ITB-24-6186LS - EXHIBIT C BID SHEET.pdf

PDF 93 KB Posted

Attached to
Districtwide Trash & Recycle Services
Solicitation number
ITB-06186
Issued by
Miami-Dade County, Florida

About this file

This document is an Invitation to Bid (ITB) issued by the Florida Department of Transportation (FDOT) District Six for Districtwide Trash & Recycling Services. The ITB requests bids for providing dumpster, trash pickup, and recycling services at various FDOT locations in Miami-Dade and Monroe counties. The ITB includes a bid sheet with itemized pricing for trash dumpsters, construction/demolition dumpsters, cardboard containers, and recycled paper containers. The bid is for a three-year term, with no stated minimum or maximum quantities guaranteed. Proposals are due on September 7, 2023 at 10:00am via email. The contract will be awarded to the lowest responsive and responsible bidder based on the grand total price.

The bid sheet requires unit pricing for each item and location, with the total cost for the three-year term to be used for evaluation. The ITB notes that the estimated quantities provided are for price evaluation only, and the actual quantities will be based on the work authorizations issued. Payment will be made upon satisfactory completion of the services. There are no set-asides or incumbent information provided, and the funding source is not specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOT-ITB-24-6186LS

State of Florida Department of Transportation

EXHIBIT “C”, BID SHEET

TO FURNISH DISTRICTWIDE DUMPSTER(S), TRASH PICK UP AND RECYCLE

SERVICES FOR THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT).

PROJECT/PROPOSAL NUMBER: DOT-ITB-24-6186LS

FINANCIAL PROJECT NUMBERS: 252058-1-A1-02

The Department reserves the right to award this contract in whole or in part. The Department does not guarantee any minimums or maximums on this contract.

The Contractor named below agrees that If this agreement is renewed, it shall be renewed for the same price, terms, and conditions as set forth in the original agreement.

Company Name

Authorized Signature

Type or Print Name

Title

Address

City, State, Zip

Telephone Fax

E- Mail Address

By signing above, the Bidder acknowledges they have read and understood the Exhibit “A”, Scope of Services and Exhibit “B”, Method of Compensation and that the unit prices submitted in this Exhibit “C”, Bid Sheet form includes the Contractor’s overhead, profits, travel, administrative expenses, materials, equipment, insurance, bonding, taxes, local fees, surcharges, all other incidentals and all direct and indirect costs required to complete the contract services.

BIDDER’S NAME

BIDDER’S FEID NUMBER

SECTION 1

TRASH DUMPSTERS

ITEM

LOCATIONS

PICK UP

FREQUENCY

NUMBER OF

DUMPSTERS

DUMPSTER

SIZE

ESTIMATED

ANNUAL

PICK-UP

(TONS) or

PULL

UNIT COST PER

TON / PULL

COST BASED ON

ESTIMATED ANNUAL

PICK-UPS ANNUAL COST x 3

TOTAL COST FOR THE 3 YEAR

TERM

1.1 District Office 1000 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 20 YARD 1 ton $ $ X3 $

1.2 District Office 1000 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 4 YARD 1 pull $ $ X3 $

1.3 North Dade Maintenance 1773 Northeast 205 Street Miami, Florida 33179

ON CALL TWO 20 YARD 1 ton $ $ X3 $

1.4 South Dade Maintenance 14655 SW 122 Avenue Miami, Florida 33186

ON CALL FIVE 20 YARD 1 ton $ $ X3 $

1.5 ITS Building 1001 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 20 YARD 1 ton $ $ X3 $

1.6 Miscellaneous future job site locations to be advised

ON CALL ONE 20 YARD 1 ton $ $ X3 $

SUBTOTAL SECTION 1 - TRASH PICK UP

(total for one (1) year annual pick-ups)

TOTAL SECTION 1 - TRASH PICK UP

(total for three (3) year term)

X3 $

BIDDER’S NAME

BIDDER’S FEID NUMBER

SECTION 2

CONSTRUCTION AND DEMOLITION DUMPSTERS

ITEM

LOCATIONS

PICK UP

FREQUENCY

NUMBER OF

DUMPSTERS

DUMPSTER

SIZE

ESTIMATED

ANNUAL

PICK-UP

(TONS)

UNIT COST PER

TON

COST BASED ON

ESTIMATED ANNUAL

PICK-UPS ANNUAL COST x 3

TOTAL COST FOR THE 3 YEAR

TERM

2.1 District Office 1000 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 20 YARD 1 ton $ $ X3 $

2.3 North Dade Maintenance 1773 Northeast 205 Street Miami, Florida 33179

ON CALL TWO 20 YARD 1 ton $ $ X3 $

2.4 South Dade Maintenance 14655 SW 122 Avenue Miami, Florida 33186

ON CALL FIVE 20 YARD 1 ton $ $ X3 $

2.5 ITS Building 1001 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 20 YARD 1 ton $ $ X3 $

2.6 Miscellaneous future job site locations to be advised

ON CALL ONE 20 YARD 1 ton $ $ X3 $

SUBTOTAL SECTION 2 - CONSTRUCTION AND DEMOLITION

PICK UP

(total for one (1) year annual pick-ups)

TOTAL SECTION 2 - CONSTRUCTION AND DEMOLITION PICK UP

BIDDER’S NAME

BIDDER’S FEID NUMBER

SECTION 3

CARDBOARD CONTAINERS

ITEM # LOCATIONS

PICK UP

FREQUENCY

NUMBER OF

DUMPSTERS

DUMPSTER

SIZE

ESTIMATED

ANNUAL

PICK-UP

/PULL

UNIT COST PER

PICK-UP/PULL

COST BASED ON

ESTIMATED ANNUAL

PICK-UPS

ANNUAL COST x 3 TOTAL COST FOR THE 3 YEAR

TERM

3.1 District Office 1000 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 4 YARD 1 pull $ $ X3 $

3.2 ITS Building 1001 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 4 YARD 1 pull $ $ X3 $

3.3 North Dade Maintenance 1773 Northeast 205 Street Miami, Florida 33179

ON CALL ONE 4 YARD 1 pull $ $ X3 $

3.4 South Dade Maintenance 14655 SW 122 Avenue Miami, Florida 33186

ON CALL ONE 4 YARD 1 pull $ $ X3 $

SUBTOTAL SECTION 3 - CARDBOARD CONTAINERS

(total for one (1) year annual pick-ups)

TOTAL SECTION 3 - CARDBOARD CONTAINERS

BIDDER’S NAME

BIDDER’S FEID NUMBER

SECTION 4

RECYCLE PAPER CONTAINERS

ITEM # LOCATIONS

PICK UP

FREQUENCY

NUMBER OF

DUMPSTERS

DUMPSTER

SIZE

ESTIMATED

ANNUAL

PICK-UP/

PULL

UNIT COST

PER PICK-

UP/PULL

COST BASED ON

ESTIMATED

ANNUAL PICK-UPS ANNUAL COST x 3 TOTAL COST FOR THE 3 YEAR

TERM

4.1 District Office 1000 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 4 YARD 1 pull $ $ X3 $

4.2 ITS Building 1001 Northwest 111 Avenue Miami, Florida 33172

ON CALL ONE 4 YARD 1 pull $ $ X3 $

4.3 North Dade Maintenance 1773 Northeast 205 Street Miami, Florida 33179

ON CALL ONE 4 YARD 1 pull $ $ X3 $

4.4 South Dade Maintenance 14655 SW 122 Avenue Miami, Florida 33186

ON CALL ONE 4 YARD 1 pull $ $ X3 $

SUBTOTAL SECTION 4 - RECYCLE PAPER CONTAINERS

(total for one (1) year annual pick-ups) $

TOTAL SECTION 4 - RECYCLE PAPER CONTAINERS

BIDDER’S NAME

BIDDER’S FEID NUMBER

SECTION 5

GRAND TOTAL AMOUNT

TOTAL SECTION 1 - TRASH PICK UP

(total for three (3) year term)

TOTAL SECTION 2 – CONSTRUCTION & DEMO PICK UP

(total for three (3) year term)

TOTAL SECTION 3 - CARDBOARD CONTAINERS

(total for three (3) year term)

TOTAL SECTION 4 - RECYCLE PAPER CONTAINERS

(total for three (3) year term)

GRAND TOTAL AMOUNT FOR DUMPSTER(S), TRASH,

C&D PICK UP AND RECYCLE SERVICES (Total of

Section 1 through 4 for three years term)

NOTE:THE NUMBER OF UNITS SPECIFIED MAY NOT MATCH THE ACTUAL NUMBER OF PICK-UPS. THE ESTIMATED UNITS SHOWN ON THE BID SHEET ARE FOR PRICE EVALUATION ONLY. THE ACTUAL QUANTITIES FOR THIS AGREEMENT WILL BE DEPENDENT ON LETTER OF AUTHORIZATION ASSIGNED. THE UNIT COST PER TASK WILL APPLY FOR THE

FULL TERM OF THE AGREEMENT.

No set volume of work is intended to be guaranteed and the estimated quantities above are shown for purposes of determining the low bidder.

BIDDER’S NAME

BIDDER’S FEID NUMBER

If the CONTRACTOR does not charge for an item, he/she shall insert a zero (“0"); if any items are left blank, the Bid shall be considered as non-responsive.

If the actual quantities during the agreement period are less than or greater than what is identified, the unit rates shall remain unchanged.

Compensation to the Contractor shall be at the unit rates set forth above as bid by the Contractor.

The Florida Department of Transportation and the Contractor shall negotiate items of work that are not included in the unit price.

Each project, as defined by the Florida Department of Transportation, shall be negotiated as a total sum based on the bid items and prices listed above (by multiplying the actual number of units for the work description by the unit prices, as specified above).

Payment will be made upon satisfactory completion of service. Payment in full of a work authorization amount shall be made by the Florida Department of Transportation upon completion by the Contractor of all work required to be performed under the terms of the agreement and acceptance of the work by the Florida Department of Transportation.

LOW BIDDER WILL BE DETERMINED BY THE “GRAND TOTAL” PRICE AND IS NOT TO BE CONSIDERED AS THE CONTRACT

AMOUNT.

File details come from the government source that posted it. Updated .