ITB 24-3037TM Captain John Smith ES Specs 02-27-2024.pdf

PDF 2 MB Posted

Attached to
ITB 24-3037TM Smith Roof
Solicitation number
63281
Issued by
Hampton City, Virginia

About this file

This document is an Invitation to Bid (ITB) from the School Board of the City of Hampton for a roof replacement project at Captain John Smith Elementary School located at 379 Woodland Road in Hampton, Virginia. The project involves the removal of the existing roof system and installation of a new PVC/KEE single-ply membrane roof system. The work includes replacing deteriorated wood blocking, metal deck repairs, and cleaning and sealing the exposed concrete canopy area. The bid number is ITB 24-3037TM and the project is being managed by RRMM Architects. Bids are due by a date not specified in the documents.

The bid includes unit prices for metal deck cleaning, priming and painting, metal deck replacement, and various treated wood nailer replacements. There is no indication of any set-asides or incumbent contractors. Funding sources are not specified, but the project appears to be a public works contract for the City of Hampton School Board.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SPECIFICATIONS

RRMM PROJECT NO. 20128.32

PROJECT

IFB# 24-3037TM

CAPTAIN JOHN SMITH ELEMENTARY SCHOOL

379 WOODLAND ROAD

HAMPTON, VIRGINIA

PREPARED FOR

THE SCHOOL BOARD OF CITY OF HAMPTON

Consolidated Procurement 1 Franklin Street Suite 345

Hampton, VA, 23669

PREPARED BY

RRMM ARCHITECTS

ARCHITECTURE & PLANNING & INTERIORS

CHESAPEAKE, VIRGINIA

ROOF CONSULTING SERVICES, INC

ROOF CONSULTANTS

GLEN ALLEN, VIRGINIA

DATED

MARCH 1, 2024

ROOF REPLACEMENT PROJECT RRMM PROJECT NO. 20128-32

Table of Contents Page 1 of 1

TABLE OF CONTENTS

SECTION TITLE

MISCELLANEOUS DOCUMENTS

Table of Contents

TECHNICAL SPECIFICATIONS:

Division 01 010100 Summary of Work 010026 Unit Prices 010450 Cutting and Patching

Division 02 020700 Selective Demolition Environmental AmeriSci Asbestos Testing Report

Division 06 061053 Rough Carpentry

Division 07 072216 Roof Insulation 075420 Adhered PVC/KEE Membrane Roofing 076200 Flashing, Sheet Metal & Accessories 079200 Sealants and Caulking

Division 09 099000 Painting

END OF TABLE OF CONTENTS

SUMMARY OF WORK 010100 - 1

SECTION 010100 - SUMMARY OF WORK

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Work by Owner.

4. Work under separate contracts.

5. Access to site.

6. Work restrictions.

7. Specification and drawing conventions

1.3 PROJECT INFORMATION

A. Project Identification: Captain John Smith Elementary School – Roof Replacement Project.

1. Project Location: Captain John Smith Elementary School, 379 Woodland Road, Hampton, Virginia 23669.

B. Architect: RRMM Architects, 1317 Executive Boulevard, Suite 200, Chesapeake, Virginia

23320.

C. Roof Consultant: Roof Consulting Services Inc., 1660 Mountain Road, Glen Allen, Virginia

232060.

1.4 WORK COVERED BY THE CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. The project scope is generally comprised of the roof replacement of approximately 7,297 +/-square feet, including new gutters, downspouts, and trim metal and cleaning and sealing of exposed concrete canopy.

B. Type of Contract: The Project will be constructed under a single prime contract.

1.5 ROOF REPLACEMENT DESCRIPTION

A. The roof replacement Work includes the removal of the existing roof systems along with the corresponding flashings and existing insulations as outlined in detail below. The Work includes the installation of a new single ply PVC/KEE membrane roof system, corresponding flashing, roof insulation and drainage accessories.

SUMMARY OF WORK 010100 - 2

B. All necessary precautions shall be taken during construction to protect the existing roof systems on adjacent roof areas which shall remain. No material or debris shall be stored or transferred over any of the roof areas not included in the project.

C. Maintain the building in watertight condition throughout this Contract. Do not permit water to build up on the roof. Provide power hook-ups and pumps on the roof to remove rain that occurs before slopes to drains are achieved. Interior of building to be kept free of water entry of ANY amount throughout the entire roof replacement process.

1. The roofing over each roof area shall be placed so as to have no more roof area open and/or under construction than can be made watertight at the end of each workday.

D. Existing Roof System Compositions:

Note: It is the roofing contractor’s sole responsibility to field verify all existing conditions prior to submitting their bid.

Roof Areas A, B & C (7,297 SF +/-)

1. Painted Metal Deck (no existing slope – exposed Deck @ Area B)

2. 1-1/2-Inch Polyisocyanurate Insulation (mech attached)

3. 1-ply Fiberglass Felt (mopped in asphalt, possibly temporary waterproofing during installation)

4. Tapered Polyisocyanurate Insulation (mopped in asphalt)

5. 60 Mil Fully Adhered EPDM

Area D – Exposed Concrete Canopy - 132 sf +/-

E. New Roof System Compositions:

Note: It is the contractor’s responsibility to verify that the proposed roof system composition meets the manufacturers and building code requirements prior to submitting their bid.

Roof Areas A, B & C (7,297 SF +/-)

1. Painted metal deck (repaired or replaced as required - exposed Deck @ Area B))

2. New 3-Inch Polyisocyanurate Insulation (mechanically attached – fasteners to be white @

Roof Area B

3. New ¼-inch per foot Tapered Polyisocyanurate Insulation 1½” minimum thickness (adhered w/ two-part low-rise polyurethane foam)

4. New ½” cover board (adhered w/ two-part low-rise polyurethane foam)

5. New 60 Mil PVC single ply membrane - (fully adhered)

Area D – Exposed Concrete Canopy – 132 sf +/-

1. For area D, the existing exposed concrete shall be power washed clean using Simple Green

Concrete and Driveway cleaner Model # S-25039 and then the concrete shall be sealed with two (2) coats of Sherwin Williams H&C Clarishield Water-Based Wet Look Clear Concrete Sealer.

Note:

1. Existing deteriorated wood blocking shall be removed and replaced with new treated blocking as required and shown on the roof plans and/or roof details. Additional blocking (if required) shall be installed to match the height of the new roof insulation system and shall

SUMMARY OF WORK 010100 - 3

provide a minimum 8-inch flashing height as required by the roof system manufacturer. All new blocking shall be fastened to the substrate to meet the specifications.

F. The work consists of removal of all existing roofing down to the structural roof deck, installation of new insulations and installation of a new PVC/KEE single ply membrane roof system fully adhered.

1. On all roof areas, remove all existing roofing materials down to the existing roof deck.

2. On all roof areas, remove all wall flashing, deteriorated wood blocking and associated metal flashings, etc.

3. Asbestos containing material that will be uncovered during the course of the project.

b. ROOF SAMPLING WAS PERFORMED AND NO ASBESTOS CONTAINING MATERIALS

WERE FOUND IN THE EXISTING ROOFING MATERIALS

c. A COPY OF THE SAMPLING REPORT HAS BEEN INCLUDED IN THESE DOCUMENTS

AND LOCATIONS WHERE SAMPLES WERE TAKEN ARE SHOWN ON THE

DRAWINGS..

d. ASBESTOS-CONTAINING MATERIALS MAY ALSO BE PRESENT IN OTHER AREAS

OF THE BUILDING WHERE WORK IS NOT DIRECTLY BEING PERFORMED. THE

CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ANY REMAINING ASBESTOS-

CONTAINING MATERIALS ARE NOT DISTURBED OR DAMAGED, AND WILL BE

RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH CLEAN-UP AND CLEARANCE

OF THE BUILDING DUE TO DISTURBANCE OR DAMAGE TO ASBESTOS-

CONTAINING MATERIALS NOT INCLUDED IN THE SCOPE OF WORK.

e. REMOVE AND DISPOSE OF ASBESTOS-CONTAINING MATERIALS, IF APPLICABLE, SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS.

f. IF APPLICABLE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A

PROJECT APPROACH BY COORDINATING WITH THE VARIOUS SUBCONTRACTORS

PERFORMING OTHER COMPONENTS OF THE CONTRACT. THE SPECIFIC WORK

TECHNIQUES AND PRACTICES SELECTED TO EXECUTE THE CONTRACT WILL

DETERMINE THE ABATEMENT MEASURES, IF ANY, REQUIRED. THE PROJECT

APPROACH SHALL BE BASED ON HISTORICAL DATA AND EXPERIENCE WITH

PROJECTS OF SIMILAR SCOPE.

g. IF APPLICABLE, THE CONTRACTOR WILL BE REQUIRED TO PROVIDE THE OWNER

WITH A DISPOSAL MANIFEST OF ALL ASBESTOS CONTAINING MATERIAL

REMOVED FROM THE PROPERTY. THIS MANIFEST SHALL ACCOMPANY EACH

APPLICATION FOR PAYMENT.

4. Remove abandoned roof curbs at locations shown on roof plan drawings and install new steel roof deck matching existing roof deck profile secured to steel bar joist. Fasten new metal deck of the same gauge, configuration, and profile to the existing structure. New metal deck shall be the same length and span as the existing decking. Fasten every deck flute at the bar joist using self- tapping hex head washer screws. Fasten perimeter side laps at midpoint of joist spacing (maximum every 36" o.c.) using self-tapping hex head washer screws.

Welding of the replacement metal deck will not be allowed. The contractor must provide an interior spotter with cellular phone or radio device to communicate with roof top personnel during all roof deck replacement.

5. Raise existing condensate lines as needed to accommodate new insulation heights.

6. Furnish and install new treated wood blocking to replace deteriorated at all roof perimeters, roof curbs, expansion joints and all other locations as required by the roof system manufacturer's standard requirements. Unit prices, as outlined in Section 01026, shall be used as an Add/Deduct from the lump sum bid dollar amount. The Contractor’s on-site

SUMMARY OF WORK 010100 - 4

representative shall keep a daily log and running total of areas of roof deck replacement / repairs with daily signatures being obtained from the Owner’s on site representative.

7. Install new wood blocking (as required) to accommodate the height of the new roof insulation system and provide a minimum 8" flashing height (to be included in the Base Bid

– unit cost will not apply to these items).

8. Remove areas of deteriorated or damaged metal roof deck and replace with new to match the existing type, gauge, configuration, thickness or size. Unit prices, as outlined in Section 01026, shall be used as an Add/Deduct from the lump sum bid dollar amount. The Contractor’s on site representative shall keep a daily log and running total of areas of roof deck replacement / repairs with daily signatures being obtained from the Owner’s on site representative.

9. If required, wire brush, properly clean and paint areas of corroded metal roof decking with Sherwin Williams B66W1 DTM. Unit prices, as provided in Section 01026, shall be used as and Add/Deduct from the lump sum bid dollar amount. The Contractor shall keep a daily log and running total of areas of decking treatment with daily signatures being obtained from the Owner's project manager.

10. Remove all abandoned equipment as indicated on the roof plans or instructed by the Owner.

Repair all holes in the roof deck as required to provide a structurally sound roof deck condition at all locations of equipment removal (to be included in the Base Bid – unit cost will not apply to these items).

11. On all roof areas, furnish and install new flat and/or tapered polyisocyanurate insulation (mechanically attached or adhered) as specified and required by Section 07220 – Roof Insulation. On roof area B, insulation fasteners must be white.

12. Furnish and install new crickets, drain sumps or tapered edge strips as required or shown to provide positive drainage.

13. Furnish and install new ½-inch cover board adhered with roof membrane manufacturer’s approved insulation adhesive. Cover board must be installed after new crickets and drain sumps (if any).

14. Furnish and install a new single ply PVC/KEE membrane fully adhered over the newly installed and prepared substrate with selected roof membrane manufacturer’s approved bonding adhesives.

15. Furnish and install new base flashing and stripping at all walls, curbs, expansion joints, gravel stop edges and other roof penetrations with proper termination as required or shown.

16. Furnish and install new termination bar and metal counter flashings as required or shown.

17. Furnish and install new perimeter edge metals, drip edges, gutters, conductor heads and downspouts as required or shown.

a. Provide new concrete splash blocks on grade at all new downspout locations unless connected to existing ground drain leaders.

18. Furnish and install new manufacturer’s protective walk pads around all motorized equipment, entrance doors, roof hatches and stationary ladders.

19. For area D, clean the existing exposed concrete by power washing using Simple Green

Concrete and Driveway cleaner Model # S-25039 and then seal exposed concrete surface with Sherwin Williams H&C Clarishield Water-Based Wet Look Clear Concrete Sealer.

Cleaning and sealing shall be as per the manufacturer’s recommendations.

1.6 WORK BY OWNER OR UNDER OTHER CONTRACTS

A. General: Work indicated in the documents as "NIC" (Not in Contract), "By Owner", or "By Others" is not included under this Contract.

SUMMARY OF WORK 010100 - 5

B. Work by Owner: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.

C. Separate Contracts: Other work at the project site may be furnished and installed either by the

Owner with his own forces or by the Owner's separate contractors. This work will be performed concurrent with the execution of the Work of this Contract.

1. Coordination of Separate Contract Work: The Contractor shall cooperate with Others performing Work for this project and coordinate their work as follows:

a. Allow them access to the Work.

b. Provide secure space on the site and/or in the building as necessary, for storage of tools, materials, and supplies.

c. Arrange and coordinate all work under this Contract so that work can be carried out smoothly without interfering or delaying the Work of this Contract or the Work of Others.

2. Considerations: The intention of the Owner to perform work with his own forces or to employ separate contractors shall be given due consideration prior to the submission of a bid and any additional cost which the Contractor believes to be associated with work by others shall be included in the cost of the Work.

1.7 SUMMARY OF REFERENCES

A. Work of Contract can be summarized by reference to the Contract, Advertisement For Bids, General Conditions, Supplementary Conditions, Specification Sections, as listed in the specification Index, Bound herewith; Drawings, as listed in the drawing Index, bound herewith;

Addenda and Modifications to the Contract Documents, issued subsequent to the initial printing of this project manual, and including, but not necessarily limited to, printed matter referenced by any of these. It is recognized that Work of Contract is also unavoidably affected or influenced by governing regulations, natural phenomena, including weather conditions, and other forces outside the Contract Documents.

1.8 ACCESS TO SITE

A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

B. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to areas affected by new work, Contractor’s staging and storage. Limit disturbance of surroundings to the minimum required to complete the work.

2. Driveways, Walkways and Entrances: Keep driveway and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

SUMMARY OF WORK 010100 - 6

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and building occupants during the construction period.

D. Preconstruction Survey: The Contractor shall perform a preconstruction survey of the existing site and building to document any deficiencies that could be attributed to construction activities.

The survey shall be reviewed with the Construction Manager prior to commencing on site operations.

1.9 CONTRACTOR USE OF PREMISES

A. Cooperate with Owner in devising a plan to allow safe ingress and egress during construction.

B. Keep driveways and entrances serving the premises clear and available to the Owner and the

Owner's employees at all time. Do not use these areas for parking or storage of materials.

C. The Contractor shall indicate at the Pre-construction meeting the location and limits of staging areas that he anticipates utilizing for approval by Owner.

D. Site Safeguards: It shall be the Contractor's responsibility to take all prudent and reasonable measures and to comply with the local codes and governing jurisdictions to provide such safeguards as necessary to maintain the construction site and adjacent areas as well as the work in progress in a manner so as to protect the workperson and the public from harm resulting from the construction work and related operations.

1.10 OWNER OCCUPANCY

A. The Owner will occupy the site and the existing building during the entire construction period.

Cooperate with the Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the work so as not to interfere with the Owner's daily operations.

B. It is the contractor’s responsibility to do all things necessary to protect the interior of the building during construction. Proper watertight tie-ins shall be required on a daily basis. Any and all damages to the Owners property due to improper or lack of tie-ins shall be immediately repaired by the contractor at no cost to the Owner.

1.11 JOB SITE TRAFFIC CONTROL

A. Construction traffic shall obey all traffic requirements as posted within the school site. Where speed limits are not posted, limit speeds to no greater than 10 mph.

B. Construction deliveries to the site shall be coordinated to not interfere with the Owner’s normal hours of operation. The Owner’s normal working hours are Monday through Friday, 7:00 AM until 5:00 PM.

1.12 MECHANICAL/ELECTRICAL GENERAL REQUIREMENTS

SUMMARY OF WORK 010100 - 7

A. All required mechanical and electrical work shall be performed by licensed mechanical and electrical subcontractors and performed by licensed tradesmen of that firm. All mechanical and electrical work shall comply with all applicable codes and the Contractor shall be responsible for providing all required inspections.

1.13 CONTRACTOR CONDUCT

A. The Contractor shall strictly prohibit weapons, drugs, alcohol and tobacco products in the Owner’s building and on the Owner’s property. A dress code which requires all construction personnel to wear shirts at all times (without slogans) will be strictly enforced.

B. No smoking shall be allowed in the building or on Owner’s property at any time.

1.14 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings.

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 010100

SUMMARY OF WORK 010100 - 8

THIS PAGE INTENTIONALLY BLANK

UNIT PRICE BASED ALLOWANCES 010260 - 1

SECTION 010260 - UNIT PRICES

PART 1 - GENERAL

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for unit prices.

B. A unit price is an amount established by the Contract Documents and stated herein as a price per unit of measurement for materials or services that will be added to or deducted from the Contract Sum by Change Order in the event the estimated quantities of Work required by the Contract Documents are increased or decreased.

C. Unit prices include all necessary material, overhead, profit and applicable taxes. No additional mark-ups or compensation will be paid by the Owner.

D. Refer to individual Specification Sections for construction activities requiring the establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

E. Quantities will be calculated jointly by Contractor, Architect, and the Owner's representative.

Quantities shall be calculated by actual area or length. All work shall be supervised and approved by the Owner's representative prior to completion.

1.3 SCHEDULE

A. A "Unit Price Based Allowance Schedule" is included at the end of this Section. Specification

Sections referenced in the Schedule contain requirements for materials and methods described under each unit price.

B. The Owner reserves the right to reject the Contractor's measurement of work-in-place that involves use of established unit prices, and to have this Work measured by an independent surveyor acceptable to the Contractor at the Owner's expense.

1.4 COSTS

A. No change order involving unit price based allowances will be paid unless the Owner's representative approved the change order prior to the work being completed.

1.5 SUBMITTALS

A. Submit data for purchase of products or systems included in allowances.

B. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.

UNIT PRICE BASED ALLOWANCES 010260 - 2

1.6 CONTINGENCY

A. Contractor's overhead, profit, and related costs for products and equipment ordered by Owner under an allowance are included in the allowance. These costs include delivery, installation, taxes, insurance, equipment rental, and similar costs.

B. At Project closeout, credit unused amounts remaining in the allowance to Owner by Change Order.

1.7 REDUCTIONS IN QUANTITIES OF WORK

A. Should less work be required than that required by the Contract Documents, reductions in the Contract Sum will be adjusted by unit prices established above less ten (10) percent

B. Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.

1. If it is not economically practical to return the material for credit, removal from the site and disposal of unused material is Contractor's responsibility.

1.8 DOCUMENTATION

A. The Contractor’s on-site representative shall keep a daily log and running total of items encountered under the Unit Price Based Allowances with daily signatures being obtained from the Owner’s on site representative.

1. The daily log shall include documentation of the location and quantity of the items on a corresponding roof plan.

B. The Contractor shall document all Unit Price Based Allowances with photographs of the deteriorated ‘before’ condition and the completed ‘after’ conditions. The Contractor shall provide his on-site representative with a camera for the purposes of the photographic documentation.

1. The Contractor shall provide the Owner with electronic copies of all photographic documentation prior to payment for the Unit Cost Allowance items.

PART 3 - EXECUTION

3.1 UNIT PRICES

A. Paul Burbank Elementary School:

Item Description Unit

2.1

Metal Deck Clean, Prime and Painting: Additional amount to clean, prime and paint deteriorated areas of the existing metal decking as indicated in the specifications and based on quantity of material specified. (include 2,000 square feet in base bid price)

SF

UNIT PRICE BASED ALLOWANCES 010260 - 3

2.2

Metal Deck Replacement: Additional amount to replace the existing metal decking to match/nest into existing as indicated in the specifications and based on quantity of material specified.

SF

2.3

Treated Wood Nailers - 2” X 4”: Additional amount to replace existing deteriorated lumber with new treated lumber as specified in Division 6, Section 06100 for directly related Work as indicated on the drawings and based on quantity of material specified.

LF

2.4

Treated Wood Nailers - 2” X 6”: Additional amount to replace existing

2.5

Treated Wood Nailers - 2” X 8”: Additional amount to replace existing

2.6

Treated Wood Nailers - 2” X 10”: Additional amount to replace existing deteriorated lumber with new treated lumber as specified in Division 6, Section 06100 for directly related Work as indicated on the drawings and based on quantity of material specified.

END OF SECTION 010260

CUTTING AND PATCHING 017400 - 1

SECTION 017400 - CUTTING AND PATCHING

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for cutting and patching.

B. Reference to Other Sections:

1. Refer to other Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.

2. Requirements of this Section apply to mechanical and electrical installations. Refer to Division-15 and Division-16 Sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.

C. Demolition: Demolition requirements are included in Section 02070, "Selective Demolition."

1.3 SUBMITTALS

A. Submit the following in accordance with conditions of the Contract and Division 1 specification

Section 013300, "Submittals."

1. Cutting and Patching Proposal:

a. Where approval of procedures for cutting and patching is required before proceeding, submit a proposal describing procedures well in advance of the time cutting and patching will be performed and request approval to proceed. Include the following information, as applicable, in the proposal:

b. Describe the extent of cutting and patching required and how it is to be performed.

c. Describe anticipated results in terms of changes to construction; include changes to structural elements and operating components.

d. Indicate dates when cutting and patching is to be performed.

e. List utilities that will be disturbed or affected, including those that will be relocated and those that will be temporarily out-of-service. Indicate how long service will be disrupted.

f. Where cutting and patching involves addition of reinforcement to structural elements, submit details and engineering calculations to show how reinforcement is integrated with the original structure.

1.4 QUALITY ASSURANCE

A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would reduce their load-carrying capacity or load-deflection ratio. Obtain approval of the cutting and patching proposal before cutting and patching the following structural elements:

1. Foundation construction.

CUTTING AND PATCHING 017400 - 2

2. Bearing and retaining walls.

3. Structural concrete.

4. Structural steel.

5. Lintels.

6. Structural decking.

7. Miscellaneous structural metals.

8. Equipment supports.

B. Operational and Safety Limitations: Do not cut and patch operating elements or safety related components in a manner that would result in reducing their capacity to perform as intended, or result in increased maintenance, or decreased operational life or safety.

C. Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces, in a manner that would reduce the building's aesthetic qualities or result in visual evidence of cutting and patching. Remove and replace Work cut and patched in a visually unsatisfactory manner.

D. Safety Requirements: No cutting and patching of the roof deck will take place at anytime while the building is occupied.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Use materials that are identical to original materials. Use materials whose installed performance will equal or surpass that of original materials.

3.1 INSPECTION

A. Before cutting surfaces, examine surfaces to be cut and patched and conditions under which cutting, and patching is to be performed. Take corrective action before proceeding, if unsafe or unsatisfactory conditions are encountered. Before proceeding, meet at the site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.

3.2 PREPARATION

A. Temporary Support: Provide temporary support of Work to be cut.

B. Protection: Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. Take all precautions necessary to avoid cutting existing pipe, conduit or ductwork serving the building.

CUTTING AND PATCHING 017400 - 3

3.3 PERFORMANCE

A. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.

1. Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.

B. Cutting: Cut existing construction using methods least likely to damage elements to be retained or adjoining construction. Where possible review proposed procedures with the original installer;

comply with the original installer's recommendations.

1. In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering, and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. To avoid marring finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.

3. Cut through concrete and masonry using a cutting machine such as carborundum saw or diamond core drill.

4. Comply with requirements of applicable Sections of Division-2 where cutting and patching requires excavating and backfilling.

C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances.

1. Where feasible, inspect and test patched areas to demonstrate integrity of the installation.

2. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

3. Remove existing floor and wall coverings and replace with new materials, if necessary to achieve uniform color and appearance.

a. Where patching occurs in a smooth painted surface, extend final paint coat over entire surface containing the patch, after the patched area has received primer and second coat. Patch, repair or rehang existing ceilings as necessary to provide an even plane surface of uniform appearance. Replace damaged ceiling tiles with units to match original or if not available, replace ceiling tiles with new units throughout space.

3.4 CLEANING

A. Thoroughly clean areas and spaces where cutting and patching is performed or used as access.

Remove completely paint, mortar, oils, putty, and items of similar nature. Thoroughly clean piping, conduit, and similar features before painting or other finishing is applied. Restore damaged pipe covering to its original condition.

END OF SECTION 017400

CUTTING AND PATCHING 017400 - 4

SITE IMPROVEMENTS AND ROOF REPLACEMENT RRMM PROJECT NO. 20128-32

SELECTIVE DEMOLITION 024116 - 1

SECTION 024116 - SELECTIVE DEMOLITION

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

A. This Section requires the selective removal and subsequent offsite disposal of the following:

1. The existing modified built-up roof systems as indicated in the contract documents and as required to accommodate a new roof system installation.

2. Existing deteriorated wood blocking.

3. Deteriorated areas of composite metal roof decking.

4. Obsolete penetrations and equipment as indicated on the roof plans and/or directed by the

Owner.

5. Asbestos containing material that may be uncovered during the course of the project.

b. ROOF SAMPLING WAS PERFORMED AND NO ASBESTOS CONTAINING MATERIALS

WERE FOUND IN THE EXISTING ROOFING MATERIALS

c. A COPY OF THE SAMPLING REPORT HAS BEEN INCLUDED IN THESE DOCUMENTS

AND LOCATIONS WHERE SAMPLES WERE TAKEN ARE SHOWN ON THE DRAWINGS..

d. ASBESTOS-CONTAINING MATERIALS MAY ALSO BE PRESENT IN OTHER AREAS OF

THE BUILDING WHERE WORK IS NOT DIRECTLY BEING PERFORMED. THE

CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ANY REMAINING ASBESTOS-

CONTAINING MATERIALS ARE NOT DISTURBED OR DAMAGED, AND WILL BE

RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH CLEAN-UP AND CLEARANCE OF

THE BUILDING DUE TO DISTURBANCE OR DAMAGE TO ASBESTOS-CONTAINING

MATERIALS NOT INCLUDED IN THE SCOPE OF WORK.

e. REMOVE AND DISPOSE OF ASBESTOS-CONTAINING MATERIALS, IF APPLICABLE, SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS.

f. IF APPLICABLE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A

PROJECT APPROACH BY COORDINATING WITH THE VARIOUS SUBCONTRACTORS

PERFORMING OTHER COMPONENTS OF THE CONTRACT. THE SPECIFIC WORK

TECHNIQUES AND PRACTICES SELECTED TO EXECUTE THE CONTRACT WILL

DETERMINE THE ABATEMENT MEASURES, IF ANY, REQUIRED. THE PROJECT

APPROACH SHALL BE BASED ON HISTORICAL DATA AND EXPERIENCE WITH

PROJECTS OF SIMILAR SCOPE.

g. IF APPLICABLE, THE CONTRACTOR WILL BE REQUIRED TO PROVIDE THE OWNER

WITH A DISPOSAL MANIFEST OF ALL ASBESTOS CONTAINING MATERIAL REMOVED

FROM THE PROPERTY. THIS MANIFEST SHALL ACCOMPANY EACH APPLICATION

FOR PAYMENT.

B. Removal work specified elsewhere:

1. Roofing membrane and roof insulation removal.

1.3 SUBMITTALS

A. General: Submit the following in accordance with the contract documents.

SELECTIVE DEMOLITION 024116 - 2

B. Schedule indicating proposed sequence of operations for selective demolition work to the Owner for review prior to start of work. Include coordination for shutoff, capping, and continuation of utility services as required, together with details for dust and noise control protection.

1. Provide detailed and/or anticipated daily sequence of demolition and removal work to ensure uninterrupted progress of Owner's on-site operations.

2. Coordinate with Owner's continuing occupation of building.

3. Coordinate with Owner’s representative, the location of equipment and dumpster facilities.

4. Prior to start of demolition at any roof area, confirm with the Owner, any and all, obsolete equipment that has been identified for proper removal/disposal, roof deck treatments and required roof installation.

C. Photographs of existing conditions of structure surfaces, equipment, and adjacent improvements that might be misconstrued as damage related to removal operations is required. File with Owner prior to start of work.

1.4 JOB CONDITIONS

A. Occupancy: Owner will occupy the building during the selective demolition. The Owner’s normal working hours are Monday through Friday, 7:00 AM until 5:00 PM.

B. Conduct selective demolition work in manner that will minimize need for disruption of Owner's normal operations. Provide minimum of seventy-two (72) hours advance notice to Owner of demolition activities that will affect Owner's normal operations.

C. Partial Demolition and Removal: Items indicated to be removed but of salvageable value to

Contractor may be removed from structure as work progresses. Transport salvaged items from site as they are removed.

1. Storage or sale of removed items on site will not be permitted.

D. Protections: Provide temporary barricades and other forms of protection to protect Owner's personnel and general public from injury due to selective demolition work.

1. Provide protective measures as required to provide free and safe passage of Owner's personnel and general public to occupied building.

2. Erect temporary covered passageways as required by authorities having jurisdiction.

3. Protect from damage existing finish work that is to remain in place and becomes exposed during demolition operations.

4. Protect floors with suitable coverings when necessary.

5. Provide temporary weather protection during interval between demolition and removal of existing construction on exterior surfaces and installation of new construction to ensure that no water leakage or damage occurs to structure or interior areas of existing building.

6. Remove protections at completion of work.

E. Damages: Promptly repair damages caused to adjacent facilities by demolition work.

F. Traffic: Conduct selective demolition operations and debris removal to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities.

1. Do not close, block, or otherwise obstruct streets, walks, parking spaces or other occupied areas or used facilities without written permission from authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.

SELECTIVE DEMOLITION 024116 - 3

G. Flame Cutting: Use of cutting torches for removal is not permitted.

3.1 PREPARATION

A. General: Provide interior and exterior shoring, bracing, or support to prevent movement, settlement, or collapse of areas to be demolished and adjacent facilities to remain.

1. Cease operations and notify Owner immediately if safety of structure appears to be endangered.

Take precautions to support structure until determination is made for continuing operations.

2. Cover and protect furniture, equipment, fixtures and products from soilage or damage when demolition work is performed in areas where such items have not been removed.

3. Daily protection of the Owner’s stored products will be required throughout the entire project.

3.2 DEMOLITION

A. General: Perform selective demolition work in a systematic manner. Use such methods as required to complete work indicated on Drawings in accordance with demolition schedule and governing regulations.

B. Remove and replace existing cellular steel decking in a systematic manner. Use such methods as required to complete replacement, install new roofing, and make system watertight in same day. See Section 07220 – Roof Insulation for specific deck repair and replacement guidelines prior to insulation replacement.

C. If unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure both nature and extent of the conflict. Submit report to Owner in written, accurate detail. Pending receipt of directive from the Owner, rearrange selective demolition schedule as necessary to continue overall job progress without undue delay.

3.3 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove from building site, debris, rubbish and other materials resulting from demolition operations.

Transport and legally dispose of all debris off site.

1. If hazardous materials are encountered during demolition operations, comply with applicable regulations, laws, and ordinances concerning removal, handling, and protection against exposure or environmental pollution.

2. Burning of removed materials is not permitted on project site.

3.4 CLEANUP AND REPAIR

A. General: Upon completion of demolition work, remove tools, equipment, and demolished materials from site. Remove protections and leave interior as clean as they were prior to demolition procedures.

SELECTIVE DEMOLITION 024116 - 4

1. Repair demolition performed in excess of that required. Return elements of construction and surfaces to remain to condition existing prior to start of operations. Repair adjacent construction or surfaces soiled or damaged by selective demolition work.

END OF SECTION 024116

February 21, 2024

Dear Brian Jones:

Roof Consulting Services Inc Attn: Brian Jones 1660 Mountain Road Glen Allen, VA 23060

RE: Roof Consulting Services Inc Job Number 124021788 P.O. #RRMM - Captain John Smith Elementary RRMM - Captain John Smith Elementary; 379 Woodland Rd, Hampton, VA 23669

AmeriSci Richmond

13635 GENITO ROAD

MIDLOTHIAN, VIRGINIA 23112

TEL: 8047631200 FAX: 8047631800

Enclosed are the results for PLM asbestos analysis of the following Roof Consulting Services Inc samples received at AmeriSci on Tuesday, February 20, 2024, for a 24 hour turnaround:

AB-1, AB-2, AB-3, AB-4, AB-5, AB-6, AB-7

The 7 samples contained in zip lock bag were shipped to AmeriSci via Hand Delivered. These samples were prepared and analyzed according to EPA PLM Method (EPA 600/R-93/116 Section 2.2). The required analytical information, analysis results, analyst signature and laboratory identification are contained in the PLM Bulk Asbestos Report. If TEM analysis was requested for selected samples the gravimetric reduction data (by Sec 2.3) and TEM Asbestos % (by Sec 2.5) are included in Table 1 along with a summary of Asbestos % by PLM for all samples analyzed.

This report relates ONLY to the sample analysis expressed as % asbestos. AmeriSci assumes no responsibility for customer supplied data such as “sample type”, "location", or “area sampled”. This report must not be used to claim product endorsement by AmeriSci, NVLAP or any agency of the U. S. Government. The National Institute of Standards and Technology accreditation requirements mandate that this report must not be reproduced, except in full, without the written approval of the laboratory.

This report may contain specific data not covered by NVLAP or ELAP accreditations, if so identified in relevant footnotes.

Glenn F. Massey

Sincerely, QA Manager | Authorized Signatory

AmeriSci appreciates this opportunity to serve your organization. Please contact us for any further assistance or with any questions.

Boston - Los Angeles - New York - Richmond

AmeriSci Richmond

13635 GENITO ROAD

MIDLOTHIAN, VIRGINIA 23112

TEL: (804) 763-1200 • FAX: (804) 763-1800

02/20/24 AmeriSci Job # 124021788 02/21/24

1 2 RRMM - Captain John Smith Elementary; 379 Woodland Rd, Hampton, VA 23669

PLM Bulk Asbestos Report Date Received Date Examined

RE:

ofPage

P.O. # Roof Consulting Services Inc

1660 Mountain Road

Glen Allen, VA 23060

Attn: Brian Jones

Asbestos Present Total % AsbestosClient No. / HGA Lab No.

Location:

Analyst Description:

Asbestos Types:

Other Material:

NoAB-1 124021788-01 NAD Felt Layer

Black, Heterogeneous, Non-Fibrous, Bulk Material

Cellulose 10%, Fibrous glass 20%, Non-fibrous 70%

(by CVES) by Jared Marko on 02/21/24

Location:

Analyst Description:

Asbestos Types:

Other Material:

NoAB-2 124021788-02 NAD Felt Layer

Black, Heterogeneous, Non-Fibrous, Bulk Material

Cellulose 10%, Fibrous glass 20%, Non-fibrous 70%

(by CVES) by Jared Marko on 02/21/24

Location:

Analyst Description:

Asbestos Types:

Other Material:

NoAB-3 124021788-03 NAD Felt Layer

Black, Heterogeneous, Non-Fibrous, Bulk Material

Cellulose 10%, Fibrous glass 20%, Non-fibrous 70%

(by CVES) by Jared Marko on 02/21/24

Location:

Analyst Description:

Asbestos Types:

Other Material:

NoAB-4 124021788-04 NAD Felt Layer

Black, Heterogeneous, Non-Fibrous, Bulk Material

Fibrous glass 40%, Non-fibrous 60%

(by CVES) by Jared Marko on 02/21/24

Location:

Analyst Description:

Asbestos Types:

Other Material:

NoAB-5 124021788-05 NAD Felt Layer

Black, Heterogeneous, Non-Fibrous, Bulk Material

Fibrous glass 30%, Non-fibrous 70%

(by CVES) by Jared Marko on 02/21/24

See Reporting notes on last page

AmeriSci Job #: 124021788 Page 2 of 2

RRMM - Captain John Smith Elementary; 379 Woodland Rd, Hampton, VA 23669

PLM Bulk Asbestos Report Client Name: Roof Consulting Services Inc

Asbestos Present Total % AsbestosClient No. / HGA Lab No.

Location:

Analyst Description:

Asbestos Types:

Other Material:

NoAB-6 124021788-06 NAD Felt Layer

Black, Heterogeneous, Non-Fibrous, Bulk Material

Cellulose 10%, Fibrous glass 20%, Non-fibrous 70%

(by CVES) by Jared Marko on 02/21/24

Location:

Analyst Description:

Asbestos Types:

Other Material:

NoAB-7 124021788-07 NAD Felt Layer

Black, Heterogeneous, Non-Fibrous, Bulk Material

Cellulose 10%, Fibrous glass 20%, Non-fibrous 70%

(by CVES) by Jared Marko on 02/21/24

Reporting Notes:

*NAD = no asbestos detected, Detection Limit <1%, Reporting Limits: CVES = 1%, 400 Pt Ct = 0.25%, 1000 Pt Ct = 0.1%; "Present" or NVA = "No Visible Asbestos" are observations made during a qualitative analysis; NA = not analyzed; NA/PS = not analyzed / positive stop; PLM Bulk Asbestos Analysis using Meiji, Model MT6120 microscope, Serial #2200362, by EPA 600/R-93/116 per 40 CFR 763 (NVLAP Lab Code 101904-0) and ELAP PLM Analysis Protocol 198.1 for New York friable samples which includes quantitation of any vermiculite observed (198.6 for NOB samples) or EPA 400 pt ct by EPA 600/M4-82-020 (NYSDOH ELAP Lab # 10984); CA ELAP Lab # 2508; Note: PLM is not consistently reliable in detecting asbestos in floor coverings and similar NOB materials. NAD or Trace results by PLM are inconclusive, TEM is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos-containing in New York State (also see EPA Advisory for floor tile, FR 59, 146, 38970, 8/1/94). NIST Accreditation requirements mandate that this report must not be reproduced except in full without the approval of the laboratory. This PLM report relates ONLY to the items tested.

Analyzed by: Jared Marko Date: 2/21/2024

Reviewed by: Glenn F. Massey

ROUGH CARPENTRY 061053 - 1

SECTION 061053 - ROUGH CARPENTRY

other Division-1 Specification Sections, apply to work of this Section.

1.2 STANDARD REFERENCES

A. References:

1. Some products and execution are specified in this Section by reference to published specifications or standards of the following (with respective abbreviations used).

American Forest and Paper Association (AFPA) American Plywood Association (APA) American Wood Preservative Association (AWPA) U.S. Dept. Of Commerce Voluntary Product Standards (PS)

1.3 SUMMARY

A. This Section includes the following:

1. Installation of wood blocking and nailers for roofing as shown on drawings.

2. Existing wood blocking shall remain in-place unless deteriorated and requiring replacement.

3. New wood blocking will be used at all locations requiring replacement and all locations requiring additional blocking to match the new roof insulation height.

4. Where required by code and/or the specifications, fire-treated wood materials shall be used.

1.4 DEFINITIONS

A. Rough carpentry includes carpentry work not specified as part of other Sections and generally not exposed, unless otherwise specified.

1.5 SUBMITTALS

A. General: Submit the following in accordance with Conditions of Contract and specification sections.

B. Submit data indicating fire-treatment of wood and plywood, in accordance with ASTM D 5516 and

ASTM D 5664.

1. For each type of treated wood product include certification by treating plant stating type of solution and pressure process used, and compliance with applicable standards.

2. For water-borne treated products included statement that moisture content of treated materials was reduced to levels indicated prior to shipment to project site.

C. Submit manufacturer’s instructions for handling, storing, installation, and finishing of treated material.

ROUGH CARPENTRY 061053 - 2

D. Product Data: submit technical data on all fasteners required for work under this section. Data shall include all required load capacities.

E. Product Sample’s: One sample of all fasteners required for work under this section.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Delivery and Storage: Keep materials under cover and dry. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber as well as plywood and other panels. Provide for air circulation within and around stacks and under temporary coverings including polyethylene and similar materials.

1. For lumber pressure treated with waterborne chemicals, place spacers between each bundle to provide air circulation.

1.7 JOB CONDITIONS

A. All methods employed in performing the work, and all equipment, tools, and machinery used for handling materials and executing any part of the work, shall be subject to the approval of the Owner before the work is started, and whenever found unsatisfactory, shall be changed, and improved as required.

B. Time delivery and installation of carpentry to avoid delaying other operations whose work is dependent on or affected by the carpentry work, and to comply with protection and storage requirements.

C. Protect installed carpentry from damage due to other work activities and weather.

D. Select anchors for attachment of carpentry suitable for structural roof substrate.

2.1 MATERIALS

A. Moisture Content: Solid wood, preservative treated, shall be kiln-dried to an amount not to exceed 15%.

B. Grade and Trademark: Grade and trademark shall be on each piece of lumber (or bundle in bundles stock). Use only recognized official markings of Association under whose rules it is graded.

C. Quality: Lumber shall be sound, thoroughly seasoned, well manufactured, and free from warp that cannot be corrected in the process of bridging, bolting, or nailing.

1. Lumber shall comply with PS 20-70 and shall be identified with grade mark.

D. Grades and Species of Solid Wood:

1. Blocking and nailers shall be No. 2 Southern yellow pine unless otherwise noted on drawings.

2. Wood sleepers shall be No. 2 Southern yellow pine, size as determined by job conditions.

3. Wood shims shall be exterior grade plywood with a…

This is the start of the file's text. The full file is on GovTribe.