This document is Addendum No. 1 for the City of Milton's Locklin Lake Restoration - Maintenance Dredge project (BDI Project No. 25525.02), issued on 4/10/2025. The addendum provides clarifications for potential contractors regarding the project, specifically addressing six key questions about project requirements. No changes were made to the contract documents or construction plans. The project involves a maintenance dredging effort for Locklin Lake, with a post-construction survey required using Drone LiDAR technology.
The addendum confirms that no pre-construction survey is required, and three soil samples were collected and analyzed, with no indication of contamination. Dredge material can be disposed of in an upland area by legal means, but cannot be used for wetland fill, structural fill, or disposed of in surface waters. The Santa Rosa County Landfill will utilize a paint filter test to determine spoil dryness and will waive tipping fees for the dredge material. The specific budget for the project was not disclosed, with the document stating that the value of allocated funding is not available at this time. Contractors are required to acknowledge receipt of this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dillon Draughn, P.E.
BDI/PNS
4/10/2025
K:\255 Milton\25525.02 Locklin Lake Restoration\9. Bidding\Bid Documents\Addenda\Addendum 1_4.10.25.docx
25525.02 ADDENDUM NO. 1 1
ADDENDUM NO. 1
City of Milton Locklin Lake Restoration – Maintenance Dredge
4/10/2025 BDI Project No. 25525.02
The following changes have been made to the plans & specifications for the above project:
A. CONTRACT DOCUMENTS/SPECIFICATIONS
NO CHANGES TO CONTRACT DOCUMENTS/SPECIFICATIONS
B. CONSTRUCTION PLAN
NO CHANGES TO CONSTRUCTION PLANS
C. QUESTIONS AND CLARIFICATIONS
1. Is there a requirement for a preconstruction survey?
A pre-construction survey is not required for this project. However, a post-construction survey, including as-built documentation, is required and shall be conducted using Drone LiDAR technology.
2. Are there contaminated materials within project limits that would not be allowed to dispose of at a landfill?
To the best of our knowledge, no contaminated materials are present within the project limits. Three soil samples were collected and analyzed in accordance with Santa Rosa County Landfill requirements, and the results did not indicate the presence of contamination.
3. Can dredge material be disposed of in an upland area if agreeable to the landowner and if it doesn't disturb any wetlands?
The dredge material can be disposed of in an upland area by legals means. However, the material shall not be used for wetland fill, structural fill, or disposed of in surface waters.
4. Does the landfill utilize the paint filter test for determining if the spoil is dry enough for disposal, if not what is the requirement for spoil moisture content prior to clearance for dropoff and how is it determined?
Yes, the landfill does utilize the paint filter test for determining if the spoil is dry enough for disposal.
5. Are there any tipping fees for disposing spoils from Locklin Lake at the landfill?
No, the landfill will be waiving the tipping fees for the dredge material for Locklin Lake.
Dillon Draughn, P.E.
BDI/PNS
4/10/2025
K:\255 Milton\25525.02 Locklin Lake Restoration\9. Bidding\Bid Documents\Addenda\Addendum 1_4.10.25.docx
25525.02 ADDENDUM NO. 1 2
6. What is the budget for this project?
The value of the allocated funding is not available at this time.