This is an Invitation to Bid (ITB) issued by the City of Milton Public Works Department for the SR9 Temporary Gravel Stabilization Installation project (Project #TS2-2515). The project consists of grading, construction of a gravel trail connecting existing sidewalks along State Route 9, gabion wall installation, fence installation, erosion control measures, temporary grassing, permanent grassing, and related improvements within Milton, Georgia. Bidders must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list with no exceptions. The ITB was issued on March 12, 2026, with a deadline for written questions on March 23, 2026, at 5:00 p.m., and sealed electronic bids due by April 2, 2026, at 2:00 p.m. EST via BidNet Direct. Public bid opening will occur at approximately 2:30 p.m. on April 2, 2026, at City Hall. The tentative contract award date is on or about April 27, 2026, with the Notice to Proceed to be coordinated with the selected contractor. The contractor must begin work within ten calendar days of receiving the Notice to Proceed, with the City desiring completion by July 31, 2026. The project involves approximately 28 line items including traffic control, mulch, grading, aggregate base and surface courses, concrete curbing, silt fence, check dams, stone filter rings, construction exits, permanent and temporary grassing, fertilizer, agricultural lime, and gabion wall construction totaling 200 square feet and 100 linear feet of wooden rail fence.
Bids must include a 5% bid bond payable to the City of Milton, and the successful bidder must furnish Performance and Payment Bonds equal to 100% of the base bid price, along with a Maintenance Bond equal to one-third of the base bid price. Contractors must obtain comprehensive general liability insurance of $1,000,000 per occurrence and $2,000,000 umbrella coverage, comprehensive automobile liability of $1,000,000, workers' compensation as required by Georgia law with $1,000,000 employers' liability, and maintain all insurance for the contract duration. A 30% construction allowance is included in the bid calculation, with 5% retainage to be held until final acceptance. Contractors are responsible for all quality control testing of materials, securing necessary permits and licenses, maintaining temporary traffic control, and protecting and restoring property and landscaping. The contractor must comply with Georgia Department of Transportation Standard Specifications and Special Provisions, including erosion control requirements, and serve as the Primary Permittee responsible for filing the Notice of Intent and associated fees under NPDES guidelines. All work must comply with OSHA regulations, the Americans with Disabilities Act, and the Manual on Uniform Traffic Control Devices. Contractors must verify compliance with federal work authorization requirements through the E-Verify program.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 26-PW06 1 | P a g e
Bid Number:
ITB 26-PW06
Project Name:
SR9 Temporary Gravel Stabilization Installation (Project #TS2-2515)
Due Date and Time: April 2, 2026, by 2:00 p.m. EST
*Link for virtual bid opening will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.
Number of Pages: 100
ISSUING DEPARTMENT INFORMATION
Issue Date:
March 12, 2026
City of Milton Public Works Department 2006 Heritage Walk Milton, GA 30004
Phone: 678-242-2500
Website: www.miltonga.gov
INSTRUCTIONS TO BIDDERS
Electronic Submittal: **Bids must be submitted electronically via Milton’s BidNet procurement portal/platform at www.miltonga.gov
If you have not registered as a vendor via BidNet we encourage you to register. There is no cost to join, and you will be notified of any potential bid opportunities with the City of Milton as well as other agencies who are part of the Georgia Purchasing Group.
Mark Face of Envelope/Package:
Bid Number: ITB 26-PW06 Name of Company or Firm
Special Instructions:
Deadline for Written Questions March 23, 2026, by 5:00 p.m.
Submit questions online via the BidNet Direct procurement portal at www.miltonga.gov/finance/bids-rfps
BIDDERS MUST COMPLETE THE FOLLOWING
Bidder Name/Address:
Authorized Bidder Signatory:
(Please print name and sign in ink)
Bidder Phone Number: Bidder FAX Number:
Bidder Federal I.D. Number: Bidder E-mail Address:
BIDDERS MUST RETURN THIS COVER SHEET WITH BID RESPONSE
CITY OF MILTON INVITATION TO BID
(THIS IS NOT AN ORDER)
http://www.miltonga.gov/ http://www.miltonga.gov/
ITB 26-PW06 2 | P a g e
Table of Contents
Topic Page
Definitions 3
Invitation to Bid 4
Schedule of Events 5
Bidding Instructions (What must be submitted) 6
Insurance/Bond Requirements 7
Bid Form and Addenda Acknowledgement 11
Bid Bond (3 pages) 13
Qualifications Signature and Certification 16
Corporate Certificate 16
List of Subcontractors 17
Contractor Affidavit and Agreement (eVerify) 18
Disclosure Form 19
Project Specifications 20
Bid Submittal Form (2 pages) 26
General Conditions 28
EPD Air Quality Rules 33
Sample Contract Agreement 34
ITB 26-PW06 3 | P a g e
DEFINITIONS
COMPW: City of Milton Public Works Department
CY: Cubic Yard
GDOT: Georgia Department of Transportation
ENGINEER: The City of Milton Director of Public Works or a duly authorized representative.
ADA: Americans with Disabilities Act
EA: Each
GAL: Gallon
LF: Linear Feet
LM: Linear Mile
LS: Lump Sum
SY: Square Yard
TN: Ton
MUTCD: Manual on Uniform Traffic Control Devices
OSHA: Occupational Safety and Health Administration
FHWA: Federal Highway Administration
AASHTO: American Association of State Highway and Transportation Officials
FOB: Free on Board
ITB 26-PW06 4 | P a g e
Invitation to Bid ITB 26-PW06
The City of Milton is accepting sealed electronic bids from qualified firms for the Public Works Department in conformance with Title 32, Chapter 4, Article 4, Part 2 of the Official Code of Georgia Annotated. All work will be done in accordance with Georgia Department of Transportation’s (GDOT) Standard Drawings, Standard Specifications (current edition), and Pay Items Index as standards and specifications for the construction and completion of the work required. All bidders must comply with all general and special requirements of the bid information and instructions enclosed herein.
Electronic bids will be received no later than 2:00 PM Local Time on April 2, 2026. Electronic bids shall be submitted online via BidNet Direct, the City’s procurement portal, at www.miltonga.gov/finance/bids-rfps .
At approximately 2:30 P.M. Local Time on the day bids are received the bids will be publicly opened and the bidder’s name and total bid amount will be read aloud at: City of Milton City Hall, 2006 Heritage Walk, Milton, GA 30004. *Link for the virtual bid opening will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.
Bids received after the above time will not be accepted.
Questions must also be submitted online in the same manner listed above for bids. Deadline for questions is March 23, 2026, at 5:00 p.m. Official answers to questions and potential changes to the ITB (Addendums) will be posted at the same web locations as the ITB on or about March 25, 2026. Any other form of interpretation, correction, or change to this ITB will not be binding upon the City. It is the bidder’s responsibility to check the websites for potential updates. Please refer to Bid (ITB 26-PW06) and bid name (SR9 Temporary Gravel Stabilization Installation) when requesting information.
The City of Milton reserves the right to reject any or all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Milton.
The selected contractor must be able to start work within ten (10) calendar days after the “Notice to Proceed” is issued. The time of completion for the project is to be determined prior to the issuance of the “Notice to Proceed.” If weather affects the required completion schedule, The City and selected contractor will negotiate a new completion date. Section
108.08 of the State of Georgia Department of Transportation Standard Specifications Construction of Transportation Systems (current edition) shall be applied.
http://www.miltonga.gov/finance/bids-rfps
ITB 26-PW06 5 | P a g e
SCHEDULE OF EVENTS
FOR REFERENCE ONLY - DO NOT SUBMIT WITH BID RESPONSE
EVENT DATE
ITB Issue Date March 12, 2026
Deadline for Receipt of Written Questions 5:00 PM on March 23, 2026
Posting of Written Answers by City to Websites on or about March 25, 2026
ITB DUE No Later than 2:00 P.M. on April 2, 2026
Tentative Contract Award (on/about) April 27, 2026
Notice to Proceed (on/about) To be coordinated with the Contractor
NOTE: PLEASE CHECK THE CITY WEBSITE (http://www.miltonga.gov) FOR ADDENDA
AND SCHEDULE UPDATES.
http://www./
ITB 26-PW06 6 | P a g e
BIDDING INSTRUCTIONS
FAILURE TO RETURN THE FOLLOWING BID DOCUMENTS COULD RESULT IN THE BID
BEING DEEMED NON-RESPONSIVE AND BEING REJECTED:
Item Description Page(s) 1 Filled out and Signed Invitation to Bid (Cover Sheet) 1 2 Bid Form and Addenda Acknowledgement (2 pages) 11-12 3 Bid Bond (3 pages) 13-15 4 Qualifications Signature and Certification 16 5 List of Subcontractors 17 6 Contractor Affidavit and Agreement (eVerify) 18 7 Disclosure Form 19 8 Bid Submittal Form ( 2 pages) 26-27
INFORMATION AND INSTRUCTIONS
The purpose of this solicitation is to enter a unit price “purchasing contract” with one firm to be the primary supplier of ITB-26 PW06, SR9 Temporary Gravel Stabilization Installation.
No specification expressed or implied shall be construed as any type of restrictive specification that would limit competition.
Unless clearly shown as “no substitute” or any words to that effect, any items in these contract documents which have been identified, described or referenced by a brand name or trade name are for reference only. Such identification is intended to be descriptive but not restrictive and is to indicate the general quality and characteristics of products that may be offered. Each bid item for which an equivalent item is proposed must be individually identified on the bid sheet with the following information: brand name, model or manufacturer’s number or identification regularly used in the trade. Photographs, specifications and cut sheets shall be provided of the proposed alternative. The City shall be the sole judge of the suitability of the proposed alternative and may consider function, design, materials, construction, workmanship, finishes, operating features, overall quality, local service facilities, warranty terms and service or other relevant features.
The City reserves the right to cancel the contract at any time, without cause, with 30 days’ written notice.
ITB 26-PW06 7 | P a g e
Title to any supplies, materials, equipment or other personal property shall remain the Contractors’ until fully paid for by the City.
All items to be bid FOB, Milton, Georgia. No sales taxes are to be charged.
Any damage to any building or traffic control device, or equipment incurred during the course of work shall be repaired at the Contractor’s expense to the complete satisfaction of the City of Milton with no additional expense to the City.
EVALUATION
The City intends to evaluate the ITB on the lowest, responsible and responsive bidder.
Bids may be found nonresponsive at any time during the evaluation or contract process, if any of the required information is not provided; the submitted price is found to be inadequate; or the proposal is not within the specifications described and required in the ITB. If a bid is found to be non-responsive or non-qualified, it will not be considered further.
INSURANCE REQUIREMENTS
Within ten (10) days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-6 or higher and acceptable to the City.
Within ten (10) days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-6 or higher and acceptable to the City. Insurance requirements are provided below and included in the CONTRACT AGREEMENT (Section 7.K).
(1) Requirements: The Contractor shall have and maintain in full force and effect for the duration of this Agreement, insurance insuring against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work by the Contractor, its agents, representatives, employees or subcontractors. All policies shall be subject to approval by the City Attorney as to form and content. These requirements are subject to amendment or waiver if so approved in writing by the City.
(2) Minimum Limits of Insurance: Contractor shall maintain the following insurance policies with limits no less than:
(a) Comprehensive General Liability of $1,000,000 (one million dollars) limit per single occurrence, $2,000,000 (two million dollars) umbrella, including coverage for bodily and personal injury, sickness, disease or
ITB 26-PW06 8 | P a g e death, injury to or destruction of property, including loss of use resulting therefrom, vandalism, property loss and theft.
(b) Comprehensive Automobile Liability (owned, non-owned, hired) of $1,000,000 (one million dollars) combined single limit per occurrence for bodily and personal injury, sickness, disease or death, injury to or destruction of property, including loss of use resulting therefrom.
(c) Workers' Compensation limits as required by the State of Georgia and Employers Liability limits of $1,000,000 (one million dollars) per accident.
(3) Deductibles and Self-Insured Retentions: Any deductibles or self-insured retentions must be declared to and approved by the City in writing.
(4) Other Insurance Provisions: The policy is to contain, or be endorsed to contain, the following provisions:
(a) General Liability and Automobile Liability Coverage.
(i) The City and City Parties are to be covered as insureds. The coverage shall contain no special limitations on the scope of protection afforded to the City or City Parties.
(ii) The Contractor’s insurance coverage shall be primary noncontributing insurance as respects to any other insurance or self-insurance available to the City or City Parties. Any insurance or self-insurance maintained by the City or City Parties shall be in excess of the Contractor’s insurance and shall not contribute with it.
(iii) Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City or City Parties.
(iv) Coverage shall state that the Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
(v) Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross-liability exclusion.
(vi) The insurer agrees to waive all rights of subrogation against the City and City Parties for losses arising from Work performed by the Contractor for the City for General Liability coverage only.
ITB 26-PW06 9 | P a g e
(b) Workers' Compensation Coverage: The insurer providing Workers’
Compensation Coverage will agree to waive all rights of subrogation against the City and City Parties for losses arising from Work performed by the Contractor for the City.
(c) All Coverages:
(i) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City.
(ii) Policies shall have concurrent starting and ending dates.
(5) Acceptability of Insurers: Insurance is to be placed with insurers authorized to do business in the State of Georgia and with an A.M. Bests' rating of no less than A:VI.
(6) Verification of Coverage: Contractor shall furnish the City with certificates of insurance and endorsements to the policies evidencing coverage required by this clause prior to the start of Work. The certificate of insurance and endorsements shall be on a form utilized by Contractor’s insurer in its normal course of business and shall be received and approved by the City within ten
(10) days of the Notice of Award. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. The Contractor shall provide proof that any expiring coverage has been renewed or replaced at least two (2) weeks prior to the expiration of the coverage.
(7) Subcontractors: Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated in this Agreement, including but not limited to naming the Parties as additional insureds.
(8) Claims-Made Policies: Contractor shall extend any claims-made insurance policy for at least six (6) years after termination or final payment under the Agreement, whichever is later.
(9) City as Additional Insured and Loss Payee: The City shall be named as an additional insured and loss payee on all policies required by this Agreement, except the City need not be named as an additional insured and loss payee on any Workers’ Compensation policy.
ITB 26-PW06 10 | P a g e
BONDING REQUIREMENTS
Each bid must be accompanied with a BID BOND (bond only: certified checks or other forms are not acceptable) in an amount equal to five percent (5%) of the base bid, payable to the City of Milton. Said bid bond guarantees the bidder will enter into a contract to construct the project strictly within the terms and conditions stated in this bid and in the bidding and contract documents, should the construction contract be awarded.
The Successful Bidder shall be required to furnish PAYMENT AND PERFORMANCE BONDS for the faithful performance on the contract and a bond to secure payment of all claims for materials furnished and/or labor performed in performance of the project, both in amounts equal to one hundred percent (100%) of the base bid price.
Bonds shall be issued by a corporate surety appearing on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to do business in the State of Georgia. Bonds shall be on the forms provided by the City and subject to the review and approval of the City Attorney.
Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners shall execute Bond.
OATH
Prior to commencing the Work, the successful bidder shall execute a written oath as required by O.C.G.A. §§ 32-4-122 and 36-91-21(e).
COST OF PREPARING A BID
The costs for developing and delivering responses to this ITB and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the bidder. The City is not liable for any expense incurred by the bidder in the preparation and presentation of their proposal. All materials submitted in response to this ITB become the property of the City of Milton.
ITB 26-PW06 11 | P a g e
[BIDDERS MUST RETURN THIS FORM WITH BID RESPONSE]
BID FORM and ADDENDA ACKNOWLEDGEMENT
TO: PURCHASING OFFICE
CITY OF MILTON
MILTON, GEORGIA 30004
Ladies and Gentlemen:
In compliance with your Invitation to Bid, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Milton, Georgia, to provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the Work in the manner therein specified within the time specified, as therein set forth, for:
Bid Number ITB 26-PW06 SR9 Temporary Gravel Stabilization Installation (Project #TS2-2515)
The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his bid is accepted, he will contract with the City of Milton in full conformance with the Contract Documents.
Unless otherwise directed, all work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition).
It is the intent of this Bid to include all items of construction, and all Work called for in the Specifications, or otherwise a part of the Contract Documents.
In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.
The Bidder agrees that the cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the Contract Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid.
The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces within ten (10) calendar days from the Notice to Proceed, and to complete all Work as scheduled.
ITB 26-PW06 12 | P a g e
If weather affects the required completion schedule, the City and selected Bidder will negotiate a new completion date.
Attached hereto is an executed Bid Bond in the amount of __________________ Dollars ($ (Five Percent of Amount Bid).
If this bid shall be accepted by the City of Milton and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of Milton may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond shall be forfeited to the City of Milton as liquidated damages.
Bidder acknowledges receipt of the following addenda:
Addendum No. Date viewed
Bidder further declares that the full name and resident address of Bidder’s Principal is as follows:
Signed, sealed, and dated this _______ day of _____________, 20_____
Bidder _______________________ (Seal) Company Name
Bidder Mailing Address:
Signature: ________________________________________
Print Name: ______________________________________
Title: _____________________________________________
ITB 26-PW06 13 | P a g e
[BIDDERS MUST RETURN THESE SHEETS WITH BID RESPONSE]
BID BOND
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (hereinafter referred to as the “City” (Name and Address):
City of Milton, Georgia ATTN: Purchasing Office 2006 Heritage Walk Milton, Georgia 30004
BID
BID DUE DATE:
PROJECT (Brief Description Including Location):
BOND
BOND NUMBER:
DATE (Not later that Bid due date):
PENAL SUM: _______________________________________________________________________
(Words) (Figures)
IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby to the City, subject to the terms printed below or on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By: ___________________________ Signature and Title: Signature and Title:
(Attach Power of Attorney)
Attest: Attest:_________________________ Signature and Title: Signature and Title:
ITB 26-PW06 14 | P a g e
Note: (1) Above addresses are to be used for giving any notice required by the terms of this Bid Bond.
(2) Any singular reference to Bidder, Surety, the City or any other party shall be considered plural where applicable.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to the City upon Default of Bidder the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 The City accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents;
or
3.2 All Bids are rejected by the City; or
3.3 The City fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension of that time agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon Default by Bidder within 30 calendar days after receipt by Bidder and Surety of a written Notice of Default from the City, which Notice will be given with reasonable promptness and will identify this Bond and the Project and include a statement of the amount due.
5. Surety waives notice of, as well as any and all defenses based on or arising out of, any time extension to issue a Notice of Award agreed to in writing by the City and Bidder, provided that the total time, including extensions, for issuing a Notice of Award shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond either prior to 30 calendar days after the Notice of Default required in paragraph 4 above is received by Bidder and Surety or later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the State of Georgia.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
ITB 26-PW06 15 | P a g e
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer or proposal, as applicable under the particular circumstances.
12. The terms of this Bid Bond shall be governed by the laws of the State of Georgia.
ITB 26-PW06 16 | P a g e
QUALIFICATIONS SIGNATURE AND CERTIFICATION
I certify that this offer is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer. I further certify that the provisions of the Official Code of Georgia Annotated, including but not limited to Title 32, Chapter 4, Article 4, Part 2 and Sections 45-10-20 et seq. have not been violated and will not be violated in any respect.
Authorized Signature______________________________Date_______________________
Print/Type Name______________________________________________________________
Print/Type Company Name Here_______________________________________________
CORPORATE CERTIFICATE
I, ___________________________________, certify that I am the Secretary of the Corporation named as Contractor in the foregoing bid; that _______________________________________ who signed said bid in behalf of the Contractor, was then (title)_________________________ of said Corporation; that said bid was duly signed for and in behalf of said Corporation by authority of its Board of Directors, and is within the scope of its corporate powers; that said Corporation is organized under the laws of the State of _________________________________.
This ________________ day of ________________, 20______
______________________________________(Seal) (Signature)
ITB 26-PW06 17 | P a g e
LIST OF SUBCONTRACTORS
I do _________, do not _______, propose to subcontract some of the work on this project. I propose to Subcontract work to the following subcontractors:
Company Name:___________________________________________________
ITB 26-PW06 18 | P a g e
CONTRACTOR AFFIDAVIT AND AGREEMENT
STATE OF GEORGIA
CITY OF MILTON
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm, or corporation which is engaged in the physical performance of services on behalf of the City of Milton has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).
Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
I hereby declare under penalty of perjury that eVerify Number
Date of Authorization
Name of Contractor
SR9 Temporary Gravel Stabilization Installation Project Name of Project
City of Milton, Georgia Name of Public Employer the foregoing is true and correct.
Executed on ____________, ______, 20____ in ____________________(city), ______(state).
Signature of Authorized Officer or Agent:
Printed Name and Title of Authorized Officer or Agent:
SUBSCRIBED AND SWORN BEFORE ME ON
THIS THE ______ DAY OF ______________,20___.
NOTARY PUBLIC
[NOTARY SEAL]
My Commission Expires:
ITB 26-PW06 19 | P a g e
DISCLOSURE FORM
This form is for disclosure of campaign contributions and family member relations with City of Milton officials/employees.
Please complete this form and return as part of your bid package when it is submitted.
Name of Bidder __________________________________________________
Name and the official position of the Milton Official to whom the campaign contribution was made (Please use a separate form for each official to whom a contribution has been made in the past two (2) years.)
List the dollar amount/value and description of each campaign contribution made over the past two (2) years by the Applicant/Opponent to the named Milton Official.
Amount/Value Description
Please list any family member that is currently (or has been employed within the last 9 months) by the City of Milton and your relation:
ITB 26-PW06 20 | P a g e
PROJECT SPECIFICATIONS
The City of Milton Public Works Department requests that interested parties submit formal sealed/electronic bids for the SR9 Temp Gravel Stabilization Installation Project. The scope of this project generally consists of grading and construction of a gravel trail connecting existing sidewalks along State Route 9 within the City of Milton.
PROJECT SPECIFICATIONS
1. To bid on this contract, the Contractor must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list. No exceptions.
Bidders shall submit with the bid a qualification sheet listing project(s) that meet the experience requirement along with references. List should include project date, location, description, and contact information.
ITB 26-PW06 21 | P a g e
2. The Contractor shall comply with the plans and specifications for the SR 9 Temporary Gravel Stabilization Installation as prepared by the City Engineering Project Manager (Design Engineer). The plans may be downloaded at:
https://acrobat.adobe.com/id/urn:aaid:sc:US:9d4267d0-2823-43d4-864a-9159dacbd04a
In addition to other standard specifications referenced herein, the bid package includes:
a. Construction Drawings;
b. Special Provision 163 – Miscellaneous Erosion Control Items;
c. Special Provision 165 - Maintenance of Temporary Erosion and Sedimentation Control
Devices;
d. Special Provision 171 – Silt Fence;
e. Special Provision 700 – Grassing.
3. Where contract documents reference "The Department" or "GA Department of Transportation" or “The Engineer”, it shall also mean "City of Milton."
4. All traffic control measures, and detour signage are the responsibility of the Contractor.
Contractor shall coordinate all work with the City of Milton.
5. Replace, in kind, any vegetation or landscaping damaged during construction. Include cost in the price bid.
6. Unless otherwise directed, all work performed under this contract shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition), and Special Provisions modifying them, except as noted herein.
PROSECUTION AND PROGRESS
The City desires to have all work completed by July 31, 2026. Please indicate on the Bid Sheet your projected response time and calendar days to complete the project. This information will be considered when awarding this contract.
Construction shall begin no later than ten (10) calendar days following the Notice to Proceed. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed within the calendar days indicated on the Bid Schedule.
Inclement weather days will not count against the available calendar days.
Normal workday for this project shall be 9:00 am to 4:00 pm and the normal workweek shall be Monday through Friday. The City will consider extended workdays or workweeks upon written request by the Contractor on a case by case basis. No work will be allowed on City recognized holidays including Memorial Day, July 4th, Labor Day. Thanksgiving Day, and Christmas Day.
The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon https://acrobat.adobe.com/id/urn:aaid:sc:US:9d4267d0-2823-43d4-864a-9159dacbd04a
ITB 26-PW06 22 | P a g e completion of all work. The Contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the Contractor at his expense prior to issuance of Final Acceptance. 5% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City.
The Contractor shall provide all materials, labor, and equipment necessary to perform the work without delay unto completion.
PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.
QC/QA TESTING OF MATERIALS
The Contractor will be responsible for all quality control testing (sampling, testing, and inspections) of materials incorporated into the project. All materials and workmanship shall meet appropriate GDOT specifications. Materials quality control testing types will meet GDOT specifications at a frequency equal to or exceeding that set by those specifications.
Contractor shall secure the services of a GDOT qualified geotechnical testing firm to perform all required tests. Test results shall be provided to the City promptly as the work progresses. Tests shall meet GDOT Specs for type, method, and frequency. This work shall be considered incidental to the rest of the work and no separate payment will be made.
Contractor will be responsible for replacing any work performed with material from rejected sample lot at no cost to the City.
DEVIATION OF QUANTITIES
The quantities given are estimates only and will vary from those indicated. Payment will be made based on actual quantities of work completed and accepted. The City reserves the right to add or delete quantities at any time. Contractor will notify the City in writing if additional items are identified, or quantities of contract items will exceed plan. At no time will Contractor proceed with work outside the prescribed scope of services for which additional payment will be requested without the written authorization of the City.
UTILITIES
Contractor shall be responsible for coordinating any utility relocation necessary to the completion of the work. Contractor is responsible for the materials and labor used for raising of water valves and manholes to the new grade of the paved surface. Any utility covered up or left below the asphalt grade will be raised to the proper grade after the fact. The area around these utilities will be saw-cut and squared off and the final surface course will be concrete. This work shall be considered incidental.
TEMPORARY TRAFFIC CONTROL
The Contractor shall, at all times, conduct his work as to assure the least possible obstruction of traffic.
The safety and convenience of the general public and the residents along the roadway and the protection of persons and property shall be provided for by the contractor as specified in the State
ITB 26-PW06 23 | P a g e of Georgia, Department of Transportation Standard Specifications Sections 104.05, 107.09 and 150.
Traffic whose origin and destination is within the limits of the project, shall be provided ingress and egress at all times unless otherwise specified by the City. The ingress and egress include entrances and exits VIA driveways at various properties, and access to the intersecting roads and streets. The Contractor shall maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project at all times, particularly during inclement weather, to ensure that ingress and egress are safely provided when and where needed.
This work will be done under a road closure with a detour placed by the Contractor. The Contractor will need to have a traffic control plan submitted before work starts. The traffic control plan shall show detour routes and signage needed to provide positive guidance to the motoring public through the detour route. In the event of an emergency situation, the Contractor shall provide access to emergency vehicles and/or emergency personnel through or around the construction area. Any pavement damaged by such an occurrence will be repaired by the Contractor at no additional cost to the City.
The Contractor shall furnish, install and maintain all necessary and required barricades, signs and other traffic control devices in accordance with the latest MUTCD and GDOT specifications, and take all necessary precautions for the protection of the workers and safety of the public.
All existing signs, markers and other traffic control devices removed or damaged during construction operations will be reinstalled or replaced at the Contractor’s expense. At no time will Contractor remove regulatory signing which may cause a hazard to the public. The Contractor shall, within 24 hours place temporary pavement markings (paint or removable tape) matching existing pavement markings on milled or patched pavements. The Contractor shall provide two (2 variable message boards to be placed at the direction of the City.
All personnel and equipment required for maintaining temporary traffic control, public convenience and safety will not be paid for separately and shall be incidental to other pay items.
PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE
The Contractor shall be responsible for the preservation of all public and private property, crops, fishponds, trees, monuments, highway signs and markers, fences, grassed and sodded areas, etc.
along and adjacent to the highway, road or street, and shall use every precaution necessary to prevent damage or injury thereto, unless the removal, alteration, or destruction of such property is provided for under the contract. No stone or asphalt chunks shall be left in the right-of-way and topsoil shall be placed in all disturbed areas before grassing. Contractor is responsible for ensuring that all permanent grassing shall match the existing grassing.
When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect or misconduct in the execution of the work, or in consequence of the non-execution thereof by the Contractor, he shall restore, at his/her own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise restoring as may be directed, or she/he shall make
ITB 26-PW06 24 | P a g e good such damage or injury in an acceptable manner. The Contractor shall correct all disturbed areas before retainage will be released.
CLEANUP
All restoration and clean-up work shall be performed daily. Operations shall be suspended if the contractor fails to accomplish restoration and clean-up within an acceptable period of time.
Asphalt and other debris shall be removed from gutters, sidewalks, yards, driveways, etc. Failure to perform clean-up activities will result in suspension of the work.
EROSION CONTROL
It is the responsibility of the Contractor to follow all Federal, State and Local erosion and sediment control laws and specifications. This includes meeting all NPDES guidelines. The Contractor shall serve as the Primary Permittee for this project and is responsible for filing the NOI and all necessary fees associated with it.
Erosion/Sediment Control measures shall be installed and maintained by the Contractor throughout the duration of the project. The Contractor is responsible for the removal and disposal, of all installed temporary erosion/sediment control measures when affected areas have been restored to a level where vegetative coverings will minimize erosion. The cost for this will be considered incidental to the project and included in the overall bid.
SAFETY
Beginning with mobilization and ending with acceptance of work, the Contractor shall be responsible for providing a clean and safe work environment at the project site. The Contractor shall comply with all OSHA regulations as they pertain to this project.
ITB 26-PW06 25 | P a g e
DETAILS
The 3-board fence that will be installed as a part of the gabion wall will be constructed with 4”x 6” posts with 1”x 6” rails. The posts will be 8’ O.C. The quantities are called out in the Bid Schedule.
ITB 26-PW06 26 | P a g e
Bid Schedule~ Page 1 of 2
Pay Item Description Unit Quantity Unit Price Total
150-1000 Traffic Control LS 1
163-0232 Temporary Grassing AC 1
163-0240 Mulch TN 6
163-0301 Construct and Remove Construction Exits EA 2
163-0528 Construct and Remove Fabric Check Dam - Type C
Fence
EA 6
163-0542 Construct and Remove Rock Filter Ring EA 6
165-0010 Maintenance of Temporary Silt Fence, TP A LF 2230
165-0041 Maintenance of Check Dams - All Types LF 120
165-0101 Maintenance of Construction Exit EA 2
162-0110 Maintenance of Stone Filter Ring EA 6
165-0310 Maintenance of Construction Exit Tire Wash Area EA 1
171-0011 Temporary Silt Fence, Type A LF 1115
210-0100 Grading Complete LS 1
310-1101 GR Aggr Base Crs, Incl Matl TN 400
318-3000 Aggr Surface Crs TN 50
441-5002 Conc Header Curb, 6 in, TP 2 LF 20
700-6910 Permanent Grassing AC 1
700-7000 Agricultural Lime TN 1
700-8000 Fertilizer Mixed Grade TN 0.4
700-8100 Fertilizer Nitrogen Content LB 50
999-0045 Gabion Wall SF 200
4' Tall Wooden Rail Fence LF 100
SR 9 TEMPORARY GRAVEL STABILIZATION
Subtotal
Construction Allowance 30% Total
ITB 26-PW06 27 | P a g e
Bid Schedule ~ Page 2 of 2
Total Bid Price: $____________________________
Construction Allowance: 30 % of Total Bid Price
Total Bid Price Including Construction Allowance: $__________________________________
Print Total Bid Price in Words: _______________________________________________ (including 30% Construction Allowance)
Number of days to fully complete project (exclude weather related days): ___________________
The undersigned, as bidder, declares and represents that it has examined the site of the work and informed himself/herself fully in regard to all conditions pertaining to the place where the work is to be performed, including those conditions affecting the cost of the work and the delivery, handling and storage of materials and equipment. The bidder has examined and read the Bidding Document and has satisfied himself/herself that the Bidding Document is an adequate and acceptable reflection of the work which is required to be performed and that the bidder is willing and able to perform all of the work necessary. The bidder further certifies that no additional information is required to complete the work encompassed by this bid within the cost and schedule established and agreed upon within this bidding document.
In compliance with the attached Specification, the undersigned offers and agrees that if this Bid is accepted, by the City Council within One Hundred and Twenty (120) days of the date of Bid opening, that he will furnish any or all of the Items upon which Prices are quoted, at the Price set opposite each Item, delivered to the designated point(s) within the time specified in the Bid Schedule.
COMPANY __________________________________________________________________
ADDRESS _______________________________________________________________________________
AUTHORIZED SIGNATURE ___________________________________________________________
PRINT/TYPE NAME/TITLE __________________________________________________________________
ITB 26-PW06 28 | P a g e
GENERAL CONDITIONS
Unless otherwise directed, all work performed under this contract shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition), and Special Provisions modifying them, except as noted below.
SECTION 101 DEFINITION AND TERMS
Section 101.10 Delete as written and substitute the BOARD following:
CITY COUNCIL OF CITY OF MILTON, GEORGIA
Section 101.14 Delete as written and substitute the COMMISSIONER following:
DIRECTOR OF PUBLIC WORKS, CITY OF MILTON
Section 101.16 Delete the second paragraph and substitute CONTRACT the following:
The Contract Documents shall be composed of the Advertisement for Bid; Notice to Contractors; Form of Bid Proposal; General Conditions; Special Provisions;
Detail Specifications, as identified in Section 105.03;
Form of Contract; Form of Bond(s); Addenda; the drawings, including all changes incorporated herein before their execution; and also any Change Orders and Supplemental Agreements that are required to complete the construction of The Work in an acceptable manner, including authorized extensions thereof, all of which constitute one instrument. No oral agreement or orders are to be considered as valid or as a part of the Contract.
Section 101.22 Delete as written and substitute the DEPARTMENT following:
PUBLIC WORKS DEPARTMENT CITY OF MILTON
Section 101.24 Delete as written and substitute the ENGINEER following:
DIRECTOR OF PUBLIC WORKS, CITY OF MILTON,
ACTING DIRECTLY OR THROUGH A DULY
AUTHORIZED REPRESENTATIVE OF THE
DIRECTOR
ITB 26-PW06 29 | P a g e
Section 101.47 Delete as written and substitute STATE HIGHWAY ENGINEER following:
DIRECTOR OF PUBLIC WORKS, CITY OF MILTON,
ACTING DIRECTLY OR THROUGH A DULY
AUTHORIZED REPRESENTATIVE OF THE
DIRECTOR
Section 101.74 Retain as written and substitute the SUPPLEMENTAL AGREEMENT following:
Any Supplemental Agreement that has a dollar value amount that is less than $25,000.00 shall not require the assent of the Surety."
Section 101.84 Add: DIRECTOR OF PUBLIC WORKS
CITY OF MILTON
SECTION 102 - BIDDING REQUIREMENTS AND CONDITIONS
Section 102.05 EXAMINATION OF PLANS, Add the following paragraph: SPECIFICATIONS, SPECIAL PROVISIONS, “The City will not be responsible for AND SITE OF THE WORK Bidders’ errors or misjudgment, nor for any information on local conditions or general laws and regulations.”
Section 102.07 REJECTION OF Add the following subparagraphs PROPOSALS “I. The City reserves the right to reject any and all bids, to waive technicalities, and to make an award as deemed in its best interest. It is understood that all bids are made subject to this Agreement, that the City reserves the right to award the bid to the lowest, responsible Bidder, and in arriving at this decision, full consideration will be given to the reputation of the Bidder, his financial responsibility, and work of this type successfully completed.
“J. The City also reserves the right to reject any and all bids from any person, firm, or corporation who is in arrears in any debt or obligation to The City of Milton, Georgia.”
Section 102.08 PROPOSAL Substitute the following for the first GUARANTY sentence
“No bid will be considered unless it is accompanied by an acceptable bid bond an amount not less than five percent
ITB 26-PW06 30 | P a g e
(5%) of the amount bid and made payable to City of Milton, Georgia. Such Bid Bond shall be on the forms provided by the City.”
Add Section 102.15 ADDENDA AND INTERPRETATION Delete in its entirety and substitute the following:
Bids shall be submitted on the Bid Form provided by the City.
The bid package as described in Notice to Contractors, Page 1 must be submitted with the bid. Failure to do so could result in the omission of pertinent documents and the rejection of the apparent low bid.”
Section 102.09 DELIVERY OF PROPOSALS: Add the following as 102.15:
“No interpretation of the meaning of the Contract Documents will be made orally to any Bidder. Any request for such interpretation should be in writing addressed to the Purchasing Department, The City of Milton 2006 Heritage Walk Milton, Ga. 30004. TEL. 678/242-2500, FAX 678/242-2499.Each such interpretation shall be given in writing, separately numbered and dated, and furnished to each interested Bidder. Any request not received in time to accomplish such interpretation and distribution will not be accepted.
SECTION 103 - AWARD OF AWARD AND EXECUTION OF CONTRACT
Section 103.02 AWARD OF CONTRACT Delete in its entirety and substitute the following:
“The contract, if awarded, shall be awarded to the lowest responsible bidder. The City of Milton reserves the right to exercise exclusive discretion as to the responsibility of any bidder.
The contract shall be executed on the forms attached, will be subject to all requirements of the Contract Document, and shall form a binding Contract between the contracting parties.”
Section 103.05 REQUIREMENTS OF Delete in its entirety and substitute the CONTRACT BONDS following:
“At the time of the execution of the contract, and as a part
ITB 26-PW06 31 | P a g e thereof, the successful bidder shall furnish Contract Bond Below:
Performance Bond in the full amount of the contract.
Payment Bond in the full amount of the contract.
Maintenance bond in the amount of one-third (1/3) of the contract. “
Section 103.07 FAILURE TO Delete in its entirety and substitute the EXECUTE CONTRACT following:
“Failure to execute the Contract Performance, Payment or Maintenance Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days after the date of Notice of Award of the Contract, may be just cause for the annulment of the award and for the forfeiture of the proposal guaranty to the City of Milton, not as a penalty, but as liquidation of damages sustained. At the discretion of the City, the award may then be made to the next lowest bidder, may be re-advertised, or may be constructed by City forces. The Contract and Contract bonds shall be executed in quadruplicate.”
SECTION 107 - LEGAL REGULATIONS AND RESPONSIBILITY TO THE PUBLIC
This is the start of the file's text. The full file is on GovTribe.