This Invitation to Bid (ITB 2026_115) is a construction document set prepared by Thomas & Hutton Engineering Company for the City of Tybee Island, Georgia, detailing a gravity sewer replacement project in Zone 2. The project encompasses the replacement of existing sanitary sewer infrastructure across multiple streets including Chatham Avenue, 17th Place, 18th Terrace, and Butler Avenue in Tybee Island. The bid set includes comprehensive construction plans with existing conditions surveys, gravity sewer plan and profile sheets, sewer abandonment and removal details, and standard construction details. Key work items include the removal and replacement of approximately 175 to 303 linear feet of 8-inch sewer mains in various segments, installation of new PVC and DIP (ductile iron pipe) gravity sewer lines at specified slopes, construction of multiple sanitary sewer manholes, abandonment of approximately 41 to 294 linear feet of existing sewer mains in place with flowable fill, mill and overlay of 444 to 896 square yards of existing pavement, and restoration of disturbed gravel areas. The project also requires lateral reconnections and coordination with existing utilities. The bid set is marked "Not for Construction" and is dated November 3, 2026.
The document establishes comprehensive contractor responsibilities including erosion and sedimentation control, traffic control measures compliant with Georgia Manual on Uniform Traffic Control Devices (GAMUTCD), protection of live oak trees and existing utilities, record survey documentation, and coordination with the City of Tybee Island Water and Sewer Department a minimum of 72 hours prior to construction activities. All sewer pipes must meet ASTM D-3034 standards for PVC SDR 26 or AWWA C900 specifications, with tracer wire installation required on all gravity sewers. The contractor is responsible for dewatering, sheeting, bracing, and all repairs to damaged utilities at the contractor's sole expense. No separate compensation is provided for temporary sewage pumping or cleaning and videoing of existing sanitary sewers, which are considered subsidiary obligations. The project requires a record survey with horizontal and vertical data provided in both digital and hard copy formats, signed by a registered land surveyor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 2026_115 _ Complete Full Set Specificatio.pdf | ||
| ITB2026_115 Gravity Sewer South Zone 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
HATHAM
AVENUE
INLET
AVEN
UE BU
TL
ER
A
VE
N
UE
18TH TERRACE
19TH STREET
6T H
A
VE
N
UE
15TH STREET
TYBEE CREEK
ATLANTIC OCEAN
17TH STREET
TYBRISA STREET
REV. NO. REVISION
REVISION HISTORY
BY DATE
SUBMITTED TO
SUBMITTAL HISTORY
DATEDATE
J-
9.
/3
/2
G
RA
V
ITY
S
EW
ER
R
EP
LA
C
EM
EN
T
ZO
N
E
Know what'sbelow.
before you dig.Call
R
GRAVITY SEWER REPLACEMENT ZONE 2
TYBEE ISLAND, GEORGIA
PREPARED FOR:
CITY OF TYBEE ISLAND
P.O. BOX 2749
403 BUTLER AVENUE
TYBEE ISLAND, GA 31328
NOVEMBER 3, 2026
J-27209.0050
VICINITY MAP
SCALE: 1" = 1000'
SITE
PREPARED BY:
50 Park of Commerce Way Savannah, GA 31405 p.912.234.5300 www.thomasandhutton.com
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
C
S.
D
W G
N ov
, 2
- 1
0:
A M
Sheet List Table Sheet Number Sheet Title
CS COVER SHEET
G0.1 GENERAL NOTES
C0.1 OVERALL SITE PLAN
C1.1 EXISTING CONDITIONS
C1.2 EXISTING CONDITIONS
C1.3 EXISTING CONDITIONS
C1.4 EXISTING CONDITIONS
C1.5 EXISTING CONDITIONS
C2.1 GRAVITY SEWER PLAN AND PROFILE
C2.2 GRAVITY SEWER PLAN AND PROFILE
C2.3 GRAVITY SEWER PLAN AND PROFILE
C2.4 GRAVITY SEWER PLAN AND PROFILE
C2.5 GRAVITY SEWER PLAN AND PROFILE
C3.1 SEWER ABANDONMENT AND REMOVAL
C3.2 SEWER ABANDONMENT AND REMOVAL
C3.3 SEWER ABANDONMENT AND REMOVAL
C4.1 SEWER DETAILS
C4.2 SEWER DETAILS
C4.3 SEWER DETAILS
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
BID SET - NOT FOR CONSTRUCTION
http://www.thomasandhutton.com
GENERAL NOTES:
1. MAPPING AND TOPOGRAPHY INFORMATION SHOWN HEREIN BASED UPON INFORMATION PREPARED BY THOMAS & HUTTON ENGINEERING COMPANY, PROJECT NO. 27209.0050.
2. ALL ELEVATIONS REFER TO NAVD88.
3. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION UNTIL THE PROPER PERMITS HAVE BEEN ISSUED.
4. ALL WORK SHALL CONFORM TO APPLICABLE STATE, COUNTY, AND MUNICIPAL REQUIREMENTS AND CODES.
5. UNDERGROUND UTILITIES ARE SHOWN ON PLANS ONLY WHERE THEY MAY BE CLOSE TO CONSTRUCTION ACTIVITY. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATION OF ALL UNDERGROUND UTILITIES PRIOR
TO ANY EXCAVATION ACTIVITIES. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES BEFORE WORK COMMENCES, VERIFY THE SIZE AND LOCATIONS OF ALL UTILITIES WITHIN THE PROJECT LIMITS, AND NOTIFY THE ENGINEER OF CONFLICTS OR VARIANCES TO THE PLANS PRIOR TO BEGINNING WORK OR PURCHASE OF MATERIALS.
6. LOCATION AND SIZES OF EXISTING SEWER LATERALS ARE BASED UPON AVAILABLE TELEVISING DATA, SITE DATA, AND OWNER INPUT. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND SIZE OF ALL EXISTING SEWER LATERALS IN THE FIELD. ALL PROPOSED LATERAL REROUTES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL ADJUST LATERAL LOCATION, AS NECESSARY, TO MINIMIZE DISTURBANCE TO EXISTING STRUCTURES AND UTILITIES. NEW SEWER LATERALS SHALL BE INSTALLED WITHIN CLOSE PROXIMITY OF EXISTING SEWER LATERALS.
7. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH LOCAL UTILITY COMPANIES. CONTACT THE CALL LOCATE LINE AT 1-800-282-7411 A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO COMMENCING OF CONSTRUCTION ACTIVITIES FOR LOCATION OF BURIED UNDERGROUND UTILITIES.CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND ANY NECESSARY REPAIRS TO EXISTING UTILITY LINES. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ANY DAMAGE TO EXISTING UTILITIES AT THE SOLE EXPENSE OF THE CONTRACTOR.
8. ALL UTILITY POLES ADJACENT TO PROPOSED CONSTRUCTION MUST BE SECURED PRIOR TO ANY ADJACENT DISTURBANCE AND THE CONSTRUCTION PROCEDURE MUST BE APPROVED BY THE UTILITY COMPANY.
9. ALL SIGNS, MAIL BOXES, SHRUBBERY, FENCES, LANDSCAPING OR EXISTING STRUCTURES INTERFERING WITH CONSTRUCTING SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S
EXPENSE.
10. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY BRACING, SHEETING AND DEWATERING TO COMPLETE THE PROJECT, PROTECT THE CONSTRUCTION WORKERS AND ALL ADJACENT STRUCTURES, TREES, LANDSCAPING, AND IS RESPONSIBLE FOR ALL REPAIR AND COST TO RETURN AREA TO ORIGINAL CONDITION.
11. TREE PROTECTION BARRICADES, IF REQUIRED, SHALL BE INSTALLED PRIOR TO ANY CLEARING ACTIVITY AND MAINTAINED UNTIL INSTRUCTED BY THE OWNER OR ENGINEER TO REMOVE THEM.THE CONTRACTOR
SHALL PROTECT AND SAVE LIVE OAK TREES WHEN POSSIBLE AND/OR ANY TREE DESIGNATED ON THE PLANS OR BY THE OWNER. CONTRACTOR TO PROTECT AND SAVE TREES BY INSTALLING 4-FOOT-HIGH TEMPORARY CHAIN LINK FENCE AROUND THE TREE A MINIMUM OF 3 FEET BEYOND THE DRIPLINE. FENCING SHALL CONFORM TO THE TREE PROTECTION DETAILS AS SHOWN.
12. IT IS THE OBLIGATION OF THE CONTRACTOR TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUBSURFACE DATA AVAILABLE AS TO THE NATURE AND EXTENT OF THE MATERIALS TO BE EXCAVATED, WASTED, GRADED, AND COMPACTED. THE INFORMATION SHOWN ON THESE PLANS IN NO WAY GUARANTEES THE AMOUNT OR NATURE OF THE MATERIAL TO BE ENCOUNTERED.
13. THE CONTRACTOR WILL NOTIFY THE ENGINEER IF UNSUITABLE MATERIAL IS DISCOVERED PRIOR TO BEGINNING ANY REMOVAL OPERATION.
14. ALL SUITABLE MATERIAL EXCAVATED DURING UTILITY CONSTRUCTION SHALL BE USED ON SITE. ANY EXCESS MATERIAL SUITABLE OR UNSUITABLE SHALL BE DISPOSED OF OFF-SITE AT THE CONTRACTOR'S EXPENSE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL CONSTRUCTION DEBRIS.
15. THE CONTRACTOR SHALL GRASS ALL AREAS DISTURBED BY CONSTRUCTION IMMEDIATELY AFTER THE DISTURBANCE.
16. CONTROL OF STORMWATER THROUGHOUT THE CONSTRUCTION PERIOD, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE EXISTING DRAINAGE CONVEYANCES SHALL BE MAINTAINED THROUGHOUT THE
CONSTRUCTION PERIOD. ALL PENALTIES, CLAIMS AND FEES IMPOSED ON THE OWNER AS A RESULT OF DAMAGE CAUSED BY ACTIONS OF THE CONTRACTOR, THEIR EMPLOYEES OR SUBCONTRACTORS SHALL BE
BORNE IN FULL BY THE CONTRACTOR.
17. THE CONTRACTOR SHALL COORDINATE DEMOLITION AND IMPAIRMENTS TO MINIMIZE TRAFFIC INTERFERENCE AND OPERATIONS OF FACILITIES.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL DEVICES AND MEASURES AS NECESSARY TO MEET THE REQUIREMENTS OF THE GEORGIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(GAMUTCD). CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO GADOT AND OWNER FOR REVIEW AND ACCEPTANCE PRIOR TO STARTING CONSTRUCTION.
19. A RECORD SURVEY OF ALL CONSTRUCTED INFRASTRUCTURE SHALL BE PROVIDED BY THE CONTRACTOR'S SURVEYOR WHO SHALL PROVIDE ALL RECORD SURVEY DATA IN BOTH DIGITAL AND HARD COPY FORM.
ALL RECORD SURVEY DRAWINGS MUST BE SIGNED BY A REGISTERED LAND SURVEYOR. THE CONTRACTOR SHALL PROVIDE A SET OF "MARKED UP" AS BUILT DRAWINGS AS WELL AS A CD/DVD CONTAINING THE RECORD SURVEY DATA IN ELECTRONIC FORM. RECORD SURVEY SHALL PROVIDE HORIZONTAL AND VERTICAL LOCATIONS BASED ON THE PROJECT CONTROL AND AT A MINIMUM SHALL INCLUDE HORIZONTAL LOCATIONS OF ALL PORTIONS OF ITEMS INSTALLED FOR THIS PROJECT. COORDINATES SHALL BE SHOWN ON ALL PERMANENT STRUCTURE CORNERS, SEWER MAINS, VALVE MANHOLES/BOXES/VAULTS, FITTINGS, GRAVITY SEWER MANHOLES, STEEL CASINGS, AND ALL OTHER ITEMS INSTALLED UNDER THIS CONTRACT. VERTICAL DATA SHALL INCLUDE BUT NOT LIMITED TO MANHOLES/BOXES/VAULTS, FRAMES AND INVERTS, TOP
OF PIPES, AND TOP OF VALVES (VALVE OPERATING NUT).
20. ALL CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN AN ACCEPTABLE WASTE DISPOSAL AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL CONSTRUCTION
DEBRIS.
21. TRACER WIRE SHALL BE STRAPPED TO ALL SEWER PIPES AS PER SPECIFICATION 33 30 00.
22. ALL CONSTRUCTION WATER SHALL BE METERED THROUGH AN ACCEPTABLE HYDRANT METER AND BACKFLOW DEVICE OBTAINED FROM THE CITY OF TYBEE ISLAND WATER AND SEWER DEPARTMENT.
23. ALL DISTURBED AREAS SHALL BE GRASSED WITH TEMPORARY SEEDING AND MULCHED IMMEDIATELY AFTER GRADING IS COMPLETE. THESE AREAS SHALL BE REGRASSED WITH PERMANENT SEEDING AFTER
CONSTRUCTION IS COMPLETE.
24. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CONSTRUCTED SIMULTANEOUSLY WITH THE DISTURBANCE OF THE LAND AND SHALL REMAIN FUNCTIONAL UNTIL THE CONTRIBUTING DISTURBED
AREAS ARE STABILIZED.
25. ALL CONNECTIONS TO THE EXISTING SEWER SYSTEM SHALL BE COORDINATED WITH THE CITY OF TYBEE ISLAND WATER AND SEWER DEPARTMENT. THE CONTRACTOR SHALL CONTACT THE WATER AND SEWER
DEPARTMENT AT (912) 786-4573 A MINIMUM OF 72 HOURS PRIOR TO CONSTRUCTION ACTIVITIES.
26. THE PROPERTY LINES AND RIGHT-OF-WAY LINES SHOWN ON THE DRAWINGS ARE BASED UPON AVAILABLE PLATS, DEEDS, AND CHATHAM COUNTY GIS DATA.
SEWER COLLECTION NOTES:
1. THE CONTRACTOR SHALL COORDINATE THE RELOCATION, RECONNECTION, AND THE ABANDONMENT OF ALL SEWER UTILITIES WITH THE UTILITY OWNER A MINIMUM OF 72 HOURS PRIOR TO CONSTRUCTION
ACTIVITIES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL RECONNECTION ACTIVITIES WITH THE UTILITY OWNER AND AFFECTED PROPERTY OWNERS.
3. ALL SEWER LATERALS NOT BEING USED SHALL BE IDENTIFIED AND CAPPED AT THE MAIN WHERE POSSIBLE.
4. THE WORK SHALL BE CONDUCTED IN SUCH A MANNER TO PREVENT ANY INTERRUPTION IN SERVICE. THE EXISTING SEWER COLLECTION IN SERVICE SHALL BE KEPT IN SERVICE UNTIL THE NEW SYSTEMS HAS BEEN
CONSTRUCTED, TESTED, AND ACCEPTED BY THE CITY OF TYBEE WATER AND SEWER DEPARTMENT.
5. PVC PIPE FOR GRAVITY SEWER SHALL BE SDR 26 POLYVINYL CHLORIDE AND SHALL MEET ALL REQUIREMENTS OF THE ASTM D-3034 FOR DIAMETERS 4” THROUGH 15”, LATEST REVISION OR AWWA C900, DR18
FOR DIAMETERS 16” THROUGH 64”, LATEST REVISION. PVC PIPE SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D-2321, LATEST REVISION. ALL PIPES SHALL BE SUITABLE FOR USE AS A GRAVITY SEWER CONDUIT AND SHALL BE GREEN IN COLOR. PROVISIONS MUST BE MADE FOR CONTRACTION AND EXPANSION AT EACH JOINT WITH A RUBBER RING. STANDARD LAYING LENGTHS SHALL BE FOURTEEN (14) FEET OR TWENTY (20) FEET, + 1-INCH, FOR ALL SIZES. FITTINGS SHALL MEET THE SAME SPECIFICATION REQUIREMENTS AS THE PIPE.
6. ALL PIPE, FITTINGS, AND OTHER APPURTENANCES SHALL BE EXAMINED CAREFULLY FOR DAMAGE AND OTHER DEFECTS IMMEDIATELY BEFORE INSTALLATION. DAMAGED OR DEFECTIVE MATERIALS WILL NOT BE ACCEPTED OR INSTALLED. RESTRAINED JOINTS, WHERE SHOWN OR NOTED, FOR PIPE AND FITTINGS SHALL BE MECHANICAL JOINTS WITH DUCTILE IRON RETAINER GLANDS EQUIVALENT TO "MEGALUG" OR PUSH-ON TYPE JOINTS EQUIVALENT TO "LOK-RING," "TR FLEX", OR "SUPER LOCK" AND SHALL HAVE A MINIMUM RATED WORKING PRESSURE EQUAL TO THE ITEM RESTRAINED WITH A MINIMUM SAFETY FACTOR OF 2:1. MECHANICAL JOINT RETAINER GLANDS SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS FOR THE PIPE MATERIAL (DUCTILE IRON VS. PVC). THE JOINTS SHALL BE IN ACCORDANCE WITH THE APPLICABLE PORTIONS OF ANSI/AWWA C111/A21.11. ADDITIONAL RESTRAINT SHALL BE AS INDICATED ON THE DRAWINGS.
7. ALL BENDS, PLUGS, CAPS, WYES AND TEES ON FOUR (4) INCH PIPE AND LARGER, SHALL BE PROVIDED WITH JOINT RESTRAINTS EQUIVALENT TO MEGALUGS. TRACER WIRE SHALL BE INSTALLED ON ALL GRAVITY SEWER WITH DIRECT BURIAL CONNECTORS, AND PROVIDE CONTINUOUS ELECTRIFIED CONDUCTIVITY. AREA MARKERS SHALL BE AT LEAST EVERY 500 FEET WITH TRACER WIRE ATTACHED, UNLESS A MANHOLE IS AVAILABLE. A SIX (6) FOOT LEAD ATTACHED TO THE INSIDE OF THE RING AND COVER SHALL BE PROVIDED AT MANHOLES. ON LATERALS, THE TRACER WIRE SHALL CONNECT THE CLEAN-OUT TO
THE GRAVITY SEWER.
8. PRIOR TO MANDREL TESTS, TELEVISING, AND BEFORE THE ACCEPTANCE OF THE GRAVITY SEWER SYSTEMS, ALL SEWER LINES SHALL BE CLEANED TO THE SATISFACTION OF THE ENGINEER. WHERE ANY OBSTRUCTION OCCURS, THE CONTRACTOR WILL BE REQUIRED TO CLEAN THE SEWERS BY FLUSHING AND BY MEANS OF ROD AND SWABS OR OTHER INSTRUMENTS. CLEANING OF NEW SEWERS IS TO BE COMPLETED WITHOUT IMPACTING THE EXISTING SEWER SYSTEM; DEBRIS/FOREIGN MATERIAL FROM THE NEW LINE (I.E. DIRT, SAND, AND TRASH) SHALL NOT BE DISCHARGED INTO THE EXISTING SYSTEM.
9. ALL SEWER PIPES SHALL BE TESTED PER SPECIFICATIONS.
10. WHEN THE WORK OR PIPE LAYING IS SUSPENDED, EITHER FOR THE NIGHT OR AT OTHER TIMES, THE END OF THE GRAVITY SEWER PIPE MUST BE CLOSED WITH A WATERTIGHT COVER. THE CONTRACTOR WILL BE
HELD RESPONSIBLE FOR KEEPING THE GRAVITY SEWER FREE FROM OBSTRUCTION. PLUGS SHALL REMAIN IN PIPE ENDS UNTIL ALL WATER IS REMOVED FROM THE TRENCH.
11. ALL MANHOLE TOPS ARE APPROXIMATE. THE CONTRACTOR SHALL DETERMINE AND SET MANHOLE TOPS RELATIVE TO FINISHED GRADES AS SHOWN ON THE DETAIL.
12. ALL GRAVITY SEWER SHALL HAVE A MINIMUM OF 3 FEET OF COVER MEASURED FROM FINISHED GRADE EXCEPT WHERE OTHERWISE NOTED ON THE PLANS.
13. MAINTAIN A 10' HORIZONTAL SEPARATION BETWEEN ALL SANITARY SEWERS AND ALL WATER MAINS. WHERE THIS SEPARATION CANNOT BE MAINTAINED, OR WHERE LINES CROSS, PROVIDE A 18" MINIMUM
VERTICAL SEPARATION BETWEEN THE OUTSIDE OF THE PIPES. IF THESE REQUIREMENTS CANNOT BE MET, PROPOSED WATERLINE WILL BE CONSTRUCTED OF DUCTILE IRON PIPE UNTIL REQUIREMENTS ARE MET.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING AND VIDEOING EXISTING SANITARY SEWER TO CONFIRM NUMBER AND LOCATION OF EXISTING LATERALS REQUIRING RECONNECTION. CONTRACTOR
SHALL COORDINATE ALL CLEANING AND VIDEO EFFORTS WITH THE CITY OF TYBEE ISLAND AND ENGINEER. ALL CLEANING, BY-PASS PUMPING, AND VIDEOING REQUIRED SHALL NOT BE MEASURED AND PAID FOR SEPARATELY. PAYMENT SHALL BE INCLUDED IN THE UNIT PRICE FOR EACH LATERAL RELOCATION AND RECONNECTION.
PERMITTING NOTES:
1. GEFA REQUIRED PERMIT STATUS:
A. GA EPD:
B. GSWCC:
BITUMINOUS PAVEMENT
EXISTING PROPOSED DESCRIPTION
CONCRETE PAVEMENT TO BE
CONCRETE CURB & GUTTER
EARTH ROAD OR DRIVEWAY
STORM DRAIN MANHOLE
STORM DRAIN PIPE
FLARED END SECTION
WATER LINE
SPOT ELEVATION
CONCRETE MONUMENT
DITCH
SIGNS
UNDERGROUND CABLE
UNDERGROUND TELEPHONE
MAIL BOX
IRON PIN
POWER POLE WITH GUY WIRE
POWER POLE
WOODS LINE
NATURAL GAS LINE
RIGHT-OF-WAY
DESCRIPTIONPROPOSEDEXISTING
CENTER LINE OF RIGHT-OF-WAY/
ROADWAY
GRATE INLET
PROPERTY LINE
TELEPHONE MANHOLEST
LIGHT POLE
TELEPHONE PEDESTAL
WATER VALVE
FORCE MAIN
SANITARY SEWER MANHOLE
FM FM
CUT SLOPE
FILL SLOPE
C F
C F F
CC
F
EASEMENT
FUTURE FUTURE
F C C
FF
C
F C
CABLE & ELECTRICAL CONDUIT CROSSING
WETLANDS
10''W
FIRE HYDRANT
FMFM
REMOVED AND REPLACED
ASPHALT PAVEMENT TO BE
REMOVED AND REPLACED
PROPOSED GDOT EASMENTSILT FENCEX
TREE PROTECTION FENCING
UNDERGROUND POWER
OVERHEAD POWER
UNDERGROUND FIBER OPTIC
PROPOSED NEW WATER SERVICE AND METER
PROPOSED NEW WATER SERVICE AND STUBOUT WITH MARKER
Know what'sbelow.
before you dig.Call
RSANITARY SEWERSS SS SS SS
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
G
N .D
W G
N ov
, 2
- 1
0:
A M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GENERAL NOTES
G0.1 27209.0050
GRAVITY SEWER REPLACEMENT
ZONE 2
P.O. BOX 2749
11/3/26
SAH
SAH
TSD
50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com
NONE
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
C
HATHAM
AVENUE
INLET
AVEN
UE
18TH STREET
17TH PLACE
BU
TL
ER
A
VE
N
UE
18TH TERRACE
18TH LANE
19TH STREET
6T H
A
VE
N
UE
15TH STREET
TYBEE CREEK
ATLANTIC OCEAN
C 2.
C
2.2 C2.3
C2.4
C 2.
TYBRISA STREET
14TH STREET
M
ILL
ER
A
VE
N
UE
2N D
A
VE
N
UE
13TH STREET
7TH AVENUE
1" = 200'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
SP
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
OVERALL SITE PLAN
C0.1
SAH
1 INCH =
0 100
200 FEET
200200
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
X
X
X
X
X X
X
X
X
X
O
HP
O
HP
O
HP
O
HP
O
HT
SS
SS
SS
SS
SS
SS
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
UTL
W
W
W
SS
SS
O
HP
SSMH
FR.: 6.35'
8" PVC
I.E.: 3.26' (NE)
I.E.: 2.56' (SE)
I.E.: 2.71' (NW)
4" PVC
I.E.: 2.51' (SW)
SSMH
FR.: 7.03'
8" PVC
I.E.: 3.38' (SW)
4" PVC
I.E.: 3.69' (E) I.E.: 3.70' (W)
SS
12" PVC
OHP
OHP
OHP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
UT
L
UTL
UTL
UTL
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
24" HDPE
24" HDPE
24" HDPE
T
S
S
BM7
BENCHTIE IN
SPLIT TRUNK LIVE OAK
EL.: 9.08'
W
W
W
W
W
OHP
OHP
OHP
UTL
UTL
W
W
W
W
O
HP
O
HP
GI
FR.: 6.25'
I.E.: 3.59' (SE)
I.E.: 3.76' (NW)
GI
FR.: 6.13'
I.E.: 3.39' (SE)
I.E.: 3.23' (NW)
DIRECTION ONLY
DIRECTION ONLY
GI
FR.: 6.47'
I.E.: 0.31' (SE)
I.E.: 0.48' (NW)
CP 16
CAPPED REBAR
N: 727,892.709 E: 1,063,276.140
CP 15
CAPPED REBAR
N: 728,115.504
E: 1,063,319.509
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EX
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS
C1.1
SAH
0 10
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
O
HT
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UTL UTL
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UTL
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
WW
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
36" HD
PE
12" HD
PE
24" RCP
SSMH
FR.: 6.97'
8" PVC
I.E.: 0.73' (E) I.E.: 0.68' (S)
4" PVC
I.E.: 1.06' (NW)
SS
SS
SSMH
FR.: 10.87'
8" PVC
I.E.: 2.15' (E)
I.E.: 4.53' (SW)
4" PVC
I.E.: 2.33' (W)
SSMH
FR.: 10.35'
8" DIP
I.E.: -1.71' (N) I.E.: -1.53' (S)
8" PVC
I.E.: 1.87' (W)
SSMH
FR.: 10.85'
8" DIP
I.E.: -1.62' (S)
8" PVC
I.E.: -1.60' (E)
SS
BM8
BENCHTIE IN
SPLIT TRUNK LIVE OAK
EL.: 8.60'
SSMH
FR.: 6.85'
8" DIP
I.E.: -0.20' (N) I.E.: -0.03' (E)
4" PVC
I.E.: 2.04' (SE)
8" CLAY
I.E.: -0.07' (S)
8" PVC
I.E.: 0.65' (W)
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W W
OHP
OHP
OHP
DIRECTION ONLY
DIRECTION ONLY
CATCH BASIN
FR.: 7.03'
I.E.: 1.39' (N)
I.E.: 0.45' (SE)
I.E.: 2.22' (S)
CATCH BASIN
FR.: 10.56'
I.E.: 0.61' (S)
CP 13
CAPPED REBAR
N: 726,276.399
E: 1,063,906.285
CP 14
CAPPED REBAR
N: 726,528.144
E: 1,063,893.795
C
HA
TH
A
M A
V
EN
UE
RI
G
HT
-O F-
W A
Y V
A
RI
ES
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EX
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS
C1.2
SAH
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
XX
OHP
UG
P
UT
L
UT
L
W W
W W W
W
W W
W
SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SSMH
FR.: 9.18'
8" DIP
I.E.: 2.43' (SE)
I.E.: 2.18' (SW)
4" PVC
I.E.: 5.83' (NW)
SS
SSMH
FR.: 6.76'
8" DIP
I.E.: 4.59' (SE)
I.E.: 3.46' (NW)
4" PVC
I.E.: 3.86' (SW)
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UGP UGP UGP UGP
UTL UTL UTL UTLUTL UTL UTL UTL
W
W
W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
UTL
BM4
BENCHTIE IN
SOUTH FACE OF
POWER POLE
EL.: 7.51'
12" HDPE
GI
FR.: 6.16'
I.E.: 4.32' (E) GI (OBSTRUCTED)
FR.: 7.00'
I.E.: 4.13' (W)
DIRECTION ONLY
DIRECTION ONLY CP 8
CAPPED REBAR
N: 726,161.712
E: 1,064,711.748
SSMH
FR.: 6.64'
SSMH
FR.: 6.89'
8" DIP
I.E.: 4.64' (NW)
6" PVC
I.E.: 5.39' (NE)
I.E.: 4.89' (SE)
I.E.: 5.24' (S)
PVC CLEANOUT
(TYP. 14)
PVC CLEANOUT
(TYP. 5)
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EX
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS
C1.3
SAH
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
X X X X X X X X X X X X X X
UTL
UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL
UTL
UT
L UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTLUTL UTL UTL UTL UTL UTL
UTL UTL UTL UTL UTL UTL UTL
W W
W W W W W W W W W W W W W W W W W W W W
W
SSMH
FR.: 8.33'
8" DIP
I.E.: 2.52' (NE)
I.E.: 2.59' (SE)
I.E.: 2.68' (NW)
I.E.: 4.35' (SW)
SSMH
FR.: 7.10'
8" DIP
I.E.: 3.62' (SE)
I.E.: 3.55' (NW)
4" DIP
I.E.: 4.18' (NE)
SS SS SS SS SS SS SS SS SS
SS
SS
S S
" R
C P
8" P
V C
BM5
BENCHTIE IN
EAST FACE OF
POWER POLE
EL.: 9.38'
OHP OHP OHP OHP OHP OHP OHP OHP
CP 10
CAPPED REBAR
N: 725,853.220
E: 1,064,455.386
CP 171
NAIL
N: 725,888.966
E: 1,064,346.349
GI
FR.: 6.46'
I.E.: 4.34' (NE)
I.E.: 4.72' (SW)
I.E.: 4.56' (W)
DIRECTION ONLY
18" CMP
DIRECTION ONLY
DIRECTION ONLY
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EX
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS
C1.4
SAH
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
X
X
OHP
UTL
UTL
W W
W W
SS
SS
SS
SS
SS
12" HDPE
" H
D
PE
OHP OHP OHP OHP OHP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
UT
L
S
S
BM6
BENCHTIE IN
WEST FACE OF
POWER POLE
EL.: 10.31'
SSMH (SEALED)
FR.: 8.37'
SSMH
FR.: 8.19'
4" DIP
I.E.: 5.60' (SE)
I.E.: 5.55' (SW)
12" HDPE
CP 12
PK NAIL
N: 725,567.993
E: 1,064,097.951
CP 11
CAPPED REBAR
N: 725,696.115
E: 1,064,099.264
GI
FR.: 7.46'
I.E.: 5.53' (NE)
GI
FR.: 8.04'
I.E.: 4.31' (SE)
I.E.: 3.85' (SW)
I.E.: 3.83' (NW)
DIRECTION ONLY
DIRECTION ONLY
DIRECTION ONLY
SSSS
SS
1" = 20'
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EX
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS
C1.5
SAH
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
XXXXXX
XXX OHP OHP
OHP
OHP
OHT
SSSSSSSSSSSS
UTL
UTL
UTL
UTL
UT
L
UTL
UTL
UTL
UTL
WW
W
SS
SS
OHP
SSM
H
FR.: 6.35'
8" PVC
I.E.: 3.26' (N E)
I.E.: 2.56' (SE)
I.E.: 2.71' (N W
4" PVC
I.E.: 2.51' (SW
SSM
H
FR.: 7.03'
8" PVC
I.E.: 3.38' (SW
4" PVC
I.E.: 3.69' (E)
I.E.: 3.70' (W
SS
12" PVC
O
HP
O
HP
O
HP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
W W W W W W W W W W W W W W W W
UTL
UTL
UTL
UTL
UTL UTL UTL UTL UTL UTL UTL UTL UTLUTL UTL UTL
24" HDPE
24" HDPE
24" HD
PE
T
SS
BM
BEN
C
HTIE IN
SPLIT TRUN
K LIVE O
A K
EL.: 9.08'
W W
W W
W
O
HP
O
HP
O
HP
UTL
UTL
W
W
W
W
OHP
OHP
G
IFR.: 6.25'
I.E.: 3.59' (SE)
I.E.: 3.76' (N W
G
IFR.: 6.13'
I.E.: 3.39' (SE)
I.E.: 3.23' (N W
D
IREC
TIO
N O
N
LY
D
IREC
TIO
N
O N
LY
G
IFR.: 6.47'
I.E.: 0.31' (SE)
I.E.: 0.48' (N W
C P 16
C A
PPED
REBA
R
N : 727,892.709
E: 1,063,276.140
C P 15
C A
PPED
REBA
R
N : 728,115.504
E: 1,063,319.509
EXISTING SURFACE
APPROXIMATE LOCATION OF
EXISTING WATER LINE
EXISTING 12" DRAINAGE PIPE EXISTING 8" SEWER MAIN
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION LINE.
CONTRACTOR TO COORDINATE
RELOCATION WITH UTILITY COMPANY.
APPROXIMATE LOCATION OF
EXISTING OVERHEAD POWER
15TH STREET
6TH AVENUE
CHATH
AM A
VEN
UE
APPROXIMATE EXISTING
PROPERTY LINE
(TYP.)
CONTRACTOR TO REMOVE 175 LF OF EXISTING
SEWER MAIN AND LAY 175 LF OF NEW 8" SEWER MAIN
IN THE EXISTING TRENCH. EXISTING LATERALS TO BE
CAPPED DURING REMOVAL AND CONNECTED TO THE
NEW MAIN AT THE END OF THE DAY.
MILL AND OVERLAY APPROX.
444 SY OF EXISTING PAVEMENT
WITH ASPHALTIC CONCRETE
PER DETAIL ON SHEET C4.2
SSSSSSSSSSSS
SS
SS
SS
8''W
0+00 1+00 1+77.40
EXISTING
MANHOLE #19
FR: 7.03
INV. IN: 3.69 (E)
INV. IN: 3.70 (W)
INV. OUT: 3.38 (S)
EXISITNG
MANHOLE #18
FR: 6.35
INV. IN: 3.26 (N)
SEE SHEETS C3.1 - C3.3 FOR
SEWER TO BE ABANDONED
AND/OR REMOVED
6th Ave - 15TH. TO CHATHAM AVE.-1
STATIONS: -0+25 - 2+50
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-0+25 0+00 1+00 2+00 2+50
6.
6.
6.
7.
EXISTING 12" DRAINAGE PIPE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
EXISTING SURFACE
173 LF 8" PVC - SDR 26 @ 0.36%
EXISTING
MANHOLE #18
FR: 6.35
INV. IN: 3.26 (N)
EXISTING
MANHOLE #19
FR: 7.03
INV. IN: 3.69 (E)
INV. IN: 3.70 (W)
INV. OUT: 3.38 (S)
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- S S
- P P.
D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRAVITY SEWER PLAN AND
PROFILE
C2.1
SAH
20 FEET
1 INCH =
0 10
20 FEET
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, INLET
PROTECTION, SILT FENCE INSTALLATION AS NEEDED, GRASSING IN UNPAVED AREAS, CONSTRUCTION ACCESS AND STORM WATER MONITORING. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REMOVING EROSION CONTROL PRACTICES ONCE CONSTRUCTION IS COMPLETE. ALL EROSION CONTROL PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE TO THE STATE OF GEORGIA SOIL
AND WATER CONSERVATION DISTRICT'S FIELD MANUAL (THE GREEN BOOK).
2. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY BRACING, SHEETING, AND DEWATERING TO COMPLETE THE PROJECT TO PROTECT EXISTING
PAVEMENT, ANY AND ALL ADJACENT STRUCTURES, TREES, AND LANDSCAPING.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL DEVICES AND MEASURES AS NECESSARY TO MEET THE REQUIREMENTS
OF THE GEORGIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (GAMUTCD).
4. CONTRACTOR SHALL RESTORE ALL FENCING,WALLS, DRIVEWAYS, WALKWAYS, MAIL BOXES, AND EXISTING STRUCTURES TO
PRE-CONSTRUCTION CONDITIONS UPON COMPLETION OF CONSTRUCTION.
5. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND STRUCTURES FROM DAMAGE THROUGHOUT CONSTRUCTION.
6. CONTRACTOR SHALL REMOVE AND REPLANT TREES WITHIN CLOSE PROXIMITY OF TRENCHES. SECURE AND PROTECT LIVE OAKS WHEN POSSIBLE
AND/OR ANY TREE DESIGNATED ON THE PLANS OR BY THE OWNER.
7. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES ON SECURING AND PROTECTING EXISTING
UTILITY LINES AND STRUCTURES.
8. ANY AND ALL TEMPORARY SEWAGE PUMPING REQUIRED TO MAKE SEWER SYSTEM CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE FOR THESE PUMPING REQUIREMENTS. ALL LABOR, DESIGN, EQUIPMENT, MATERIALS, RENTAL FEES, TEMPORARY PIPING AND INCIDENTALS SHALL BE CONSIDERED A SUBSIDIARY OBLIGATION TO THE
CONTRACT.
9. ALL SANITARY SEWER STRUCTURES AND MANHOLES SHALL BE COATED AS PER SPECIFICATION SECTION 33 30 00.
10. ALL KNOWN UTILITY FACILITIES ARE SHOWN SCHEMATICALLY ON PLANS, AND ARE NOT NECESSARILY ACCURATE IN LOCATION AS TO PLAN OR ELEVATION. UTILITIES SUCH AS SERVICE LINES OR UNKNOWN FACILITIES NOT SHOWN ON PLANS WILL NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITY UNDER THIS REQUIREMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND SIZE OF ALL UNDERGROUND UTILITIES AND OTHER SALIENT FEATURES PRIOR TO BEGINNING CONSTRUCTION."EXISTING UTILITIES" MEANS ANY UTILITY THAT EXISTS ON THE PROJECT IN ITS ORIGINAL, RELOCATED, OR NEWLY INSTALLED POSITION. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE COST OF REPAIRS TO DAMAGED UNDERGROUND UTILITIES; EVEN WHEN SUCH UTILITIES ARE NOT SHOWN ON THE PLANS. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES PRIOR TO BEGINNING WORK AND REQUEST AN ACCURATE FIELD LOCATION OF THEIR RESPECTIVE UTILITY LINES.
11. ALL CONNECTIONS TO THE EXISTING WATER AND SEWER SYSTEMS SHALL BE COORDINATED WITH CITY OF TYBEE ISLAND. CONTRACTOR SHALL CONTACT CITY OF TYBEE ISLAND WATER AND SEWER DEPARTMENT A MINIMUM OF 72 HOURS PRIOR TO CONNECTION ACTIVITIES.
12. ALL CONNECTIONS TO EXISTING SANITARY SEWERS SHALL BE STAGED TO PREVENT INTERRUPTION IN SERVICE.
13. IF ANY PIPES OR LATERALS ARE LOCATED IN THE FIELD THAT ARE NOT SHOWN ON THE CONSTRUCTION PLANS, CONTRACTOR SHALL NOTIFY CITY
OF TYBEE ISLAND AND THE ENGINEER IMMEDIATELY.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEANING, TESTING, AND DISINFECTION OF MAINS PRIOR TO CONNECTING PROPOSED UTILITIES TO
THE CITY OF TYBEE ISLAND SYSTEM.
15. CONTRACTOR SHALL RESTRAIN JOINTS PER THE MINIMUM RESTRAINT LENGTH AS SPECIFIED ON THE DETAILS.
16. CONTRACTOR SHALL COMPLETE WORK FOR DIVISION/PHASE OF PROJECT BEFORE COMMENCING WORK FOR NEXT DIVISION/PHASE OF PROJECT.
17. LOCATIONS AND SIZES OF EXISTING SEWER LATERALS ARE APPROXIMATE AND BASED UPON AVAILABLE TELEVISING DATA, SITE DATA, AND OWNER
INPUT. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND SIZE OF ALL EXISTING SEWER LATERALS IN THE FIELD. ALL PROPOSED LATERAL REROUTES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL ADJUST LATERAL LOCATION, AS NECESSARY, TO MINIMIZE DISTURBANCE TO EXISTING STRUCTURES AND UTILITIES. NEW SEWER LATERALS SHALL BE INSTALLED WITHIN CLOSE PROXIMITY OF EXISTING SEWER
LATERALS.
18. CONTRACTOR SHALL COORDINATE ALL LATERAL INSTALLATIONS AND RIGHT-OF-ENTRY WITH EACH PROPERTY OWNER PRIOR TO COMMENCING
WORK.
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
OHT OHT OHT OHT OHT OHTOHTOHTOHTOHTOHTOHTOHT
OHT
OHT
OHT
OHT
OHT
OHT
UTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTL
UT
L
UT
L
UTL
UTL
UTLUTL
UTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTL
UTL
UTL
UTLUTLUTLUTLUTLUTL
WWWWWWWWWWWWWWWWWWWWWWWWWWW
W
W
W W
WSS
SS
SS
SSSSSSSSSSSSSSSSSSSS
S
S
S
S
S
36" HDPE 12" HDPE
" R
C P
SS
M
H
FR
6.
8" P
V C
I.E
0.
E)
I.E
0.
S)
4" P
V C
I.E
1.
N
W
SS
SS
SS
M
H
FR
.8 7'
8" P
V C
I.E
2.
E)
I.E
4.
SW
4"
P V
C I.E
2.
W
SS
M
H
FR
.3 5'
8" D
IP
I.E
-1
.7 1'
(N
I.E
-1 .5
3' (S
8"
P V
C I.E
1.
W
SS
M
H
FR
.8 5'
8" D
IP
I.E
-1
.6 2'
(S
8" P
V C
I.E
-1 .6
0' (E
SS
BM
BE
N
C
HT
IE
IN
SP
LI
T
TR
UN
K
LI
V
E O
A K
EL
8.
SS
M
H
FR
6.
8" D
IP
I.E
-0
.2 0'
(N
I.E
-0 .0
3' (E
4"
P V
C I.E
2.
SE
8" C
LA
Y
I.E
-0 .0
7' (S
8"
P V
C I.E
0.
W
W W W W W W W W W W W W W W W W W W W W W W W W
W W
W
W W
OHP
OHP
OHP
D
IR
EC
TIO
N O
N
LY
D
IR
EC
TIO
N O
N
LY
C A
TC
H
BA
SI
N
FR
7.
I.E
1.
N
I.E
0.
SE
I.E
2.
S)
C A
TC
H
BA
SI
N
FR
.5 6'
I.E
0.
S)
C P
C
A
PP
ED
R
EB
A
R N
: 7
,2
.3
E:
,0
,9
.2
C P
C
A
PP
ED
R
EB
A
R N
: 7
,5
.1
E:
,0
,8
.7
CHATHAM AVENUE
RIGHT-OF-WAY VARIES
EXISTING SURFACE EXISTING 8" SEWER MAIN
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION LINE.
CONTRACTOR TO COORDINATE
RELOCATION WITH UTILITY COMPANY.
APPROXIMATE LOCATION OF
EXISTING WATER LINE
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION LINE
EXISTING 24" DRAINAGE PIPE
APPROXIMATE LOCATION OF
EXISTING WATER LINE
TH
S
TR
EE
T
APPROXIMATE EXISTING
PROPERTY LINE
(TYP.)
MILL AND OVERLAY APPROX.
896 SY OF EXISTING PAVEMENT
WITH ASPHALTIC CONCRETE
PER DETAIL ON SHEET C4.2
303 LF 8" PVC - SDR 26 @ 0.29%
REMOVE EXISTING
MANHOLE AND ADD A
SLEEVE TO CONNECT NEW
SEWER MAIN TO EXISTING
SEWER MAIN. SS
0+00
1+00 2+00 3+00
3+
.33
PROPOSED
MANHOLE #1
FR: 10.79
INV. IN: -1.31 (S)
INV. OUT: -1.41 (NE)
PROPOSED
MANHOLE #2
FR: 6.94
INV. IN: -0.15 (SE)
INV. OUT: -0.25 (N)
303 LF 8" PVC - SDR 26 @ 0.35%
32 LF 8" PVC - SDR 26
@ 0.65%
22 LF 8" PVC - SDR 26
@ 0.35%
SSSSSSSSSSSSSSSSSSSS
SS
SS
SS
SS
2' 'W
2' 'W
UTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTL
UT
L
UT
L
UTL
EXISITING
MANHOLE #3
FR: 6.85
INV. IN: 0.65 (W)
INV. IN: 2.04 (SE)
INV. IN: -0.07 (S)
INV. IN: -0.03 (E)
INV. OUT: -0.20 (N)
CHATHAM AVE. - INLET AVE. TO 18TH ST.
STATIONS: -0+25 - 4+00
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-5
-5
-0+25 0+00 1+00 2+00 3+00 4+00
CHATHAM AVE. - INLET AVE. TO 18TH ST.
STATIONS: -0+25 - 4+00
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-5
-5
-0+25 0+00 1+00 2+00 3+00 4+00
.7
.7
.6
.6
9.
9.
59 8.
8.
28 7.
7.
46 7.
7.
05 7.
7.
04 6.
6.
EXISTING SURFACE
PROPOSED
MANHOLE #1
FR: 10.79
INV. IN: -1.31 (S)
INV. OUT: -1.41 (NE)
303 LF 8" PVC - SDR 26 @ 0.35%
PROPOSED
MANHOLE #2
FR: 6.94
INV. IN: -0.15 (SE)
INV. OUT: -0.25 (N)
EXISTING
MANHOLE #3
FR: 6.85
INV. IN: 0.65 (W)
INV. IN: 2.04 (SE)
INV. IN: -0.07 (S)
INV. IN: -0.03 (E)
INV. OUT: -0.20 (N)
INV. OUT: -0.20 (NW)
32 LF 8" PVC - SDR 26
@ 0.65%
22 LF 8" PVC - SDR 26
@ 0.35%
APPROXIMATE LOCATION AND DEPTH
OF EXISTING COMMUNICATION LINE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
APPROXIMATE LOCATION AND DEPTH
OF EXISTING COMMUNICATION LINE
EXISTING 24" DRAINAGE PIPE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
EXISTING
MANHOLE #2
FR: 10.74
INV. IN: -1.62 (S)
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- S S
- P P.
D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRAVITY SEWER PLAN AND
PROFILE
C2.2
SAH
20 FEET
1 INCH =
0 10
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
UG
P
UT
L
UT
L
W W
W
W W
W W
W W
S
SS
S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SSMH
FR.: 9.18'
8" DIP
I.E.: 2.43' (SE)
I.E.: 2.18' (SW)
4" PVC
I.E.: 5.83' (NW)
SS
SSMH
FR.: 6.76'
8" DIP
I.E.: 4.59' (SE)
I.E.: 3.46' (NW)
4" PVC
I.E.: 3.86' (SW)
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UGP UGP UGP UGP
UTL UTL UTL UTL
UTL UTL UTL UTLW
W
W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
UTL
BM4
BENCHTIE IN
SOUTH FACE OF
POWER POLE
EL.: 7.51'
12" HDPE
GI
FR.: 6.16'
I.E.: 4.32' (E) GI (OBSTRUCTED)
FR.: 7.00'
I.E.: 4.13' (W)
DIRECTION ONLY
DIRECTION ONLY CP 8
CAPPED REBAR
N: 726,161.712
E: 1,064,711.748
SSMH
FR.: 6.64'
SSMH
FR.: 6.89'
8" DIP
I.E.: 4.64' (NW)
6" PVC
I.E.: 5.39' (NE)
I.E.: 4.89' (SE)
I.E.: 5.24' (S)
PVC CLEANOUT
(TYP. 14)
PVC CLEANOUT
(TYP. 5)
APPROXIMATE LOCATION OF
EXISTING WATER LINE
APPROXIMATE LOCATION OF EXISTING
UNDERGROUND POWER LINE
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION LINE
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION LINE
EXISTING 4" SEWER LATERAL
APPROXIMATE LOCATION OF
EXISTING WATER LINES
APPROXIMATE LOCATION OF
EXISTING WATER LINE
APPROXIMATE LOCATION OF
EXISTING SEWER LATERAL
EXISTING 12" DRAINAGE PIPE
APPROXIMATE LOCATION OF
EXISTING WATER LINES
EXISTING SURFACE
EXISTING 8" SEWER MAIN
EXISTING 8" SEWER MAIN
EXISTING 8" SEWER MAIN
EXISTING OVERHEAD POWER
EXISTING OVERHEAD POWER
EXISTING OVERHEAD POWER
EXISTING SEWER LATERAL
EXISTING SEWER LATERAL
APPROXIMATE EXISTING
PROPERTY LINE
(TYP.)
SEE SHEETS C3.1 -
C3.3 FOR SEWER
TO BE ABANDONED
AND/OR REMOVED
MILL AND OVERLAY APPROX.
549 SY OF EXISTING PAVEMENT
WITH ASPHALTIC CONCRETE
PER DETAIL ON SHEET C4.2
145 LF 8" PVC - SDR 26 @ 0.35%
230 LF 8" PVC - SDR 26 @ 0.35%
0+00 1+00
2+00 3+00
4+00
4+
.19
230 LF 8" PVC - SDR 26 @ 0.35%
PROPOSED SADDLE
MANHOLE #11
FR: 9.00
INV. IN: 2.15 (E)
PROPOSED
MANHOLE #12
FR: 6.40
INV. IN: 3.05 (E)
INV. OUT: 2.95 (W)
84 LF 8" PVC - SDR 26
@ 0.35%
PROPOSED
MANHOLE #9
FR: 6.87
INV. IN: 3.54 (E)
INV. OUT: 3.35 (W)
145 LF 8" PVC - SDR 26 @ 0.35%
PROPOSED
MANHOLE #20
FR: 7.37
INV. IN: 4.12 (NE)
INV. OUT: 4.05 (W)
11 LF 8" PVC - SDR 26
@ 0.40%
SSSSSSSSSSSSSSSS
SSSSSS
SS
2''W
2' 'W
2' 'W
SSSSSS
SSSS
PROPOSED SADDLE
MANHOLE #10
FR: 7.33
INV. OUT: 4.16 (SW)
17TH PL. - RUN 1
STATIONS: -0+25 - 4+80
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-0+25 0+00 1+00 2+00 3+00 4+00 4+80
17TH PL. - RUN 1
STATIONS: -0+25 - 4+80
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-0+25 0+00 1+00 2+00 3+00 4+00 4+80
9.
9.
00 7.
7.
66 7.
7.
22 6.
6.
83 6.
6.
49 6.
6.
43 6.
6.
80 7.
7.
17 7.
7.
48 7.
7.
EXISTING SURFACE
PROPOSED SADDLE
MANHOLE #11
FR: 9.00
INV. IN: 2.15 (E)
INV. IN: 2.15 (NE)
INV. OUT: 2.15 (SW)
PROPOSED
MANHOLE #12
FR: 6.40
INV. IN: 3.05 (E)
INV. OUT: 2.95 (W)
PROPOSED
MANHOLE #9
FR: 6.87
INV. IN: 3.54 (E)
INV. OUT: 3.35 (W)
PROPOSED
MANHOLE #20
FR: 7.37
INV. IN: 4.12 (NE)
INV. OUT: 4.05 (W)
230 LF 8" PVC - SDR 26 @ 0.35%
84 LF 8" PVC - SDR 26
@ 0.35%
145 LF 8" PVC - SDR 26 @ 0.35%
11 LF 8" PVC - SDR 26
@ 0.40%
PROPOSED SADDLE
MANHOLE #10
FR: 7.33
INV. IN: 4.16 (SE)
INV. OUT: 4.16 (NW)
INV. OUT: 4.16 (SW)
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
APPROXIMATE LOCATION AND DEPTH
OF EXISTING COMMUNICATION LINE
APPROXIMATE LOCATION AND DEPTH
OF EXISTING COMMUNICATION LINE
APPROXIMATE LOCATION AND DEPTH
OF EXISTING UNDERGROUND POWER
EXISTING 4" SEWER LATERAL
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
EXISTING 12" DRAINAGE PIPE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINEEXISTING SEWER LATERAL
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
EXISTING SEWER LATERAL
EXISTING SEWER LATERAL
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- S S
- P P.
D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRAVITY SEWER PLAN AND
PROFILE
C2.3
SAH
20 FEET
1 INCH =
0 10
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
X X X X X X X X X X X X X X
UTL
UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL
UTL
UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTLUTL UTL UTL UTL UTL UTLUTL UTL UTL UTL UTL UTL UTL
W W
W W W W W W W W W W W W W W W W W W W W
W
SSMH
FR.: 8.33'
8" DIP
I.E.: 2.52' (NE)
I.E.: 2.59' (SE)
I.E.: 2.68' (NW)
I.E.: 4.35' (SW)
SSMH
FR.: 7.10'
8" DIP
I.E.: 3.62' (SE)
I.E.: 3.55' (NW)
4" DIP
I.E.: 4.18' (NE)
SS SS SS SS SS SS SS SS SS
SS
SS
S
S
" R
C P
8" P
V C
BM5
BENCHTIE IN
EAST FACE OF
POWER POLE
EL.: 9.38'
OHP OHP OHP OHP OHP OHP OHP OHP
CP 10
CAPPED REBAR
N: 725,853.220
E: 1,064,455.386
CP 171
NAIL
N: 725,888.966
E: 1,064,346.349
GI
FR.: 6.46'
I.E.: 4.34' (NE)
I.E.: 4.72' (SW)
I.E.: 4.56' (W)
DIRECTION ONLY
18" CMP
DIRECTION ONLY
DIRECTION ONLY
BU
TL
ER
A
V
EN
UE
18TH TERRACE
APPROXIMATE EXISTING
PROPERTY LINE
(TYP.)
CONTRACTOR TO REMOVE 270 LF OF EXISTING
SEWER MAIN AND LAY 270 LF OF NEW 8" SEWER MAIN
IN THE EXISTING TRENCH. EXISTING LATERALS TO BE
CAPPED DURING REMOVAL AND CONNECTED TO THE
NEW MAIN AT THE END OF THE DAY.
RESTORE APPROX. 217 SY OF
DISTURBED GRAVEL ROAD
PER DETAIL ON SHEET C4.2
SEE SHEETS C3.1 -
C3.3 FOR SEWER
TO BE ABANDONED
AND/OR REMOVED
SS
0+00 1+00
2+00 2+72.34
EXISTING
MANHOLE #4
FR: 8.33
INV. IN: 2.59 (E)
INV. OUT: 2.52 (NE)
EXISTING
MANHOLE #5
FR: 7.10
INV. OUT: 3.55 (W)
18TH TERRACE
STATIONS: -0+25 - 3+50
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-0+25 0+00 1+00 2+00 3+00 3+50
272 LF 8" DIP @ 0.35%
EXISTING SUFRACE
EXISITNG
MANHOLE #4
FR: 8.33
INV. IN: 2.59 (E)
INV. OUT: 2.52 (NE)
EXISITNG
MANHOLE #5
FR: 7.10
INV. OUT: 3.55 (W)
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- S S
- P P.
D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRAVITY SEWER PLAN AND
PROFILE
C2.4
SAH
20 FEET
1 INCH =
0 10
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
X
O
HP
UTL
UTL
W W
W W
SSM
H
FR.: 8.33'
8" D
IP
I.E.: 2.52' (N E)
I.E.: 2.59' (SE)
I.E.: 2.68' (N W
I.E.: 4.35' (SW
SS SS SS SS SS
12" HD
PE
12" HDPE
O
HP
O
HP
O
HP
O
HP
O
HP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
W W
W
W W W W W W W W W W
W W W W W W W
UTL UTL UTL UTL UTLUTL UTL UTL
SS
BM
BEN
C
HTIE IN
W
EST FA
C E O
F
PO
W
ER PO
LE
EL.: 10.31'
SSM
H (SEA
LED
FR.: 8.37'
SSM
H
FR.: 8.19'
4" D
IP
I.E.: 5.60' (SE)
I.E.: 5.55' (SW
12" HD
PE
C P 12
PK N
A
IL
N : 725,567.993
E: 1,064,097.951
C P 11
C A
PPED
REBA
R
N : 725,696.115
E: 1,064,099.264
G
IFR.: 7.46'
I.E.: 5.53' (N E)
G
IFR.: 8.04'
I.E.: 4.31' (SE)
I.E.: 3.85' (SW
I.E.: 3.83' (N W
D
IREC
TIO
N
O N
LY
D
IREC
TIO
N
O N
LY
D
IREC
TIO
N
O N
LY
SS
SS
SS
APPROXIMATE LOCATION OF
EXISTING WATER LINE
APPROXIMATE LOCATION OF
EXISTING COMMUNICATION LINE.
CONTRACTOR TO COORDINATE
RELOCATION WITH UTILITY COMPANY.
EXISTING OVERHEAD POWER LINE
APPROXIMATE LOCATION OF
EXISTING WATER LINES
EXISTING SURFACE
EXISTING 4" SEWER LINE
APPROXIMATE LOCATION OF
EXISTING WATER LINE
18TH LA
N
E
19TH STREET
APPROXIMATE EXISTING
PROPERTY LINE
(TYP.)
CONTRACTOR TO REMOVE 270 LF OF EXISTING
SEWER MAIN AND LAY 270 LF OF NEW 8" SEWER MAIN
IN THE EXISTING TRENCH. EXISTING LATERALS TO BE
CAPPED DURING REMOVAL AND CONNECTED TO THE
NEW MAIN AT THE END OF THE DAY.
SEE SHEETS C3.1 -
C3.3 FOR SEWER
TO BE ABANDONED
AND/OR REMOVED
MILL AND OVERLAY APPROX.
263 SY OF EXISTING PAVEMENT
WITH ASPHALTIC CONCRETE
PER DETAIL ON SHEET C4.2
CONTRACTOR
REMOVE MANHOLE
AND ADD A SLEEVE
TO CONNECT
EXISTING GRAVITY
SEWER
REMOVE AND REPLACE
APRROX. 12 SY OF
CONCRETE SIDEWALK PER
DETAIL ON SHEET C4.2113 LF 8" PVC - SDR 26 @ 0.35%
1+33.17
0+00 1+00
PROPOSED SADDLE
MANHOLE#14
FR: 9.02
INV. IN: 4.97 (N) 113 LF 8" PVC - SDR 26 @ 0.35%
PROPOSED
MANHOLE #15
FR: 8.62
INV. IN: 5.46 (NE)
INV. OUT: 5.36 (S) 20 LF 8" PVC - SDR 26
@ 0.45%
SSSSSSSS
2''W
2''W
BUTLER AVE. - 18TH LN. TO 19TH ST.
STATIONS: -0+25 - 1+30
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-0+25 0+00 1+00 1+30
BUTLER AVE. - 18TH LN. TO 19TH ST.
STATIONS: -0+25 - 1+30
SCALE: HORZ.: 1" = 20'
VERT.: 1" = 2'
-0+25 0+00 1+00 1+30
8.
8.
01 8.
8.
63 8.
8.
63 8.
8.
EXISTING SURFACE
PROPOSED SADDLE
MANHOLE #14
FR: 9.02
INV. IN: 4.97 (N)
PROPOSED
MANHOLE #15
FR: 8.62
INV. IN: 5.46 (NE)
INV. OUT: 5.36 (S)
20 LF 8" PVC - SDR 26
@ 0.45%
113 LF 8" PVC - SDR 26 @ 0.35%
APPROXIMATE LOCATION AND DEPTH
OFEXISTING COMMUNICATION LINE.
CONTRACTOR TO COORDINATE
RELOCATION WITH UTILITY COMPANY.
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE
APPROXIMATE LOCATION AND
DEPTH OF EXISTING WATER LINE.
CONTRACTOR TO COORDINATE
RELOCATION WITH UTILITY COMPANY.
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- S S
- P P.
D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GRAVITY SEWER PLAN AND
PROFILE
C2.5
SAH
20 FEET
1 INCH =
0 10
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
OHT OHT OHT OHT OHT OHT
OHTOHTOHTOHTOHTOHTOHT
OHT
OHT
OHT
OHT
OHT
OHT
UTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTL
UT
L
UT
L
UTL
UTL
UTLUTL
UTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTL
UTL
UTLUTLUTLUTLUTLUTL
WWWWWWWWWWWWWWWWWWWWWWWWWWW
W
W
W W
W
SS
SS
SS
SSSSSSSSSSSSSSSSSSSS
S
S
S
S
S
36" HDPE
12" HDPE
" R
C P
SS
M
H
FR
6.
8" P
V C
I.E
0.
E)
I.E
0.
S)
4" P
V C
I.E
1.
N
W
SS
SS
SS
M
H
FR
.8 7'
8" P
V C
I.E
2.
E)
I.E
4.
SW
4"
P V
C I.E
2.
W
SS
M
H
FR
.3 5'
8" D
IP
I.E
-1
.7 1'
(N
I.E
-1 .5
3' (S
8"
P V
C I.E
1.
W
SS
M
H
FR
.8 5'
8" D
IP
I.E
-1
.6 2'
(S
8" P
V C
I.E
-1 .6
0' (E
SS
BM
BE
N
C
HT
IE
IN
SP
LI
T
TR
UN
K
LI
V
E O
A K
EL
8.
' SS
M
H
FR
6.
8" D
IP
I.E
-0
.2 0'
(N
I.E
-0 .0
3' (E
4"
P V
C I.E
2.
SE
8" C
LA
Y
I.E
-0 .0
7' (S
8"
P V
C I.E
0.
W
W W W W W W W W W W W W W W W W W W W W W W W W
W W
W
W W
OHP
OHP
OHP
D
IR
EC
TIO
N O
N
LY
D
IR
EC
TIO
N O
N
LY
C A
TC
H
BA
SI
N
FR
7.
I.E
1.
N
I.E
0.
SE
I.E
2.
S)
C A
TC
H
BA
SI
N
FR
.5 6'
I.E
0.
S)
C P
C
A
PP
ED
R
EB
A
R N
: 7
,2
.3
E:
,0
,9
.2
C P
C
A
PP
ED
R
EB
A
R N
: 7
,5
.1
E:
,0
,8
.7
CHATHAM AVENUE
RIGHT-OF-WAY VARIES
SSSSSSSSSSSSSSSSSSSS
SS
SS
SS
SS 2'
'W 2' 'W
ABANDON APPROX. +/- 41 LF
OF EXISTING 8" SEWER
MAIN IN PLACE AND FILL
COMPLETELY WITH FLOWABLE
FILL. PLUG ENDS WITH BRICK
AND MORTAR PLUGS.
MANHOLE TO BE ABANDONED
PER DETAIL ON SHEET C4.3
AFTER PROPOSED MAIN IS
ON-LINE
ABANDON APPROX. +/- 294 LF
OF EXISTING 8" SEWER
MAIN IN PLACE AND FILL
COMPLETELY WITH FLOWABLE
FILL. PLUG ENDS WITH BRICK
AND MORTAR PLUGS.
PROPOSED MANHOLE (TYP.)
XXXXXX
XX
XXX OHP OHP
OHP
OHP
OHT
SSSSSSSSSSSS
UTL
UTL
UTL
UTL
UT
L
UTL
UTL
UTL
UTL
WW
W
SS
SS
OHP
SSM
H
FR.: 6.35'
8" PVC
I.E.: 3.26' (N E)
I.E.: 2.56' (SE)
I.E.: 2.71' (N W
4" PVC
I.E.: 2.51' (SW
SSM
H
FR.: 7.03'
8" PVC
I.E.: 3.38' (SW
4" PVC
I.E.: 3.69' (E)
I.E.: 3.70' (W
SS
12" PVC
OHP
OHP
OHP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
W W W W W W W W W W W W W W W W
UTL
UTL
UTL
UTL
UTL UTL UTL UTL UTL UTL UTL UTL UTLUTL UTL UTL
24" HDPE
24" HDPE
24" HD
PE
T
SS
BM
BEN
C
HTIE IN
SPLIT TRUN
K LIVE O
A K
EL.: 9.08'
W W
W W
W
O
HP
O
HP
O
HP
UTL
UTL
W
W
W
W
OHP
OHP
G
IFR.: 6.25'
I.E.: 3.59' (SE)
I.E.: 3.76' (N W
G
IFR.: 6.13'
I.E.: 3.39' (SE)
I.E.: 3.23' (N W
D
IREC
TIO
N O
N
LY
D
IREC
TIO
N
O N
LY
G
IFR.: 6.47'
I.E.: 0.31' (SE)
I.E.: 0.48' (N W
C P 16
C A
PPED
REBA
R
N : 727,892.709
E: 1,063,276.140
C P 15
C A
PPED
REBA
R
N : 728,115.504
E: 1,063,319.509
SSSSSSSSSSSS
SS
SS
SS
8''W
CONTRACTOR TO REMOVE 175
LF OF EXISTING SEWER
AND LAY 175 LF OF NEW 8"
SEWER MAIN IN EXISTING
TRENCH. EXISTING LATERALS TO
BE CAPPED DURING REMOVAL
AND CONNECTED TO THE NEW
MAIN AT THE END OF THE DAY.
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- D M
PP
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
SEWER ABANDONMENT AND
REMOVAL
C3.1
SAH
20 FEET
1 INCH =
0 10
20 FEET
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, INLET PROTECTION, SILT FENCE INSTALLATION AS NEEDED, GRASSING IN UNPAVED AREAS, CONSTRUCTION ACCESS AND STORM WATER MONITORING. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REMOVING EROSION CONTROL PRACTICES ONCE CONSTRUCTION IS COMPLETE. ALL EROSION CONTROL PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE TO THE STATE OF GEORGIA SOIL AND WATER CONSERVATION DISTRICT'S FIELD
MANUAL (THE GREEN BOOK).
2. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY BRACING, SHEETING, AND DEWATERING TO COMPLETE THE PROJECT TO PROTECT EXISTING
PAVEMENT, ANY AND ALL ADJACENT STRUCTURES, TREES, AND LANDSCAPING.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL DEVICES AND MEASURES AS NECESSARY TO MEET THE REQUIREMENTS OF THE
GEORGIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (GAMUTCD).
4. CONTRACTOR SHALL RESTORE ALL FENCING,WALLS, DRIVEWAYS, WALKWAYS, MAIL BOXES, AND EXISTING STRUCTURES TO PRE-CONSTRUCTION
CONDITIONS UPON COMPLETION OF CONSTRUCTION.
5. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND STRUCTURES FROM DAMAGE THROUGHOUT CONSTRUCTION.
6. CONTRACTOR SHALL REMOVE AND REPLANT TREES WITHIN CLOSE PROXIMITY OF TRENCHES. SECURE AND PROTECT LIVE OAKS WHEN POSSIBLE
AND/OR ANY TREE DESIGNATED ON THE PLANS OR BY THE OWNER.
7. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES ON SECURING AND PROTECTING EXISTING
UTILITY LINES AND STRUCTURES.
8. ANY AND ALL TEMPORARY SEWAGE PUMPING REQUIRED TO MAKE SEWER SYSTEM CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE FOR THESE PUMPING REQUIREMENTS. ALL LABOR, DESIGN, EQUIPMENT, MATERIALS, RENTAL FEES, TEMPORARY PIPING AND INCIDENTALS SHALL BE CONSIDERED A SUBSIDIARY OBLIGATION TO THE
CONTRACT.
9. ALL SANITARY SEWER STRUCTURES AND MANHOLES SHALL BE COATED AS PER SPECIFICATION SECTION 33 30 00.
10. ALL KNOWN UTILITY FACILITIES ARE SHOWN SCHEMATICALLY ON PLANS, AND ARE NOT NECESSARILY ACCURATE IN LOCATION AS TO PLAN OR ELEVATION. UTILITIES SUCH AS SERVICE LINES OR UNKNOWN FACILITIES NOT SHOWN ON PLANS WILL NOT RELIEVE THE CONTRACTOR OF HIS OR HER RESPONSIBILITY UNDER THIS REQUIREMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND SIZE OF ALL UNDERGROUND UTILITIES AND OTHER SALIENT FEATURES PRIOR TO BEGINNING CONSTRUCTION."EXISTING UTILITIES" MEANS ANY UTILITY THAT EXISTS ON THE PROJECT IN ITS ORIGINAL, RELOCATED, OR NEWLY INSTALLED POSITION. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE COST OF REPAIRS TO DAMAGED UNDERGROUND UTILITIES; EVEN WHEN SUCH UTILITIES ARE NOT SHOWN ON THE PLANS. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES PRIOR TO BEGINNING WORK AND REQUEST AN ACCURATE FIELD LOCATION OF THEIR RESPECTIVE UTILITY LINES.
11. ALL CONNECTIONS TO THE EXISTING WATER AND SEWER SYSTEMS SHALL BE COORDINATED WITH CITY OF TYBEE ISLAND. CONTRACTOR SHALL CONTACT CITY OF TYBEE ISLAND WATER AND SEWER DEPARTMENT A MINIMUM OF 72 HOURS PRIOR TO CONNECTION ACTIVITIES.
12. ALL CONNECTIONS TO EXISTING SANITARY SEWERS SHALL BE STAGED TO PREVENT INTERRUPTION IN SERVICE.
13. IF ANY PIPES OR LATERALS ARE LOCATED IN THE FIELD THAT ARE NOT SHOWN ON THE CONSTRUCTION PLANS, CONTRACTOR SHALL NOTIFY CITY
OF TYBEE ISLAND AND THE ENGINEER IMMEDIATELY.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEANING, TESTING, AND DISINFECTION OF MAINS PRIOR TO CONNECTING PROPOSED UTILITIES
TO THE CITY OF TYBEE ISLAND SYSTEM.
15. CONTRACTOR SHALL RESTRAIN JOINTS PER THE MINIMUM RESTRAINT LENGTH AS SPECIFIED ON THE DETAILS.
16. CONTRACTOR SHALL COMPLETE WORK FOR DIVISION/PHASE OF PROJECT BEFORE COMMENCING WORK FOR NEXT DIVISION/PHASE OF
PROJECT.
17. LOCATIONS AND SIZES OF EXISTING SEWER LATERALS ARE APPROXIMATE AND BASED UPON AVAILABLE TELEVISING DATA, SITE DATA, AND OWNER
INPUT. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND SIZE OF ALL EXISTING SEWER LATERALS IN THE FIELD. ALL PROPOSED LATERAL REROUTES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL ADJUST LATERAL LOCATION, AS NECESSARY, TO MINIMIZE DISTURBANCE TO EXISTING STRUCTURES AND UTILITIES. NEW SEWER LATERALS SHALL BE INSTALLED WITHIN CLOSE PROXIMITY OF EXISTING SEWER
LATERALS.
18. CONTRACTOR SHALL COORDINATE ALL LATERAL INSTALLATIONS AND RIGHT-OF-ENTRY WITH EACH PROPERTY OWNER PRIOR TO COMMENCING
WORK.
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
UG
P
UT
L
UT
L
W W
W W W
W
W W
W
SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SSMH
FR.: 9.18'
8" DIP
I.E.: 2.43' (SE)
I.E.: 2.18' (SW)
4" PVC
I.E.: 5.83' (NW)
SS
SSMH
FR.: 6.76'
8" DIP
I.E.: 4.59' (SE)
I.E.: 3.46' (NW)
4" PVC
I.E.: 3.86' (SW)
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UGP UGP UGP UGP
UTL UTL UTL UTLUTL UTL UTL UTL
W
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
UTL
BM4
BENCHTIE IN
SOUTH FACE OF
POWER POLE
EL.: 7.51'
12" HDPE
GI
FR.: 6.16'
I.E.: 4.32' (E) GI (OBSTRUCTED)
FR.: 7.00'
I.E.: 4.13' (W)
DIRECTION ONLY
DIRECTION ONLY CP 8
CAPPED REBAR
N: 726,161.712
E: 1,064,711.748
SSMH
FR.: 6.64'
SSMH
FR.: 6.89'
8" DIP
I.E.: 4.64' (NW)
6" PVC
I.E.: 5.39' (NE)
I.E.: 4.89' (SE)
I.E.: 5.24' (S)
PVC CLEANOUT
(TYP. 14)
PVC CLEANOUT
(TYP. 5)
SSSSSSSSSSSSSSSSSSSSSS
SS
2''W
2' 'W
2' 'W
SSSSSSSSSS
ABANDON APPROX. +/- 173 LF
OF EXISTING 8" SEWER
MAIN IN PLACE AND FILL
COMPLETELY WITH FLOWABLE
FILL. PLUG ENDS WITH BRICK
AND MORTAR PLUGS.
MANHOLE TO BE ABANDONED
PER DETAIL ON SHEET C4.3
AFTER PROPOSED MAIN IS
ON-LINE.
ABANDON APPROX. +/- 135 LF
OF EXISTING 8" SEWER
MAIN IN PLACE AND FILL
COMPLETELY WITH FLOWABLE
FILL. PLUG ENDS WITH BRICK
AND MORTAR PLUGS.
PROPOSED MANHOLE
(TYP.)
MANHOLE TO BE ABANDONED
PER DETAIL ON SHEET C4.3
AFTER PROPOSED MAIN IS
ON-LINE.
ABANDON APPROX. +/- 149 LF
OF EXISTING 8" SEWER
MAIN IN PLACE AND FILL
COMPLETELY WITH FLOWABLE
FILL. PLUG ENDS WITH BRICK
AND MORTAR PLUGS.
X X X X X X X X X X X X X X
UTL
UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL
UTL
UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTL UTLUTL UTL UTL UTL UTL UTLUTL UTL UTL UTL UTL UTL UTL
W W
W W W W W W W W W W W W W W W W W W W W
W
SSMH
FR.: 8.33'
8" DIP
I.E.: 2.52' (NE)
I.E.: 2.59' (SE)
I.E.: 2.68' (NW)
I.E.: 4.35' (SW)
SSMH
FR.: 7.10'
8" DIP
I.E.: 3.62' (SE)
I.E.: 3.55' (NW)
4" DIP
I.E.: 4.18' (NE)
SS SS SS SS SS SS SS SS SS
SS
SS
S
S
" R
C P
8" P
V C
BM5
BENCHTIE IN
EAST FACE OF
POWER POLE
EL.: 9.38'
OHP OHP OHP OHP OHP OHP OHP OHP
CP 10
CAPPED REBAR
N: 725,853.220
E: 1,064,455.386
CP 171
NAIL
N: 725,888.966
E: 1,064,346.349
GI
FR.: 6.46'
I.E.: 4.34' (NE)
I.E.: 4.72' (SW)
I.E.: 4.56' (W)
DIRECTION ONLY
18" CMP
DIRECTION ONLY
DIRECTION ONLY
SSSSSSSSSSSSSSSSSS
SS
CONTRACTOR TO REMOVE 270
LF OF EXISTING SEWER MAIN
AND LAY 270 LF OF NEW 8"
SEWER MAIN IN THE EXISTING
TRENCH. EXISTING LATERALS TO
BE CAPPED DURING REMOVAL
AND CONNECTED TO THE NEW
MAIN AT THE END OF THE DAY.
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- D M
PP
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
SEWER ABANDONMENT AND
REMOVAL
C3.2
SAH
20 FEET
1 INCH =
0 10
20 FEET
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
X
O
HP
UTL
UTL
W W
W W
SS SS SS SS SS
12" HD
PE
12" HDPE
O
HP
O
HP
O
HP
O
HP
O
HP
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
W W
W
W W W W W W W W W W
W W W W W W WUTL UTL UTL UTL UTLUTL UTL UTL
SS
BM
BEN
C
HTIE IN
W
EST FA
C E O
F
PO
W
ER PO
LE
EL.: 10.31'
SSM
H (SEA
LED
FR.: 8.37'
SSM
H
FR.: 8.19'
4" D
IP
I.E.: 5.60' (SE)
I.E.: 5.55' (SW
12" HD
PE
C P 12
PK N
A
IL
N : 725,567.993
E: 1,064,097.951
C P 11
C A
PPED
REBA
R
N : 725,696.115
E: 1,064,099.264
G
IFR.: 7.46'
I.E.: 5.53' (N E)
G
IFR.: 8.04'
I.E.: 4.31' (SE)
I.E.: 3.85' (SW
I.E.: 3.83' (N W
D
IREC
TIO
N
O N
LY
D
IREC
TIO
N
O N
LY
D
IREC
TIO
N
O N
LY
SS
SS
SS
SSSSSSSS
2''W
2''W
ABANDON APPROX. +/- 124 LF
OF EXISTING 8" SEWER
MAIN IN PLACE AND FILL
COMPLETELY WITH FLOWABLE
FILL. PLUG ENDS WITH BRICK
AND MORTAR PLUGS.
CONTRACTOR TO REMOVE
MANHOLE AND ADD A SLEEVE
TO CONNECT EXISTING GRAVITY
SEWER
SEE SCALE BAR
Z:
\2
\2
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
RE
D
LI
N
ES
\2
.0
- D M
PP
.D W
G
N ov
, 2
- 1 0:
A
M
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
SEWER ABANDONMENT AND
REMOVAL
C3.3
SAH
682 Johnnie Dodds Blvd. • Suite 100 Mt. Pleasant, SC 29464 • 843.849.0200
20 FEET
1 INCH =
0 10
20 FEET
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, INLET PROTECTION, SILT FENCE INSTALLATION AS NEEDED, GRASSING IN UNPAVED AREAS, CONSTRUCTION ACCESS AND STORM WATER MONITORING. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REMOVING EROSION CONTROL PRACTICES ONCE CONSTRUCTION IS COMPLETE. ALL EROSION CONTROL PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE TO THE STATE OF GEORGIA SOIL AND WATER CONSERVATION DISTRICT'S FIELD MANUAL (THE GREEN BOOK).
2. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY BRACING, SHEETING, AND DEWATERING TO COMPLETE THE PROJECT TO PROTECT EXISTING PAVEMENT, ANY AND ALL ADJACENT STRUCTURES, TREES, AND LANDSCAPING.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL DEVICES AND MEASURES AS NECESSARY TO MEET THE REQUIREMENTS OF THE GEORGIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (GAMUTCD).
4. CONTRACTOR SHALL RESTORE ALL FENCING,WALLS, DRIVEWAYS, WALKWAYS, MAIL BOXES, AND EXISTING STRUCTURES TO PRE-CONSTRUCTION CONDITIONS UPON COMPLETION OF CONSTRUCTION.
5. CONTRACTOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .