This Invitation to Bid (ITB 26-FD02) issued by the City of Milton, Georgia Fire Department requests sealed bids for the removal of an existing generator and automatic transfer switch (ATS) at Milton Fire Station 43 and the installation of a new fixed industrial generator system consisting of one 130 kW, 120/208V generator and one 600-amp service-rated ATS. The project is funded through the Hazard Mitigation Grant Program (HMGP Project Number 4738-0035). Bids must be submitted electronically via BidNet Direct at www.miltonga.gov/finance/bids-rfps by May 18, 2026 at 2:00 p.m. EST, with public bid opening at approximately 2:30 p.m. the same day. The deadline for written questions is May 4, 2026 at 5:00 p.m., with answers posted by May 7, 2026. Tentative contract award is scheduled for approximately June 1, 2026. The selected contractor must commence work within ten calendar days of receiving the Notice to Proceed and complete all work within 120 calendar days. The project is located at Milton Fire Station 43, 750 Hickory Flat Road, Milton, Georgia 30004.
Bidders must be licensed and qualified to perform electrical and generator installation work in Georgia with a minimum of five years' experience installing industrial or commercial generator systems of 100 kW or larger and demonstrated experience with ATS installation. All bid items are priced on a lump sum basis with line items for generator facility, transfer switch and connections, shipping, and installation. A bid bond equal to five percent of the base bid is required; the successful bidder must provide performance and payment bonds equal to 100 percent of the contract price and a maintenance bond equal to one-third of the contract price. Contractors must maintain comprehensive general liability insurance of $1,000,000 per occurrence with $2,000,000 aggregate, commercial automobile liability of $1,000,000, workers' compensation as required by Georgia law with $1,000,000 employers' liability, and builder's risk insurance equal to 100 percent of the contract price. The bid must include all costs for removal of existing equipment, delivery, installation, startup, functional testing, labor, materials, permits, and compliance with all applicable building and electrical codes. Bidders must provide proof of compliance with the federal E-Verify program, include a minimum of three professional references for similar work completed within the last five years, and acknowledge all addenda. The City reserves the right to reject any or all bids and to cancel the contract with 30 days' written notice.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Number:
ITB 26-FD02
Project Name
Generator and ATS Replacement – Fire Station 43
HMGP Project Number: 4738-0035
Due Date and Time: May 18, 2026 by 2:00 p.m. EST
*Link for virtual bid opening will be posted as a
“Communication” under this solicitation listing on the
City’s procurement portal, BidNet Direct.
Number of Pages: 104
ISSUING DEPARTMENT INFORMATION
Issue Date:
April 16, 2026
City of Milton
Fire Department
2006 Heritage Walk
Milton, GA 30004
Phone: 678-242-2500
Website: www.miltonga.gov
INSTRUCTIONS TO BIDDERS
Electronic Submittal: **Bids must be submitted electronically via Milton’s
BidNet procurement portal/platform at www.miltonga.gov
If you have not registered as a vendor via BidNet we encourage you to register. There is no cost to join, and you will be notified of any potential bid opportunities with the City of
Milton as well as other agencies who are part of the Georgia Purchasing
Group.
Mark Face of Envelope/Package:
Bid Number: ITB 26-FD02
Name of Company or Firm
Special Instructions:
Deadline for Written Questions
May 4, 2026 by 5:00 p.m.
Submit questions online via the BidNet
Direct procurement portal at www.miltonga.gov/finance/bids-rfps
BIDDERS MUST COMPLETE THE FOLLOWING
Bidder Name/Address:
Authorized Bidder Signatory:
(Please print name and sign in ink)
Bidder Phone Number: Bidder FAX Number:
Bidder Federal I.D. Number: Bidder E-mail Address:
BIDDERS MUST RETURN THIS COVER SHEET WITH BID RESPONSE
City OF MILTON INVITATION TO BID
(THIS IS NOT AN ORDER)
http://www.miltonga.gov/ http://www.miltonga.gov/
Table of Contents
Topic Page
Invitation to Bid 3
Schedule of Events 4
Bidding Instructions (What must be submitted) 5
Insurance/Bond Requirements 6
Bid Form and Addenda Acknowledgement 10
Bid Bond (3 pages) 12
Qualifications Signature and Certification 15
Corporate Certificate 15
List of Subcontractors 16
Contractor Affidavit and Agreement (eVerify) 17
Disclosure Form 18
Project Specifications 19
Bid Submittal Form 21
Appendix A – Federal Requirements 22
Sample Contract Agreement 40
Invitation to Bid ITB 26-FD02
The City of Milton is seeking sealed bids from qualified contractors for the removal of the existing generator and automatic transfer switch (ATS) and the installation of a new fixed industrial generator system at Milton Fire Station 43. All bidders must comply with all general and special requirements of the bid information and instructions enclosed herein.
Sealed bids will be received no later than 2:00 PM Local Time on May 18, 2026. Electronic bids shall be submitted online via BidNet Direct, the City’s procurement portal, at www.miltonga.gov/finance/bids-rfps .
At approximately 2:30 P.M. Local Time on the day bids are received the bids will be publicly opened and the bidder’s name and total bid amount will be read aloud at: City of Milton
City Hall, 2006 Heritage Walk, Milton, GA 30004. *Link for the virtual bid opening will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.
Bids received after the above time will not be accepted.
Questions must also be submitted online in the same manner listed above for bids. Deadline for questions is May 4, 2026, at 5:00 p.m. Official answers to questions and potential changes to the ITB (Addendums) will be posted at the same web locations as the ITB on or about
May 7, 2026. Any other form of interpretation, correction, or change to this ITB will not be binding upon the City. It is the bidder’s responsibility to check the websites for potential updates. Please refer to Bid (ITB 26-FD02) and bid name (Generator and ATS Replacement
– Fire Station 43) when requesting information.
The City of Milton reserves the right to reject any or all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Milton.
The selected contractor must be able to start work within ten (10) calendar days after the
“Notice to Proceed” is issued. The time of completion for the project is to be determined prior to the issuance of the “Notice to Proceed.” If weather affects the required completion schedule, The City and selected contractor will negotiate a new completion date.
http://www.miltonga.gov/finance/bids-rfps
SCHEDULE OF EVENTS
FOR REFERENCE ONLY - DO NOT SUBMIT WITH BID RESPONSE
EVENT DATE
ITB Issue Date April 16, 2026
Deadline for Receipt of Written Questions 5:00 PM on May 4, 2026
Posting of Written Answers by City to Websites on or about May 7, 2026
ITB DUE No Later than 2:00 P.M. on May 18, 2026
Tentative Contract Award (on/about) June 1, 2026
Notice to Proceed (on/about) To be coordinated with the Contractor
NOTE: PLEASE CHECK THE CITY WEBSITE (http://www.miltonga.gov) FOR ADDENDA
AND SCHEDULE UPDATES.
http://www./
BIDDING INSTRUCTIONS
FAILURE TO RETURN THE FOLLOWING BID DOCUMENTS COULD RESULT IN THE BID
BEING DEEMED NON-RESPONSIVE AND BEING REJECTED:
Item Description Page(s)
1 Filled out and Signed Invitation to Bid (Cover Sheet) 1
2 Bid Form and Addenda Acknowledgement (2 pages) 10-11
3 Bid Bond (3 pages) 12-14
4 Qualifications Signature and Certification 15
5 List of Subcontractors 16
6 Contractor Affidavit and Agreement (eVerify) 17
7 Disclosure Form 18
8 Bid Submittal Form 21
INFORMATION AND INSTRUCTIONS
The purpose of this solicitation is to enter a lump sum “purchasing contract” with one firm to be the primary supplier of the Generator and ATS Replacement – Fire
Station 43, ITB 26-FD02 (HMGP Project #4738-0035).
No specification expressed or implied shall be construed as any type of restrictive specification that would limit competition.
Unless clearly shown as “no substitute” or any words to that effect, any items in these contract documents which have been identified, described or referenced by a brand name or trade name are for reference only. Such identification is intended to be descriptive but not restrictive and is to indicate the general quality and characteristics of products that may be offered. Each bid item for which an equivalent item is proposed must be individually identified on the bid sheet with the following information: brand name, model or manufacturer’s number or identification regularly used in the trade. Photographs, specifications and cut sheets shall be provided of the proposed alternative. The City shall be the sole judge of the suitability of the proposed alternative and may consider function, design, materials, construction, workmanship, finishes, operating features, overall quality, local service facilities, warranty terms and service or other relevant features.
The City reserves the right to cancel the contract at any time with 30 days’ written notice.
Title to any supplies, materials, equipment or other personal property shall remain the Contractors’ until fully paid for by the City.
All items to be bid FOB, Milton, Georgia. No sales taxes are to be charged.
Any damage to any vehicle or equipment incurred during the course of work shall be repaired at the Contractor’s expense to the complete satisfaction of the City of
Milton with no additional expense to the City.
EVALUATION
The City intends to evaluate the ITB on the lowest, responsible and responsive bidder.
Bids may be found nonresponsive at any time during the evaluation or contract process, if any of the required information is not provided; the submitted price is found to be inadequate; or the proposal is not within the specifications described and required in the ITB. If a bid is found to be non-responsive or non-qualified, it will not be considered further.
INSURANCE REQUIREMENTS
Within ten (10) days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best
Rating A-6 or higher and acceptable to the City.
Within ten (10) days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best
Rating A-6 or higher and acceptable to the City. Insurance requirements are provided below and included in the CONTRACT AGREEMENT (Section 7.K).
(1) Requirements: The Contractor shall have and maintain in full force and effect for the duration of this Agreement, insurance insuring against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work by the Contractor, its agents, representatives, employees or subcontractors. All policies shall be subject to approval by the
City Attorney as to form and content. These requirements are subject to amendment or waiver if so approved in writing by the City.
(2) Minimum Limits of Insurance: Contractor shall maintain the following insurance policies with limits no less than:
(a) Comprehensive General Liability of $1,000,000 (one million dollars) limit per single occurrence, $2,000,000 (two million dollars) umbrella, including coverage for bodily and personal injury, sickness, disease or death, injury to or destruction of property, including loss of use resulting therefrom, vandalism, property loss and theft.
(b) Comprehensive Automobile Liability (owned, non-owned, hired) of
$1,000,000 (one million dollars) combined single limit per occurrence for bodily and personal injury, sickness, disease or death, injury to or destruction of property, including loss of use resulting therefrom.
(c) Workers' Compensation limits as required by the State of Georgia and
Employers Liability limits of $1,000,000 (one million dollars) per accident.
(3) Deductibles and Self-Insured Retentions: Any deductibles or self-insured retentions must be declared to and approved by the City in writing.
(4) Other Insurance Provisions: The policy is to contain, or be endorsed to contain, the following provisions:
(a) General Liability and Automobile Liability Coverage.
(i) The City and City Parties are to be covered as insureds. The coverage shall contain no special limitations on the scope of protection afforded to the City or City Parties.
(ii) The Contractor’s insurance coverage shall be primary noncontributing insurance as respects to any other insurance or self-insurance available to the City or City Parties. Any insurance or self-insurance maintained by the City or City Parties shall be in excess of the Contractor’s insurance and shall not contribute with it.
(iii) Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City or City Parties.
(iv) Coverage shall state that the Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
(v) Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross-liability exclusion.
(vi) The insurer agrees to waive all rights of subrogation against the
City and City Parties for losses arising from Work performed by the
Contractor for the City for General Liability coverage only.
(b) Workers' Compensation Coverage: The insurer providing Workers’
Compensation Coverage will agree to waive all rights of subrogation against the City and City Parties for losses arising from Work performed by the Contractor for the City.
(c) All Coverages:
(i) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City.
(ii) Policies shall have concurrent starting and ending dates.
(5) Acceptability of Insurers: Insurance is to be placed with insurers authorized to do business in the State of Georgia and with an A.M. Bests' rating of no less than A:VI.
(6) Verification of Coverage: Contractor shall furnish the City with certificates of insurance and endorsements to the policies evidencing coverage required by this clause prior to the start of Work. The certificate of insurance and endorsements shall be on a form utilized by Contractor’s insurer in its normal course of business and shall be received and approved by the City within ten
(10) days of the Notice of Award. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. The
Contractor shall provide proof that any expiring coverage has been renewed or replaced at least two (2) weeks prior to the expiration of the coverage.
(7) Subcontractors: Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated in this Agreement, including but not limited to naming the Parties as additional insureds.
(8) Claims-Made Policies: Contractor shall extend any claims-made insurance policy for at least six (6) years after termination or final payment under the
Agreement, whichever is later.
(9) City as Additional Insured and Loss Payee: The City shall be named as an additional insured and loss payee on all policies required by this Agreement, except the City need not be named as an additional insured and loss payee on any
Workers’ Compensation policy.
BONDING REQUIREMENTS
Each bid must be accompanied with a BID BOND (bond only: certified checks or other forms are not acceptable) in an amount equal to five percent (5%) of the base bid, payable to the City of Milton. Said bid bond guarantees the bidder will enter into a contract to construct the project strictly within the terms and conditions stated in this bid and in the bidding and contract documents, should the construction contract be awarded.
The Successful Bidder shall be required to furnish PAYMENT AND PERFORMANCE
BONDS for the faithful performance on the contract and a bond to secure payment of all claims for materials furnished and/or labor performed in performance of the project, both in amounts equal to one hundred percent (100%) of the base bid price.
The Successful Bidder shall also be required to furnish a MAINTENANCE BOND, in the amount of one-third (1/3) of the contract price, guaranteeing the repair or replacement caused by defective workmanship or materials for a period of two (2) years from the completion of construction.
Bonds shall be issued by a corporate surety appearing on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to do business in the
State of Georgia. Bonds shall be on the forms provided by the City and subject to the review and approval of the City Attorney.
Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners shall execute Bond.
OATH
Prior to commencing the Work, the successful bidder shall execute a written oath as required by O.C.G.A. §§ 32-4-122 and 36-91-21(e).
COST OF PREPARING A BID
The costs for developing and delivering responses to this ITB and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the bidder. The City is not liable for any expense incurred by the bidder in the preparation and presentation of their proposal. All materials submitted in response to this ITB become the property of the City of Milton.
[BIDDERS MUST RETURN THIS FORM WITH BID RESPONSE]
BID FORM and ADDENDA ACKNOWLEDGEMENT
TO: PURCHASING OFFICE
CITY OF MILTON
MILTON, GEORGIA 30004
Ladies and Gentlemen:
In compliance with your Invitation to Bid, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Milton, Georgia, to provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the Work in the manner therein specified within the time specified, as therein set forth, for:
Bid Number 26-FD02
Generator and ATS Replacement – Fire Station 43 (HMGP Project #4738-0035)
The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the
Work, and hereby proposes and agrees that if his bid is accepted, he will contract with the
City of Milton in full conformance with the Contract Documents.
Unless otherwise directed, all work performed shall be in accordance with the Georgia
Department of Transportation Standard Specifications, Construction of Transportation
Systems (current edition).
It is the intent of this Bid to include all items of construction and all Work called for in the
Specifications, or otherwise a part of the Contract Documents.
In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.
The Bidder agrees that the cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the Contract
Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid.
The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces within ten (10) calendar days from the Notice to Proceed, and to complete all Work as scheduled in Task Order(s) issued.
If weather affects the required completion schedule, the City and selected Bidder will negotiate a new completion date.
Attached hereto is an executed Bid Bond in the amount of __________________ Dollars ($
(Five Percent of Amount Bid).
If this bid shall be accepted by the City of Milton and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory
Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of
Milton may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond shall be forfeited to the City of Milton as liquidated damages.
Bidder acknowledges receipt of the following addenda:
Addendum No. Date viewed
Bidder further declares that the full name and resident address of Bidder’s Principal is as follows:
Signed, sealed, and dated this _______ day of _____________, 20_____
Bidder _______________________ (Seal)
Company Name
Bidder Mailing Address:
Signature: ________________________________________
Print Name: ______________________________________
Title: _____________________________________________
[BIDDERS MUST RETURN THESE SHEETS WITH BID RESPONSE]
BID BOND
CITY OF MILTON, GEORGIA
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (hereinafter referred to as the “City” (Name and Address):
City of Milton, Georgia
ATTN: Purchasing Office
2006 Heritage Walk
Milton, Georgia 30004
BID
BID DUE DATE:
PROJECT (Brief Description Including Location):
BOND
BOND NUMBER:
DATE (Not later that Bid due date):
PENAL SUM: _______________________________________________________________________
(Words) (Figures)
IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby to the City, subject to the terms printed below or on the reverse side hereof, do each cause this Bid
Bond to be duly executed on its behalf by its authorized officer, agent or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By: ___________________________
Signature and Title: Signature and Title:
(Attach Power of Attorney)
Attest: Attest:_________________________
Signature and Title: Signature and Title:
Note: (1) Above addresses are to be used for giving any notice required by the terms of this Bid Bond.
(2) Any singular reference to Bidder, Surety, the City or any other party shall be considered plural where applicable.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to the City upon Default of Bidder the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 The City accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents;
or
3.2 All Bids are rejected by the City; or
3.3 The City fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension of that time agreed to in writing by
Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon Default by Bidder within 30 calendar days after receipt by Bidder and Surety of a written Notice of Default from the
City, which Notice will be given with reasonable promptness and will identify this Bond and the Project and include a statement of the amount due.
5. Surety waives notice of, as well as any and all defenses based on or arising out of, any time extension to issue a Notice of Award agreed to in writing by the City and Bidder, provided that the total time, including extensions, for issuing a Notice of Award shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond either prior to 30 calendar days after the Notice of Default required in paragraph 4 above is received by Bidder and Surety or later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the State of Georgia.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer or proposal, as applicable under the particular circumstances.
12. The terms of this Bid Bond shall be governed by the laws of the State of Georgia.
QUALIFICATIONS SIGNATURE AND CERTIFICATION
I certify that this offer is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer. I further certify that the provisions of the Official Code of Georgia Annotated, including but not limited to Title
32, Chapter 4, Article 4, Part 2 and Sections 45-10-20 et seq. have not been violated and will not be violated in any respect.
Authorized Signature______________________________Date_______________________
Print/Type Name______________________________________________________________
Print/Type Company Name Here_______________________________________________
CORPORATE CERTIFICATE
I, ___________________________________, certify that I am the Secretary of the Corporation named as Contractor in the foregoing bid; that _______________________________________ who signed said bid in behalf of the Contractor, was then (title)_________________________ of said Corporation; that said bid was duly signed for and in behalf of said Corporation by authority of its Board of Directors, and is within the scope of its corporate powers; that said
Corporation is organized under the laws of the State of _________________________________.
This ________________ day of ________________, 20______
______________________________________(Seal)
(Signature)
LIST OF SUBCONTRACTORS
I do _________, do not _______, propose to subcontract some of the work on this project. I propose to Subcontract work to the following subcontractors:
Company Name:___________________________________________________
BIDDERS MUST RETURN THIS FORM WITH BID RESPONSE]
CONTRACTOR AFFIDAVIT AND AGREEMENT
STATE OF GEORGIA
CITY OF MILTON
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-
91, stating affirmatively that the individual, firm, or corporation which is engaged in the physical performance of services on behalf of the City of Milton has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in
O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).
Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
I hereby declare under penalty of perjury that eVerify Number
Date of Authorization
Name of Contractor
Generator and ATS Replacement – Fire
Station 43 (HMGP Project #4738-0035)
Name of Project
City of Milton, Georgia
Name of Public Employer the foregoing is true and correct.
Executed on ____________, ______, 20____ in
____________________(city), ______(state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME ON
THIS THE ______ DAY OF ______________,20___.
NOTARY PUBLIC
[NOTARY SEAL]
My Commission Expires:
DISCLOSURE FORM
This form is for disclosure of campaign contributions and family member relations with
City of Milton officials/employees.
Please complete this form and return as part of your bid package when it is submitted.
Name of Bidder __________________________________________________
Name and the official position of the Milton Official to whom the campaign contribution was made (Please use a separate form for each official to whom a contribution has been made in the past two (2) years.)
List the dollar amount/value and description of each campaign contribution made over the past two (2) years by the Applicant/Opponent to the named Milton Official.
Amount/Value Description
Please list any family member that is currently (or has been employed within the last 9 months) by the City of Milton and your relation:
PROJECT SCOPE
The City of Milton is requesting sealed bids for the removal of the existing generator and automatic transfer switch (ATS) at Milton Fire Station 43 and the installation of a new fixed industrial generator system. This project is funded through the Hazard Mitigation Grant
Program (HMGP), Project Number 4738-0035.
The replacement system shall consist of one (1) 130 kW, 120/208V generator and one (1)
600-amp service-rated automatic transfer switch (ATS) rated at 120/208V.
The Contractor shall remove the existing generator and ATS currently serving Fire Station
43 located at 750 Hickory Flat Rd, Milton, Georgia 30004. The City will retain ownership of the removed generator for auction, and the Contractor shall coordinate with the City regarding its removal and placement at a location designated by the City. The new generator shall be installed in the same location as the existing generator.
If required, the Contractor shall modify, extend, or reinforce the existing concrete pad or base to accommodate the new generator and ensure proper installation, stability, and operation.
All removed equipment shall remain the property of the City, and the Contractor shall have no claim to salvage, resale, or disposal rights for the generator, ATS, or associated components.
Bidders shall include all costs associated with the project, including but not limited to removal of existing equipment; delivery, installation, startup, and functional testing of the new generator and ATS to ensure full operational capability. The bid shall also cover all labor, materials, equipment, permits, and any additional components required to complete the installation and place the system into service.
All work shall comply with applicable local, state, and national building and electrical codes, as well as all relevant generator manufacturer requirements, codes, and standards. Contractor shall ensure the system is properly installed, tested, and fully operational upon project completion.
Bidders shall include documentation of the manufacturer’s warranty for the generator and associated equipment, as well as a written statement outlining the Contractor’s warranty covering workmanship and installation related to the generator system.
Address of the Fire Station location where the generator shall be installed:
Milton Fire Station 43
750 Hickory Flat Rd.
Milton, GA 30004
• Project Timeline / Completion
Contractor shall complete all work under this ITB within 120 calendar days from the
Notice to Proceed. Any delays must be communicated in writing and approved by the City. Substantial completion shall be achieved on or before the Completion
Date and shall include full startup, testing, and verification that the generator system is fully operational and functional for its intended use. The City has the right to impose Liquidated Damages.
• Contractor Qualifications / Licensing ~ Bidders must include in bid submittal:
applicable certifications, licenses, etc. as well as a minimum of three (3) references for similar work completed within the last five (5) years. Reference should include contactor’s email address and phone number.
Bidders must be licensed and qualified to perform electrical and generator installation work in the State of Georgia. The contractor shall have:
A minimum of five (5) years of experience installing industrial or commercial generator systems of 100 kW or larger.
Demonstrated experience with automatic transfer switch (ATS) installation.
Proof of insurance, including general liability and workers’ compensation, in amounts acceptable to the City.
• Startup, Training, and Documentation ~
Contractor shall:
Perform a complete startup and commissioning of the generator and ATS.
Provide hands-on training to designated Milton Fire personnel on operation and basic troubleshooting.
Deliver complete documentation, including operator manuals, wiring diagrams, maintenance schedules, and warranty information.
All bidders must comply with all general and special requirements of the ITB information and instructions enclosed herein.
ITB 26-FD02 BID SCHEDULE
Description Cost
Generator
Facility Transfer Switch & Connections (ATS)
Shipping
Installation
Print Bid (Total Cost): $_______________________________
Print Total Bid Price in Words (Total Cost) : ____________________________________________
The undersigned, as bidder, declares and represents that it has examined the site of the work and informed himself/herself fully in regard to all conditions pertaining to the place where the work is to be performed, including those conditions affecting the cost of the work and the delivery, handling and storage of materials and equipment. The bidder has examined and read the Bidding Document and has satisfied himself/herself that the
Bidding Document is an adequate and acceptable reflection of the work which is required to be performed and that the bidder is willing and able to perform all of the work necessary. The bidder further certifies that no additional information is required to complete the work encompassed by this bid within the cost and schedule established and agreed upon within this bidding document.
In compliance with the attached Specification, the undersigned offers and agrees that if this Bid is accepted, by the City Council within One Hundred and Twenty (120) days of the date of Bid opening, that he will furnish any or all of the Items upon which Prices are quoted, at the Price set opposite each Item, delivered to the designated point(s) within the time specified in the Bid Schedule.
COMPANY_________________________________________________________________
ADDRESS__________________________________________________________________
AUTHORIZED SIGNATURE____________________________________________________
PRINT / TYPE NAME & TITLE___________________________________________________
Appendix A to City of Milton Invitation to Bid 26-FD02 (Generator and
ATS Replacement – Fire Station 43: HMGP Project #4738-
0035)
Certifications Regarding Conflict of Interest; Tax Delinquency;
Lobbying
By submitting a bid, each contractor certifies that to the best of its knowledge no circumstances exist which will cause a conflict of interest in performing the services required by this ITB, that no employee of the City, nor any member thereof, nor any public agency or official affected by the proposed contract for services has any pecuniary interest in the business of the firm or its subcontractor(s), and that no person associated with the firm or its subcontractor(s) has any interest that would conflict in any manner or degree with the performance of the proposed contract.
By submitting a bid, the bidder certifies the accuracy of the following two statements: (1) The bidder represents that it is not a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability. (2) The bidder represents that it is not a corporation that was convicted of a criminal violation under any Federal law within the preceding 24 months.
By submitting a bid, the bidder certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the bidder, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in connection with this
Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
(3) The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Davis-Bacon-Related Act Requirements
Compliance with Davis Bacon prevailing wage rates is a requirement of the contract, and bids should reflect the current Davis Bacon general wage determination for the area where construction will occur.
The following is the prevailing wage determination for Fulton County, taken from
Fulton County in Georgia. County, Georgia - Prevailing Wages | Davis-Bacon
Wages "General Decision Number: GA20260039 01/02/2026
Superseded General Decision Number: GA20250039
State: Georgia
Construction Type: Residential
County: Fulton County in Georgia.
RESIDENTIAL CONSTRUCTION PROJECTS (Consists of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 01/02/2026
ENGI0926-009 08/01/2025
Rates Fringes
Operating Engineers:
Backhoe, Compactor, and
Loader......................$ 28.32 13.45
ENGI0926-014 08/01/2025
Operating Engineer:
Bulldozer...................$ 28.32 13.45 https://davisbaconwages.com/state/ga/fulton-county-in-georgia./ https://davisbaconwages.com/state/ga/fulton-county-in-georgia./
PLAS0148-004 07/01/2023
CEMENT MASON/CONCRETE FINISHER... $ 27.15 11.01
SHEE0085-006 08/01/2023
SHEET METAL WORKER (including
HVAC duct installation)
Buildings over 100,000 square feet.................$ 32.60 15.52
Buildings up to 100,000 square feet.................$ 25.49 11.73
FOOTNOTE: Work on swinging stages, boatswains chairs or scaffolds, booms, or scissors lifts over 50 ft. high: $1.25 per hour additional.
SUGA2008-095 08/14/2008
BRICKLAYER....................... $ 13.83 0.00
CARPENTER, Excludes Drywall
Hanging, and Form Work........... $ 12.00 0.00
DRYWALL FINISHER/TAPER.......$ 13.45 0.00
DRYWALL HANGER................... $ 11.42 0.00
ELECTRICIAN, Includes
Installation of Alarms........... $ 11.57 0.00
FORM WORKER...................... $ 8.50 0.16
HVAC MECHANIC (HVAC Pipe
Installation).................... $ 11.14 0.00
LABORER: Common or General.....$ 10.09 0.00
LABORER: Mason Tender........... .$ 8.00 0.00
OPERATOR: Excavator............. $ 8.96 0.00
PAINTER: Brush, Roller and
Spray, Excludes Drywall
Finishing/Taping................. $ 10.57 0.00
PLUMBER, Excludes HVAC Pipe
Installation..................... $ 11.53 0.00
ROOFER.......................... .$ 11.50 0.00
TILE SETTER...................... $ 11.07 0.00
TRUCK DRIVER..................... $ 12.13 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Equal Opportunity
All work procured and performed must strictly comply with federal Equal
Employment Opportunity requirements (Executive Order No. 11246 and amendments and supplements to that Order). More details regarding these requirements are found in Exhibit N.1 to the Sample Contract attached to the ITB.
Standard Federal Equal Employment Opportunity Construction
Contract Specifications (Executive Order 11246)
1. As used in these specifications:
a. “Covered area” means the geographical area described in the solicitation from which this contract resulted;
b. “Director” means Director, Office of Federal Contract Compliance Programs, United States Department of Labor, or any person to whom the Director delegates authority;
c. “Employer identification number” means the Federal Social Security number used on the Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941.
d. “Minority” includes:
(i) Black (all persons having origins in any of the Black African racial groups not of
Hispanic origin);
(ii) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or other Spanish Culture or origin, regardless of race);
(iii) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and
(iv) American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).
2. Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted.
3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the U.S. Department of Labor in the covered area either individually or through an association, its affirmative action obligations on all work in the Plan area
(including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. Contractors must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan.
Each Contractor or Subcontractor participating in an approved Plan is individually required to comply with its obligations under the EEO clause, and to make a good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other Contractors or Subcontractors toward a goal in an approved Plan does not excuse any covered Contractor's or Subcontractor's failure to take good faith efforts to achieve the Plan goals and timetables.
4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 7 a through p of these specifications. The goals set forth in this solicitation are expressed as percentages of the total hours of employment and training of minority and https://www.law.cornell.edu/cfr/text/41/60-4 female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Covered Construction contractors performing construction work in geographical areas where they do not have a Federal or federally assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed. Goals are published periodically in the FEDERAL REGISTER in notice form, and such notices may be obtained from any Office of Federal Contract Compliance Programs office or from
Federal procurement contracting officers. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified.
5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the Contractor has a collective bargaining agreement, to refer either minorities or women shall excuse the Contractor's obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto.
6. In order for the nonworking training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees must be employed by the
Contractor during the training period, and the Contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor.
7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following:
a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the Contractor's employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.
b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations' responses.
c. Maintain a current file of the names, addresses and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefor, along with whatever additional actions the Contractor may have taken.
https://www.govinfo.gov/link/cpd/executiveorder/11246
d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the
Contractor a minority person or woman sent by the Contractor, or when the
Contractor has other information that the union referral process has impeded the
Contractor's efforts to meet its obligations.
e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 7b above.
f. Disseminate the Contractor's EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company
EEO policy on bulletin boards accessible to all employees at each location where construction work is performed.
g. Review, at least annually, the company's EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination or other employment decisions including specific review of these items with onsite supervisory personnel such as
Superintendents, General Foremen, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter.
h. Disseminate the Contractor's EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the Contractor's EEO policy with other
Contractors and Subcontractors with whom the Contractor does or anticipates doing business.
i. Direct its recruitment efforts, both oral and written, to minority, female and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the Contractor's recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.
j. Encourage present minority and female employees to recruit other minority persons and women and, where reasonable, provide after school, summer and vacation employment to minority and female youth both on the site and in other areas of a
Contractor's work force.
k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR part 60-3.
l. Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities.
m. Ensure that seniority…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .