quantities of ACM reflects field observations and the condition of the structure and material at the time of the asbestos inspection. Quantities and conditions may change due to vandalism, exposure to weather/climate, or for other unknown conditions. The Abatement Contractor should visit the site to verify quantities and condition of ACM prior to preparing and submitting a bid and should notify the GDOT Contracting Officer and the Asbestos Consultant to report any significant discrepancies.

No: 0013617PI No: 092 Parcel

No: 03 Structure

No.

Additional Site Photographs

S3 - View from right rear of structure. Note on cover picture there is a wood (red) dresser just outside the door to S3.

S3 - View of items abandoned within S3. S3 - View of items abandoned within S3.

S3 - View of items abandoned within S3. S3 - Exterior items at door. Three (3) 21”x21”x4” concrete plugs with handles.

PI# 0013617 - Morgan Co. - Parcel 92 - S3

CMU & Brick Storage Bldg.

4150 Athens Hwy

Madison GA 30650 July 2024

Inspector: Thomas K. Corish, Jr Accreditation Certificate No: 19573 Expiration Date: 9/12/24 Date of Inspection:4/15/24

Bulk Sample No. Location Bulk Sample Description Bulk Sample Result

NONE

*Materials must have more than (>) 1% asbestos-containing material to be considered as an asbestos-containing building material (ACBM). OSHA defines asbestos-containing material (ACM) as a material with any amount of asbestos, even less than (<) 1 percent.

Abbreviations: Ext. - exterior; Int. - interior; SM - surfacing material; TSI - thermal system insulation; Misc. - miscellaneous material; VFT -vinyl/asphalt floor tile; VSF - vinyl sheet flooring; WPG - window pane glazing; WFC - window frame caulking; DFC - door frame caulking; ACT -acoustical ceiling tile; ACP - acoustical ceiling panel; DW/JTC - drywall/joint tape compound; JTC - joint tape compound; TCM - textured ceiling

01133060 Polygon

01133060 Polygon

01133060 Polygon

01133060 Polygon

01133060 Preliminary

01133060

1) Commercial Building

01133060

2) Brick Storage Shed

01133060

3) Carport

01133060

4) Septic Tank & Lines

01133060

5) Sign

6) Concrete Island

7) Two Lampposts

8) UST's

01133060

9) Old Brick Firepit

ABATEMENT and DEMOLITION CONTRACT ITEMS

SR 24/US 441 Widening, Morgan Co.Project No: 0013617PI No: 092Parcel No:

ADDITIONAL DEMOLITION PROJECT NOTES

* Contractor is to refer and adhere to the requirements of the Georgia Erosion and Sedimentation Act (O.C.G.A. Title 12, Chapter 7 when performing work on GDOT Right of Way. Please consult the 2016 Field Manual for Erosion & Sediment Control in Georgia that is available from the Georgia Soil & Water Conservation Commission - www.gaswcc.org. It is required that a Blue Card holder be on site throughout the performance of this project. A Blue Card holder is a person that has completed and passed an exam in the Level 1A Fundamentals Seminar: Education and Training Certification Requirements for Persons Involved with Land Disturbing Activities sponsored by the Georgia Soil and Water Conservation Commission (GSWCC).

1. All work is to be performed in accordance with the GDOT ROW master abatement and demolition specifications issued on June 1, 2018 by ROW’s State Property Manager, Demolition & Removal.

Demolition workers must show evidence of having attended a GDOT approved awareness training program.

2. Asbestos abatement includes:

S1 Ext. Misc. Window pane glazing (WPG) at four (4) vertical glass, steel-framed windows - 4±SF.

Ext. Misc. Window frame caulk (WFC) ) at eight (8) aluminum frame windows - 4±SF.

Int. Misc. 12”x12” Floor tile (gray w/ white specks) & associated black mastic on concrete (under a non-suspect self-adhesive floor tile covering)., 12”x12” FT is located in front left living room, left rear bedroom, restroom, and two (2) closets - 465±SF.

Int. Misc. Kitchen - double basin, stainless steel sink condensate insulation - 2±SF.

MI1- N/A; MI2 - N/A; MI3 - N/A; MI4 - N/A; MI5 - N/A; MI6 - N/A; MI7 - N/A; MI8 - N/A; MI9 - N/A; MI10 - N/A; and

MI11 - N/A.

S2 None.

S3 None.

3. Demolition includes:

S1 - CMU & wood-framed commercial & residential (2445±SF) building with aluminum siding on partial concrete (912 ±SF) slab. Front right asphalt/concrete (5610±SF). Concrete (248±SF) porch / pad at building rear. Septic tank & drain field associated with S1 is to be removed as part of demolition work.

MI1 - “Equine Consign” metal framed (5’x4”x4’±) sign on 8.25”x3.25”x16’±ht metal wrapped pole set in 18”x18” x8” concrete base/footer. Sign has 6’x5’x3’ metal fabricated roof. Sign is electrified with wiring/conduit. De-electrify, trace, and remove electrical wiring/conduit and associated items from R/W.

MI2 - Concrete island (23.75’x4’) at parcel front with two (2) 32”x21”x16” and two (2) 22”x21”x4” concrete blocks/pads. Island has water spigot line and an air hose line at island center. Electrical outlet box is also present. De-electrify, trace, and remove electrical wiring/conduit and associated items from R/W.

MI3 - Two (2) steel light posts at parcel front. Posts are 2.5”dia.x7’±ht. De-electrify, trace, and remove all associated electrical items from R/W.

MI4 - Brick/CMU fire-pit (9’x4.5’x2.25’±ht.) with loose adjacent granite blocks.

MI5 - Abandoned concrete (2’4”x2’3”) sign footer (very near MI4) with electric conduit stub within footer. De-electrify, trace, and remove electrical wiring/conduit and associated items from R/W.

MI6 - Abandoned metal framed swing with wood-framed bench and cushion. Swing is 13’ wide and has a 6’6” height. Located at parcel front right..towards S3.

MI7 -Vine trellis consisting of two (2) wood (3.5”dia.x5’±ht.) poles with plastic mesh fencing. Located 20-25’ to right of S1.

MI8 - Landscape timbers surrounding flower bed. Three (3) courses of 8’ length x4 sides. Total of 12± timbers.

MI9 - 8”±dia x8’±ht. post with bird box and yard arms. Remove post and fill hole with compactible soils.

MI10 - Abandoned 12-14”±dia. concrete (210±LF) pipe just below grade at parcel front. Remove and fill back to grade with compactible soils.

MI11 - Trace and remove underground propane gas line from propane tank stand to S1. Also remove remnant CMU blocks that were part of propane tank support stand and additional 5’x1”±dia. steel pole.

S2 - Wood-framed (22’x27’) carport with dirt floor. Carport roof is attached to nine (9) 8”±dia. telephone style poles with varying heights from 9’-11’±ht. Roof is wood-framed with tin panel roofing.

S3 - CMU/brick structure - Abandoned “Election House” - 15.75’x13.5’x8.75’±ht. Roof is 4” concrete slab. Floor is concrete slab. Structure has contents - see photos.

ABATEMENT and DEMOLITION CONTRACT ITEMS Page 2

Cut and remove public water supply piping at the meters and cut, cap, and remove sewer line, if present, at the right of way or street in accord with GDOT technical specifications. Severed service lines within the footprint of the former structures and leading to the meter and the street are to be removed and disposed. It was reported that the buildings originally employed a septic system. Should these lines be discovered as part of the demolition activities the lines should be followed and the septic system removed should it be within the right of way or demolition easement.

De-electrify, trace, and remove electrical stubs, wiring and/or conduit and associated electrical items from R/W & Easements.

All foundations, concrete footers, wood platforms, piers, & slabs related to the removal/clearance are to be removed.

Parts of the removed items are not to be pushed into the soil. Affected clearance areas of the parcels are to be cleared of debris caused by the removal/clearance. Any dead foliage or foliage damaged to access removal of the items that may be considered a potential fire hazard are to be removed from the parcel and disposed.

Appropriate erosion and sedimentation control devices and vegetative & structural best management practices (BMPs) are to be deployed & maintained during the demolition in accordance with Georgia Erosion and Sedimentation Act

(GESA)*.

Items discovered during the demolition not included in the report are to be reported to the Site Inspector. Parcel is to be cleared of debris, rock raked, graded and sloped properly for drainage, and sown with seed (appropriate for the season) and straw*.

UNDERGROUND STORAGE TANK PRE-DEMOLITION REPORT

No facility ID is available for this site located at 4150 Athens Hwy.; Madison, GA 30650. Last operated as service station:

unknown. No tank portals or vent pipes were found. Other than that the parcel “was once used as a store and gas station”, no other local hearsay was available.

The owner and “responsible party for this facility is: Unknown.

GPS co-ordinates for the site are: Latitude: Lat.: 33° 41’ 46.72” N; Long.: 83° 26’ 33.14” W.

If tanks are found, they are considered to be “abandoned” tanks and, therefore, a UST closure…