ITB 2026002 Vol 2~1.pdf
PDF 32 MB Posted
- Attached to
- Columbia Heights Substation
- Solicitation number
- S-R33123-00017897
- Issued by
- Wasco County, Oregon
About this file
This document is an Invitation to Bid (ITB #2026002) issued by Northern Wasco County People's Utility District for the construction of the Columbia Heights Substation in The Dalles, Oregon. The project scope encompasses complete retirement and replacement of existing substation facilities through a two-phase construction approach, with Phase I improvements occurring in an expanded yard to the southeast while existing facilities remain operational. The work includes installation of two 12.47kV metalclad switchgear buildings with 2000A capacity, two 115-12.47/7.2kV transformers rated at 24/32/40 MVA, control buildings, circuit breakers, bus support structures, grounding systems, conduit infrastructure, and related electrical and civil work. The project requires coordination of staging sites, with two potential options identified: an open sloped yard across from the substation or a yard behind 1910 Golden Way. Phase I construction must be completed and tested before load transfer occurs and Phase II begins, with each phase capable of serving load and operating independently. The existing Columbia Heights Substation will be completely demolished and cleared following Phase I energization, with all equipment, structures, foundations, and infrastructure removed and replaced with a masonry wall panel perimeter system.
The project documentation includes comprehensive drawing lists and general notes covering electrical, structural, civil, and fabrication specifications across multiple sheets. Contractor responsibilities include furnishing and installing conduit systems, verifying transformer and circuit breaker locations, coordinating staging areas with the owner, and reviewing steel structure drawings for assembly and equipment mounting compatibility. The contractor must stub and cap conduit outside the substation fence for future communication provider connections and PUD feeder cable extensions. Ground grid cables extending into Phase II areas are to be coiled above grade during Phase I for future interconnection. The bid package specifies use of first-class, new materials free from defects and approved by UL where standards exist, with detailed conduit material lists including approximately 3,000 linear feet of 2" PVC Schedule 40 conduit, 4,400 linear feet of 6" PVC conduit, and various fittings and vaults. CAD files are available upon contractor request, and specific construction recommendations are detailed in technical specifications and design drawings throughout the document package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 2026002 Vol 1~1.pdf | ||
| Bid Amendment 001.pdf | ||
| Volume 1 Cover Page R1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .