This is a construction plan document prepared by the City of Sandy Springs Department of Public Works for sidewalk gap fill improvements located at 1165 Spalding Drive and 1185 Dunwoody Road NE in Sandy Springs, Georgia. The project, designated ITB 27_013 and assigned Project Number T6026-2, involves the construction of approximately 411 linear feet of new sidewalk with associated infrastructure improvements along Dunwoody Road. The project is located in Fulton County and is 100 percent within Congressional District No. 1. The scope of work includes construction of concrete sidewalks, curb and gutter installation, drainage improvements, tree protection measures, utility coordination, traffic control, erosion control, and site restoration. The plans were prepared by GFT Inc. and received permit approval on September 18, 2026, with permit number CITY-26-33 issued by Nicole Brown. The project design speed is 35 miles per hour, and the construction limits extend from station 9+89.06 to station 13+41.96 with a net project length of 411 linear feet.
The construction plans include detailed specifications for concrete sidewalk construction with 4-inch thickness, 6-inch by 24-inch Type 2 concrete curb and gutter, 6-inch aggregate base course, and Class B concrete base or pavement widening as required. Multiple utilities are present within the project area, including water lines owned by the City of Atlanta and DeKalb County, sewer lines from DeKalb County and Fulton County, natural gas from Atlanta Gas Light, electric distribution from Georgia Power Company, telecommunications from AT&T and Google Fiber, cable television from Comcast, and traffic control systems from the City of Sandy Springs and DeKalb County. The contractor is responsible for dust control, positive drainage maintenance, erosion control measures including silt fencing and check dams, tree protection with fencing, traffic control using reflectorized drums and temporary concrete barriers, and coordination with property owners regarding driveway and mailbox relocations. Construction standards are based on the City of Sandy Springs Technical Manual and Code and GDOT standards, with all revisions superseding the standard specifications manual.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Responsibility Questionnaire (VRQ).docx | DOCX document | |
| Special Provisions.pdf | ||
| ITB 27_013 Dunwoody Road Gap Sidewalk T6026_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION
PROJECT
ZONED:RE-1
P.B. 76, PG. 21
D.B. 56196, PG. 519
PID: 170022000100649
1185 DUNWOODY RD NE
& ANN COFER VOLLE
PAUL EDWARD VOLLE
N/F
PL
P O B
ZONED:RE-1
P.B. 76. PG.21
D.B. 60605 PG. 188
PID: 17002200010056
1165 SPALDING RD NE
BHUIYAN TASLIMA
N/F
(50' RIGHT-OF-WAY)
DUNWOODY RD
S
W
P
E
E:2241794.172'
N:1440653.082'
.0013+75STA
END PROJECT
13+41.96STA
END CONSTRUCTION
S69°46'48.4"E
S75°41'24.1"E
S77°51'04.2"E
S81°43'54.9"E
S84°33'14.9"E
S86°13'54.7"E
S86°33'03.4"E
P
P
E:2241402.068'
N:1440719.432'
.009+75STA
BEGIN PROJECT
2+43.78STA
LIMIT OF CONSTRUCTION
9+92.02
STA
DUNWOODY ROAD
2+01.70
STA
SPALDING DRIVE
9+89.06STA
BEGIN CONSTRUCTION
EX ROW
EX ROW
EX ROW (GIS)
ZONED:RE-1
P.B. 76. PG.21
D.B. 60605 PG. 188
PID: 17002200010056
1165 SPALDING RD NE
BHUIYAN TASLIMA
N/F
FEET
PLANS COMPLETED
REVISIONS
411 LF
PLAN AND PROFILE OF PROPOSED
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
LENGTH OF PROJECT
SPEED DESIGN: 35 MPH
DESIGN DATA: N/A
PROJECT DESIGNATION: EXEMPT
COUNTY No.121
FULTON
SPECIFICALLY DIRECTED TO SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE SPECIFICATIONS.
BIND THE DEPARTMENT OF TRANSPORTATION IN ANY WAY. THE ATTENTION OF BIDDER IS
HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT
UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS.
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
THE DEPARTMENT OF TRANSPORTATION.
HIGHWAY DEPARTMENT OF GEORGIA, AND SHALL BE DEEMED TO MEAN
" DEPARTMENT " WHEN THE CONTEXT THEREOF MEANS THE STATE
STATE HIGHWAY DEPARTMENT ", " HIGHWAY DEPARTMENT ", OR
DEPARTMENT OF GEORGIA ", " STATE HIGHWAY DEPARTMENT ", " GEORGIA
USED IN CONNECTION WITH THIS DOCUMENT, TO " STATE HIGHWAY
WRITINGS, DOCUMENTS, DRAWINGS, OR PHOTOGRAPHS USED, OR TO BE
ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES ALL PAPERS,
NOTE :
5. 100% IN CONG. DIST. NO.
FULTON COUNTY AND IS
100% IN THIS PROJECT IS
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
T6026-2
Project No.
BY:
PLANS PREPARED
department of public works city of sandy springs
PROJECT NO. T6026-2
LOCATION SKETCH
SIDEWALK GAP FILL IMPROVEMENTS
1165 SPALDING DR & 1185 DUNWOODY RD NE
STANDARDS AND DETAILS BOOK WHICH THEY REVISE OR IN WHICH THERE IS A CONFLICT.
CONSTRUCTION ANY REVISIONS CONTAINED WITHIN THIS PLAN SET SUPERSEDE THE
https://library.municode.com/ga/sandy_springs/codes/technical_manuals http://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/Forms/AllItems.aspx
CONSTRUCTION STANDARDS AND DETAILS BOOK IS AVAILABLE AT:
STANDARDS AND DETAILS BOOK AND ATTACHED APPLICABLE REVISIONS. THE
CONSTRUCTION THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE
N/A
411 LF
N/A
411 LF
DUNWOODY RD
GEORGIA
SANDY SPRINGS
SANDY SPRINGS
CITY OF
CITY LIMITS DUNWOODY
CITY OF
EX ROW
E X
R O
W
E X
R O
W
G I S
E X
R O
W
G I S
11/05/2020 mfrias
9/15/2026 GPLOT-ORD
gplotborder-ORD-PO.tbl
DUNWOODY_1 SERIES.dgn
CONCOV
PROJECT NO.
DRAWING No.
CONCOV-CE
20 80
SCALE IN FEET
0 40
T6026-2
0001 - 01
Tel 678.224.9730 | GFTInc.com Suite 350, Atlanta, GA 30328
5901-C Peachtree Dunwoody Rd
9/16/2026
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
CITY-26-33
Nicole Brown
DRAWING NO. DESCRIPTION REVISION DATE REVISION DATEDESCRIPTIONDRAWING NO.
EROSION CONTROL DETAILS 56-0001 - 56-0002
BMP LOCATION DETAILS54-0001
EROSION CONTROL LEGEND AND UNIFORM CODE SHEET52-0001 - 52-0007
SPECIAL CONSTRUCTION DETAIL 38-0001
TREE PROTECTION PLAN29-0001 - 29-0002
SIGNING AND MARKING PLANS 26-0001
UTILITY PLANS24-000A - 24-0001
CROSS SECTIONS23-0001 - 23-0002
DRIVEWAY PROFILES17-0001
CONSTRUCTION PLAN13-0001
QUANTITIES REQUIRED BY CONSTRUCTION 08-0001
QUANTITIES REQUIRED BY AMMENDMENT07-0001
SUMMARY OF QUANTITIES06-0001
TYPICAL SECTIONS05-0001
GENERAL NOTES04-0001 - 04-0002
REVISION SUMMARY03-0001
INDEX02-0001
COVER01-0001
GEORGIA
SANDY SPRINGS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT ID
11/05/2020
REVISION DATES
9/17/2026 mfrias
GPLOT-ORD
gplotborder-ORD-PO.tbl
DUNWOODY_2 SERIES.dgn
8:38:59 AM
GPLN-CE
02-0001
CITY OF SANDY SPRINGS
1165 SPALDING DR SIDEWALK
1185 DUNWOOD RD AND
T6026-2
SHEET INDEX
Tel 678.224.9730 | GFTInc.com Suite 350, Atlanta, GA 30328
5901-C Peachtree Dunwoody Rd
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
DRAWING NO. DESCRIPTION REVISION DATE REVISION DATEDESCRIPTIONDRAWING NO.
GEORGIA
SANDY SPRINGS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT ID
11/05/2020
REVISION DATES
9/14/2026 mfrias
GPLOT-ORD
DUNWOODY_3 SERIES.dgn
2:49:34 PM
03-0001
DUNWOODY RD NE SIDEWALK
1165 SPALDING DR & 1185
REVISON SUMMARY
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
3. THE FOLLOWING UTILITIES HAVE FACILITIES IN THE PROJECT AREA:
RELOCATED TO CLEAR CONSTRUCTION IN ADVANCE OF HIS WORK.
AND ARE NOT COVERED AS SPECIFIC ITEMS IN THE DETAILED ESTIMATE ARE TO BE REMOVED OR
NEWLY INSTALLED POSITION. ALL UTILITY FACILITIES WHICH ARE IN CONFLICT WITH CONSTRUCTION
MEANS ANY UTILITY THAT EXISTS ON THE HIGHWAY PROJECT IN ITS ORIGINAL, RELOCATED, OR
CONTRACTOR OF HIS RESPONSIBILITY UNDER THIS REQUIREMENT. "EXISTING UTILITY FACILITIES"
SERVICE LINES OR UNKNOWN FACILITIES NOT SHOWN ON HIGHWAY PLANS WILL NOT RELIEVE THE
NECESSARILY ACCURATE IN LOCATION AS TO PLAN OR ELEVATION. UTILITY FACILITIES SUCH AS
2. ALL KNOWN UTILITY FACILITIES ARE SHOWN SCHEMATICALLY ON HIGHWAY PLANS AND ARE NOT
CURRENT EDITION, AS WELL AS GDOT STANDARDS AS A BACKUP SOURCE.
1. ALL WORK TO BE DONE IN ACCORDANCE WITH CITY OF SANDY SPRINGS TECHNICAL MANUAL AND CODE, GENERAL NOTES
COSTS INCURRED TO COMPLY WITH THIS REQUIREMENT.
PAY ITEMS IN THE DETAILED ESTIMATE. NO SEPARATE PAYMENT WILL BE MADE FOR ANY
DRAINAGE ITEMS SHOWN AT SPECIFIC LOCATIONS IN THE PLANS AND HAVING SPECIFIC
DAMAGED OR REMOVED OR RE-GRADED AS REQUIRED BY THE ENGINEER EXCEPT FOR THOSE
REPLACEMENT OR RECONSTRUCTION OF EXISTING DRAINAGE STRUCTURES THAT HAVE BEEN
ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE, BUT IS NOT LIMITED TO,
17. THE CONTRACTOR SHALL ENSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS MAINTAINED AT
REFER TO SECTION 161 OF THE STANDARD SPECIFICATIONS.
NOT PERMIT GRASSING, TEMPORARY MULCH SHALL BE USED AS DIRECTED BY THE ENGINEER.
AFTER THE SLOPES ARE ESTABLISHED IN ORDER TO REDUCE EROSION. IF THE SEASON DOES
16. ALL CUT AND FILL SLOPES SHALL BE GRASSED AS DIRECTED BY THE ENGINEER IMMEDIATELY
BE 8" THICKNESS.
15. ALL CONCRETE SIDEWALKS AND WHEELCHAIR RAMPS LOCATED IN THE RADIUS RETURN SHALL
UNLESS DIRECTED BY THE ENGINEER.
AND EASEMENT LIMITS, BUT OUTSIDE THE LIMITS OF CONSTRUCTION, SHALL NOT BE DISTURBED
14. STRUCTURES, TREES, SHRUBS AND OTHER PLANT MATERIAL THAT FALL WITHIN THE RIGHT-OF-WAY
SIDEWALK LONGITUDINAL SLOPE SHALL NOT EXCEED THE ADJACENT ROADWAY LONGITUDINAL SLOPE.
TO EXISTING DRIVEWAYS. IF THE ADJACENT ROADWAY LONGITUDINAL SLOPE EXCEEDS 5.00%,
ENSURE SIDEWALK LONGITUDINAL SLOPE DOES NOT EXCEED 5.00% WHERE SIDEWALK TIES
DIRECTED BY THE ENGINEER. IF A HANDICAP RAMP IS NOT INDICATED IN THE PLANS,
CURB OR IS BISECTED BY DRIVEWAYS, IF NECESSARY. TYPE OF RAMP MAY BE MODIFIED AS
13. HANDICAP RAMPS SHALL BE CONSTRUCTED AT ALL POINTS WHERE SIDEWALK TERMINATES AT
DIRECTED BY THE ENGINEER.
WITH THE "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES" CURRENT EDITION AND/OR AS
CONSTRUCTION. ALL TEMPORARY SIGNING AND PAVEMENT MARKING SHALL BE IN ACCORDANCE
BARRICADES, CHANNELIZING DEVICES, ETC. REQUIRED FOR MAINTENANCE OF TRAFFIC DURING
CONSTRUCTION, MAINTENANCE, AND REMOVAL OF TEMPORARY SIGNING AND PAVEMENT MARKINGS,
12. PRICE BID FOR TRAFFIC CONTROL-LUMP SUM SHALL INCLUDE, BUT IS NOT LIMITED TO,
SEQUENCE OF OPERATIONS IN REGARDS TO MAINTENANCE OF TRAFFIC DURING CONSTRUCTION.
STANDARD SPECIFICATIONS AND THE SPECIAL PROVISIONS FOR TRAFFIC CONTROL AND
11. THE CONTRACTOR'S ATTENTION IS DIRECTED TO ARTICLES 104.05 & 107.07 OF THE
PROPERLY STRIPED.
DIRECTED BY THE ENGINEER. TRAFFIC SHALL NOT BE ALLOWED ON ANY PAVEMENT NOT
WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION OR AS
THE TRAVELING PUBLIC. ALL REMAINING LINES OR MARKINGS SHALL BE IN ACCORDANCE
LINES TO THE SATISFACTION OF THE ENGINEER SUCH THAT THE LINES DO NOT CONFUSE
PATTERN BEING USED ON CONSTRUCTION, THE CONTRACTOR SHALL REMOVE OR OVERLAY
10. WHERE EXISTING PAVEMENT MARKINGS AND LINES ARE IN CONFLICT WITH THE TRAFFIC
CONCRETE PAVEMENT.
INCLUDED IN PRICE BID FOR OTHER CONTRACT ITEMS. EXCEPT WHEN SAWING P.C.C.
REMOVAL TO A NEAT LINE. THE COST FOR SAWED JOINTS, WHEN REQUIRED, SHALL BE
JOINT SHALL BE SAWED ON A LINE ESTABLISHED BY THE ENGINEER TO ENSURE PAVEMENT
WITHOUT AN OVERLAY OR WHERE CURBING IS TO BE PLACED ACROSS A PAVED AREA, A
9. AT LOCATIONS WHERE NEW PAVEMENT IS TO BE PLACED ADJACENT TO EXISTING PAVEMENT
CLEARING AND EARTHWORK
(770)-730-5600TRAFFIC CONTROLCITY OF SANDY SPRINGS
(404)904-1202WATERCITY OF ATLANTA(COA)
(478)697-5783FIBER OPTICSGOOGLE FIBER GEORGIA LLC
JSALLEN@SOUTHERNCO.COMELECTRIC DISTRIBUTIONGEORGIA POWER COMPANY
(404)612-9456WATERFULTON COUNTY SEWER
WATERDEKALB COUNTY WATER
SEWERDEKALB COUNTY SEWER
TRAFFICDEKALB COUNTYITS TRAFFIC
(770)833-1014COMMUNICATIONSCOMCAST
FUELCOLONIAL PIPELINE
(404)584-4126GASATLANTA GAS LIGHT
TELECOMMUNICATIONSAT&T
CONTACT INFORMATIONSERVICEUTILITY OWNER
IN THE PRICE FOR GRADING COMPLETE.
PLANS TO BE REMOVED OR AS DIRECTED BY THE ENGINEER. COST FOR REMOVAL SHALL BE INCLUDED
8. ALL EXISTING PIPES AND DRAINAGE STRUCTURES SHALL BE RETAINED UNLESS OTHERWISE NOTED ON
PLANS FOR LOCATIONS AND DESCRIPTIONS OF MONUMENTS USED.
