ITB 26-FD01: Fire Station Cascade Systems
This Invitation to Bid (ITB) document issued by the City of Milton Fire Department in Milton, Georgia solicits sealed bids from qualified vendors to provide and install two Self-Contained Breathing Apparatus (SCBA) air compressors and fill station systems. All equipment must be manufactured in the USA. Unit 1, a triple fill station system, will be installed at Milton Fire Station 43 located at 750 Hickory Flat Road, while Unit 2, a double fill station system, will be installed at Milton Fire Station 42 located at 15240 Thompson Road. Both compressor units must comply with specified dimensions not exceeding 67 inches in height by 54 inches in depth by 73 inches in width with doors open, and 67 inches in height by 24 inches in depth by 38 inches in width with doors closed. The fill station dimensions shall not exceed 56 inches in height by 21 inches in depth by 42 inches in width. Sealed bids must be submitted electronically via BidNet Direct at www.miltonga.gov/finance/bids-rfps no later than February 5, 2026 at 2:00 p.m. EST. The deadline for written questions is January 26, 2026 at 5:00 p.m., with official answers posted by January 28, 2026. The bid opening will occur at approximately 2:30 p.m. on February 5, 2026 at City Hall, with a virtual link posted on the procurement portal. The tentative contract award date is March 2, 2026, with a Notice to Proceed to be coordinated with the selected contractor. Work must commence within ten calendar days of Notice to Proceed and be completed within twelve weeks. The contract term extends through the completion date, with no renewal options specified.
Bidders must submit a lump sum price for both units combined. The successful bidder must provide a bid bond equal to five percent of the base bid amount, and upon award, furnish Performance and Payment Bonds equal to one hundred percent of the base bid price and a Maintenance Bond equal to one-third of the contract price for two years following completion. Comprehensive General Liability insurance of $1,000,000 per occurrence and $2,000,000 umbrella coverage, Comprehensive Automobile Liability of $1,000,000 combined single limit, Workers' Compensation as required by Georgia, and an A.M. Best Rating of A-6 or higher are required. All equipment must be FOB Milton, Georgia with no sales taxes charged to the City. The bid schedule includes specific line items for compressor units, fill stations, storage cylinders, hoses, adapters, switches, storage racks, and NFPA 1989 air quality testing. The City reserves the right to reject any or all bids and to cancel the contract at any time with thirty days' written notice. There are no identified set-asides, incumbent contractors, or specific funding sources mentioned in the solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Bid Number:
ITB 26-FD01
Project Name Fire Station Cascade Systems
Due Date and Time: February 5, 2026 by 2:00 p.m. EST
*Link for virtual bid opening will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.
Number of Pages: 90
ISSUING DEPARTMENT INFORMATION
Issue Date:
January 15, 2026
City of Milton Fire Department 2006 Heritage Walk Milton, GA 30004
Phone: 678-242-2500
Website: www.miltonga.gov
INSTRUCTIONS TO BIDDERS
Electronic Submittal: **Bids must be submitted electronically via Milton’s BidNet procurement portal/platform at www.miltonga.gov If you have not registered as a vendor via BidNet we encourage you to register. There is no cost to join, and you will be notified of any potential bid opportunities with the City of Milton as well as other agencies who are part of the Georgia Purchasing Group.
Mark Face of Envelope/Package:
Bid Number: ITB 26-FD01 Name of Company or Firm
Special Instructions:
Deadline for Written Questions January 26, 2026 by 5:00 p.m.
Submit questions online via the BidNet Direct procurement portal at www.miltonga.gov/finance/bids-rfps
BIDDERS MUST COMPLETE THE FOLLOWING
Bidder Name/Address:
Authorized Bidder Signatory:
(Please print name and sign in ink)
Bidder Phone Number: Bidder FAX Number:
Bidder Federal I.D. Number: Bidder E-mail Address:
BIDDERS MUST RETURN THIS COVER SHEET WITH BID RESPONSE
City OF MILTON INVITATION TO BID
(THIS IS NOT AN ORDER)
http://www.miltonga.gov/ http://www.miltonga.gov/
2 | P a g e
Table of Contents
Topic Page
Invitation to Bid 3
Schedule of Events 4
Bidding Instructions (What must be submitted) 5
Insurance/Bond Requirements 6
Bid Form and Addenda Acknowledgement 10
Bid Bond (3 pages) 12
Qualifications Signature and Certification 15
Corporate Certificate 15
List of Subcontractors 16
Contractor Affidavit and Agreement (eVerify) 17
Disclosure Form 18
Project Specifications 19
Bid Submittal Form (4 pages) 21
Sample Contract Agreement 25
3 | P a g e
Invitation to Bid ITB 26-FD01
The City of Milton is accepting sealed bids from qualified firms for the Fire-Rescue Department. All bidders must comply with all general and special requirements of the bid information and instructions enclosed herein.
Sealed bids will be received no later than 2:00 PM Local Time on February 5, 2026. Electronic bids shall be submitted online via BidNet Direct, the City’s procurement portal, at www.miltonga.gov/finance/bids-rfps .
At approximately 2:30 P.M. Local Time on the day bids are received the bids will be publicly opened and the bidder’s name and total bid amount will be read aloud at: City of Milton City Hall, 2006 Heritage Walk, Milton, GA 30004. *Link for the virtual bid opening will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.
Bids received after the above time will not be accepted.
Questions must also be submitted online in the same manner listed above for bids. Deadline for questions is January 26, 2026, at 5:00 p.m. Official answers to questions and potential changes to the ITB (Addendums) will be posted at the same web locations as the ITB on or about January 28, 2026. Any other form of interpretation, correction, or change to this ITB will not be binding upon the City. It is the bidder’s responsibility to check the websites for potential updates. Please refer to Bid (ITB 26-FD01) and bid name (Fire Station Cascade Systems) when requesting information.
The City of Milton reserves the right to reject any or all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Milton.
The selected contractor must be able to start work within ten (10) calendar days after the “Notice to Proceed” is issued. The time of completion for the project is to be determined prior to the issuance of the “Notice to Proceed.”
http://www.miltonga.gov/finance/bids-rfps
4 | P a g e
SCHEDULE OF EVENTS
FOR REFERENCE ONLY - DO NOT SUBMIT WITH BID RESPONSE
EVENT DATE
ITB Issue Date January 15, 2026
Deadline for Receipt of Written Questions 5:00 PM on January 26, 2026
Posting of Written Answers by City to Websites on or about January 28, 2026
ITB DUE No Later than 2:00 P.M. on February 5, 2026
Tentative Contract Award (on/about) March 2, 2026
Notice to Proceed (on/about) To be coordinated with the Contractor
NOTE: PLEASE CHECK THE CITY WEBSITE (http://www.miltonga.gov) FOR ADDENDA
AND SCHEDULE UPDATES.
http://www./
5 | P a g e
BIDDING INSTRUCTIONS
FAILURE TO RETURN THE FOLLOWING BID DOCUMENTS COULD RESULT IN THE BID
BEING DEEMED NON-RESPONSIVE AND BEING REJECTED:
Item Description Page(s) 1 Filled out and Signed Invitation to Bid (Cover Sheet) 1 2 Bid Form and Addenda Acknowledgement (2 pages) 10-11 3 Bid Bond (3 pages) 12-14 4 Qualifications Signature and Certification 15 5 List of Subcontractors 16 6 Contractor Affidavit and Agreement (eVerify) 17 7 Disclosure Form 18 8 Bid Submittal Form (4 pages) 21-24
INFORMATION AND INSTRUCTIONS
The purpose of this solicitation is to enter a lump sum price “purchasing contract” with one firm to be the primary supplier of the Fire Station Cascade Systems, ITB 26-
FD01.
No specification expressed or implied shall be construed as any type of restrictive specification that would limit competition.
Unless clearly shown as “no substitute” or any words to that effect, any items in these contract documents which have been identified, described or referenced by a brand name or trade name are for reference only. Such identification is intended to be descriptive but not restrictive and is to indicate the general quality and characteristics of products that may be offered. Each bid item for which an equivalent item is proposed must be individually identified on the bid sheet with the following information: brand name, model or manufacturer’s number or identification regularly used in the trade. Photographs, specifications and cut sheets shall be provided of the proposed alternative. The City shall be the sole judge of the suitability of the proposed alternative and may consider function, design, materials, construction, workmanship, finishes, operating features, overall quality, local service facilities, warranty terms and service or other relevant features.
The City reserves the right to cancel the contract at any time, without cause, with 30 days’ written notice.
6 | P a g e
Title to any supplies, materials, equipment or other personal property shall remain the Contractors’ until fully paid for by the City.
All items to be bid FOB, Milton, Georgia. No sales taxes are to be charged.
Any damage to any building or traffic control device, or equipment incurred during the course of work shall be repaired at the Contractor’s expense to the complete satisfaction of the City of Milton with no additional expense to the City.
EVALUATION
The City intends to evaluate the ITB on the lowest, responsible and responsive bidder.
Bids may be found nonresponsive at any time during the evaluation or contract process, if any of the required information is not provided; the submitted price is found to be inadequate; or the proposal is not within the specifications described and required in the ITB. If a bid is found to be non-responsive or non-qualified, it will not be considered further.
INSURANCE REQUIREMENTS
Within ten (10) days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-6 or higher and acceptable to the City.
Within ten (10) days of Notice of Award, and at all times that this Contract is in force, the Contractor shall obtain, maintain and furnish the City Certificates of Insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-6 or higher and acceptable to the City. Insurance requirements are provided below and included in the CONTRACT AGREEMENT (Section 7.K).
(1) Requirements: The Contractor shall have and maintain in full force and effect for the duration of this Agreement, insurance insuring against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work by the Contractor, its agents, representatives, employees or subcontractors. All policies shall be subject to approval by the City Attorney as to form and content. These requirements are subject to amendment or waiver if so approved in writing by the City.
(2) Minimum Limits of Insurance: Contractor shall maintain the following insurance policies with limits no less than:
(a) Comprehensive General Liability of $1,000,000 (one million dollars) limit per single occurrence, $2,000,000 (two million dollars) umbrella, including coverage for bodily and personal injury, sickness, disease or
7 | P a g e death, injury to or destruction of property, including loss of use resulting therefrom, vandalism, property loss and theft.
(b) Comprehensive Automobile Liability (owned, non-owned, hired) of $1,000,000 (one million dollars) combined single limit per occurrence for bodily and personal injury, sickness, disease or death, injury to or destruction of property, including loss of use resulting therefrom.
(c) Workers' Compensation limits as required by the State of Georgia and Employers Liability limits of $1,000,000 (one million dollars) per accident.
(3) Deductibles and Self-Insured Retentions: Any deductibles or self-insured retentions must be declared to and approved by the City in writing.
(4) Other Insurance Provisions: The policy is to contain, or be endorsed to contain, the following provisions:
(a) General Liability and Automobile Liability Coverage.
(i) The City and City Parties are to be covered as insureds. The coverage shall contain no special limitations on the scope of protection afforded to the City or City Parties.
(ii) The Contractor’s insurance coverage shall be primary noncontributing insurance as respects to any other insurance or self-insurance available to the City or City Parties. Any insurance or self-insurance maintained by the City or City Parties shall be in excess of the Contractor’s insurance and shall not contribute with it.
(iii) Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City or City Parties.
(iv) Coverage shall state that the Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
(v) Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross-liability exclusion.
(vi) The insurer agrees to waive all rights of subrogation against the City and City Parties for losses arising from Work performed by the Contractor for the City for General Liability coverage only.
8 | P a g e
(b) Workers' Compensation Coverage: The insurer providing Workers’
Compensation Coverage will agree to waive all rights of subrogation against the City and City Parties for losses arising from Work performed by the Contractor for the City.
(c) All Coverages:
(i) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City.
(ii) Policies shall have concurrent starting and ending dates.
(5) Acceptability of Insurers: Insurance is to be placed with insurers authorized to do business in the State of Georgia and with an A.M. Bests' rating of no less than A:VI.
(6) Verification of Coverage: Contractor shall furnish the City with certificates of insurance and endorsements to the policies evidencing coverage required by this clause prior to the start of Work. The certificate of insurance and endorsements shall be on a form utilized by Contractor’s insurer in its normal course of business and shall be received and approved by the City within ten
(10) days of the Notice of Award. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. The Contractor shall provide proof that any expiring coverage has been renewed or replaced at least two (2) weeks prior to the expiration of the coverage.
(7) Subcontractors: Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated in this Agreement, including but not limited to naming the Parties as additional insureds.
(8) Claims-Made Policies: Contractor shall extend any claims-made insurance policy for at least six (6) years after termination or final payment under the Agreement, whichever is later.
(9) City as Additional Insured and Loss Payee: The City shall be named as an additional insured and loss payee on all policies required by this Agreement, except the City need not be named as an additional insured and loss payee on any Workers’ Compensation policy.
9 | P a g e
BONDING REQUIREMENTS
Each bid must be accompanied with a BID BOND (bond only: certified checks or other forms are not acceptable) in an amount equal to five percent (5%) of the base bid, payable to the City of Milton. Said bid bond guarantees the bidder will enter into a contract to construct the project strictly within the terms and conditions stated in this bid and in the bidding and contract documents, should the construction contract be awarded.
The Successful Bidder shall be required to furnish PAYMENT AND PERFORMANCE BONDS for the faithful performance on the contract and a bond to secure payment of all claims for materials furnished and/or labor performed in performance of the project, both in amounts equal to one hundred percent (100%) of the base bid price.
The Successful Bidder shall also be required to furnish a MAINTENANCE BOND, in the amount of one-third (1/3) of the contract price, guaranteeing the repair or replacement caused by defective workmanship or materials for a period of two (2) years from the completion of construction.
Bonds shall be issued by a corporate surety appearing on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to do business in the State of Georgia. Bonds shall be on the forms provided by the City and subject to the review and approval of the City Attorney.
Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners shall execute Bond.
OATH
Prior to commencing the Work, the successful bidder shall execute a written oath as required by O.C.G.A. §§ 32-4-122 and 36-91-21(e).
COST OF PREPARING A BID
The costs for developing and delivering responses to this ITB and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the bidder. The City is not liable for any expense incurred by the bidder in the preparation and presentation of their proposal. All materials submitted in response to this ITB become the property of the City of Milton.
10 | P a g e
[BIDDERS MUST RETURN THIS FORM WITH BID RESPONSE]
BID FORM and ADDENDA ACKNOWLEDGEMENT
TO: PURCHASING OFFICE
CITY OF MILTON
MILTON, GEORGIA 30004
Ladies and Gentlemen:
In compliance with your Invitation to Bid, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Milton, Georgia, to provide the necessary machinery, tools, apparatus, other means of construction, and all materials and labor specified in the Contract Documents or as necessary to complete the Work in the manner therein specified within the time specified, as therein set forth, for:
Bid Number ITB 26-FD01 Fire Station Cascade Systems
The Bidder has carefully examined and fully understands the Contract, Specifications, and other documents hereto attached, has made a personal examination of the Site of the proposed Work, has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his bid is accepted, he will contract with the City of Milton in full conformance with the Contract Documents.
It is the intent of this Bid to include all items of construction and all Work called for in the Specifications, or otherwise a part of the Contract Documents.
In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the attached Bid schedule for the unit prices stated.
The Bidder agrees that the cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the Contract Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid.
The Bidder further proposes and agrees hereby to promptly commence the Work with adequate forces within ten (10) calendar days from the Notice to Proceed, and to complete all Work as scheduled in Task Order(s) issued.
11 | P a g e
If weather affects the required completion schedule, the City and selected Bidder will negotiate a new completion date.
Attached hereto is an executed Bid Bond in the amount of __________________ Dollars ($ (Five Percent of Amount Bid).
If this bid shall be accepted by the City of Milton and the undersigned shall fail to execute a satisfactory contract in the form of said proposed Contract, and give satisfactory Performance and Payment Bonds, or furnish satisfactory proof of carriage of the insurance required within ten days from the date of Notice of Award of the Contract, then the City of Milton may, at its option, determine that the undersigned abandoned the Contract and there upon this bid shall be null and void, and the sum stipulated in the attached Bid Bond shall be forfeited to the City of Milton as liquidated damages.
Bidder acknowledges receipt of the following addenda:
Addendum No. Date viewed
Bidder further declares that the full name and resident address of Bidder’s Principal is as follows:
Signed, sealed, and dated this _______ day of _____________, 20_____
Bidder _______________________ (Seal) Company Name
Bidder Mailing Address:
Signature: ________________________________________
Print Name: ______________________________________
Title: _____________________________________________
12 | P a g e
[BIDDERS MUST RETURN THESE SHEETS WITH BID RESPONSE]
BID BOND
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (hereinafter referred to as the “City” (Name and Address):
City of Milton, Georgia ATTN: Purchasing Office 2006 Heritage Walk Milton, Georgia 30004
BID
BID DUE DATE:
PROJECT (Brief Description Including Location):
BOND
BOND NUMBER:
DATE (Not later that Bid due date):
PENAL SUM: _______________________________________________________________________
(Words) (Figures)
IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby to the City, subject to the terms printed below or on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By: ___________________________ Signature and Title: Signature and Title:
(Attach Power of Attorney)
Attest: Attest:_________________________ Signature and Title: Signature and Title:
13 | P a g e
Note: (1) Above addresses are to be used for giving any notice required by the terms of this Bid Bond.
(2) Any singular reference to Bidder, Surety, the City or any other party shall be considered plural where applicable.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to the City upon Default of Bidder the penal sum set forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 The City accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension of that time agreed to in writing by the City) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents;
or
3.2 All Bids are rejected by the City; or
3.3 The City fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension of that time agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon Default by Bidder within 30 calendar days after receipt by Bidder and Surety of a written Notice of Default from the City, which Notice will be given with reasonable promptness and will identify this Bond and the Project and include a statement of the amount due.
5. Surety waives notice of, as well as any and all defenses based on or arising out of, any time extension to issue a Notice of Award agreed to in writing by the City and Bidder, provided that the total time, including extensions, for issuing a Notice of Award shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond either prior to 30 calendar days after the Notice of Default required in paragraph 4 above is received by Bidder and Surety or later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the State of Georgia.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
14 | P a g e
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer or proposal, as applicable under the particular circumstances.
12. The terms of this Bid Bond shall be governed by the laws of the State of Georgia.
15 | P a g e
QUALIFICATIONS SIGNATURE AND CERTIFICATION
I certify that this offer is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign this proposal for the proposer. I further certify that the provisions of the Official Code of Georgia Annotated, including but not limited to Title 32, Chapter 4, Article 4, Part 2 and Sections 45-10-20 et seq. have not been violated and will not be violated in any respect.
Authorized Signature______________________________Date_______________________
Print/Type Name______________________________________________________________
Print/Type Company Name Here_______________________________________________
CORPORATE CERTIFICATE
I, ___________________________________, certify that I am the Secretary of the Corporation named as Contractor in the foregoing bid; that _______________________________________ who signed said bid in behalf of the Contractor, was then (title)_________________________ of said Corporation; that said bid was duly signed for and in behalf of said Corporation by authority of its Board of Directors, and is within the scope of its corporate powers; that said Corporation is organized under the laws of the State of _________________________________.
This ________________ day of ________________, 20______
______________________________________(Seal) (Signature)
16 | P a g e
LIST OF SUBCONTRACTORS
I do _________, do not _______, propose to subcontract some of the work on this project. I propose to Subcontract work to the following subcontractors:
Company Name:___________________________________________________
17 | P a g e
BIDDERS MUST RETURN THIS FORM WITH BID RESPONSE]
CONTRACTOR AFFIDAVIT AND AGREEMENT
STATE OF GEORGIA
CITY OF MILTON
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm, or corporation which is engaged in the physical performance of services on behalf of the City of Milton has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).
Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
I hereby declare under penalty of perjury that eVerify Number
Date of Authorization
Name of Contractor
Fire Station Cascade Systems Name of Project
City of Milton, Georgia Name of Public Employer the foregoing is true and correct.
Executed on ____________, ______, 20____ in ____________________(city), ______(state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME ON
THIS THE ______ DAY OF ______________,20___.
NOTARY PUBLIC
[NOTARY SEAL]
My Commission Expires:
ITB 26-FD01 18 | P a g e
DISCLOSURE FORM
This form is for disclosure of campaign contributions and family member relations with City of Milton officials/employees.
Please complete this form and return as part of your bid package when it is submitted.
Name of Bidder __________________________________________________
Name and the official position of the Milton Official to whom the campaign contribution was made (Please use a separate form for each official to whom a contribution has been made in the past two (2) years.)
List the dollar amount/value and description of each campaign contribution made over the past two (2) years by the Applicant/Opponent to the named Milton Official.
Amount/Value Description
Please list any family member that is currently (or has been employed within the last 9 months) by the City of Milton and your relation:
ITB 26-FD01 19 | P a g e
PROJECT BACKGROUND AND SPECIFICATIONS
The City of Milton is soliciting sealed bids from qualified vendors with demonstrated experience and proven technical competence to provide and install two (2) Self-Contained Breathing Apparatus (SCBA) air compressors and fill station systems. All equipment must be manufactured in the USA.
For both Unit I and Unit 2, the compressor dimensions shall not exceed 67" (H) x 54"
(D) x 73" (W) with the doors open, and 671' (H) x 24" (D) x 38" (W) with the doors closed. The fill station dimensions shall not exceed 56" (H) x 21" (D) x 42" (W) for Unit 1 triple fill station and Unit 2 double fill station.
Unit 1 will be installed at Milton Fire Station 43 located at 750 Hickory Flat Rd, and Unit 2 will be installed at Milton Fire Station 42 located at 15240 Thompson Rd, both in Milton, Georgia.
The scope of work shall include complete equipment installation services for both units. The Contractor must maintain a facility of sufficient size and staffing to perform all required work without undue delay. A list of acceptable equipment types is included for reference; however, it should be considered illustrative rather than restrictive.
PROSECUTION AND PROGRESS
Construction shall begin no later than TEN (10) calendar days past the issuance of Notice to Proceed. The time of completion for the project will be within twelve (12) weeks from the Notice to Proceed issued by the City.
No change in Contract Sum will be authorized because of adjustments of Contract Time due to Owner’s acceptance of Contract Claims for adjustments to Time due to abnormal weather conditions.
If weather (beyond normal) affects the required completion schedule, The City and selected contractor will negotiate a new completion date.
Normal workday for this project shall be 7:30 am to 7:30 pm and the normal workweek shall be Monday through Friday. The City will consider extended workdays or workweeks upon written request by the Contractor on a case-by-case basis. No work will be allowed on Sunday or national holidays (i.e., Memorial Day, July 4th, Labor Day, etc.).
The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform
ITB 26-FD01 20 | P a g e a Final Inspection upon completion of all work. The Contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the Contractor at his expense prior to issuance of Final Acceptance.
PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.
PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE
The Contractor shall be responsible for the preservation of all public and private property.
When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect or misconduct in the execution of the work, or in consequence of the non-execution thereof by the Contractor, he/she shall restore, at his/her own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise restoring as may be directed, or he/she shall make good such damage or injury in an acceptable manner. The Contractor shall correct all disturbed areas before retainage will be released.
CLEANUP
All restoration and clean-up work shall be performed daily. Operations shall be suspended if the Contractor fails to accomplish restoration and clean-up within an acceptable period of time. Asphalt and other debris shall be removed from gutters, sidewalks, yards, driveways, etc. Failure to perform clean-up activities may result in suspension of the work. Milling operation shall be followed immediately by clean-up at which the Contractor is to provide power brooms, vacuum sweepers, power blowers, or other means to remove loose debris or dust. Do not allow dust control to restrict visibility of passing traffic or to disrupt adjacent property owners. All pavement areas shall be clean and dry prior to placing tack coat, asphaltic concrete or other materials.
SAFETY
Beginning with mobilization and ending with acceptance of work, the Contractor shall be responsible for providing a clean and safe work environment at the project site. The Contractor shall comply with all OSHA regulations as they pertain to this project.
SILENCE OF SPECIFICATIONS
The apparent silence of these specifications and any supplemental specifications as to any details, or the omission from it of a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices are to prevail and that only materials of first quality and correct type, size and design are to be used. All workmanship is to be first quality. All interpretations of this specification shall be made upon the basis of this statement, with City interpretation to prevail.
ITB 26-FD01 21 | P a g e
ITB 26-FD01 BID SCHEDULE on the following pages – 4 pages total
MILTON FIRE STATION 43 CASCADE SYSTEM
ITEM ITEM DESCRIPTION QTY
EACH
UNIT PRICE TOTAL PRICE
C-E4-10-A6-E3C Compressor unit with carbon monoxide monitor, four- stage configuration, 6,000 PSI capacity, 10 HP, 14 CFM, three-phase electric motor, and sound-suppressing cabinet.
Includes a filtration system capable of processing 24,000 cubic feet, magnetic starter, automatic drain system, gauge panel, and high-pressure switch.
1 $ $
C-FS3C55 Triple Fill w/controls 5500
PSI
1 $ $
C-6000-UN 6000 PSI UN
Storage Cylinder
4 $ $
C-CLAMPS I -4 Unistrut & Clamps 1/per 4 Cylinders
1 $ $
A-H1000-0120 Hose 120” (10FT) 7000 PSI w/ends
2 $ $
A-H1000-0048 Hose 48” 7000 PSI w/ends 4 $ $
A-I1350 CGA-702 N&N w/JIC elbow
4 $ $
F-01560 1/4 NPT Plug 1 $ $
ITB 26-FD01 22 | P a g e
A-S1300 High Temp Switch 1 $ $
A-S5000 Low Oil Level Switch Component
1 $ $
12 Bottle SCBA Storage Rack
1 $ $
MSA G1 Adapters/Quick Connect Fittings for Fill Lines
3 $ $
NFPA 1989 Air Quality Test 1 $ $
Stn 43 TOTAL:
Milton Fire Station 42 Cascade System
ITEM ITEM DESCRIPTON QTY
EACH
UNIT PRICE TOTAL PRICE
C-E4-10-A6-E3C Compressor unit with carbon monoxide, four-stage configuration, 6000 PSI capacity, 10 HP, 14 CFM, three-phase electric motor, and sound-suppressing cabinet. Includes filtration system capable of processing 24,000 cubic feet, magnetic starter, automatic drain system, gauge panel, and high-pressure switch.
1 $ $
C-FS2C55 Double Fill w/controls
5500 PSI
1 $ $
C-6000-UN 6000 PSI UN Storage Cylinder
4 $ $
C-CLAMPS 1-4 Unistrut & Clamps 1-per 4 Cylinders
1 $ $
A-H1000-0120 Hose 120” (10FT) 7000 PSI w/ends
2 $ $
A-H1000-0048 Hose 48” 7000 PSI w/ends
4 $ $
A-I1350 CGA-702 N&N w/JIC 4 $ $
ITB 26-FD01 23 | P a g e elbow F-01560 1/4 NPT Plug 1 $ $ A-S1300 High Temp Switch 1 $ $
A-S5000 Low Oil Level Switch Component
1 $ $
12 Bottle SCBA Storage Rack
1 $ $
MSA G1 Adapters/Quick Connect Fittings for Fill Lines
2 $ $
NFPA 1989 Air Quality Test
1 $ $
Stn 42 TOTAL:
Total Bid Price for Both Stations: $________________________
Print Total Bid Price in Words for Both Stations:
[page 3 of 4]
ITB 26-FD01 24 | P a g e
ITB 26-FD01 BID SCHEDULE on the following pages – 4 pages total
The undersigned, as bidder, declares and represents that it has examined the site of the work and informed himself/herself fully in regard to all conditions pertaining to the place where the work is to be performed, including those conditions affecting the cost of the work and the delivery, handling and storage of materials and equipment. The bidder has examined and read the Bidding Document and has satisfied himself/herself that the Bidding Document is an adequate and acceptable reflection of the work which is required to be performed and that the bidder is willing and able to perform all of the work necessary. The bidder further certifies that no additional information is required to complete the work encompassed by this bid within the cost and schedule established and agreed upon within this bidding document.
In compliance with the attached Specification, the undersigned offers and agrees that if this Bid is accepted, by the City Council within One Hundred and Twenty (120) days of the date of Bid opening, that he will furnish any or all of the Items upon which Prices are quoted, at the Price set opposite each Item, delivered to the designated point(s) within the time specified in the Bid Schedule.
COMPANY_________________________________________________________________
ADDRESS__________________________________________________________________
AUTHORIZED SIGNATURE____________________________________________________
PRINT / TYPE NAME & TITLE___________________________________________________
[page 4 of 4]
ITB 26-FD01 25 | P a g e
SAMPLE - CONSTRUCTION SERVICES AGREEMENT ~ DO NOT RETURN WITH
BID
[PROJECT NAME]
This Construction Services Agreement (the “Agreement”) is made and entered into this
___ day of ____, 20___ [INSERT DATE] (the “Effective Date”), by and between the CITY OF MILTON, GEORGIA, a municipal corporation of the State of Georgia, acting by and through its governing authority, the Mayor and Milton City Council (hereinafter referred to as the “City”), and ____________________________ [INSERT CONTRACTOR NAME], a _____________________ [INSERT TYPE OF ENTITY] (hereinafter referred to as the “Contractor”), collectively referred to herein as the "Parties”.
W I T N E S S E T H:
WHEREAS, the City desires to retain a contractor to perform services for the construction of a Project, as defined below; and
WHEREAS, the City solicited _______________ (bids/proposals) for construction of the
Project pursuant to the Request for _________ (Bids/Proposals), dated ___________________, 20___ [INSERT DATE], attached hereto as “Exhibit A” and incorporated herein by reference;
and
WHEREAS, the Contractor submitted a complete and timely ___________
(bid/proposal), attached hereto as “Exhibit B” and incorporated herein by reference, and met all _____________ (bid/proposal) requirements such that the City awarded Project Number __________ [INSERT PROJECT NUMBER] to the Contractor; and
WHEREAS, the City finds that specialized knowledge, skills, and training are necessary to perform the Work (defined below) contemplated under this Agreement; and
WHEREAS, the Contractor has represented that it is qualified by training and experience to perform the Work; and
WHEREAS, based upon Contractor’s _____________ (proposal/bid), the City has selected Contractor as the successful _____________ (proposer/bidder), and
WHEREAS, Contractor desires to perform the Work as set forth in this Agreement under the terms and conditions provided in this Agreement; and
ITB 26-FD01 26 | P a g e
WHEREAS, the public interest will be served by this Agreement; and
WHEREAS, Contractor has familiarized itself with the nature and extent of the Contract Documents, the Project, and the Work, and with all local conditions and federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of Work, and Contractor is aware that it must be licensed to do business in the State of Georgia.
NOW THEREFORE, for and in consideration of the mutual promises, the public purposes, and the acknowledgements and agreements contained herein and other good and adequate consideration, the sufficiency of which is hereby acknowledged, the Parties hereto do mutually agree as follows:
Section 1. Contract Documents
This Agreement along with the following documents, attached hereto (except as expressly noted otherwise below) and incorporated herein by reference, constitute the “Contract Documents”:
A. Request for ____________ (Proposals/Bids), attached hereto as “Exhibit A”;
B. ___________ (Proposal/Bid) Documents from Contractor, dated ____________ ____, ______ [INSERT DATE], attached hereto as “Exhibit B”;
C. Scope of Work, attached hereto as “Exhibit C”;
D. Any required Performance Bond and/or Payment Bond, attached hereto collectively as “Exhibits D.1 and D.2”;
E. Noncollusion Affidavit of Prime _________________ (Proposer/Bidder), attached hereto as “Exhibit E”;
F. Final Affidavit, attached hereto as “Exhibit F”;
G. Alien Employment affidavits, attached hereto as “Exhibits G.1 and G.2”;
H. Plans, drawings and specifications, attached hereto collectively as “Exhibit H”;
I. Additional Payment/Retainage Requirements, attached hereto as “Exhibit I”;
J. Key Personnel, attached hereto as “Exhibit J”;
K. Contract Administration provisions (if issued), attached hereto as “Exhibit K”;
L. General Conditions (if issued), attached hereto as “Exhibit L”;
M. Supplementary Conditions (if issued), attached hereto as “Exhibit M”;
ITB 26-FD01 27 | P a g e
N. Notice of Award, attached hereto as “Exhibit N”;
O. City of Milton Code of Ethics (codified in the official Code of the City of Milton);
P. The following, which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto: All Change Orders (defined in Section 6 below), other written amendments, and other documents amending, modifying, or supplementing the Contract Documents if properly adopted in writing and executed by the Parties.
Section 2. Project Description; Architect; Engineer; Contract Administrator
A. Project. A general description of the Project is as follows:
_____________________________ [INSERT GENERAL PROJECT
DESCRIPTION] (the “Project”). A third-party Architect or Engineer (as identified below) □ has/ □ has not [check one] been retained related to this Project.
B. Architect/Engineer (if any).
(i) Architect [if applicable]. The Project has been designed by
_____________________ [INSERT ARCHITECT NAME, IF ANY]
(hereinafter referred to as the “Architect”). The Architect will have authority to act on behalf of the City only to the extent provided in the Contract Documents, unless otherwise modified in accordance with the provisions of this Agreement.
(ii) Engineer [if applicable]. The Project has been designed by
______________________ [INSERT ENGINEER NAME, IF ANY]
(hereinafter referred to as the “Engineer”). The Engineer will have authority to act on behalf of the City only to the extent provided in the Contract Documents, unless otherwise modified in accordance with the provisions of this Agreement.
C. Contract Administrator. The Contract Administrator for this Agreement shall be:
___________________________ [INSERT CONTRACT ADMINISTRATOR
NAME – specify the City, Architect, Engineer, or other entity fulfilling this role].
Section 3. The Work
A. The Work. The Work to be completed under this Agreement (the “Work”) includes, but shall not be limited to, the work described in the Scope of Work provided in “Exhibit C”, attached hereto and incorporated herein by reference.
The Work includes all material, labor, insurance, tools, equipment, machinery, water, heat, utilities, transportation, facilities, services and any other miscellaneous items and work reasonably inferable from the Contract Documents. The term “reasonably inferable” takes into consideration the understanding of the Parties that
ITB 26-FD01 28 | P a g e some details necessary for proper execution and completion of the Work may not be shown on the drawings or included in the specifications or Scope of Work, but they are a requirement of the Work if they are a usual and customary component of the Work or are otherwise necessary for proper and complete installation and operation of the Work. Contractor shall complete the Work in strict accordance with the Contract Documents. In the event of any discrepancy among the terms of the various Contract Documents, the provision most beneficial to the City, as determined by the City in its sole discretion, shall govern.
B. Notice to Proceed. The City will issue a Notice to Proceed, which Notice to
Proceed shall state the dates for beginning Work (“Commencement Date”) and the Expected Date of Final Completion (defined in Section 4(A) below). Unless otherwise approved, the Contractor shall perform its obligations under this Agreement as expeditiously as is consistent with reasonable skill and care and the orderly progress of the Work.
C. Plans; Drawings and Specifications. The plans, drawings and specifications provided in “Exhibit H”, attached hereto, are hereby acknowledged by the Parties and incorporated herein by reference.
D. Shop Drawings, Product Data, and Samples. Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents, but must be in conformity therewith. The purpose of their submittal is to demonstrate, for those portions of the Work for which submittals are required by the Contract Documents, the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents.
(i) “Shop Drawings” are drawings, diagrams, schedules and other data specifically prepared for the Work by the Contractor or a subcontractor, sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.
(ii) “Product Data” are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.
(iii) “Samples” are physical examples that illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.
The Contractor shall review for compliance with the Contract Documents and shall approve and submit to the Contract Administrator Shop Drawings, Product Data, Samples, and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the City or of separate contractors. By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents that the Contractor has determined and verified materials, field
ITB 26-FD01 29 | P a g e measurements and field construction criteria related thereto, or will do so, and has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. Submittals which are not marked as reviewed for compliance with the Contract Documents and approved by the Contractor may be returned by the Contract Administrator without action.
The Contractor shall perform no portion of the Work for which the Contract Documents require submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved in writing by the Contract Administrator, provided that submittals that are not required by the Contract Documents may be returned without action.
The Work shall be completed in accordance with approved submittals, provided that the Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Contract Administrator’s approval of Shop Drawings, Product Data, Samples or similar submittals, unless the Contractor has specifically informed the Contract Administrator in writing of such deviation at the time of submittal and (1) the Contract Administrator has given written approval to the specific deviation as a minor change in the Work, or (2) a written Change Order has been issued and approved to authorize the deviation. The Contract Administrator’s approval of the Shop Drawings, Product Data, Samples or similar submittals shall not relieve the Contractor of responsibility for errors or omissions therein.
The Contractor shall, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, direct the Contract Administrator’s attention to any additional revisions included other than those requested by the Contract Administrator on previous submittals. In the absence of such written notice drawing the Contract Administrator’s attention to such additional revisions, the Contract Administrator’s approval of a resubmission shall not apply to such additional revisions.
The Contractor shall maintain at the Project site(s) one record copy of the Contract Documents in good order and marked currently to record field changes and selections made during construction and one record copy of approved Shop Drawings, Product Data, Samples and similar required submittals. These documents shall be available to the City and Contract Administrator and shall be delivered to the Contract Administrator or City upon completion of the Work.
Section 4. Contract Term; Liquidated Damages; Expedited Completion; Partial
Occupancy or Use
A. Contract Term. The term of this Agreement (“Term”) shall commence on the Effective Date and continue until the earlier of the Expected Date of Final Completion or the proper termination and non-renewal of this Agreement (provided that certain obligations, including but not limited to Warranty obligations, will survive termination/expiration of this Agreement). Contractor warrants and represents that it will perform its Work in a prompt and timely manner, which shall
ITB 26-FD01 30 | P a g e not impose delays on the progress of the Work. The Contractor shall commence Work pursuant to this Agreement within five (5) business days of the Commencement Date provided by the City, and the Parties intend that all Work shall be completed on or before _______________________, 20___ [INSERT
DATE OF EXPECTED COMPLETION – NOTE DEFINED TERMS IN
“EXHIBIT I” RELATED TO SAME] (the “Expected Date of Final Completion”). Every effort will be made by Contractor to shorten this period. If the Term of this Agreement continues beyond the calendar year in which this Agreement is executed, the Parties agree that this Agreement, as required by O.C.G.A. § 36-60-13, shall terminate absolutely and without further obligation on the part of the City on December 31 each calendar year of the Term [ □ unless this box is checked, in which case the Agreement shall terminate absolutely and without further obligation on the part of the City at the end of the City’s fiscal year each year of the Term], and further, that this Agreement shall automatically renew on January 1 of each subsequent calendar year [ □ unless this box is checked, in which…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .