ITB-24-14 Bridge Bid form PBF-3.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Chain of Lakes Trail Bridge Repair Project
- Solicitation number
- ITB-07757
- Issued by
- Polk County, Florida
About this file
This document is an Invitation to Bid (ITB-24-14) from the City of Winter Haven, Florida in Polk County for the Chain of Lakes Trail Bridge Repair Project. The project includes the repair of two pedestrian bridges - Bridge No. 1 (113-foot-long pony truss) and Bridge No. 2 (91-foot-long pony truss). The required repairs range from concrete and sidewalk replacement to expansion joint repairs, timber rub rail replacement, bridge deck repairs, and power washing. Bidders must provide unit pricing for each listed repair item. There is no specified bid due date or award date provided in the document.
The bid solicitation does not include any information about pricing terms, set asides, incumbent contractors, funding sources, or other salient financial details. The document solely focuses on describing the scope of work and the two bridge repair projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB-24-14 Trail Bridge Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COL Trail Bridge Project- Portr
| Chain of Lakes Trail Bridge Project |
| ITB-24-14 |
Bidder Name: _______________________________
| BRIDGE 1 REPAIRS | |||||
| Item | Description | Quantity | Units | Unit Cost | Item Total |
| 1-1 | MOBILIZATION | 1 | LS | 0 | |
| 1-2 | MAINTENANCE OF TRAFFIC | 1 | LS | 0 | |
| 1-3 | CONCRETE APRON REPLACEMENT | 1 | LS | 0 | |
| 1-4.1 | REPLACE SIDEWALK APPROACH SLABS | 1 | LS | 0 | |
| 1-4.2 | REPLACE SIDEWALK SLABS | 1 | LS | 0 | |
| 1-4.3 | REMOVE AND REINSTALL RAILINGS | 1 | LS | 0 | |
| 1-4.4 | REPAIR SIDEWALK SLAB CRACKS | 110 | LF | 0 | |
| 1-4.5 | INSTALL NEW BOLLARD | 1 | LS | 0 | |
| 1-5 | EXPANSION JOINT REPAIRS | 1 | LS | 0 | |
| 1-6 | TIMBER RUB RAIL REPLACEMENT | 1 | LS | 0 | |
| 1-7 | BRIDGE DECK REPAIRS | 1 | LS | 0 | |
| 1-8 | COAT EXISTING STRUCTURAL STEEL | 1 | LS | 0 | |
| 1-9 | POWER WASH PEDESTRIAN RAILING & SIDEWALKS | 1 | LS | 0 |
| Total Bridge 1: | 0 | ||||
| 0 | |||||
| BRIDGE 2 REPAIRS | |||||
| Item | Description | Quantity | Units | Unit Cost | Item Total |
| 2-1 | MOBILIZATION | 1 | LS | $0.00 | |
| 2-2 | MAINTENANCE OF TRAFFIC | 1 | LS | $0.00 | |
| 2-3 | VEGETATION REMOVAL | 1 | LS | $0.00 | |
| 2- 4.1 | REPLACE SIDEWALK APPROACH SLABS | 1 | LS | $0.00 | |
| 2- 4.2 | REPLACE SIDEWALK SLABS | 1 | LS | $0.00 | |
| 2- 4.3 | REMOVE AND REINSTALL RAILINGS | 1 | LS | $0.00 | |
| 2- 4.4 | REPAIR SIDEWALK SLAB CRACKS | 102 | LF | $0.00 | |
| 2-5 | EXPANSION JOINT REPAIRS | 1 | LS | $0.00 | |
| 2-6 | TIMBER RUB RAIL REPLACEMENT | 1 | LS | $0.00 | |
| 2-7 | BRIDGE DECK REPAIRS | 1 | LS | $0.00 | |
| 2-8 | COAT EXISTING STRUCTURAL STEEL | 1 | LS | $0.00 | |
| 2-9 | POWER WASH PEDESTRIAN RAILING & SIDEWALKS | 1 | LS | $0.00 |
| Total Bridge 2: | $0.00 |
| Total of Bridge 1 & Bridge 2: | $0.00 |
| PBF-3 |
COL Trail Bridge Project -Lands
ITB-24-14 ITB-24-14
Bidder Name: _______________________________ Bidder Name: _______________________________
| BRIDGE 1 REPAIRS | BRIDGE 2 REPAIRS | ||||||||||
| Item | Description | Quantity | Units | Unit Cost | Item Total | Item | Description | Quantity | Units | Unit Cost | Item Total |
| 1-1 | MOBILIZATION | 1 | LS | 0 | 2-1 | MOBILIZATION | 1 | LS | $0.00 | ||
| 1-2 | MAINTENANCE OF TRAFFIC | 1 | LS | 0 | 2-2 | MAINTENANCE OF TRAFFIC | 1 | LS | $0.00 | ||
| 1-3 | CONCRETE APRON REPLACEMENT | 1 | LS | 0 | 2-3 | VEGETATION REMOVAL | 1 | LS | $0.00 | ||
| 1-4.1 | REPLACE SIDEWALK APPROACH SLABS | 1 | LS | 0 | 2- 4.1 | REPLACE SIDEWALK APPROACH SLABS | 1 | LS | $0.00 | ||
| 1-4.2 | REPLACE SIDEWALK SLABS | 1 | LS | 0 | 2- 4.2 | REPLACE SIDEWALK SLABS | 1 | LS | $0.00 | ||
| 1-4.3 | REMOVE AND REINSTALL RAILINGS | 1 | LS | 0 | 2- 4.3 | REMOVE AND REINSTALL RAILINGS | 1 | LS | $0.00 | ||
| 1-4.4 | REPAIR SIDEWALK SLAB CRACKS | 110 | LF | 0 | 2- 4.4 | REPAIR SIDEWALK SLAB CRACKS | 102 | LF | $0.00 | ||
| 1-4.5 | INSTALL NEW BOLLARD | 1 | LS | 0 | 2-5 | EXPANSION JOINT REPAIRS | 1 | LS | $0.00 | ||
| 1-5 | EXPANSION JOINT REPAIRS | 1 | LS | 0 | 2-6 | TIMBER RUB RAIL REPLACEMENT | 1 | LS | $0.00 | ||
| 1-6 | TIMBER RUB RAIL REPLACEMENT | 1 | LS | 0 | 2-7 | BRIDGE DECK REPAIRS | 1 | LS | $0.00 | ||
| 1-7 | BRIDGE DECK REPAIRS | 1 | LS | 0 | 2-8 | COAT EXISTING STRUCTURAL STEEL | 1 | LS | $0.00 | ||
| 1-8 | COAT EXISTING STRUCTURAL STEEL | 1 | LS | 0 | 2-9 | POWER WASH PEDESTRIAN RAILING & SIDEWALKS | 1 | LS | $0.00 | ||
| 1-9 | POWER WASH PEDESTRIAN RAILING & SIDEWALKS | 1 | LS | 0 |
| Total Bridge 1: | 0 | Total Bridge 2: | $0.00 |
| 0 | Total of Bridge 1 & Bridge 2: | $0.00 |
File details come from the government source that posted it. Updated .