7. HORIZONTAL CONTROL IS BASED UPON GEORGIA STATE PLANE COORDINATE SYSTEM. SEE CONSTRUCTION
THE PROJECT AND DISPOSE OF ANY UNSUITABLE OR WASTE MATERIAL.
6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FURNISH SUITABLE BORROW MATERIAL FOR
RELIES ON THE AREA SHOWN ON THE PLANS. THE ESTIMATED TOTAL AREA FOR GRASSING IS 0.03 ACRES.
AREA TO BE GRASSED. NO CLAIMS WILL BE CONSIDERED FOR EXTRA COMPENSATION IF THE CONTRACTOR
GRASSING COMPLETE. LUMP SUM. AND IT SHALL BE HIS RESPONSIBILITY TO DETERMINE THE ACTUAL
SANDY SPRINGS ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. THE CONTRACTOR SHALL BID ON
5. THE TOTAL AREA SHOWN ON THE PLANS FOR GRASSING IS FOR INFORMATION ONLY. THE CITY OF
FOR DUST CONTROL SHALL BE INCLUDED IN PRICE BID FOR GRADING COMPLETE.
TO DUST FORMATION MUST BE PERIODICALLY WATERED. SUFFICIENT TO RETARD DUST. ALL COSTS
4. THE CONTRACTOR SHALL STRICTLY ADHERE TO DUST CONTROL REGULATIONS. ALL AREAS SUBJECTED
GEORGIA
SANDY SPRINGS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT ID
11/05/2020
REVISION DATES
9/14/2026 mfrias
GPLOT-ORD
DUNWOODY_4 SERIES.dgn
2:50:46 PM
04-0001
1165 SPALDING DR & 1185
GENERAL NOTES
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
THE DRIVES SHALL BE PAVED AS FOLLOWS:
SUCH AS TO LOCATION, WIDTH AND/OR NUMBER OF DRIVES TO BE CONSTRUCTED. WHERE REQUIRED
THE CONTRACTOR SHALL OBTAIN APPROVAL OF THE ENGINEER PRIOR TO MAKING ANY REVISIONS
OF EXISTING DRIVEWAYS WHERE THEY ARE NOT IN CONFLICT WITH THE RULES AND REGULATIONS.
THE CONTRACTORS SHALL CONSTRUCT NEW DRIVEWAYS TO MATCH THE ACTUAL FIELD LOCATION
THE DRIVEWAY LOCATIONS INDICATED ON THE PLANS ARE FROM THE BEST AVAILABLE DATA.
IN GRADE SHALL BE CONSTRUCTED WITH CONCRETE, UNLESS DIRECTED BY THE ENGINEER.
SURFACE COURSE FOR EARTH, UNLESS DIRECTED BY THE ENGINEER. DRIVEWAY PROFILES OVER 11%
REPLACED, IN KIND, I.E., ASPHALT FOR ASPHALT, CONCRETE FOR CONCRETE, AND ASPHALT
TRANSPORTATION RIGHTS-OF-WAY. ALL DRIVEWAYS THAT ARE TO BE RECONSTRUCTED SHALL BE
IN ACCORDANCE WITH RULES AND REGULATIONS FOR CONTROL AND PROTECTION OF DEPARTMENT OF
24. ALL DRIVEWAYS, WHERE ACCESS IS ALLOWED, SHALL BE PLACED AS DIRECTED BY THE ENGINEER
THIS WORK SHALL BE PAID FOR UNDER PAY ITEM 210-0100 GRADING COMPLETE.
23. TRIM ALL TREE LIMBS TO PROVIDE A MINIMUM OF 10' CLEARANCE ABOVE THE SIDEWALK.
MINIMUM OF 48 INCHES OF COVER.
22. UNLESS OTHERWISE SPECIFIED OR DIRECTED BY THE INSPECTOR, ALL WATER LINES SHALL HAVE A
REQUIREMENT SHALL BE INCLUDED IN THE BID ITEM COST FOR NO. 700-9300 - SOD.
FOR ANY COST INCURRED TO COMPLY WITH THIS REQUIREMENT. THE TOTAL COST OF THIS
BERMUDA SOD FOR BERMUDA SOD, ZOYSIA FOR ZOYSIA, ETC. NO SEPARATE PAYMENT WILL BE MADE
ANY TYPE OF GRASS OR SOD WHICH MAY BE PLANTED AND GROWING ON THE ADJACENT LAWN. I.E.
21. TYPE OF SOD USED ON THIS PROJECT, UNLESS OTHERWISE SHOWN, WILL BE REQUIRED TO MATCH
DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT NO. GAR100002.
AS DEFINED UNDER "CONSTRUCTION ACTIVITIES" IN THE STATE OF GEORGIA NATIONAL POLLUTANT
FILLING OF LAND, OR OTHER SIMILAR ACTIVITIES WHICH MAY RESULT IN SOIL EROSION,
THE DISTURBED AREA IS THE AREA ASSOCIATED WITH CLEARING, GRADING, EXCAVATING,
TOTAL AREA IS THE TOTAL AREA OF THE RIGHT OF WAY AND EASEMENTS, AND
AREA OF 0.56 ACRES AND THE EXPECTED DISTURBED AREA OF IS 0.14 ACRES. THE
REQUIRED FOR THIS PROJECT. THIS PROJECT HAS A TOTALNOT20. A NOTICE OF INTENT (NOI) IS
BY THE ENGINEER.
DEVICES SHALL BE INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTION OR AS DIRECTED
AND SHALL BE MAINTAINED AT ALL TIMES. ADDITIONAL EROSION AND SEDIMENT CONTROL
19. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE ACTIVITIES
WATERWAYS AND MAINTAIN WATER QUALITY.
CORPS OF ENGINEERS RULES AND REGULATIONS CONCERNING CONSTRUCTION ADJACENT TO
AND SEDIMENT CONTROL BY G.S.W.C.C. THE CONTRACTOR SHALL OBTAIN AND ABIDE BY ALL
GDOT STANDARD SPECIFICATION REGARDING EROSION CONTROL AND THE MANUAL FOR EROSION
SHALL BE PLACED ACCORDING TO THE PLANS AND AS DIRECTED BY THE ENGINEER. SEE THE
IMMEDIATELY AFTER DRAINAGE STRUCTURES ARE IN PLACE. ALL EROSION CONTROL DEVICES
FENCE THAT IS NOT SATISFACTORY. EROSION CONTROL CHECK DAMS SHALL BE PLACED
RESPONSIBILITY TO MAINTAIN ALL SILT FENCES AND TO REPAIR OR REPLACE ANY SILT
SHALL BE DONE UNTIL SILT FENCE INSTALLATION IS COMPLETE. IT IS THE CONTRACTOR'S
18. ALL SILT FENCES MUST BE PLACED AS ACCESS IS OBTAINED DURING CLEARING. NO GRADING
CONSTRUCTION.
WIRING AND SET ASIDE FOR THE PROPERTY OWNER TO RECONNECT UPON COMPLETION OF
AND THE PROPERTY OWNER. CONTRACTOR TO ENSURE NOT TO DAMAGE DECORATIVE LIGHTING OR
26. DECORATIVE LIGHTING OR WIRING CONFLICTS WILL BE COORDINATED BETWEEN SANDY SPRINGS
MONUMENT MAILBOX RELOCATIONS.
25. CONTRACTOR TO COORDINATE WITH PROPERTY OWNER AND FOLLOW USPS GUIDELINES FOR
OF PAVEMENT TO PROVIDE A SMOOTH EDGE.
ALL DRIVEWAYS WILL BE CONSTRUCTED TO THE TIE-DOWN. CONTRACTOR IS TO SAWCUT THE EDGE
- 4" CONCRETE DRIVEWAY
- 6" CONCRETE VALLEY GUTTER
RESIDENTIAL
CONCRETE DRIVES:
SHIFTS. MAXIMUM SPACING EQUALS THE DESIGN SPEED LIMIT FOR THE TAPER.
11. REFLECTORIZED DRUMS SHALL BE PROVIDED FOR CHANNELIZATION OF TRAFFIC IN ALL TRAFFIC
INTERFERE WITH SIGHT DISTANCE ALONG ANY ADJACENT SIDE ROAD OR DRIVEWAY.
10. ALL TRAFFIC CONTROL DEVICES SHALL BE MAINTAINED BY THE CONTRACTOR SO AS TO NOT
9. THE CONTRACTOR SHALL MAINTAIN INGRESS AND EGRESS TO DRIVEWAYS AT ALL TIMES.
IS GRANTED BY THE DEPARTMENT OF PUBLIC WORKS.
A MINIMUM OF 2 FEET (0.6 M) FROM THE EDGE OF THE TRAVEL LANES UNLESS PRIOR APPROVAL
8. ALL REFLECTORIZED PLASTIC DRUMS AND TEMPORARY CONCRETE BARRIERS SHALL BE PLACED
ADJACENT TO TRAVEL LANES. TYPE I AND TYPE II BARRICADES AND CONES SHALL NOT BE USED.
7. ONLY REFLECTORIZED PLASTIC DRUMS AND TEMPORARY CONCRETE BARRIERS SHALL BE USED
BY THE CONTRACTOR BY GRINDING OR PAVING OVER. "BLACK OUT" PAINT IS PROHIBITED.
6. EXISTING PAVEMENT MARKINGS THAT CONFLICT WITH TRAFFIC SHIFTS SHALL BE OBLITERATED
RELATED TRAFFIC CONTROL DEVICES.
PERIODIC CLEANING OF EXISTING SIGNS, BARRELS, AND OTHER CONSTRUCTION
CONSTRUCTION. MAINTENANCE INCLUDES REPLACING DAMAGED AND STOLEN SIGNS, AND
5. EXISTING TRAFFIC SIGNS SHALL BE MAINTAINED BY THE CONTRACTOR THROUGHOUT
PROPERTY LINES.
4. IN RESIDENTIAL AREAS SIGNS SHALL BE LOCATED ON, OR AS CLOSE AS POSSIBLE TO,
PANELS. PLYWOOD SIGN PANELS ARE PROHIBITED.
3. ALL TEMPORARY SIGNS SHALL HAVE HIGH INTENSITY REFLECTORIZED SHEETING ON METAL SIGN
CONTROL DEVICES, AND STANDARD HIGHWAY SIGNS, (LATEST EDITIONS).
2. ALL SIGNS AND PAVEMENT MARKINGS SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC
PRICE BID FOR TRAFFIC CONTROL, LUMP SUM.
1. ALL ITEMS NECESSARY FOR COMPLIANCE WITH THESE REQUIREMENTS SHALL BE INCLUDED IN THE
MAINTENANCE OF TRAFFIC
GEORGIA
SANDY SPRINGS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT ID
11/05/2020
REVISION DATES
9/17/2026 mfrias
GPLOT-ORD
DUNWOODY_4 SERIES.dgn
8:38:12 AM
04-0002
T6026-4
1165 SPALDING DR & 1185
GENERAL NOTES
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
EXST
STA 9+89.06 - 13+41.96
N.T.S
EAST BOUND SIDEWALK
TYPICAL SECTION
DUNWOODY ROAD GAP FILL
DUNWOODY ROAD¡
EXST
STRIP*
VARIABLE LANDSCAPE
BUFFER
1'SIDEWALK
B
A
TYP
2:1
C
VARIABLE SHOULDER
EXISTING
SODD
EXISTING PAVEMENT TO BE RETAINEDC
CLASS B CONC. BASE OR PAVEMENT WIDENING (SEE NOTE)B2
GR AGGR BASE CRS, INCL MATL (6")B1
CONCRETE CURB AND GUTTER , 6" X 24", TP2 (GA STD. 9032B)B
CONCRETE SIDEWALK, 4 INA
REQUIRED PAVEMENT
(MAX)
2.00%
B1
NOTE)
(SEE
B2**
POSITIVE DRAINAGE.
& GUTTER AND THE EXISTING PAVEMENT. CONTRACTOR TO ENSURE
CONSISTENT AND THERE ARE GAPS BETWEEN THE PROPOSED CURB
IN CASES WHERE THE SAW CUT OF EXISTING PAVEMENT IS NOT
**CLASS B CONCRETE WILL BE USED, AS DIRECTED BY THE ENGINEER,
*LANDSCAPE STRIP WIDTH VARIES SEE PLAN FOR DETAILS
THROUGHT THE PROJECT AND SUJECT TO ENGINEERS APPROVAL.
PAVEMENT COLOR. ALL TINTING SHALL BE CONSISTENT
BE TINTED TO CLOSELY MATCH THE ADJACENT ASPHALT
AND APPROVED CONCRETE PLANT. THE CONCRETE SHALL
NOTE: CONTRACTOR SHALL OBTAIN TINTED CONCRETE FROM
VARIABLE
9' - 13.25'
EXST
STA 2+00 - 2+43.78
N.T.S
EAST BOUND SIDEWALK
TYPICAL SECTION
DUNWOODY ROAD GAP FILL
SPALDING DRIVE¡
EXST
TRAVEL LANE
EXISTING
VARIABLE
SIDEWALK
6' MAX
STRIP*
VARIABLE LANDSCAPE
BUFFER
1'SIDEWALK
B
A
TYP
2:1
C
VARIABLE SHOULDER
EXISTING
(MAX)
2.00%
B1
NOTE)
(SEE
B2**
VARIABLE
9' - 13.25'
TRAVEL LANE
EXISTING
VARIABLE
TRAVEL LANE
EXISTING
VARIABLE
TRAVEL LANE
EXISTING
VARIABLE
SIDEWALK
VARIABLE
SAWCUT
SAWCUT
SOD
SOD
GEORGIA
SANDY SPRINGS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT ID
11/05/2020
REVISION DATES
9/14/2026 mfrias
GPLOT-ORD
DUNWOODY_05 SERIES.dgn
2:48:29 PM
05-0001
TYPICAL SECTIONS
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
SANDY SPRINGS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT ID
11/05/2020
REVISION DATES
9/17/2026 mfrias
GPLOT-ORD
DUNWOODY_6 SERIES.dgn
10:11:02 AM
06-0001
SUMMARY OF QUANTITIES
Suite 350, Atlanta, GA 30328
5901-C Peachtree Dunwoody Rd
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
DESCRIPTIONDATE UNIT
QUANTITY
AMENDMENT
BY
REQUIRED
QUANTITY
ORIGINAL
QUANTITIES REQUIRED BY AMENDMENT
NUMBER
AMENDMENT
DATE
AMENDMENT
NO.
ITEM
XX-XX-XX XXX-XXXX XX XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XX-XX-XX
X
SANDY SPRINGS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/14/2026 mfrias
GPLOT-ORD
DUNWOODY_7 SERIES dgn.dgn
2:53:57 PM
1185 DUNWOODY RD AND
QUANTITIES (AMENDMENT)
07-0001
PROJECT ID
T6026-2
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
QUANTITIES REQUIRED ON CONSTRUCTION
ORIGINAL
XXX
DESCRIPTIONDATE UNIT
PREVIOUS
NO.
ITEM
QUANTITY
CONSTRUCTION
REQUIRED ON
XX-XX-XX XXX-XXXX XX XXX XXX
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/14/2026 mfrias
GPLOT-ORD
DUNWOODY_8 SERIES.dgn
2:54:52 PM
1185 DUNWOODY RD AND
QUANTITIES (CONSTRUCTION)
08-0001
PROJECT ID
T6026-2
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
SEE 29-0002 FOR DETAILS
TREE PROTECTION FENCING
REPLACED
TO BE REMOVED AND
CITY LIMIT SIGN"
EXISTING "DUNWOODY
GDOT TYPE D RAMP
�AND PROPOSED
EXISTING
TP 1 CONC CURB & GUTTER
FULTON COUNTY
TO ENSURE POSITIVE DRAINAGE
WIDENNG CONTRACTOR
EXTENTS OF CLASS B
25'R
EXISTING UTILITY POLE
DO NOT DISTURB
GDOT TYPE B RAMP
12" DIAMETER
EXISTING UTILITY POLE
DO NOT DISTURB
EXISTING MAILBOX
DO NOT DISTURB
DEMOLISHED AND REPLACED IN KIND
EXISTING DRIVEWAY TO BE
SURVEY LIMITS
5'R
EXISTING UTILITY POLE
DO NOT DISTURB
TO BE ADJUSTED TO GRADE
EXISTING UTILITY MANHOLE
OFF: 10.94' RT
STA: 10+07.47
BEGIN CLASS B WIDENING
OFF: 11.77' RT
STA: 2+43.78
EXISTING EOP
TIE TO
OFF: 13.77' RT
STA: 2+43.78
CURB AND GUTTER
TIE TO EXISTNG
OFF: 16.47' RT
STA: 2+43.78
GRASS STRIP
TIE TO EXISTNG
OFF: 21.35' RT
STA: 2+43.78
AND BEGIN SIDEWALK
TIE TO EXISTNG
OFF: 5.58' RT
STA: 10+50.64
END CLASS B WIDENING (SEE 38-0001)
OFF: 11.61' RT
STA: 11+53.75
CONCRETE DRIVEWAY 1
(SEE 38-0001)
OFF: 11.43' RT
STA: 12+90.86
15.5' WIDE
CONCRETE DRIVEWAY 2
WITH BACK OF CURB
SIDEWALK TO BE FLUSH
OFF: 11.13' RT
STA: 13+41.96
TIE TO EXISTNG EOP
OFF: 13.13' RT
STA: 13+41.96
CURB AND GUTTER
TIE TO EXISTNG
OFF: 18.13' RT
STA: 13+41.96
SIDEWALK
TIE TO EXISTNG
TO BE ADJSUTED TO GRADE
EXISTING WATER METER
LL 23
LL 378
OFF: 11.61' RT
STA: 11+39.33
BEGIN DRIVEWAY
OFF: 11.61' RT
STA: 11+69.03
END DRIVEWAY
OFF: 11.61' RT
STA: 13+02.46
END DRIVEWAY
OFF: 11.61' RT
STA: 12+77.46
BEGIN DRIVEWAY
.2
.5
EX ROW
EX ROW
EX ROW (GIS)
N/F
BHUIYAN TASLIMA
1165 SPALDING RD NE
PID: 17002200010056
D.B. 60605 PG. 188
P.B. 76. PG.21
ZONED:RE-1
N/F
PAUL EDWARD VOLLE
& ANN COFER VOLLE
1185 DUNWOODY RD NE
PID: 170022000100649
D.B. 56196, PG. 519
P.B. 76, PG. 21
ZONED:RE-1
DUNWOODY CIT
Y LIMIT
LOCATION CD
D3#
1032.
EL:
22417
84.18
E:
14406 37.28
N:
STOPSPALDING DR
LOCATION CD
D2#
1046.
EL:
22413
82.95
E:
14407 08.84
N:
GEORGIA
SANDY SPRINGS
(50' RIGHT-OF-WAY)
DUNWOODY RD
S
W
2+65.78
POE
2+00 E:2241794.172' N:1440653.082'
.0013+75STA
END PROJECT
13+41.96STA
END CONSTRUCTION
E:2241402.068' N:1440719.432'
.009+75STA
BEGIN PROJECT
2+43.78STA
LIMIT OF CONSTRUCTION
9+92.02STA
DUNWOODY ROAD
2+01.70STA
SPALDING DRIVE
9+89.06STA
BEGIN CONSTRUCTION
S69°46'48.4"E
S75°41'24.1"E S77°51'04.2"E S81°43'54.9"E S84°33'14.9"E
S86°13'54 .7"E
S86°33'0 3.4"E
P
P
15 60
SCALE IN FEET
0 30
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PROJECT ID
11/05/2020
REVISION DATES
9/17/2026 mfrias
GPLOT-ORD
DUNWOODY_13 SERIES.dgn
10:37:47 AM
0001 - 13
1165 SPALDING DR & 1185
CONSTRUCTION PLAN
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
Tel 678.224.9730 | GFTInc.com Suite 350, Atlanta, GA 30328
5901-C Peachtree Dunwoody Rd
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
E X
R O
W
E X
R O
W
0+00 0+10 0+20 0+30
1040 1040
P V I
L
.3
-8.3300%
2.0000% -0.8036% -1.8845%
P V
I
P V
I
P V
I
P V
I
DRIVEWAY 1
STA 11+53.75
TIE TO EXISTING
0+00 0+10 0+20
1030 1030 1
.2
5.00' VC
K = 0.28
P V
I
P V
I
P V
I
-8.33%
-1.45
-19.08%
P V
I
P V
C
P V
T
DRIVEWAY 2
STA 12+90.86
TIE TO EXISTING
1" = 2.5'
VERTICAL
1" = 5'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/15/2026 mfrias
GPLOT-ORD
DUNWOODY_17 SERIES.dgn
8:39:03 AM
17-0001
DRIVEWAY PROFILES
DUNWOODY RD NE SIDEWALK
1165 SPALDING DR & 1185
PROJECT ID
T6026-2
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
10+25.00
-10 0 10 20 30 40 50
1040 1040
1050 1050
2.00% 2:1
10+50.00
-10 0 10 20 30 40 50
1040 1040
1050 1050
1.95% 2:1
10+75.00
-10 0 10 20 30 40 50
1040 1040
1050 1050
1.95%
11+00.00
-10 0 10 20 30 40 50
1040 1040
1050 1050
2.00%
11+25.00
-10 0 10 20 30 40 50
1040 1040
1050 1050
2.00%
11+50.00
-10 0 10 20 30 40 50
1040 1040
1050 1050
11+75.00
-10 0 10 20 30 40 50
1030 1030
1040 1040
1050 1050
2.00%2.00%
12+00.00
-10 0 10 20 30 40 50
1030 1030
1040 1040
1050 1050
2.00%
12+25.00
-10 0 10 20 30 40 50
1030 1030
1040 1040
1050 1050
2.00%
12+50.00
-10 0 10 20 30 40 50
1030 1030
1040 1040
2.00%
12+75.00
-10 0 10 20 30 40 50
1030 1030
1040 1040
2.00%
13+00.00
-10 0 10 20 30 40 50
1030 1030
1040 1040
1.98%
13+25.00
-10 0 10 20 30 40 50
1030 1030
1040 1040
2.00% 2:1
13+50.00
-10 0 10 20 30 40 50
1020 1020
1030 1030
1040 1040
GEORGIA
SANDY SPRINGS
WIDENING
CLASS "B"
WIDENING
CLASS "B"
WIDENING
CLASS "B"
E X
R O
W E
X R
O W
E X
R O
W E
X R
O W
E X
R O
W E
X R
O W
E X
R O
W E
X R
O W
E X
R O
W
E X
R O
W E
X R
O W
E X
R O
W
E X
R O
W
SEE SHEET 17-0001
DRIVEWAY 1
EXISITING SIDEWALK
EXISITING SIDEWALK
13+75.00
-10 0 10 20 30 40 50
1020 1020
1030 1030
1040 1040
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/14/2026 mfrias
GPLOT-ORD
DUNWOODY_23 SERIES.dgn
3:50:14 PM
1" = 20'
HORIZONTAL
1" = 20'
VERTICAL
CITY OF SANDY SPRINGS
DUNWOODY RD NE SIDEWALK
1165 SPALDING DR & 1185
EARTHWORK CROSS SECTIONS
23-0001
PROJECT ID
T6026-2
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
2+25.00
-50 -40 -30 -20 -10 0 10
1040 1040
1050 1050
2.00%
2+50.00
-50 -40 -30 -20 -10 0 10
1040 1040
1050 1050
GEORGIA
SANDY SPRINGS
E X
R O
W E
X R
O W
E X
R O
W
EXISITING SIDEWALK
EXISITING SIDEWALK
2+65.78
-50 -40 -30 -20 -10 0 10
1040 1040
1050 1050
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/14/2026 mfrias
GPLOT-ORD
DUNWOODY_23 SERIES.dgn
3:52:48 PM
PROJECT ID
1" = 20'
VERTICAL
1" = 20'
HORIZONTAL
CITY OF SANDY SPRINGS
DUNWOODY RD NE SIDEWALK
1165 SPALDING DR & 1185
EARTHWORK CROSS SECTIONS
23-0002
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
GENERAL NOTES:
UTILITY SUMMARY:
NOTED ON THE PLANS.
(4) ALL FIRE HYDRANT CONNECTION MATERIAL SIZES AND TYPES ARE UNKNOWN UNLESS OTHERWISE
(3) ALL UNDERGROUND TELEPHONE LINES ARE DIRECT-BURIED UNLESS OTHERWISE NOTED.
IN THIS SUE PROJECT.
IRRIGATION/SPRINKLER, AND OTHER PRIVATELY OWNED UTILITY LINES WERE NOT INCLUDED
(2) EMPTY CONDUITS, OVERHEAD COMMERCIAL LIGHTING, TRAFFIC CONTROL SENSORS IN PAVING, RECORD PLANS.
(1) WHERE INDICATED, UTILITY PIPE SIZE AND MATERIAL ARE BASED ON VISUAL EVIDENCE OR
SUE INVESTIGATION DESCRIPTION:
BY GEORGIA POWER COMPANY UNLESS OTHERWISE NOTED ON THE PLANS. (ROF)
NOTE: ALL ELECTRIC DISTRIBUTION LINES FOUND WITHIN THE LOS ARE OWNED
GEORGIA POWER COMPANY (GPC) - ELECTRIC DISTRIBUTION
ARE OWNED BY ATLANTA GAS LIGHT UNLESS OTHERWISE NOTED ON THE PLANS. (ROF)
NOTE: ALL NATURAL GAS LINES FOUND WITHIN THE LOS
ATLANTA GAS LIGHT (AGL) - NATURAL GAS
BY DEKALB COUNTY UNLESS OTHERWISE NOTED ON THE PLANS. (ROF)
NOTE: ALL SEWER LINES FOUND WITHIN THE LOSARE OWNED
DEKALB COUNTY(DC) - SEWER
BY AMERICAN TELEPHONE & TELEGRAPH UNLESS OTHERWISE NOTED ON THE PLANS. (RNA)
NOTE: ALL TELECOMMUNICATION LINES FOUND WITHIN THE LOS ARE OWNED
AMERICAN TELEPHONE & TELEGRAPH (ATT) - TELECOMMUNICATIONS DISTRIBUTION
THAT ARE OWNED BY GOOGLE FIBER INC ARE NOTED ON THE PLANS. (ROF)
NOTE: ALL TELECOMMUNICATION DISTRIBUTION LINES FOUND WITHIN THE LOS
GOOGLE FIBER INC (GF) - TELECOMMUNICATIONS DISTRIBUTION
BY CITY OF SANDY SPRINGS UNLESS OTHERWISE NOTED ON THE PLANS. (RNA)
NOTE: ALL TRAFFIC CONTROL LINES FOUND WITHIN THE LOS ARE OWNED
CITY OF SANDY SPRINGS (COS) - TRAFFIC CONTROL
BY COMCAST UNLESS OTHERWISE NOTED ON THE PLANS. (RNA)
NOTE: ALL TELEVISION LINES FOUND WITHIN THE LOS ARE OWNED
COMCAST (COM) - TELEVISION
BY THE CITY OF ATLANTA UNLESS OTHERWISE NOTED ON THE PLANS. (ROF)
NOTE: ALL WATER LINES FOUND WITHIN THE LOS ARE OWNED
CITY OF ATLANTA (COA) - WATER
NO FACILITIES WITHIN THE LOS OF THIS PROJECT. (RNA)
NOTE: COLONIAL PIPELINE REPORTED TO HAVE
COLONIAL PIPELINE (CP)-NATURAL GAS
BY DEKALB COUNTY UNLESS OTHERWISE NOTED ON THE PLANS. (RNA)
NOTE: ALL ITS TRAFFIC LINES FOUND WITHIN THE LOS ARE OWNED
DEKALB COUNTY (DC) - ITS TRAFFIC
BY DEKALB COUNTY ARE NOTED IN THE PLANS. (RNA)
NOTE: ALL WATER LINES FOUND WITHIN THE LOS THAT ARE OWNED
DEKALB COUNTY (DC) - WATER
BY FULTON COUNTY ARE NOTED IN THE PLANS. (RNA)
NOTE: ALL SEWER LINES FOUND WITHIN THE LOS THAT ARE OWNED
FULTON COUNTY (FC) - SEWER
GEROGIA
SANDY SPRINGS
(RNA) = RECORDS NOT AVAILABLE
(ROF) = RECORDS ON FILE
OWNER LISTED AND ARE SHOWN ON THE PLANS HEREON.
WITHIN THE LOS AT THE TIME OF THE SUE INVESTIGATION ARE NOTED OR EACH UTILITY
VICINITY OF THIS PROJECT AT THE TIME OF THE SUE INVESTIGATION. UTILITIES FOUND
ALL THE FOLLOWING UTILITY OWNERS WERE REPORTED TO HAVE FACILITIES WITHIN THE
AND DATED 04/20/26.
FROM A TOPOGRAPHIC / MAPPING SURVEY AND CONTROL PACKAGE PROVIDED BY PLATINUM GEOMATICS
ALL OTHER EXISTING TOPOGRAPHIC FEATURES DEPICTED HEREON HAVE BEEN REFERENCED
INCLUDED IN THIS INVESTIGATION AND SHOULD BE CONSIDERED AS FROM RECORD DRAWING ONLY.
THE PLANS. UTILITIES THAT HAVE BEEN INSTALLED AFTER THE DATE ABOVE HAVE NOT BEEN
INVESTIGATED AND THE METHOD OF DETERMINING THEIR LOCATION IS INDICATED AS SHOWN IN
INVESTIGATION. THE PRESENCE OF THESE UTILITY FACILITIES HAS BEEN THOROUGHLY
OVERHEAD AND UNDERGROUND FACILITIES SHOWN HEREON WERE INCLUDED IN THIS SUE
AND COMPLETED BY PLATINUM GEOMATICS ON 04/27/26 FOR THIS PROJECT. THE EXISTING
A QL-B OVERHEAD/SUBSURFACE UTILITY ENGINEERING INVESTIGATION (SUE) WAS PERFORMED
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/15/2026 mfrias
GPLOT-ORD
DUNWOODY_24A SERIES.dgn
9:35:39 AM
24-000A
T6026-2
UTILITY PLANS
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
09/18/2026
##"W(C)
##"W
##"W
##"W(B)
##"W(C)
##"W
##"W(B)
##"W(C)
##"W
##"W
##"W(B)
##"W(C)
##"W
##"W(B)
GEROGIA
SANDY SPRINGS
UNDERGROUND
OVERHEAD
EXISTING TO BE REMOVED
UTILITY LINECODES
TYPE OF UTILITYPROPOSED EXISTING PROPOSED TEMPORARY
UTILITY SYMBOLS
EXISTING PROPOSED TEMPORARY
(UTILITY IMPACT ANALYSIS (UIA) ONLY)
CONFLICT LOCATION
QL-D DEPICTED ACCORDING TO UTILITY RECORD INFORMATION AND IN-FIELD VISUAL INSPECTION. NO ELECTRONIC DESIGNATING INFORMATION WAS OBTAINED.
QL-C EXISTING UTILITY STRUCTURES HAVE BEEN FIELD LOCATED AND SURVEYED TO ASSIST IN DEPICTING THE UTILITIES SHOWN ON RECORDS. NO ELECTRONIC DESIGNATING INFORMATION WAS OBTAINED.
TELEPHONE PAIR SIZE TELEPHONE CABLE DIAMETER
101 - 2400
0.50 TO 2.00 IN5 - 100
UP TO 3.50 IN
BY THE PROJECT AND REDUCED ONTO PLAN DOCUMENTS.
SUBSURFACE UTILITIES. QL-B DATA SHOULD BE REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES DEFINED
QL-B INFORMATION WAS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROPRIATE HORIZONTAL POSITION OF THE
TELEPHONE PAIR SIZE TABLE
QUALITY LEVELS AND DEFINITIONS
EXACT LOCATION AND POSITION OF THE UTILITY LINE.
NONDESTRUCTIVE EQUIPMENT IN A MANNER AS TO CAUSE NO DAMAGE TO THE UTILITY LINE. AFTER EXCAVATING A TEST HOLE, A FIELD SURVEY SHALL BE PERFORMED TO DETERMINE THE
QL-A OBTAIN PRECISE HORIZONTAL AND VERTICAL POSITION OF THE UTILITY LINE BY EXCAVATING A TEST HOLE. THE TEST HOLE SHALL BE DONE USING VACUUM EXCAVATION OR COMPARABLE
ELECTRIC (QL-D)
TELECOMMUNICATIONS (QL-D)
CABLE TV (QL-D)
WATER (QL-D)
WATER FOR LABELED PIPE SIZES (QL-D)
NON-POTABLE WATER (QL-D)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-D)
STEAM (QL-D)
STEAM FOR LABELED PIPE SIZES (QL-D)
SANITARY SEWER WITH FLOW DIRECTION (QL-D)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-D)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-D)
GAS (QL-D)
GAS FOR LABELED PIPE SIZES (QL-D)
PETROLEUM (QL-D)
PETROLEUM FOR LABELED PIPE SIZES (QL-D)
TRAFFIC CONTROL (QL-D)
ELECTRIC (QL-C)
ELECTRIC (QL-B)
TELECOMMUNICATIONS (QL-C)
TELECOMMUNICATIONS (QL-B)
CABLE TV (QL-C)
CABLE TV (QL-B)
WATER (QL-C)
WATER (QL-B)
WATER FOR LABELED PIPE SIZES (QL-C)
WATER FOR LABELED PIPE SIZES (QL-B)
NON-POTABLE WATER (QL-C)
NON-POTABLE WATER (QL-B)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-C)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-B)
STEAM (QL-C)
STEAM (QL-B)
STEAM FOR LABELED PIPE SIZES (QL-C)
STEAM FOR LABELED PIPE SIZES (QL-B)
SANITARY SEWER WITH FLOW DIRECTION (QL-C)
SANITARY SEWER WITH FLOW DIRECTION (QL-B)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-C)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-B)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-C)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-B)
GAS (QL-C)
GAS (QL-B)
GAS FOR LABELED PIPE SIZES (QL-C)
GAS FOR LABELED PIPE SIZES (QL-B)
PETROLEUM (QL-C)
PETROLEUM (QL-B)
PETROLEUM FOR LABELED PIPE SIZES (QL-C)
PETROLEUM FOR LABELED PIPE SIZES (QL-B)
TRAFFIC CONTROL (QL-C)
TRAFFIC CONTROL (QL-B)
ELECTRIC
ELECTRIC/TRAFFIC CONTROL
GUY WIRE
TRAFFIC CONTROL
ELECTRIC/CABLE TV
ELECTRIC/CABLE TV/TRAFFIC CONTROL
CABLE TV
CABLE TV/TRAFFIC CONTROL
ELECTRIC/TELECOMMUNICATIONS
ELECTRIC/TELECOMMUNICATIONS/TRAFFIC CONTROL
TELECOMMUNICATIONS
TELECOMMUNICATIONS/TRAFFIC CONTROL
ELECTRIC/TELECOMMUNICATIONS/CABLE TV
ELECTRIC/TELECOMMUNICATIONS/CABLE TV/TRAFFIC CONTROL
TELECOMMUNICATIONS/CABLE TV/TRAFFIC CONTROL
SIGNAL/BUTTON POST
TRAFFIC CONTROL PEDESTRIAN
ELECTRIC COMMUNICATIONS BOX
TRAFFIC CONTROL MANHOLE/
REFER TO TRAFFIC SIGNAL PLANS
TRAFFIC CONTROL INFORMATION
FOR PROPOSED/TEMPORARY
REFER TO TRAFFIC SIGNAL PLANS
TRAFFIC CONTROL INFORMATION
FOR PROPOSED/TEMPORARY
TELECOMMUNICATIONS/CABLE TV
COMBINED SANITARY SEWER WITH FLOW DIRECTION
POLE ID123
A01
TH
QUALITY LEVEL (QL) DELINEATION
SANITARY SEWER MANHOLE (SSMH) ID
EOI
END OF INFORMATION
TEST HOLE (QL-A ONLY)
C123
UTILITY INVESTIGATION
LIMITS OF OVERHEAD AND SUBSURFACE
(UTILITY IMPACT ANALYSIS (UIA) ONLY)
CONFLICT LOCATION
MISCELLANEOUS
TRANSFORMER
SPLICE BOX
PHONE BOOTH
STAND PIPE
BACKFLOW PREVENTER
PRESSURE INDICATOR VALVE
AIR RELEASE VALVE
CLEANOUT
GREASE TRAP
AIR RELEASE VALVE
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC BOX
CABLE TV MANHOLE
WATER VALVE
WATER METER
WATER MANHOLE
WATER VAULT
SANITARY SEWER MANHOLE
GAS PRESSURE REGULATOR
UTILITY POLE/GUY POLE PETROLEUM VALVE
GAS VAULT
GAS MANHOLE
GAS VALVE
GAS METER
TELECOMMUNICATIONS MANHOLE
TELECOMMUNICATIONS PEDESTAL
CABLE TV PEDESTAL
SANITARY SEWER FORCE MAIN VALVE
WATER VALVE MARKER
GAS TEST STATION
GUY ANCHOR
(INCLUDES ASSOCIATED VALVE)
FIRE HYDRANT ASSEMBLY
TRANSMISSION TOWER
ELECTRIC HAND HOLE
ELECTRIC YARD LIGHT POLE
SATELLITE DISH
GAS YARD LIGHT POLE
TELECOMMUNICATIONS HANDHOLE
CABLE TV HANDHOLE
VENT
LIGHT POLE
GAS VALVE MARKER
PETROLEUM VALVE MARKER
(aka "SLICK")
SUBCRIBER LOOP CARRIER
VALVE MARKER
SANITARY SEWER FORCE MAIN
CABLE TV CABINET
TELECOMMUNICATIONS CABINET
TRAFFIC CONTROL CABINET
TRAFFIC CONTROL HANDHOLE/PULLBOX
ELECTRIC LINE MARKER U/G
GAS LINE MARKER U/G
WATER LINE MARKER U/G
CABLE TV LINE MARKER U/G
TELECOMMUNICATIONS LINE MARKER U/G
PETROLEUM LINE MARKER U/G
SANITARY SEWER FORCE MAIN LINE MARKER U/G
ABBREVIATIONS LEGEND
ASBESTOS CONCRETE PIPE
ABANDONED ACCORDING TO UTILITY RECORDS
AIR RELEASE VALVE
ABANDONED
CONDUIT
DUCTILE IRON PIPE
CAST IRON PIPE
FIBER OPTIC
ACP
FO
AATUR
ARV
COND
ABAND.
DIP
CIP
GALV
FDC
GALVANIZED PIPE
FIRE DEPARTMENT CONNECTION
HP
MP
HDPE
NURIA NO UTILITY RECORD INFORMATION AVAILABLE
HIGH PRESSURE
MEDIUM PRESSURE
HIGH DENSITY POLYETHYLENE
POLYETHYLENE PIPE
POLYVINYL CHLORIDE PIPE
STR STRAND
TEL TELECOMMUNICATIONS
PE
RCP
PVC
PAIR
REINFORCED CONCRETE PIPE
PL PLASTIC PIPE
STL STEEL PIPE
PR
OVHD OVERHEAD
SVC SERVICE, UNKNOWN SIZE/TYPE
UNK UNKNOWN
DIA DIAMETER
CORRUGGATED METAL PIPECMP
DIRECT BURIED CABLEDBC
UG UNDERGROUND
QL-D DEPICTED ACCORDING TO UTILITY RECORD INFORMATION AND IN-FIELD VISUAL INSPECTION. NO ELECTRONIC DESIGNATING INFORMATION WAS OBTAINED.
QL-C EXISTING UTILITY STRUCTURES HAVE BEEN FIELD LOCATED AND SURVEYED TO ASSIST IN DEPICTING THE UTILITIES SHOWN ON RECORDS. NO ELECTRONIC DESIGNATING INFORMATION WAS OBTAINED.
TELEPHONE PAIR SIZE TELEPHONE CABLE DIAMETER
101 - 2400
0.50 TO 2.00 IN5 - 100
UP TO 3.50 IN
BY THE PROJECT AND REDUCED ONTO PLAN DOCUMENTS.
SUBSURFACE UTILITIES. QL-B DATA SHOULD BE REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES DEFINED
QL-B INFORMATION WAS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROPRIATE HORIZONTAL POSITION OF THE
TELEPHONE PAIR SIZE TABLE
QUALITY LEVELS AND DEFINITIONS
EXACT LOCATION AND POSITION OF THE UTILITY LINE.
NONDESTRUCTIVE EQUIPMENT IN A MANNER AS TO CAUSE NO DAMAGE TO THE UTILITY LINE. AFTER EXCAVATING A TEST HOLE, A FIELD SURVEY SHALL BE PERFORMED TO DETERMINE THE
QL-A OBTAIN PRECISE HORIZONTAL AND VERTICAL POSITION OF THE UTILITY LINE BY EXCAVATING A TEST HOLE. THE TEST HOLE SHALL BE DONE USING VACUUM EXCAVATION OR COMPARABLE
ELECTRIC (QL-D)
TELECOMMUNICATIONS (QL-D)
CABLE TV (QL-D)
WATER (QL-D)
WATER FOR LABELED PIPE SIZES (QL-D)
NON-POTABLE WATER (QL-D)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-D)
STEAM (QL-D)
STEAM FOR LABELED PIPE SIZES (QL-D)
SANITARY SEWER WITH FLOW DIRECTION (QL-D)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-D)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-D)
GAS (QL-D)
GAS FOR LABELED PIPE SIZES (QL-D)
PETROLEUM (QL-D)
PETROLEUM FOR LABELED PIPE SIZES (QL-D)
TRAFFIC CONTROL (QL-D)
ELECTRIC (QL-C)
ELECTRIC (QL-B)
TELECOMMUNICATIONS (QL-C)
TELECOMMUNICATIONS (QL-B)
CABLE TV (QL-C)
CABLE TV (QL-B)
WATER (QL-C)
WATER (QL-B)
WATER FOR LABELED PIPE SIZES (QL-C)
WATER FOR LABELED PIPE SIZES (QL-B)
NON-POTABLE WATER (QL-C)
NON-POTABLE WATER (QL-B)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-C)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-B)
STEAM (QL-C)
STEAM (QL-B)
STEAM FOR LABELED PIPE SIZES (QL-C)
STEAM FOR LABELED PIPE SIZES (QL-B)
SANITARY SEWER WITH FLOW DIRECTION (QL-C)
SANITARY SEWER WITH FLOW DIRECTION (QL-B)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-C)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-B)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-C)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-B)
GAS (QL-C)
GAS (QL-B)
GAS FOR LABELED PIPE SIZES (QL-C)
GAS FOR LABELED PIPE SIZES (QL-B)
PETROLEUM (QL-C)
PETROLEUM (QL-B)
PETROLEUM FOR LABELED PIPE SIZES (QL-C)
PETROLEUM FOR LABELED PIPE SIZES (QL-B)
TRAFFIC CONTROL (QL-C)
TRAFFIC CONTROL (QL-B)
ELECTRIC
ELECTRIC/TRAFFIC CONTROL
GUY WIRE
TRAFFIC CONTROL
ELECTRIC/CABLE TV
ELECTRIC/CABLE TV/TRAFFIC CONTROL
CABLE TV
CABLE TV/TRAFFIC CONTROL
ELECTRIC/TELECOMMUNICATIONS
ELECTRIC/TELECOMMUNICATIONS/TRAFFIC CONTROL
TELECOMMUNICATIONS
TELECOMMUNICATIONS/TRAFFIC CONTROL
ELECTRIC/TELECOMMUNICATIONS/CABLE TV
ELECTRIC/TELECOMMUNICATIONS/CABLE TV/TRAFFIC CONTROL
TELECOMMUNICATIONS/CABLE TV/TRAFFIC CONTROL
SIGNAL/BUTTON POST
TRAFFIC CONTROL PEDESTRIAN
ELECTRIC COMMUNICATIONS BOX
TRAFFIC CONTROL MANHOLE/
REFER TO TRAFFIC SIGNAL PLANS
TRAFFIC CONTROL INFORMATION
FOR PROPOSED/TEMPORARY
REFER TO TRAFFIC SIGNAL PLANS
TRAFFIC CONTROL INFORMATION
FOR PROPOSED/TEMPORARY
TELECOMMUNICATIONS/CABLE TV
COMBINED SANITARY SEWER WITH FLOW DIRECTION
POLE ID123
A01
TH
QUALITY LEVEL (QL) DELINEATION
SANITARY SEWER MANHOLE (SSMH) ID
EOI
END OF INFORMATION
TEST HOLE (QL-A ONLY)
C123
UTILITY INVESTIGATION
LIMITS OF OVERHEAD AND SUBSURFACE
(UTILITY IMPACT ANALYSIS (UIA) ONLY)
CONFLICT LOCATION
MISCELLANEOUS
TRANSFORMER
SPLICE BOX
PHONE BOOTH
STAND PIPE
BACKFLOW PREVENTER
PRESSURE INDICATOR VALVE
AIR RELEASE VALVE
CLEANOUT
GREASE TRAP
AIR RELEASE VALVE
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC BOX
CABLE TV MANHOLE
WATER VALVE
WATER METER
WATER MANHOLE
WATER VAULT
SANITARY SEWER MANHOLE
GAS PRESSURE REGULATOR
UTILITY POLE/GUY POLE PETROLEUM VALVE
GAS VAULT
GAS MANHOLE
GAS VALVE
GAS METER
TELECOMMUNICATIONS MANHOLE
TELECOMMUNICATIONS PEDESTAL
CABLE TV PEDESTAL
SANITARY SEWER FORCE MAIN VALVE
WATER VALVE MARKER
GAS TEST STATION
GUY ANCHOR
(INCLUDES ASSOCIATED VALVE)
FIRE HYDRANT ASSEMBLY
TRANSMISSION TOWER
ELECTRIC HAND HOLE
ELECTRIC YARD LIGHT POLE
SATELLITE DISH
GAS YARD LIGHT POLE
TELECOMMUNICATIONS HANDHOLE
CABLE TV HANDHOLE
VENT
LIGHT POLE
GAS VALVE MARKER
PETROLEUM VALVE MARKER
(aka "SLICK")
SUBCRIBER LOOP CARRIER
VALVE MARKER
SANITARY SEWER FORCE MAIN
CABLE TV CABINET
TELECOMMUNICATIONS CABINET
TRAFFIC CONTROL CABINET
TRAFFIC CONTROL HANDHOLE/PULLBOX
ELECTRIC LINE MARKER U/G
GAS LINE MARKER U/G
WATER LINE MARKER U/G
CABLE TV LINE MARKER U/G
TELECOMMUNICATIONS LINE MARKER U/G
PETROLEUM LINE MARKER U/G
SANITARY SEWER FORCE MAIN LINE MARKER U/G
ABBREVIATIONS LEGEND
ASBESTOS CONCRETE PIPE
ABANDONED ACCORDING TO UTILITY RECORDS
AIR RELEASE VALVE
ABANDONED
CONDUIT
DUCTILE IRON PIPE
CAST IRON PIPE
FIBER OPTIC
ACP
FO
AATUR
ARV
COND
ABAND.
DIP
CIP
GALV
FDC
GALVANIZED PIPE
FIRE DEPARTMENT CONNECTION
HP
MP
HDPE
NURIA NO UTILITY RECORD INFORMATION AVAILABLE
HIGH PRESSURE
MEDIUM PRESSURE
HIGH DENSITY POLYETHYLENE
POLYETHYLENE PIPE
POLYVINYL CHLORIDE PIPE
STR STRAND
TEL TELECOMMUNICATIONS
PE
RCP
PVC
PAIR
REINFORCED CONCRETE PIPE
PLA PLASTIC PIPE
STL STEEL PIPE
PR
OVHD OVERHEAD
SVC SERVICE, UNKNOWN SIZE/TYPE
UNK UNKNOWN
DIA DIAMETER
CORRUGGATED METAL PIPECMP
DIRECT BURIED CABLEDBC
UG UNDERGROUND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/15/2026 mfrias
GPLOT-ORD
DUNWOODY_24B SERIES.dgn
9:29:38 AM
24-000B
UTILITY PLANS
T6026-2
Tel 678.224.9730 | GFTInc.com
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE