ITB 26.27-3 Fire House 1 Wind Retrofit Safe Room Specs to publish - Updated.pdf

PDF 4 MB Posted

Attached to
Fire Station #1 Wind Retrofit and Safe Room
Solicitation number
26.27-3
Issued by
Bay County, Florida

About this file

This document comprises the technical specifications and bidding requirements for ITB 26.27-3, a construction project issued by the City of Lynn Haven, Florida, for a wind retrofit and safe room addition to Fire Station #1 located at 1412 Pennsylvania Avenue, Lynn Haven, Florida 32444. The project involves construction of a 384 square-foot safe room designed to ICC-500 specifications with 200 MPH wind speed impact resistance rating using insulating concrete forming (ICF) structures, combined with wind retrofit of the existing firehouse through armoring of windows and doors to provide maximum protection. A mandatory pre-bid meeting is scheduled for November 23, 2026 at 1:00 PM CST at the fire station. Sealed bids are due by 1:00 PM CST on December 11, 2026, addressed to Andrea Marsh at the City of Lynn Haven, 825 Ohio Avenue, Lynn Haven, Florida 32444, with electronic submission through the OpenBids platform strongly encouraged. The selected contractor will be notified on December 16, 2026, and must submit bid documents to the Building Department by December 30, 2026. The Notice to Proceed is anticipated for January 12, 2027, with substantial completion required within 232 calendar days (approximately August 31, 2027). Bidder questions must be submitted in writing by December 1, 2026 at 2:00 PM CST to purchasing@cityoflynnhaven.com.

The contract requires a five percent (5%) bid bond, with performance and payment bonds each required at 100 percent of the contract price. Liquidated damages are assessed at $500 per calendar day for each day beyond the 232-day completion period. The City reserves the right to reject any or all bids and will award to the lowest responsive, responsible qualified bidder based on ability, capacity, skill, financial resources, character, integrity, reputation, experience, quality of previous performance, litigation history, compliance with local laws, and ability to provide future maintenance. All applicable permits, except technology-related work under separate contract, are the contractor's responsibility, though the City of Apalachicola will waive all City permitting fees. The contractor must provide water and electricity for construction and testing, secure the site 24 hours per day, erect a project sign per specifications, maintain a delays log with weather documentation, and require all personnel to wear company-identifying shirts. No Davis-Bacon requirements apply to this project. Three signed copies of the bid, along with a bid bond, public entity crimes statement, drug-free workplace form, debarment certification, anti-collusion clause, and evidence of appropriate licensing, must be submitted.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Specifications For:

Wind Retrofit & Safe Room for

Fire Station #1

ITB 26.27-3

Wind Retrofit and Safe Room

City of Lynn Haven, Florida

Construction Documents Architects Project Number: 2307

Architecture AR16903 Landscape Architecture LA0001313

2627 S. Blair Stone Road Tallahassee, Florida 32301

(850) 222-2092 Phone, www.hdg-architects.com

*Dates in this schedule occurring after the release date may be amended by the City.

The City reserves the right to delay or modify dates and will notify Bidder/Vendors of all changes.

CITY OF LYNN HAVEN

Fire Station #1

ITB 26.27-3

Wind Retrofit & Safe Room

ARCH FILE #2307

SECTION 00020 INFORMATION FOR BIDDERS 1

SECTION 00020

INFORMATION FOR BIDDERS

BIDS will be received by the CITY OF LYNN HAVEN, FLORIDA (herein called the "OWNER"), until 1:00 pm, Local Time (CST), December 11, 2026 then at said office publicly opened and read aloud.

Each BID must be submitted in a sealed envelope addressed to CITY OF LYNN HAVEN, 825

OHIO AVENUE, LYNN HAVEN, FLORIDA, 32444.

Each sealed envelope containing a BID must be plainly marked on the outside as BID for CITY

OF LYNN HAVEN, FIRE STATION #1, WIND RETROFIT AND SAFE ROOM CONSTRUCTION,

ITB 26.27-3 and the BIDDER'S name, address and license number if applicable. If forwarded by mail, the sealed envelope containing the BID must be enclosed in another envelope addressed to the OWNER at Attn: Andrea Marsh, 825 Ohio Avenue, Lynn Haven, FL 32444.

Vendors are strongly encouraged to submit proposals electronically through the City's OpenBids platform at:

https://www.demandstar.com/app/agencies/florida/city-of-lynn-haven/procurement-opportunities/1d8acbbf-7cb5-44a9-962e-62cc58e39a7b/

All BIDS must be made on the required BID form. All blank spaces for BID prices must be filled in, in ink or typewritten, and the BID form must be fully completed and executed when submitted. Only two copies of the BID form are required. Bidder is required to submit the bid (2 copies), bid bond, and the following forms:

- Public Entity Crimes Statement Form - Drug-Free Workplace Form

- Certification Regarding Debarment, Suspension Form - Anti-Collusion Clause Form

- Show evidence of appropriate Licensing

The project consists of the construction of a 384 square foot safe room and wind retro-fit of the existing Fire House structure. The construction of the safe room is an ICF structure designed to ICC-500 specifications meeting a 200 MPH wind speed or greater impact resistance rating. Wind Retrofit of the existing firehouse is armoring windows and doors to provide maximum protection, but is not designed to the ICC-500 rating system

The City reminds bidders that it reserves the right to reject any or all bids. If a bid is awarded the City shall choose the lowest responsible bidder, which shall mean the lowest bidder whose offer best responds in quality, fitness and capacity to requirements of the proposed work or usage, as specified. In determining the lowest responsible bidder, the following shall be considered , in addition to price:

1. The ability, capacity and skill of the bidder to perform the supplies or services required.

2. Whether the bidder can perform the contract or provide the supplies or services promptly, or within the time specified, without delay or interference.

3. The sufficiency of the bidder’s financial resources and the effect thereof on his/her ability to perform the contract or provide the supplies or services.

4. The character, integrity, reputation, judgement, experience and efficiency of the bidder.

ITB 26.27-3

Wind Retrofit & Safe Room

ARCH FILE #2307

SECTION 00020 INFORMATION FOR BIDDERS 2

5. The quality of bidder’s performance on previous orders or contracts for the City.

6. Litigation by the bidder on previous orders or contracts with the City.

7. The previous and existing compliance by the bidder with local laws and ordinances relation to the subject of the purchase or contract.

8. The ability of the bidder to provide future maintenance and service where such maintenance and service is essential.

9. There will be a mandatory pre-bid meeting on November 23, 2026 at 1:00 pm CST at:

Fire Station Building #1 1400 Pennsylvania Avenue Lynn Haven, Florida 32444

10. Bidder Questions should be submitted 10 days prior to opening to allow for adequate responses from professional consultants. All questions should be submitted in writing by 12/01/2026 by 2:00 PM, CST to purchasing@cityoflynnhaven.com.

11. The Contractor selected will be notified on December 16 of the intent to award. At that notice of intent the selected contractor will begin submission of bid documents to the City of Lynn Haven, Building Department prior to December 30, 2026.

The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered.

No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof.

Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER.

BIDDERS must satisfy themselves as to the accuracy of the estimated quantities in the BID Schedules by examination of the site and a review of the drawings and specifications including any ADDENDA. After BIDS have been submitted the BIDDER shall not assert that there has been any misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done.

The OWNER shall provide to BIDDERS prior to BIDDING, all the information which is pertinent to, and which delineates and describes, the land owned and rights-of-way acquired or to be acquired.

The CONTRACT DOCUMENTS contain the provisions required for construction of the PROJECT. Information obtained from an officer, agent, or employee of the OWNER or any other person shall not affect the risks or obligations assumed by the CONTRACTOR or relieve the CONTRACTOR from fulfilling any of the conditions of the contract.

Liquidated damages shall be assessed at $500.00 per calendar day for each day from the date of the Notice to Proceed. The contract period for construction shall be 232 days.

ITB 26.27-3

Wind Retrofit & Safe Room

ARCH FILE #2307

SECTION 00020 INFORMATION FOR BIDDERS 3

Each BID must be accompanied by a BID BOND payable to the OWNER for five percent (5%) of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS (if requested) of all except the three lowest responsible BIDDERS. When the Agreement is executed, the bonds of the two remaining unsuccessful BIDDERS will be returned (if requested).

The BID BOND of each successful BIDDER will be retained until the PAYMENT BOND and PERFORMANCE BOND have been executed and approved, after which (if requested) will be returned. A certified check may be used in lieu of BID BOND.

A PERFORMANCE BOND and a PAYMENT BOND each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract.

Attorneys-in-fact who sign BID BONDS or PAYMENT BONDS and PERFORMANCE BONDS must file with each BOND a certified and effective dated copy of their power of attorney.

The party to whom the contract is awarded will be required to execute the AGREEMENT and obtain the PERFORMANCE BOND and PAYMENT BOND within three (3) calendar days from the date when NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accompanied by the necessary AGREEMENT and BOND forms. In case of failure of a BIDDER to execute the AGREEMENT, the OWNER may consider the BIDDER in default, in which case the BID BOND accompanying the proposal shall become the property of the OWNER.

The OWNER, within ten (10) days of receipt of acceptable PERFORMANCE BOND, PAYMENT BOND and AGREEMENT signed by the party to whom the AGREEMENT was awarded, shall sign the AGREEMENT and return to such party an executed duplicate of the AGREEMENT.

Should the OWNER not execute the AGREEMENT within such period, the BIDDER may by WRITTEN NOTICE withdraw the signed AGREEMENT. Such notice of withdrawal shall be effective upon receipt of the notice by the OWNER.

The NOTICE TO PROCEED shall be issued within ten (10) days of the execution of the AGREEMENT by the OWNER. Should there be reasons why the NOTICE TO PROCEED cannot be issued within such period, the time may be extended by mutual agreement between the OWNER and CONTRACTOR. If the NOTICE TO PROCEED has not been issued within the ten

(10) day period or within the period mutually agreed upon, the CONTRACTOR may terminate the AGREEMENT without further liability on the part of either party.

The OWNER may make such investigations as deemed necessary to determine the ability of each BIDDER to perform the WORK, and each BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the AGREEMENT and to complete the WORK contemplated therein.

A conditional or qualified BID may not be accepted.

Award will be made to the lowest responsive, responsible qualified, BIDDER.

ITB 26.27-3

Wind Retrofit & Safe Room

ARCH FILE #2307

SECTION 00020 INFORMATION FOR BIDDERS 4

All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the contract throughout.

Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of any BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to its BID.

The low BIDDER shall supply the names and addresses of major material SUPPLIERS and SUBCONTRACTORS when required to do so by the OWNER.

The ARCHITECT Bret D. Hammond, AIA, ASLA, HAMMOND DESIGN GROUP, LLC, 2627 S. Blair Stone Road, Tallahassee, FL 32301. Contact 850-222-2092, bhammond@hdg-architects.com.

The OWNER reserves the right to delete or add any portion of the construction plans, bid items and bid quantities after the bid is awarded.

DISCRIMINATION: An entity or affiliate who has been placed on the discriminatory vendor list may not submit a bid on a contract to provide goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not award or perform work as a contractor, supplier, subcontractor, or consultant under contract with any public entity, and may not transact business with any public entity.

PUBLIC ENTITY CRIME INFORMATION: A person or affiliate who has been placed on the convicted vendor list following a conviction of a public entity crime may not submit a bid on a contract to provide any goods or services to a pubic entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases on real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for category two for a period of 36 months from the date of being placed on the convicted vendor list.

END OF SECTION 00020

mailto:bhammond@hdg-architects.com

SUPPLEMENTAL INSTRUCTIONS:

This document forms an integral part of the Request for Proposal Documents and the Contract Documents. The receipt of this document must be acknowledged in the space provided on your Proposal. This General Terms and Conditions are hereby modified as follows:

1. SUBMIT 3 SIGNED COPIES OF THE BID: Submit 3 signed original copies of your qualified bid in a sealed envelope to the City of Lynn Haven at the time and place referenced in the aforementioned advertisement ITB 26.27- 3 City of Lynn Haven Fire Station, Wind Retrofit and Safe Room.

2. SUBMISSION TO CITY OF LYNN HAVEN, BUILDING DEPARTMENT: At or around December 16, 2026, once the contractor has been notified that the City of Lynn Haven intends to award to the specific contractor, the contractor will prepare and submit to the City of Lynn Haven, Building Department and complete permit package, by December 30, 2026.

3. SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES: This Project is to be substantially complete within 232 calendar days after the date of the Notice to Proceed. This date may be extended only in accordance with the Contract Documents. If the project is not substantially completed by the required date, liquidated damages shall be assessed at the rate of $500.00 per calendar day. Delays will be documented in a log book maintained by the general contractor. Documentation submitted for consideration would be airport weather reports for rain and severe weather for the immediate area.

4. WATER: Water necessary for construction of the building and testing its plumbing and mechanical systems shall be furnished by the Contractor. He shall make all connections, install a meter, take out and pay for all permits necessary, do all piping and clear away all evidence of same after the job is completed.

5. ELECTRICITY: All electricity for light and power necessary for the construction of the building and testing of its electrical and mechanical systems shall be paid for by the Contractor. He shall make all necessary arrangements for this service and perform the work required.

6. PROJECT SIGN: A sign shall be erected at the site by the Contractor and shall be 3/4"- 4' X 8' exterior grade plywood mounted on 4 x 4 wood posts (p.t.), located in a prominent location approved by the Architect/Engineer and Owner. Sign shall conform to the size, colors and design specifications provided by Architect/Engineer.

7. INITIAL CONSTRUCTION CONFERENCE: Immediately prior to starting construction or as soon as possible after the construction has started with the Owner's Representative, the Design Professional, and General Contractor and other interested parties. The purpose of this meeting shall be to discuss requirements and responsibilities of the various parties involved with the objective of expeditious handling of the construction contract.

The Owner's Project Director will chair this meeting.

8. SITE SECURITY: The Contractor shall pay for and be responsible to secure the site and the project against theft, vandalism, fire and for public safety at all times (24 hours per day) from Notice to Proceed until Substantial Completion.

9. WORK DAYS: Contractor will have access to the job site as needed. Advanced notice is required to work after hours and on weekends. Contractor will be responsible for notifying the City’s representative.

10. IDENTIFYING SHIRTS: GC and all subcontractors will be required to wear shirts with a identifying logo of the company they work for.

BONDING: Bid and Performance Bonding is required

DAVIS-BACON REQUIREMENTS: Not required on this project.

PERMIT FEES: Contractor is responsible for preparation of all permit applications required for this project. The City of Apalachicola will waive all applicable fees associated with City permitting.

REQUESTS FOR INFORMATION (RFI) RFI’s will be submitted no less than ten (10) prior to bid opening. RFI’s submitted after that time period will not be answered.

EXCEPT AS SPECIFICALLY PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF THE BIDDING

DOCUMENTS AND CONTRACT DOCUMENTS REMAIN UNCHANGED.

(SUBMIT IN TRIPLICATE ON CONTRACTOR'S LETTERHEAD)

Contractor Proposal and Subcontractor List

(Insert Date)

(Insert Time)

TO:

Ladies and Gentlemen:

The undersigned, hereinafter called "Bidder", having visited the site of the proposed project and familiarized himself with the local conditions, nature and extent of the work, and having examined carefully any drawings or specifications, the Form of Agreement, and other Contract Documents with the Bond Requirements therein, proposes to furnish all labor, materials, equipment and other items, facilities, and services for the proper execution and completion of (Insert Name and Address of Project and Project No.), in full accordance with any drawings and specifications prepared by the firm of (Insert Name and Address of the Architect/Engineer), in full accordance with the advertisement for bids, General Terms and Conditions, Agreement and all other documents relating thereto on file in the office of the Architect/Engineer and if awarded the contract, to complete the said work within the time limits specified for the following bid price:

Base Bid: $ (Dollars)

With foregoing as a Base Bid, the following costs of alternate proposals are submitted in accordance with the drawings and specifications.

Alternate No. 1 Add or Deduct $ (Insert Dollar Amount) Alternate No. 2 Add or Deduct $ (Insert Dollar Amount) Alternate No. 3 Add or Deduct $ (Insert Dollar Amount)

If more or less work is required than that qualified by the specifications and drawings, the following unit prices shall be applicable:

1. Item: Unit Price:

2. Item: Unit Price:

(If this section is not applicable it may be left out).

The Bidder hereby agrees that:

a. The above proposal shall remain in full force and effect for a period of ninety (90) calendar days after the time of the opening of this proposal and that the Bidder will not revoke or cancel this proposal or withdraw from the competition within the said ninety (90) calendar days.

b. If the Base Bid or the Base Bid plus the sum of any alternates exceed $100,000, the bidder shall enclose a certified check, cashier's check, treasurer's check, bank draft or Bid Bond in the amount of not less than five percent (5%) of the Bid, payable to the Owner as a guarantee for the purpose set out in Instructions to Bidders. (Failure to submit a bid bond will result in disqualification).

c. In the event the contract is awarded to this Bidder, they will enter into a formal written Agreement with the Owner in accordance with the accepted bid within ten (10) calendar days after said contract is submitted to the bidder. If the Base Bid or the Base Bid plus the sum of any alternates exceed $100,000, Bidder will furnish to the Owner a Contract Performance Bond with good and sufficient sureties, satisfactory to the Owner, in the amount of 100% of the accepted bid, the form of which is shown by Exhibits to the General Terms and Conditions and which shall fully comply with Section 255.05, Florida Statutes. The Bidder further agrees that in the event of the Bidder's default or breach of any of the agreements of this proposal, the said bid deposit shall be forfeited as liquidated damages.

Acknowledgement is hereby made that the owner is responsible for all required permit fees.

Acknowledgement is hereby made of receipt of the following addenda issued during the bidding period.

Addendum No. Dated

Florida Construction Industries Licensing Board Certification.

Holder: (Insert Name of Holder) Certificate No: (Insert Certificate No.)

In witness whereof, the Bidder has hereunto set his signature and affixed his seal this (Insert Day) day of (Insert Month) (Insert Year).

(SEAL)

By:

Title:

Proposal Form Continued

LIST OF SUBCONTRACTORS

(Submit in triplicate on the Bidder's letterhead, place in a sealed envelope and attach to Bidder's proposal.)

(Insert Date)

THIS LIST IS ATTACHED TO, AND IS AN INTEGRAL PART OF THE BID SUBMITTED BY:

Bidder’s Name:

Bidder’s Address:

FOR THE CONSTRUCTION OF:

Project Number:

Project Name:

THE UNDERSIGNED, HEREINAFTER CALLED "BIDDER", LISTS BELOW THE NAME OF EACH SUBCONTRACTOR WHO WILL PERFORM THE PHASES OF THE WORK INDICATED. FAILURE OF THE BIDDER TO SUPPLY SUFFICIENT INFORMATION TO ALLOW VERIFICATION OF THE CORPORATE, AND DISCIPLINE LICENSE STATUS

OF THE SUBCONTRACTOR MAY DEEM THE BID AS BEING NON-RESPONSIVE.

SUBCONTRACT/TRADE NAME OF SUBCONTRACTOR

1.

2.

3.

4.

5.

By (Signature)

Lynn Haven Fire Station Wind Retrofit & Safe Room September 2023

City of Lynn Haven Fire Station Technical Specifications

Wind Retrofit & Safe Room

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

011000 SUMMARY

012200 UNIT PRICES

012300 ALTERNATES

013300 SUBMITTAL PROCEDURE

014000 QUALITY REQUIREMENTS

016000 PRODUCT REQUIREMENTS

017700 CLOSEOUT PROCEDURES

DIVISION 3 CONCRETE

031119 INSULATING CONCRETE FORMING GENERAL

031119A INSULATING CONCRETE FORMING FLOORS AND WALLS

033000 CAST-IN-PLACE CONCRETE

DIVISION 5 METALS

054000 COLD FORMED METAL FRAMING

DIVISION 6 WOOD WORK

062023 INTERIOR FINISH CARPENTRY

DIVISION 7 THERMAL AND MOISTURE PROTECTION

072500 WEATHER BARRIERS

074133 STANDING SEAM METAL ROOF PANELS

074213 FORMED METAL WALL PANELS

079200 JOINT SEALANTS

DIVISION 8 OPENINGS

081113 HOLLOW METAL DOORS

DIVISION 9 FINISHES

092900 GYPSUM BOARD

096519 RESILIENT TILE FLOORING

096813 TILE CARPETING

099123 INTERIOR PAINTING

ADDITIVE ALTERNATE #3

Securitas submission for ACS-1 Storefront & 8 readers on hurricane doors

GEOTECHNICAL REPORT

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Phased construction.

4. Work by Owner.

5. Work under separate contracts.

6. Future work.

7. Purchase contracts.

8. Owner-furnished products.

9. Contractor-furnished, Owner-installed products.

10. Access to site.

11. Coordination with occupants.

12. Work restrictions.

13. Specification and Drawing conventions.

14. Miscellaneous provisions.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.3 PROJECT INFORMATION

A. Project Identification: Lynn Haven Fire Station #1 Wind Retrofit & Safe Room

1. Project Location: 1412 Pennsylvania ave, Lynn Haven, FL 32444.

B. Owner: City of Lynn Haven

1. Owner's Representative: To Be Determined

C. Bids to be Submitted:

Attn: Andrea Marsh

City of Lynn Haven

825 Ohio Avenue

SUMMARY 011000 - 2

Lynn Haven, Florida 32444

D. Architect: Hammond Design Group, LLC, 2627 S. Blair Stone Road, Tallahassee, Florida

32301.

E. Contractor: To be Determined has been engaged as Contractor for this Project.

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. Construction documents dated To be Determined and other Work indicated in the

Contract Documents.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.5 PHASED CONSTRUCTION

A. The Work shall be conducted in 1 phases, complete as indicated.

1. Phase 1: The Contractor selected will be notified on December 16 of the intent to award.

At that notice of intent the contractor will begin submission of bid documents to the City of Lynn Haven, Building Department prior to Decembre 30, 2026. Construction Work of this phase shall commence within 14 days after the Notice to Proceed issued on

January 12, 2027 and be substantially complete and ready for occupancy 232 days after the Notice to Proceed, on or around August 31, 2027.

B. Before commencing Work, submit a copy of Contractor's construction schedule showing the sequence, commencement and completion dates for all phases of the Work.

1.6 WORK UNDER SEPARATE CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying Work under this Contract or other contracts.

Coordinate the Work of this Contract with work performed under separate contracts.

B. Preceding Work: Owner will award separate contract(s) for the following construction operations at Project site. Those operations are scheduled to be substantially complete before

Work under this Contract begins.

1. Technology.

1.7 PURCHASE CONTRACTS

A. General: Owner has negotiated Purchase contracts with suppliers of material and equipment to be incorporated into the Work. Owner will assign these Purchase contracts to Contractor.

SUMMARY 011000 - 3

Include costs for purchasing, receiving, handling, storage if required, and installation of material and equipment in the Contract Sum unless otherwise indicated.

1. Contractor's responsibilities are same as if Contractor had negotiated Purchase contracts, including responsibility to renegotiate purchase and to execute final purchasing agreements.

1.8 ACCESS TO SITE

A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

B. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

C. Use of Site: Limit use of Project site to areas to be determined. Do not disturb portions of

Project site beyond areas in which the Work is indicated.

1. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

E. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.9 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Architect, Owner not less than two days in advance of proposed utility interruptions.

SUMMARY 011000 - 4

C. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Architect, Owner not less than two days in advance of proposed disruptive operations.

D. Restricted Substances: Use of tobacco products and other controlled substances on Project site is not permitted.

E. Employee Identification: Provide identification tags for Contractor personnel working on

Project site. Require personnel to use identification tags at all times.

F. Employee Screening: Comply with Owner's requirements for background screening of

Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Owner's representative.

1.10 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations

3. Keynoting: Materials and products are identified by reference keynotes referencing

Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

UNIT PRICES 012200 - 1

SECTION 012200 - UNIT PRICES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1. Section 014000 "Quality Requirements" for field testing by an independent testing agency.

1.3 DEFINITIONS

A. Unit price is an amount incorporated into the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

UNIT PRICES 012200 - 1

SECTION 012200 - UNIT PRICES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1. Section 014000 "Quality Requirements" for field testing by an independent testing agency.

1.3 DEFINITIONS

A. Unit price is an amount incorporated into the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

UNIT PRICES 012200 - 2

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

A. Unit Price No. 1: Removal of unsatisfactory soil and replacement with satisfactory soil material.

1. Description: Unsatisfactory soil excavation and disposal off-site and replacement with satisfactory fill material or engineered fill from off-site, as required, according to Section 312000 "Earth Moving."

2. Unit of Measurement: Cubic yard of soil excavated, based on in-place surveys of volume before and after removal.

3. Quantity Allowance: Coordinate unit price with allowance adjustment requirements in Section 012100 "Allowances."

B. Unit Price No. 2: Rock excavation and replacement with satisfactory soil material.

1. Description: Classified rock excavation and disposal off-site and replacement with satisfactory fill material or engineered fill from off-site, as required, according to Section 312000 "Earth Moving."

2. Unit of Measurement: Cubic yard of rock excavated, based on survey of in-place surveys volume of before and after removal.

3. Quantity Allowance: Coordinate unit price with allowance adjustment requirements in Section 012100 "Allowances."

C. Unit Price No. 3: Cutting and patching of concrete slabs-on-grade.

1. Description: Cutting of new or existing concrete slabs-on-grade up to 6 inches (152 mm) thick, removal and excavation as required, and subsequent backfill, compaction, and patching of concrete according to Section 017300 "Execution." not otherwise indicated in the Contract Documents.

2. Unit of Measurement: Square feet of concrete removed.

D. Unit Price No. 4: Miscellaneous and structural steel.

1. Description: Miscellaneous lintels and other supports not otherwise indicated in the Contract Documents, according to Section 051200 "Structural Steel Framing" and Section 055000 "Metal Fabrications."

2. Unit of Measurement: Cost in place of pounds of fabricated steel as indicated on itemized invoice of steel supplier.

END OF SECTION 012200

ALTERNATES 012300 - 1

SECTION 012300 - ALTERNATES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for alternates.

1.3 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.

2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternates into the Work. No other adjustments are made to the Contract Sum.

1.4 PROCEDURES

A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Execute accepted alternates under the same conditions as other work of the Contract.

C. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.

ALTERNATES 012300 - 2

PART 3 - EXECUTION

3.1 SCHEDULE OF ALTERNATES

A. Alternate No..

1. Additive Alternate 1: Make the Roll down shutters at the entrance an electrical motorized roll down system, provide electrical circuit for proper operation. Basis of Design: ASSA Shutters. Refer to sheet A5.01

2. Additive Alternate 2: All window hurricane shutter panels shall be replaced with roll down shutters. Basis of Design: ASSA Shutters. Refer to A5.01.

3. Additive Alternate 3: Provide all access controllers, locks and equipment outlined in the design package, by Securitas, located in the back of the specification booklet. This should be considered a basis of design. Alternates may be considered.

END OF SECTION 012300

SUBMITTAL PROCEDURES 013300 - 1

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Submittal schedule requirements.

2. Administrative and procedural requirements for submittals.

B. Related Requirements:

1. Section 014000 "Quality Requirements" for submitting test and inspection reports, and schedule of tests and inspections.

2. Section 017700 "Closeout Procedures" for submitting closeout submittals and maintenance material submittals.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's and Construction Manager's responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's and Construction Manager's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

1.4 SUBMITTAL SCHEDULE

A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Architect and additional time for handling and reviewing submittals required by those corrections.

1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule.

SUBMITTAL PROCEDURES 013300 - 2

2. Initial Submittal: Submit concurrently with startup construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.

3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's construction schedule.

a. Submit revised submittal schedule to reflect changes in current status and timing for submittals.

4. Format: Arrange the following information in a tabular format:

a. Scheduled date for first submittal.

b. Specification Section number and title.

c. Submittal Category: Action; informational.

d. Name of subcontractor.

e. Description of the Work covered.

f. Scheduled date for Architect's final release or approval.

g. Scheduled dates for purchasing.

h. Scheduled date of fabrication.

i. Scheduled dates for installation.

j. Activity or event number.

1.5 SUBMITTAL FORMATS

A. Submittal Information: Include the following information in each submittal:

1. Project name.

2. Date.

3. Name of Architect.

4. Name of Construction Manager.

5. Name of Contractor.

6. Name of firm or entity that prepared submittal.

7. Names of subcontractor, manufacturer, and supplier.

8. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.

9. Category and type of submittal.

10. Submittal purpose and description.

11. Number and title of Specification Section, with paragraph number and generic name for each of multiple items.

12. Drawing number and detail references, as appropriate.

13. Indication of full or partial submittal.

14. Location(s) where product is to be installed, as appropriate.

15. Other necessary identification.

16. Remarks.

17. Signature of transmitter.

B. Options: Identify options requiring selection by Architect.

SUBMITTAL PROCEDURES 013300 - 3

C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by Architect on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.

D. Paper Submittals:

1. Place a permanent label or title block on each submittal item for identification; include name of firm or entity that prepared submittal.

2. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review and approval markings and action taken by Architect.

3. Action Submittals: Submit four paper copies of each submittal unless otherwise indicated. Architect through Construction Manager will return three copies.

4. Informational Submittals: Submit four paper copies of each submittal unless otherwise indicated. Architect through Construction Manager will return three copies.

5. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

6. Transmittal for Submittals: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form.

E. PDF Submittals: Prepare submittals as PDF package, incorporating complete information into each PDF file. Name PDF file with submittal number.

F. Submittals for Web-Based Project Software: Prepare submittals as PDF files, or other format indicated by Project software website.

1.6 SUBMITTAL PROCEDURES

A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Email: Prepare submittals as PDF package, and transmit to Architect by sending via email. Include PDF transmittal form. Include information in email subject line as requested by Architect.

a. Architect will return annotated file. Annotate and retain one copy of file as a digital Project Record Document file.

2. Web-Based Project Software: Prepare submittals in PDF form, and upload to web-based Project software website. Enter required data in web-based software site to fully identify submittal.

3. Paper: Prepare submittals in paper form, and deliver to Architect.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

SUBMITTAL PROCEDURES 013300 - 4

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

4. Coordinate transmittal of submittals for related parts of the Work specified in different Sections so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect and Construction Manager reserve the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 10 days for review of each resubmittal.

4. Sequential Review: Where sequential review of submittals by Architect's consultants, Owner, or other parties is indicated, allow 21 days for initial review of each submittal.

D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked with approval notation from Architect's action stamp.

E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

F. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp.

1.7 SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

SUBMITTAL PROCEDURES 013300 - 5

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

f. Application of testing agency labels and seals.

g. Notation of coordination requirements.

h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams that show factory-installed wiring.

b. Printed performance curves.

c. Operational range diagrams.

d. Clearances required to other construction, if not indicated on accompanying Shop

Drawings.

5. Submit Product Data before Shop Drawings, and before or concurrent with Samples.

B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data unless submittal based on Architect's digital data drawing files is otherwise permitted.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products.

b. Schedules.

c. Compliance with specified standards.

d. Notation of coordination requirements.

e. Notation of dimensions established by field measurement.

f. Relationship and attachment to adjoining construction clearly indicated.

g. Seal and signature of professional engineer if specified.

2. Paper Sheet Size: Except for templates, patterns, and similar full-size Drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches, but no larger than 30 by 42 inches.

C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other materials.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Permanently attach label on unexposed side of Samples that includes the following:

a. Project name and submittal number.

b. Generic description of Sample.

c. Product name and name of manufacturer.

d. Sample source.

e. Number and title of applicable Specification Section.

f. Specification paragraph number and generic name of each item.

SUBMITTAL PROCEDURES 013300 - 6

3. Email Transmittal: Provide PDF transmittal. Include digital image file illustrating Sample characteristics, and identification information for record.

4. Web-Based Project Software: Prepare submittals in PDF form, and upload to web-based Project software website. Enter required data in web-based software site to fully identify submittal.

5. Paper Transmittal: Include paper transmittal including complete submittal information indicated.

6. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

7. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit one full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect, through Construction Manager, will return submittal with options selected.

8. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected.