ITB 24-177-PW Addendum 3 - Q and A.pdf
PDF 2 MB Posted
- Attached to
- Eugene Water & Electric Board (EWEB) ITB 24-177-PW Hayden Bridge Raw Water Intake - Pump Replacement
- Solicitation number
- S-P00140-00011736
- Issued by
- Lane County, Oregon
About this file
This document is an Addendum to Invitation to Bid (ITB) 24-177-PW issued by the Eugene Water & Electric Board (EWEB) for the Hayden Bridge Raw Water Intake - Pump #6 Replacement project. The addendum modifies the bidding documents by replacing drawings, adding new exhibits, and providing questions and answers. The project involves the procurement and installation of a new pump #6 and the installation of an EWEB provided motor. The addendum clarifies requirements related to the pump, motor, coatings, and vibration analysis. The closing date and time for this bid remain unchanged.
The addendum provides details on approved equals for the pump, required pump materials and configuration, coating specifications, and vibration analysis standards. It also confirms that EWEB will provide the motor and be responsible for wiring and testing it. Bidders must acknowledge receipt of this addendum and agree to be bound by the conditions within.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 4-21-20
October 14, 2024
ADDENDUM #3
Hayden Bridge Raw Water Intake – Pump #6 Replacement
ITB 24-177-GS
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
1. Drawings G1 & M1 are hereby replaced by the attached Exhibit 1.
2. Exhibit 2 – Water Systems, Hayden Bridge Water Intake Improvements, Phase 2, is hereby added to the Drawings section of the solicitation.
3. Exhibit 3 – Peerless Curve is hereby added to the Drawings section of the solicitation.
QUESTIONS & ANSWERS
Question 00450, Item 1 Substitution Bidder’s past performance states three (3) projects completed within the past five (5) years, regarding the installation of vertical turbine pumps that match the scope and complexity specified and required in this solicitation. Can this be changed to three (3) projects completed within the past ten (10) years?
Answer No. The Minimum Qualifications of this solicitation will not be adjusted at this time.
Question
1.02.A Substitution Request to review attached Simflo curve for ‘Approved Equal’
Answer The following is required to be equal with the Peerless pump:
1. The pump shall be new from the manufacture and intended for municipal application meeting NSF certification for all components in contact with potable water.
2. The pump shall provide 160-ft of total dynamic head at 12,200-gpm with an minimum efficiency of 87.5%. The existing pump curve, attached, was used to determine the required equal efficiency.
3. A four-bowl pump assembly is required to meet performance requirements.
4. The net positive suction head required shall not exceed 43-feet at the end of the pump curve.
1.03.B.7 Clarification Is intent that Contractor provide the vibration analysis for EWEB & OTS review? Wording is for motor, but with lower level access there’s opportunity to take readings at 2 points on the pump.
Looks like it is Contractor provided based on 3.02.A.1.f Answer The contractor is required to perform a vibration analysis and EWEB will utilize a third party (OTS) to verify the vibration analysis. The pump and motor shall undergo dynamic balancing and a vibration analysis at each bearing point.
2.A.3.A.2 Comment B584 does meet the E103 standard, but from what we see on the repair side, the silicon bronze does not hold up well over time when there’s silt or occasional solids.
Again, this is just a general comment. I don’t have material property comparisons, but on the repair side, I’ve seen the below highlighted materials hold up well over time.
Answer 1. Update Specification 11305, Section 2.A.3, A. MATERIALS, by replacing “2. Impellers Bronze, ASTM B584” with “2. Impellers Bronze, ASTM B584 or Stainless Steel, 316”.
2. Update Specification 11305, Section 3.03 COATINGS, by removing the following “Impellers shall be ceramic coated in accordance with manufacturers”.
2.A.3.A.9 Substitution Would steel weld in bearing retainer be acceptable
Answer A steel weld is not acceptable in the bearing retainer.
2.A.3.B.1.b.i Observation Motor plates with the registered connection is standard. Your VFD had tabs on the side to help align the motor. New pump and motor register should have about a 0.002in clearance and not need them, but obviously there was something on the VFD that did. If you intend to have them, will need to note it.
2.A.3.B.1.c Clarification Reference to figures 53 & 54, but which HI standard not specified. Ports are standard and we can specify size, if standard is not known, I’d recommend just dropping the last sentence
Answer Update Specification 11305, Section 2.A.3,B.1.c by removing “The connection size and configuration shall conform to Figures 53 and 54 of the Hydraulic Institute Standards”.
2.A.3.B.1.d.i Clarification Pump discharge is through column not integral with pedestal
Answer Update Specification 11305, Section 2.A.3,B.1.d.i. by replacing “integral with pedestal” to “integral with column”.
2.A.3.B.1.e New On site statement that 4” 150# connection for existing air/vac valve, integral with pedestal is required, but not specified.
I’d recommend matching CL and offset of original to avoid any piping changes on the air/vac valve Answer Matching the original installation to the greatest extent possible is allowed.
The contract drawing M1 is updated to include air valve installation requirements.
2.A.3.B.4.c Clarification Wear rings not listed in MATERIALS. Confirm you do want them in the bowls. Mfgs ‘should’ be doing this, but E103 recommends a 50 rockwell hardness difference between impeller and wear ring materials.
Answer Wear rings should be installed in the bowls in accordance with manufacturers recommendations.
2.A.3.B.5.a Clarification Elevation and of 4” pipe for desilt nozzle not specified, possible interference fit. Do you have another dwg view that shows if these are right under the pump?
Answer The 4” pipe is not in conflict with the pump. See attached reference drawing
M1.
2.A.3.B.6.a Clarification Mfgs will have their own standard on basket size and % opening of the mesh. This is going to be based on estimated pressure drop across the basket and impact the NPSHr. On site comment that water is pre screened and intended basket would have something like 1x1” mesh. Larger openings would allow for a shorter basket, but if not specified, mfg will just go with their standard
Ex) standard (Simflo SM28)
NOTE: Length of basket can impact 1/3-3/4D clearance from floor to bell specified in 2.B.5.A
Answer The 1”x1” mesh size is acceptable. However, the contractor is responsible for field verifying the existing clearance, assumed to be 14-inches, and installing a screen to meet the application.
2.A.3.B.7.a Clarification I assume this is referring to shaft straightness, but which standard ‘Sections
A4 and A5’ are from is not specified Answer Specification 11305, Section 1.02.C. states, “Governing Standard: Except as modified or supplemented, the vertical pump shall conform to the applicable requirements of ANSI/AWWA E101 and the Hydraulic Institute Standards.”
2.A.3.B.7.c&d Clarification Please confirm that this is related to the head shaft sleeve at the packing location only.
Answer This is related to the packing location.
Comment Some of the standards are behind current mfg abilities. We apply an HVOF chromium dioxide spray to the shaft and while it doesn’t stop packing from burning up if it’s over tightened, it does an excellent job protecting the shaft
Ex) no spray, cut grooves
Ex) spray, heat from burnt packing, but no cut grooves
Answer Include a HVOF chromium dioxide spray, or equal, for EWEB review and approval during submittal review.
3.03
MOTOR
Clarification Is the intent that contractor for current bid provide all lifting equipment and transportation necessary to have it painted in a shop and deliver to the job site?
It was my understanding that this was a requirement of previous ITB 24-008 / 24-064. Please confirm so we can price accordingly
Answer Specification 11305, Section 3.03 COATINGS shall be completed by the contractor in a shop. The contractor is responsible for all lifting and transportation required to complete the work.
Submerged
COMPONENTS
Clarification My interpretation of this is that the bowls will have the fusion bonded epoxy ID&OD and only pipe that is submerged will have liquid epoxy where everything else would be enamel (per RAW WATER PUMP bullet points)
Anything can be done, but my recommendation to reduce number of steps and cost would be
Fusion bond lining (Scotchkote 134 or equal) -Bowls ID
Liquid epoxy (Tnemec N140 or equal) -Bowls OD
-Column ID & OD -Pedestal ID & OD
Also, as it reads, only the coating needs to be NSF approved. To have a pump assembly NSF ‘certified’ is not the same and would need to be specified if required
Answer Update Specification 11305, Section 3.03 COATINGS by removing the following, “RAW WATER PUMP: All exposed ferrous metal pump components shall be shop primed with two coats of rust inhibitive primer with a minimum dry film thickness of 2 mils, and finished with two coats of semigloss alkyd enamel with a minimum dry thickness of 4 mils. Total dry film thickness for this system shall be a minimum of 10 mls. Sherwin Williams Artesian BrownI001 71YR08/119.”
Update Specification 11305, Section 3.03 COATINGS by removing the following, “RAW WATER PUMP MOTOR: The motor will be shop primed with two coats of rust inhibitive primer with a minimum dry film thickness of 2 mils. Contractor shall apply two finish coats of semigloss alkyd enamel with a minimum dry thickness of 4 mils on all exposed ferrous metal components.
Total dry film thickness for this system shall be a minimum of 10 mls. Sherwin Williams Artesian BrownI001 71YR08/119. Submit coating data for EWEB review and approval.”
Update Specification 11305, Section 3.03 COATINGS by replacing “Submerged components” with “Pump Components”.
In accordance with Specification 11305, Section 3.03 COATINGS:
1. Bowls shall be fusion bonded epoxy lined and coated.
2. Only components in contact with potable water, including linings and coatings, shall be NSF approved.
3. Liquid or fusion bonded epoxy lined and coated is required for all pump components (column, header, pedestal, ferrous metal, etc.).
Clarification - The owner provided motor will not require additional coating.
Also, EWEB will wire and bump test the motor.
Submerged
COMPONENTS
(impeller)
Clarification Manufactures do not recommend coating their new impellers. Most coatings are not hydrophobic and the combination of increased coefficient of friction and profile change from coating will derate the impeller to an unknown amount.
Answer As stated above, Update Specification 11305, Section 3.03 COATINGS, by removing the following “Impellers shall be ceramic coated in accordance with manufacturers”.
3.04 Clarification Can you confirm both the vibration and the balance standards?
Ex) vibration per HI 9.6.4d or ISO 20816 / balance per ISO 21940 Answer OTS will follow industry standards in accordance with the specification.
CLOSING DATE AND TIME
Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR BY CIRCLING THE ADDENDUM
NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Tim Rogers, Purchasing Analyst, Nathan Endicott, Staff Engineer, Toby Dixon, Water Treatment Supervisor, & Jared Giacomelli, Water Treatment Plant Lead Operator
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________ Date __________________________
End of Addendum
I-5
EUGENE WATER & ELECTRIC BOARD
EUGENE, OREGON
HAYDEN BRIDGE RAW WATER INTAKES
MARCOLA RD
PUMP 6 REPLACEMENT
EWEB WO# 2302821
INDEX OF DRAWINGS
G1
Ml
TITLE SHEET. LOCATION MAP & INDEX OF DRAWINGS
SITIE PLAN, LEGEND & ABBREVIATIONS
PUMP & MOTOR INSTALLATION
HAYDEN BRIDGE
RAW WATER INTAKES
LEGEND AND ABBREVIATIONS
NEW
EXISTING
EXISTING CONCRETE
NEW CONCRETE
BLDG- BUILDING
DIA - DIAMETER
EQPT - EQUIPMENT
EX - EXISTING
HVAC- HEATING VENTILATING AND COOLING
MAX - MAXIMUM
MIN - MINIMUM
OC - ON CENTER
PVC - POLYVINYL CHLORIDE
SCH - SCHEDULE
XFMR- TRANSFORMER
SECTION AND DETAIL DESIGNATIONS
SECTION CUT ON E[ SECTION DESIGNATION
DRAWING M1
M2
DRAWING WHERE
SECTION APPEARS
�����E�:
s m, s
¢ SECTION DESIGNATIOO
DRAWING FROM WHICH
SECTION WAS TAKEN
DETAILS ARE CROSS REFERENCED IN A SIMILAR MANNER.
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED10 BE .ACOJRATE FOR UNINTENDED PURPOSES.
VICINITY MAP f-, __ L_I:-� �-��-t�s'!-ES-----<
(IF NOT Z" - SCALE ACCOROINGL Y)
FUNC BY
DES ENDICOTT
OWN
STANDARDS CHECK
EWEB VKlRK ORDER NO.
DATE, 09/27/24
CHK APP
WATER SYSTEMS
HAYDEN BRIDGE RAW WATER INTAKE
PUMP 6 REPLACEMENT
TITLE SHEET
EUGENE WATER & ELECTRIC BOARD- BJGENE, OREGON
SCALE: NONE
REV DATE OWN STD (HK APP
REV
Gl
EXHIBIT 1
I
INTAKE 2
FUNC BY
OES ENDICOTI
OWN MOL/ESR
STANDARDS CHECK
SPONSOR
SHEET NOTES·
1. DIMENSIONS OF EXISTING EQUIPMENT AND FACILITIES ARE
APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL REQUIRED
MEASUREMENTS.
2.
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.
CHK APP
SCALE:
REV DATE
°""'o
AS NOTED
DWN STD
M1
CHK APP
REV
WATER SYSTEMS
HAYDEN BRIDGE RAW WATER INTAKE
UMP 6 IMPROVEMENTS
PLAN AND PROFILE VIEWS
EUGENE WATER & ELECTRIC BOARD - EUGENE, OREGON
L----------------------------------------......1-------------------......1---------------------------------
EW2541
Line
EW2541
Polygon
EW2541
Line
EW2541
Polygonal Line
EW2541
Rectangle
EW2541
Rectangle
EW2541
Rectangle
EW2541
Rectangle
EW2541
Rectangle
EW2541
Stamp
EW2541
Text Box
EXISTING PUMP 6
EW2541
Callout
THE EXISTING SUBBASE PLATE AND GROUT SHALL BE CHIPPED OUT AND COMPLETLY REMOVED.
EW2541
Text Box A
EW2541
Text Box M1
EW2541
Text Box A
EW2541
Text Box M1
EW2541
Text Box M1
EW2541
Text Box M1
EW2541
Text Box
TREAT EXISTING CONCRETE WITH SIKA ARMATEC 110 EPOCEM
EW2541
Text Box
SUBBASE PLATE
EW2541
Text Box
SUBBASE PLATE
EW2541
Callout THE EXISTING PUMP, PUMP COLUMN PIPING, AND MOTOR HAVE BEEN REMOVED AND NOT SALVAGED.
EW2541
Text Box 85.38
EW2541
Text Box 29.00
EW2541
Text Box 83.68
EW2541
Text Box 86.00
EW2541
Text Box 24.00
EW2541
Text Box 141.94
EW2541
Text Box 472.80'
EW2541
Text Box 460.97'
EW2541
Text Box 368.44
EW2541
Text Box 382.44
EW2541
Text Box 86.00
EW2541
Text Box 112.75
EW2541
Text Box 440.93'
EW2541
Text Box 60.00
EW2541
Text Box 28.00
EW2541
Text Box 2.00
EW2541
Text Box
PUMP BASE PLATE
EW2541
Line
EW2541
Text Box THE PUMP BASE AND SUBBASE PLATE MATERIAL, COATING, FABRICATION, AND INSTALLATION SHALL BE IN STRICK ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND DESIGN CRITERIA. SUBMIT FOR EWEB REVIEW AND APPROVAL.
ALL NEW PIPES (AIR RELIFE AND DRAIN PIPES) SHALL BE SUPPORTED WITH STAINLESS STEEL STRUT, PIPE CLAMPS, AND FASTNERS.
EW2541
Polygonal Line
EW2541
Text Box EXISTING PIPE AT DISCHARGE HEADER ELBOW CONNECTION. CONTRACTOR SHALL FABRICATE TO MATCH EXISTING CONDITIONS. NEW SS BOLTS, NUTS, WASHERS ARE REQUIRED.
EW2541
Callout THE EXISTING 4" AIR RELIFE VALVE SHALL BE SALVAGED AND REINSTALLED WITH ALL NEW ASTM A53 STEEL PIPE. COATED IN ACCORDANCE WITH CONTRACT SPECIFICATIONS FOR FERROUS METAL.THE PIPE SHALL BE INTEGRAL WITH THE PEDESTAL AND ROUTED THROUGH BUILDING EXTERIOR TO MATCH EXISTING CONDITIONS.
EW2541
Text Box
A CLEAR PRINT OF THIS FIGURE (PDF) IS IN ATTACHMENT 3.
EW2541
Callout REPLACE EXISTING DRAIN HOSE WITH SCHEDULE 80 PVC PIPE. PROVIDE AND INSTALL ALL PIPE AND FITTINGS (ELBOWS, UNIONS, BUSHINGS) AS REQUIRED TO CONNECT TO THE PUMP AND DRAIN THROUGH THE EXISTING FLOOR SLAB. A CONCRETE CORE IN THE SLAB AND RESTORATION IS REQUIRED.
EW2541
Callout
EXISTING SLAB
EW2541
Callout
EXISTING SLAB
EW2541
Polygonal Line
EW2541
Callout
EWEB IS PROVIDING NEW MOTOR
EXHIBIT 2
EXHIBIT 3