ITB 250095 for PR Athletic Field Chemical Tre.pdf
PDF 395 KB Posted
- Attached to
- Jackson County Facilities Maintenance - Park & Recreation - Turf & Field Chemical Applications & Mai
- Solicitation number
- PE-67800-NONST-2026-000000030
- Issued by
- Jefferson County, Georgia
About this file
This Invitation to Bid (ITB 250095) is issued by the Jackson County Board of Commissioners in Georgia for athletic field chemical application and turf treatment/weed control services across multiple Parks & Recreation facilities. The County seeks a qualified contractor to provide all labor, materials, equipment, and supervision necessary to apply herbicides, fertilizers, fungicides, and insecticides to maintain healthy and playable athletic fields. Services are required at 12 locations including East Jackson Park, Jackson County Equestrian Center, Gum Springs Park, Hoschton Park, Lamar Murphy Park, Mountain Creek Church, North Jackson Elementary School, Sells Mill Park, West Jackson Elementary School, West Jackson/Hoschton Baseball Fields, Gordon Street Center, and ECCC, covering approximately 29 fields and turf areas with varying service levels (full service or fire ant control only). Applications must follow a seasonal schedule including early spring, late spring, early summer, late summer, early fall, fall, late fall, and as-needed spot treatments. Sealed bids are due September 25, 2025 at 11:30 a.m. at the Jackson County Board of Commissioners office in Jefferson, Georgia, with public bid opening at the same time and location. Questions must be directed to Kenneth Morris, Purchasing Manager, by September 15, 2025. The contract term is three years from January 1, 2026 through December 31, 2028, with an option for Jackson County to extend for two consecutive years of renewal with fixed pricing. No formal pre-bid conference will be held, though site visits are encouraged and bidders are responsible for ascertaining local conditions.
Bidders must submit pricing as a firm monthly rate for all services and all contract extensions. Payment will be made monthly within 30 days of invoice submission, with invoices detailing date of service, personnel, areas treated, chemicals used, and observations signed by both parties. All bidders must provide proof of current Georgia Department of Agriculture and Consumer Services certification for personnel, Workers' Compensation insurance compliant with Georgia state law, and Broad Form Comprehensive General Liability insurance with minimum limits of $100,000 including premises operations, products/completed operations, contractual liability, personal injury, and owners and contractors protective coverage. Contractors must also complete a notarized Contractor Affidavit verifying compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The contract is funded through Jackson County General Fund and Special Revenue Funds. All materials and chemicals must conform to current Federal, State, and OSHA requirements and be EPA-approved, with Material Safety Data Sheets (MSDS) submitted prior to use. Jackson County reserves the right to reject any or all bids, conduct inspections and tests to verify conformance to specifications, require higher insurance limits if necessary, cancel the contract with 30 days written notice, and make changes within the general scope of work with equitable adjustments to price if applicable.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
September 3, 2025
TO: Turf/Grass Maintenance & Chemical Application Control Companies
SUBJECT: Invitation to Bid for Athletic Field Chemical Application - Turf Treatment/Weed
Control Service Delivery - P&R Fields(FM)
The Jackson County Board of Commissioners is soliciting bids for Athletic Field Chemical
Application - Turf Treatment/Weed Control Service Delivery – for the Parks & Recreation locations referenced in the attached Scope of Work (SOW). Specifications, terms and conditions are contained herein.
BID NUMBER: ITB 250095
BID NAME: Jackson County Athletic Field Chemical Application - Turf Treatment/Weed
Control
BID DUE DATE/TIME: September 25, 2025 at 11:30 am, local time pertaining
RETURN BID VIA: sealed bid sent to:
Jackson County Board of Commissioners
Attn: Purchasing Department – Bid # ITB 250095, Athletic Field Chemical Application -
Turf Treatment/Weed Control
4965 Jackson Parkway
Jefferson, GA 30549
PUBLIC BID OPENING DATE/TIME: September 25, 2025 at 11:30 am, local time pertaining
LOCATION: 4965 Jackson Parkway, Jefferson, GA 30549
Direct all questions concerning this bid to:
Kenneth Morris, Jackson County Purchasing Manager
(706) 367-6309 / kmorris@jacksoncountygov.com
Jackson County Board of Commissioners 4965 Jackson Parkway
Jefferson, Georgia 30549 Phone: (706) 367-6309
Fax: (706) 367-1505
Email: kmorris@jacksoncountygov.com mailto:kmorris@jacksoncountygov.com
GENERAL INFORMATION FOR BIDDERS
1. GENERAL INFORMATION FOR BIDDERS:
A. From the issue date of this Invitation to Bid (ITB) until an award has been announced, vendors shall not communicate with any Jackson County elected official or employee, with the exception of the name stated above concerning this ITB or any information herein.
B. Whenever the terms “shall”, “must”, “will”, or “is required” are used in the ITB, the item to which the term is referring is a mandatory requirement of this ITB and failure to meet any mandatory requirement may be cause for rejection of the bid.
C. All amendments and or addendums will be posted on the Jackson County Purchasing
Information website, www.jacksoncountygov.com and it is the bidder’s responsibility to check this site on a regular basis. The Board will not be responsible for any information not viewed by bidders.
http://www.jacksoncountygov.com/
DETAILED SPECIFICATIONS ASSOCIATED WITH THIS BID FOR ATHLETIC
TURF/FIELD MAINTENANCE SERVICES
I. PURPOSE: The County of Jackson (“County”) is seeking proposals from highly qualified companies experienced in athletic and recreational sport field chemical treatment and maintenance services of county parks and recreation department fields to provide all personnel, materials and services necessary to ensure the safe, effective, and compliant application of herbicides, fertilizers, fungicides, and insecticides to maintain healthy, playable, and aesthetically pleasing athletic fields throughout the year as provided in this ITB for the period of three (3) years unless otherwise extended.
The County wishes to enter into agreement with a company that is able to maintain and treat the grounds spaces listed within the scope of this ITB and provide “quality and timely” delivery of services as listed in the attached scope of work.
These projects will be locally funded utilizing General Fund and other Special Revenue Funds as they come available.
II. SCOPE OF SERVICE:
A. WORK INCLUDED: The contractor shall provide all labor, tools, equipment, materials, and all incidentals required and/or implied for the complete and satisfactory performance of turf chemical applications/treatment and maintenance for the properties/fields listed on
Attachment A, SCOPE OF WORK. Treatment shall be provided for all athletic fields and other grass recreation areas listed within the frequencies given, or as specifically directed otherwise by
Jackson County at the time of treatment. Treatment is to be confined to the exterior areas indicated as specified herein. See attached Scope of Work for further clarification.
B. QUALITY OF WORKMANSHIP: All work shall be quality work performed according to the standards of the industry, and to the complete satisfaction of Jackson County to provide well maintained and treated athletic fields and turf areas at the locations specified. All work shall be performed in accordance with current state, federal and local laws and regulations which govern lawn chemical services, including applicable EPA and FDA regulations, and chemical manufacturer's directions, whichever is more stringent.
C. PERSONNEL QUALIFICATIONS: All personnel used by the contractor for the performance of this work shall be properly trained and qualified applicators, and shall have current certification from the Georgia Department of Agriculture and Consumer Services, as well as any other required licenses and certifications. The contractor shall provide evidence of qualifications for any personnel performing work under this contract upon request by Jackson County.
Jackson County reserves the right to refuse to accept services from any personnel deemed by Jackson County to be unqualified, disorderly, or otherwise unable to perform assigned work.
D. TREATMENT SPECIFICATIONS: As a minimum, routine standard treatment shall be provided as described below. Additional treatment shall be provided as necessary to provide a well maintained athletic fields.
1. See attached Scope of Work
E. MATERIAL SPECIFICATIONS: All materials and chemicals used for the per-formance of this work shall conform to current Federal, State, and OSHA requirements and shall be approved and in compliance with existing EPA labeling and the use requirements under the Federal
Insecticide, and Fungicide (as amended). The contractor shall submit MSDS sheets to the Jackson
County Purchasing Department on any chemical used for the performance of this work prior to its use. Chemical sprays shall be defined as low odor.
F. SCHEDULING AND COORDINATION:
1. All treatments shall be scheduled ahead of time as agreed upon by the contractor and Jackson County. A set schedule for routine standard treatment shall be established as soon as practicable after the start date of the contract.
G. OTHER REQUIREMENTS
1. Invoices shall be submitted monthly during the month following service.
This requirement is in addition to and independent from any other requirements regarding invoices contained within this contract.
2. Reports: The invoice that shall be submitted to Jackson County shall contain the date of service, personnel performing service, areas treated, chemical used in treating the area, special infestations noted, and shall be signed by both parties.
3. Uniforms: All contract personnel shall be required to wear uniforms with company patches or other identifying clothing to clearly identify the personnel as being an employee of the contractor.
4. Parking: All vehicles shall be clearly identified as belonging to the contractor and shall park in designated parking areas only.
III. PRE-BID CONFERENCE:
There will be no formal pre-bid conference. Questions concerning this bid package should be directed to Kenneth Morris at (706) 769-6309 no later than the close of normal business hours on
September 15, 2025 so that an appropriate addendum can be created and sent to all vendors prior to the closing of the bid on September 25, 2025.
IV. GENERAL TERMS AND CONDITIONS:
A. PURCHASING MANUAL: This Invitation to Bid (ITB) is subject to the provisions of the Jackson County Purchasing Ordinance and any revisions thereto, which are hereby incorporated into this contract in their entirety except as amended or superseded herein.
B. MANDATORY USE OF JACKSON COUNTY FORM AND TERMS AND
CONDITIONS: Failure to submit a bid on the official Jackson County form provided for that purpose shall be a cause for rejection of the bid. Return of the complete document is required.
Modification of or additions to any portion of the invitation may be cause for rejection of the bid;
however, Jackson County reserves the right to decide, on a case by case basis, in its sole discretion, whether or not to reject such a bid as non-responsive.
C. PRECEDENCE OF TERMS: Except for paragraphs A, B, C, J, K and N of the
General Terms and Conditions, which shall apply in all instances, in the event there is a conflict between the General Terms and Conditions and any Special Terms and Conditions for use in a particular procurement, the Special Terms and Conditions shall prevail.
D. CLARIFICATION OF TERMS: If any prospective bidder has questions about the specifications or other bid documents, the prospective bidder should contact the person whose name appears on the title page of the invitation, no later than seven (7) days before the opening date. Any revisions to the invitation will be made only by addendum issued by Jackson County.
E. TESTING/INSPECTION: Jackson County reserves the right to conduct any test or inspection it may deem advisable to assure supplies and services conform to the specifications.
F. PAYMENT TERMS: Any payment terms requiring payment in less than 30 days will be regarded as requiring payment 30 days after invoice or delivery, whichever occurs last. This shall not affect offers of discounts for payment in less than 30 days, however.
G. INVOICES: Invoices for services ordered, delivered and accepted by Jackson
County shall be submitted by the contractor direct to the payment address shown on the contract. A monthly statement with all invoices detailed and charges associated with such invoices shall be submitted so that one monthly payment is made to the Contractor for services provided.
H. DEFAULT: In case of failure to deliver goods or services in accordance with the contract terms and conditions, Jackson County, after due oral or written notice, may procure substitute goods or services from other sources and hold the contractor responsible for any resulting additional purchasing and administrative costs. This remedy shall be in addition to any other remedies, which Jackson County may have.
I. ASSIGNMENT OF CONTRACT: A contract shall not be assignable by the contractor in whole or in part without the written consent of Jackson County.
J. ANTITRUST: By entering into a contract, the bidder conveys, sells, assigns, and transfers to Jackson County all rights, title and interest in and to all causes of the action it may now or hereafter acquire under the Antitrust Laws of the United States, relating to the particular goods or services purchased or acquired by Jackson County under said contract.
K. ETHICS IN PUBLIC CONTRACTING: By submitting their bids, all bidders certify that their bids are made without collusion or fraud and that they have not offered or received any kickbacks or inducements from any other bidder, supplier, manufacturer or subcontractor in connection with their bid, and that they have not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit or money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged.
L. ANTI-DISCRIMINATION: By submitting their bids, all bidders certify to Jackson
County that they will conform to the provisions of the Federal Civil Rights Act of 1964, as amended.
In every contract of over $10,000 the provisions in 1 and 2 below apply:
1. During the performance of this contract, the contractor agrees as follows:
a. The contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex or national origin, except where religion, sex or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the contractor. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.
b. The contractor, in all solicitations or advertisements for employees placed by or on behalf of the contractor, will state that such contractor is an equal opportunity employer.
c. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section.
2. The contractor will include the provisions of 1 above in every subcontract or purchase order of over $10,000 so that the provisions will be binding upon each subcontractor or vendor.
M. DEBARMENT STATUS: By submitting their bids, all bidders certify that they are not currently debarred from bidding on contracts by any agency of the State of Georgia, nor are they an agent of any person or entity that is currently debarred from submitting bids on contracts by any agency of the State of Georgia.
N. APPLICABLE LAW AND COURTS: Any contract resulting from this invitation for bid shall be governed in all respects by the laws of the State of Georgia and any litigation with respect thereto shall be brought in the courts of the State of Georgia. The contractor shall comply with applicable federal, state and local laws and regulations.
O. QUALIFICATION OF BIDDERS: Jackson County may make such reasonable investigations as deemed proper and necessary to determine the ability of the bidder to perform the work/furnish the items and the bidder shall furnish to Jackson County all such information and data for this purpose as may be requested. Jackson County reserves the right to inspect bidder's physical plant prior to award to satisfy questions regarding the bidder's capabilities. Jackson County further reserves the right to reject any bid if the evidence submitted by, or investigations of, such bidder fails to satisfy Jackson County that such bidder is properly qualified to carry out the obligations of the contract and to complete the work/furnish the items contemplated therein.
P. EO/AA STATEMENT: Jackson County, an Equal Opportunity Affirmative Action institution covered by Presidential Executive Order 11246 as amended, advises all contractors, subcontractors, vendors and suppliers that direct or indirect receipt of federal funds may require appropriate action on their part.
Q. ILLEGAL IMMIGRAT IMMIGRATION REFORM AND ENFORCEMENT
ACT OF 2011 - Vendors submitting a response to this ITB must complete the Contractor
Affidavit under O.C.G.A. §13-10-91(b)(1) which is provided with the ITB package to verify compliance with the Illegal Immigration Reform and Enforcement Act of 2011.
1. The form must be signed by an authorized officer of the contractor or their authorized agent.
2. The form must be notarized.
3. The contractor will be required to have all subcontractors and sub-subcontractors who are engaged to complete physical performance of services under the final contract executed between the County and the contractor complete the appropriate subcontractor and sub-subcontractor affidavits and return them to the County a minimum of five (5) days prior to any work being accomplished by said subcontractor or sub-subcontractor. Format for this affidavit can be provided to the contractor if necessary.
V. SPECIAL TERMS AND CONDITIONS:
A. AUDIT: The contractor hereby agrees to retain all books, records, and other documents relative to this contract for five years after final payment, or until audited by the State of
Georgia, whichever is sooner. Jackson County, its authorized agents, and/or state auditors shall have full access to and the right to examine any of said materials during said period.
B. AVAILABILITY OF FUNDS: It is understood and agreed between the parties herein that Jackson County shall be bound hereunder only to the extent of the funds available or which may hereafter become available for the purpose of this agreement.
C. AWARD OF CONTRACT: Jackson County will make award to the lowest responsive and responsible bidder. Due consideration will be given to price, quality as judged by tests and previous experience, and the ability of the bidders to render required services. Jackson
County reserves the right to conduct any test it may deem advisable and to make all evaluations.
Jackson County also reserves the right to reject any or all bids, in whole or in part, to waive informalities and to delete items prior to making the award, whenever it is deemed in the sole opinion of Jackson County to be in its best interest.
D. BID ACCEPTANCE PERIOD: This bid shall be binding upon the bidder for 60 calendar days following the bid opening date. Any bid on which the bidder shortens the acceptance period may be rejected.
E. BID PRICES: Bid shall be in the form of a firm monthly price during the contract period and all extension to the contract.
F. CANCELLATION OF CONTRACT: Jackson County reserves the right to cancel and terminate any resulting contract, in part or in whole, without penalty, upon 30 days written notice to the contractor. Any contract cancellation notice shall not relieve the contractor of the obligation to deliver and/or perform on all outstanding orders issued prior to the effective date of cancellation.
G. CHANGES: By written notice to the contractor that may be in the form of electronic communications (i.e. email or fax), Jackson County may from time to time make changes, within the general scope of the contract, in the goods or services to be provided by the contractor. This includes, but is not limited to, adding and/or deleting parts of the Scope of Work. The contractor shall promptly comply with the notice and shall make all subsequent goods or services conform to the notice. If any such change causes an increase or decrease in the contractor's cost of performance or the time required for performance, an equitable adjustment in the contract price and/or the time allowed for performance of the contract shall be negotiated and the contract modified accordingly by written supplemental agreement. Any claim by the contractor for adjustment under this clause must be asserted by written notice to Jackson County within 30 days from the date of receipt by the contractor of the change notice. Again, this written notice may be in the form of electronic communication.
H. CONTRACT DOCUMENTS: The contract entered into by the parties shall consist of this Invitation to Bid (ITB), the signed bid submitted by the contractor, the Jackson County
Contract Form, General Terms and Conditions, Special Terms and Conditions, Specifications and
Attachments, including all modifications thereof, all of which shall be referred to collectively as the
Contract Documents.
I. CONTRACT PERIOD: The contract shall be for a period of three years from the period of January 1, 2026 through December 31, 2028. The contract will contain provisions for an option for Jackson County to extend the contract to allow for two (2) consecutive years of renewal with the contract prices remaining fixed. The contract shall be renegotiated 60 days prior to the expiration date. Notification requesting the extension of the contract may be completed by electronic communications.
IDENTIFICATION OF BID ENVELOPE: The signed bid should be returned in a separate envelope or package, sealed and identified as follows:
From:
Name of Bidder Bid Due Date Time
Street or Box Number Bid Number
City, State, Zip Code Bid Title
Name of Buyer:
The envelope should be addressed to Jackson County Board of Commissioners, Attention: Kenneth Morris, Purchasing Manager, 4965 Jackson Parkway, Jefferson, GA, 30549.
If a bid not contained in the special envelope is mailed, the bidder takes the risk that the envelope even if marked as described above, may be inadvertently opened and the information compromised which may cause the bid to be disqualified. Bids may be hand delivered to the office of the Purchasing Department issuing the invitation at the location given above. No other correspondence or other bids should be placed in the envelope.
K. INDEMNIFICATION: The contractor agrees to indemnify, defend and hold harmless Jackson County and their officers, agents, and employees from any claims, damages and actions of any kind or nature whether at law or in equity, arising from or caused by the use of any materials, goods, or equipment of any kind or nature furnished by the contractor/any services of any kind or nature provided by the contractor.
L. INDEPENDENT CONTRACTOR: The contractor shall not be an employee of
Jackson County, but shall be an independent contractor. Nothing in this agreement shall be construed as authority for the contractor to make commitments, which shall bind Jackson County or to otherwise act on behalf of Jackson County, except as Jackson County may expressly authorize in writing.
M. INSPECTION OF WORK SITE: Bidders shall visit the Jackson County areas included and shall be responsible for having ascertained pertinent local conditions such as location, accessibility and general character of the areas referenced. Claims, as a result of failure to do so, will not be considered by Jackson County.
N. INSURANCE:
1. The contractor shall provide Jackson County a Certificate of Insurance prior to the start of any work and agrees to maintain such insurance until the completion of the contract.
The minimum limits of liability shall be:
A. Workers' Compensation - In compliance with Georgia State Law
B. Broad Form Comprehensive General Liability, $100,000.00, to include:
1. Premises - Operations
2. Products / Completed Operations
3. Contractual
4. Personal Injury
5. Owners and Contractors Protective
2. Jackson County reserves the right to require higher limits on any contract provided notice of such requirements is stated in the proposal for such contract. Included in the certificate of insurance shall be a hold harmless agreement saving Jackson County harmless from any liability from the contractor or from any subcontractors or by anyone directly or indirectly employed by either. Jackson County is to be named as additional insured.
A 30-day notice of cancellation or non-renewal in writing shall be furnished by certified mail to the certificate holder at the address indicated on the face of this form. Also, when deemed necessary, the contractor will provide explosion, collapse and underground coverage (X, C and U coverage).
The contractor agrees to be responsible for, indemnify and save harmless
Jackson County and their representatives from the payment of all sums of money by reason of any claim against Jackson County or their representatives under the Workmen's Compensation Act, and by reason of all or any other occurrences resulting in bodily injury or property damage that may happen to occur upon or about said work. The contractor agrees that it will, at all times, and at least for one year after the completion of the work, indemnify and save harmless Jackson County against liabilities resulting from bodily injury or property damage directly or indirectly arising out of the performance or nonperformance of the contract.
3. ALL BIDDERS PROVIDE THE FOLLOWING INFORMATION:
NAME OF INSURANCE CARRIER:
NAME OF INSURANCE AGENT:
TELEPHONE NUMBER:
BROAD FORM COMPREHENSIVE
GENERAL LIABILITY LIMIT: $
AUTOMOBILE LIABILITY LIMIT: $
POLICY EXPIRATION DATE:
If a bidder fails to provide all the above information or does not indicate an amount of coverage, the bidder's signature on this invitation constitutes certification that, if the bidder is awarded the contract, the bidder shall obtain the necessary coverage as specified within ten days of notification of award of the contract.
If at any time or times any claim or claims shall be made to Jackson County by a subcontractor or other persons for any money due for any work, labor or material done upon or supplied upon the work herein contracted for, done for, furnished, or supplied, to the party of the first part, Jackson
County may retain such amount as may be due, or may thereafter become due under this contract, or may pay the same when said claim shall thereafter be finally established in court, and such amount is hereby assigned to Jackson County to pay such claim or claims, such payment to be done when so established, but the contractor shall not be entitled to demand or receive payment of this agreement until all disputes, disagreements, and questions between the parties herein affecting the right to any portion of the amount claimed, shall have been settled as above provided for, and Jackson County is hereby authorized to deduct from the said amount any money due it upon any account or claim.
O. PROTECTION OF PERSONS AND PROPERTY:
1. The contractor shall take every precaution at all times for the protection of persons and property, including Jackson County's employees and property and its own.
2. The contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work under this contract.
3. The contractor shall continuously maintain adequate protection of all work from damage and shall protect Jackson County property from injury or loss arising in connection with this contract. The contractor shall make good any such damage, injury or loss.
P. SAFETY: The contractor shall maintain an adequate safety program to insure the safety of contractor employees, subcontractor employees, and all other individuals working under this contract. In addition, the contractor must also provide Jackson County with a written safety program that he intends to follow in pursuing work under this contract. No work under this contract will be permitted until Jackson County is assured that the contractor has an adequate safety program in effect.
Q. SUBCONTRACTS: No portion of the work shall be subcontracted without prior written consent of Jackson County. In the event that the contractor desires to subcontract some part of the work specified herein, the contractor shall furnish Jackson County the names, qualifications and experience of their proposed subcontractors. The contractor will, however, remain fully liable and responsible for the work to be done by his subcontractor(s) and shall assure compliance with all requirements of the contract.
Nothing in the agreement shall be constructed as authority for the contractor to make commitments, which shall bind Jackson County or to otherwise act on behalf of Jackson County, except as Jackson County may expressly authorize in writing.
R. SUPERINTENDENCE BY CONTRACTOR: The contractor shall be responsible for all work means, methods, techniques, sequences and procedures and for coordinating all portions of the work under the contract except where otherwise specified herein. The contractor shall, at all times, enforce strict discipline and good order among the workers, and shall not employ any unfit person or anyone not skilled in their work.
S. WORK SITE DAMAGES: Any damage, including damage to finished surfaces, resulting from the performance of this contract shall be repaired to Jackson County's satisfaction at the contractor's expense.
VI. METHOD OF PAYMENT:
Jackson County will authorize payment to the contractor after providing satisfactory service and receipt of the contractor's invoice for services rendered. Payment will be made on a monthly basis at the prices as bid. All invoices will be summarized on one statement with the exception of the
Senior Center which will be paid directly by their accountant.
VII. DOCUMENTS THAT ARE TO BE SUBMITTED:
The following items will be submitted to be considered a complete bid package:
A. Pricing Schedule
B. Insurance Information as outlined in paragraph V.N.3 above.
C. Vender Information (minimum requirements are the Vendor Form, W-9, and AP
Certificate)
D. Immigration Affidavit
VIII. PRICING SCHEDULE:
In accordance with this Invitation to Bid (ITB) and subject to all conditions imposed herein and in attachments, the undersigned agrees to provide Athletic Field and Turf Maintenance Services for the price given for each location listed on Attachment A, SCOPE OF WORK:
Facility Name Address Month Cost to Treat
Breakdown Included in Attachment A – Provide Total Here:
1. TOTAL MONTHLY PRICE: $ /MONTH
I certify that I have read and understand the terms and conditions herein except as stated below.
I further state that I am and/or my company is capable, able to, and will provide the requested products and/or service described herein. I am the owner or agent of the company stated below and am authorized and empowered to contract. By my signature on this ITB, I/we guarantee and certify that all items included in my bid meet or exceed specifications.
I certify that this quotation is made without prior understanding, agreement, or connection with any corporation, firm or person submitting a quotation for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the quotation and certify that I am authorized to sign this quotation for the Contractor.
(Please print or Type)
Firm Name: _________________________________________________
Address: ____________________________________________________
City, State, Zip Code: __________________________________________
Telephone Number: ___________________________________________
Name/Title: __________________________________________________
Signature (in Ink):______________________________________________
Date: _______________________________________________________
IX. OTHER ATTACHMENTS:
ATTACHMENT A: SCOPE OF WORK
ATTACHMENT B: SAMPLE CONTRACT
VENDOR PACKET
ATTACHMENT A
SCOPE OF WORK
Athletic Field Chemical Application Scope of Work
1. Objective To ensure the safe, effective, and compliant application of herbicides, fertilizers, fungicides, and insecticides to maintain healthy, playable, and aesthetically pleasing athletic fields throughout the year.
2. Scope of Services
The Contractor shall furnish all labor, materials, equipment, and supervision necessary to perform scheduled chemical applications on natural turf athletic fields. This includes, but is not limited to:
Pre-emergent and post-emergent herbicide applications Insecticide applications for pest control Fungicide treatments for disease prevention Fertilization for turf health and growth Soil conditioning and pH balancing, if necessary
3. Areas Covered
Applications will be performed on the following field types):
Football fields Soccer/Multi-purpose fields Baseball/softball fields Practice fields Playground (Gum Springs) Equestrian Park (Arena)
All treated areas must be clearly marked or identified prior to and following application.
4. Application Schedule/Service
Early Spring: Fertilization, broadleaf weed, crabgrass and pre-emergent weed control Late Spring: Fertilization, broadleaf weed, crabgrass and pre-emergent weed control Early Summer: Insecticide and fungicide as needed, fertilization and broadleaf weed control Late Summer: Insecticide and fungicide as needed, fertilization and broadleaf weed control Early Fall: Broadleaf weed control and soil amendments Fall: Broadleaf weed control Late Fall: Broadleaf weed control Fire Ant Control (x10) Lime Application (x3) Only apply Lime per Soil Test recommendations As Needed: Spot treatments for weeds, diseases, or pest outbreaks
Application timing may vary based on weather, field usage, and turf conditions.
County Agent Notes:
For Bermuda Turf-Do not apply any Nitrogen in Early Fall, Fall, or Late Fall. Bermuda goes dormant in the winter. Potassium can be added in the fall if the soil test indicates a need for additions.
Lime should be added in January/February only based on Soil Tests.
If fields are over seeded with Ryegrass, a January/ February Fertilization can be added based on a Soil Test
Recommendation. It is not suggested to over seed Bermuda if strong Bermuda Turf is the goal.
The Extension Office is available for Soil Test assistance and specific pest/weed issues. It is suggested that all fertilizer applications be based on Soil Test Results.
5. Products and Equipment
Only EPA-approved chemicals may be used.
Products shall be appropriate for athletic turf use and safe for children and pets after prescribed re-entry intervals.
All application equipment must be calibrated regularly to ensure accurate product distribution.
6. Safety and Compliance
Contractor must hold all required state and local pesticide applicator licenses.
Safety Data Sheets (SDS) must be available on-site for all chemicals used.
Notification must be provided 24 hours prior to application.
Treated areas must be clearly flagged with signage indicating application time, date, and re-entry instructions.
Spill prevention and emergency response plans must be in place.
7. Reporting and Documentation
Provide detailed reports after each application, including:
o Date/time of service o Product(s) used o Application rate o Weather conditions o Field conditions and observations
Maintain records in compliance with local regulations for at least two years.
8. Quality Assurance
Fields will be inspected regularly for treatment effectiveness.
Contractor must reapply or retreat areas if results are unsatisfactory, at no additional cost.
Any damage to turf or surrounding property caused by misapplication must be repaired at the Contractor’s expense.
9. Coordination with Facility Use
Applications must be scheduled around athletic events to avoid disruption.
Contractor must coordinate with the field manager to establish treatment windows.
Fields must not be used until after the designated re-entry interval.
10. Service Locations and Area of Service
East Jackson Park 225 Lakeview Dr. Nicholson, GA 30565 o Baseball Fields (5) – Full Service o Multi-purpose Field (1) – Full Service
Jackson County Equestrian Center 2219 Wheeler Cemetery Rd, Maysville, GA 30558 o Arena (1) – Fire Ant Control Only
Gordon Street Center 441 Gordon St. Jefferson, GA 30549 o Multi-Purpose Field (1) Full Service
Gum Springs Park 4889 GA-124 Hoschton, GA 30548 o Baseball Fields (3) – Full Service o Multi-purpose Field (1) – Full Service o Turf around Playground Area (1) – Full Service
Hoschton Park 4727 Hwy 53 Hoschton, GA 30548 o Multi-purpose Field (1) – Full Service o Ornamental Beds - Weed Control, Spring Fertilization, Insect & Disease Control
Lamar Murphy Park 180 I W Davis Rd. Jefferson, GA 30549 o Baseball Fields (4) – Full Service o Multi-purpose Fields (2) – Full Service
Mountain Creek Church 1668 Brooks Rd. Pendergrass, GA 30567 o Baseball Field (1) Fire Ant Control Only o Multi-purpose Field (1) Fire Ant Control Only
North Jackson Elementary School 1880 Old Gainesville Hwy Talmo, GA 30575 o Baseball Field (1) Fire Ant Control Only
Sells Mill Park 8783 Jackson Trail Rd. Hoschton, GA 30558 o Turf Areas - Fire Ant Control Only
West Jackson Elementary School 391 E Jefferson St. Hoschton, GA 30548 o Football Field (1) Full Service
West Jackson/Hoschton Baseball Fields 374 Cabin Dr, Hoschton, GA 30548 o Baseball Fields (4) Full Service
ECCC 1952 Winder Hwy Jefferson, GA 30549 o Practice Field (1) – Full Service o Baseball Field (1) – Full Service o Softball Field (1) – Full Service
ATTACHMENT B
SAMPLE CONTRACT
This Agreement made and entered into this _____ Day of ___________ , Two Thousand and
Twenty Five, BETWEEN
The Owner: The Jackson County Board of Commissioners
Jackson County, Georgia
4965 Jackson Parkway
Jefferson, GA 30549
And the Contractor: Company Name
Company Address
Company City, State Zip
PROJECT: THREE YEAR ATHETIC TURF MAINTENACE CONTRACT FOR JACKSON
COUNTY, GEORGIA
WITNESSETH: That said Contractor has agreed, and by these presents does agree, with the said
County, for the consideration herein mentioned and under the provisions of the Request for
Quote as required by the Specifications to furnish all equipment, tools, material, skill and labor of every description necessary to carry out and complete in a good, firm and substantial and workmanlike manner, proposal made by the Contractor, the Advertisement, the Instructions to
Bid, Special Terms and Conditions and this Agreement, including all work outlined in the Scope of Service and listed in the conditions, provisions and specification to wit:
ARTICLE 1
The Contract Documents
The Contract Documents consist of this Agreement, conditions of the Contract (General, Supplementary and Other Conditions), Drawings, Specifications, and Addenda issued prior to execution of this Agreement and all Change Orders issued subsequent thereto. These form the
Contract, and all are as fully a part of the Contract as if attached to this Agreement or repeated herein.
ARTICLE 2
The Work
The Contractor shall perform all work required by the Contract Documents for:
PROJECT: THREE YEAR ATHETIC TURF MAINTENACE CONTRACT FOR JACKSON
COUNTY, GEORGIA
All Work performed under this contract is subject to inspection by the Purchasing Department of
Jackson County, Georgia. It shall be the Contractor’s responsibility to coordinate with the
Purchasing Department of Jackson County, Georgia for inspection services. All Work shall be performed in accordance with current federal, state, and local laws and regulations which govern athletic turf/field maintenance services, including applicable EPA and FDA regulations and chemical manufacturer’s directions, whichever is more stringent.
ARTICLE 3
Time of Commencement and Completion
The Work to be performed under this Contract shall begin on January 1st, 2026 and continue for a period of 36 months (3 years) to be completed on December 31, 2028. Contract may be renewed by Jackson County for an additional two (2) years so that the contract is in effect for no more than five (5) consecutive years. After five (5) years, the contract must be re-bid by Jackson
County.
ARTICLE 4
Contract Price
The Owner shall pay the Contractor, for the performance of the Work as provided in the
Conditions of the Contract, in current funds, the amount of $ _________________ per month.
This price may be increased or decreased during the initial term of the contract and during all renewal terms based upon changes to the Scope of Service as outlined in the Special Terms and
Conditions of the Request for Quotes, ARTICLE 5
Payment
Payment for the Work as described in Article 4 above, shall be made upon completion of Work by the Contractor within thirty (30) days after the completion of the Work, provided that the
Work has been completed and the Contractor fully performed in accordance with the Contract
Documents. The Contractor shall complete and submit an invoice for the monthly payment to the Jackson County Government, Attention: Accounts Payable, 4965 Jackson Parkway, Jefferson, Georgia 30549. Jackson County reserves the right to request proof of performance of all work completed under this contract.
IN WITNESS WHEREOF, the parties have executed this Contract on the date first written above.
OWNER: CONTRACTOR:
Jackson County Board of Commissioners Company’s Legal Name
Marty Clark, Chairman Representative
ATTEST: ATTEST:
Notary Public Notary Public
File details come from the government source that posted it. Updated .