This is an Invitation to Bid (ITB) administrative document issued by the Idaho Transportation Department (ITD) for the procurement of brine tanker trailers. The ITB, numbered 1255, was issued on March 19, 2026, and solicits bids from qualified vendors for the purchase and delivery of two 6,000-gallon brine tanker trailers, with one trailer to be delivered to ITD District 5 Yard in Pocatello, Idaho, and one to ITD District 6 Yard in Rigby, Idaho. The solicitation requires delivery within 120 calendar days after receipt of order, with deliveries scheduled Monday through Thursday between 8:00 a.m. and 3:00 p.m. local time, excluding state-recognized holidays. Bidders must submit responses electronically through IPRO Powered by Luma, with a closing date and question deadline as indicated in the IPRO header document. A public bid opening will be held at 10:30 a.m. Mountain Time on the next business day following the closing date via Microsoft Teams. Within 14 calendar days of acceptance, the contractor must provide eight hours of minimum training at each delivery location covering operations, maintenance, safety, setup, and initial startup. The contract includes a manufacturer's standard two-year warranty and a potential requirement for the contractor to provide repair services at no additional cost if the trailers malfunction on multiple occasions.

Bidders must provide fully burdened total cost information on the provided Bid Schedule (Attachment 2) and must be authorized distributors or manufacturers of the trailers offered. The solicitation specifies detailed technical requirements including Grade T316 stainless steel construction, specific axle configurations, air ride suspension with air scales, LED sealed lighting, an OSHA-approved catwalk, and a self-contained Banjo model 300 PH-6V engine/pump distribution system rated at 300 gallons per minute. Acceptable payment will be made per Idaho Code 67-2302 following ITD's acceptance of delivered equipment and receipt of the contractor's itemized invoice. Award will be made to the most responsive and responsible bidder with the lowest total cost, and the state reserves the right to make multiple awards per manufacturer. The document contains no identified set-asides for disadvantaged business enterprises or other restricted vendor categories. Bidders must comply with Idaho Code Section 49, Chapter 16 regarding dealers and salesmen licensing and must provide the original Manufacturer's Statement of Origin and an ITD0502 form for vehicle titling. Insurance requirements and detailed specifications are outlined in the attachments, and all bidders must establish a free IPRO account to participate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1

STATE OF IDAHO

IDAHO TRANSPORTATION DEPARTMENT

Invitation to Bid (ITB) 1255

BRINE TANKER TRAILERS

Date of Issuance: 3/19/2026

TABLE OF CONTENTS

ITB ADMINISTRATIVE INFORMATION1
1 PURPOSE2
2 GENERAL INFORMATION, SOLICITATION INSTRUCTIONS AND STANDARD TERMS AND CONDITIONS2
3 INQUIRIES2
4 SUBMISSION REQUIREMENTS2
5 BID SUBMISSION METHODS3
6 TRADE SECRETS3
7 AWARD4
8 AUTHORIZED DISTRIBUTOR/MANUFACTURER4
9 DEALERS AND SALESMAN LICENSE AND MANUFACTURER’S STATEMENT OF ORIGIN4
10 MANUFACTURER BRAND COMPONENTS – BRAND NAMES4
11 SPECIFICATIONS4
12 QUANTITY7
13 COST7
14 ASSEMBLY7
15 DELIVERY7
16 MANUALS8
17 ACCEPTANCE8
18 BILLING PROCEDURE – INVOICE AND PAYMENT8
19 TRAINING9
20 WARRANTY9
21 NON-COMPLIANCE AND REMEDIES9
22 PRODUCT SUBSTITUTION9
23 RECORDS MAINTENANCE10
24 AUDIT RIGHTS10
25 TERMINATION AND CURE10
26 RESPONSIBILITIES PURSUANT TO IDAPA 38.05.01.08110
27 INSURANCE REQUIREMENTS10
28 TARIFF COSTS10

ITB ADMINISTRATIVE INFORMATION

ITB Title:
Brine Tanker Trailers
ITB Project Description:
The State of Idaho Transportation Department (“ITD”), is requesting Bids from qualified Vendors for the purchase and delivery of 6,000 gallon Brine Tanker Trailers
ITB Lead:
Caylie Hansen, Contract Officer

Idaho Transportation Department 3311 W State St. Boise, ID. 83703 Caylie.Hansen@itd.idaho.gov

(208) 334-8088

Submit electronically via IPRO:
Electronic Submission

IPRO LOGIN

Public Bid Opening:

Teams Link:

Phone:

Phone Conference ID:

A public bid opening will be held at 10:30 am MT on the next business day following the closing date to announce the Offerors who have submitted proposals. Offeror’s proposals will not be opened. The bid opening will be conducted virtually, with the access link provided below.

https://teams.microsoft.com/meet/29413170371154?p=choAoAsdrAHhsip8CJ 1-208-473-7075 244 376 993#

Deadline To Receive Questions:
See IPRO Header Document
ITB Closing Date:
See IPRO Header Document
ITB Opening Date:
10:30 a.m. Mountain Time the following business day after closing
Delivery Date:
Delivery is expected 30 120 days ARO (after receipt of order)

PURPOSE

The State of Idaho Transportation Department (“ITD”) is requesting Bids from qualified Vendors for the purchase and delivery of six thousand (6,000) gallon brine tanker trailers (Trailers) in accordance with the specifications provided below.

GENERAL INFORMATION, SOLICITATION INSTRUCTIONS AND STANDARD TERMS AND CONDITIONS

This Solicitation is issued by the State of Idaho (the “State”) via IPRO Powered by Luma (IPRO). The ITB Lead is the only contact for this Solicitation. All correspondence regarding this ITB shall be in writing. In the event that it becomes necessary to revise any part of this ITB, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this ITB shall not be relied upon. All changes to this ITB must be in writing and posted at IPRO to be valid. Alternate Bids are not allowed.

INQUIRIES

Questions or other correspondence must be submitted in writing to the ITB Lead listed below. QUESTIONS MUST BE RECEIVED BY 4:59:59 P.M. Mountain Time ON THE DATE LISTED IN THE ITB ADMINISTRATIVE INFORMATION. Written questions must be submitted using Attachment 1, Bidder Questions. Official answers to all written questions will be posted on IPRO as an amendment to this ITB.

ITB Lead: Caylie Hansen Phone: 208-334-8088 E-mail: Caylie.Hansen@itd.idaho.gov

Any questions regarding the State of Idaho Standard Contract Terms and Conditions found at (Contract Terms and Conditions) must also be submitted in writing, using Attachment 1, Bidder Questions, by the deadline identified in the ITB Administrative Information. The State will not consider proposed modifications to these requirements after the date and time set for receiving questions. Questions regarding these requirements must contain the following:

1. The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency).

2. Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.

3. Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.

Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, or which take exception to the State’s terms and conditions, will be found non-responsive, and no further consideration of the Bid will be given.

SUBMISSION REQUIREMENTS

Your Bid Submission must consist of the following:

Bid Schedule;

Provide your cost information on Attachment 2 - Bid Schedule. Do not submit your Bid on any other form. Submitting your Bid on a form different than the Bid Schedule may cause your Bid to be rejected as non-responsive;

The State of Idaho Signature Page must be completed and submitted as part of your Bid.

The State of Idaho Signature Page is attached in IPRO.

Warranty documentation and an acceptance letter agreeing to the warranty provisions of the Trailers.

BID SUBMISSION METHODS

Bids must be submitted electronically via IPro Powered by Luma. Do not fax or e-mail your bid. The official time, for bid closing purposes, is 5:00 pm mountain standard time date as indicated on ITB 1255 IPro Powered by Luma event tab.

Submitting electronically via IPRO, upload all of the Required Bid Submission Items (See Section 4.0) and enter your cost in IPRO for each line item; as the “Total Cost” on the Bid Schedule OR $0.01 as your cost in IPRO;

Upload all Required Bid Submission Items using Microsoft products such as Word and Excel. Do not submit items in .pdf format, unless provided otherwise in this ITB and;

Submitting via IPRO be advised that the Bidder for Bid evaluation and award purposes is the entity profile under which submit in IPRO, which must be the same legal entity presented in your uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Bid in IPRO, the information provided on the Signature Page prevails;

It is mandatory to submit your Bid electronically via IPRO, all Bidders participating in a Solicitation issued through IPRO must establish an account in the IPRO system as it is necessary in order to process and/or award the resulting Contract(s). It is free to establish an account and only takes a few minutes and;

Bidders are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows the State to efficiently navigate the Bidder’s response as the State will print uploaded documents for evaluation in the manner received via IPRO.

TRADE SECRETS

If your Bid contains trade secret information which you have identified, you must also submit a redacted copy of the Bid (in electronic format, with the word “redacted” in the file name) with all trade secret information removed or blacked out; as well as a separate document containing a complete list (per the instructions in the three (3) paragraphs directly below) of all trade secret information which was removed or blacked out in the redacted copy.

Paragraph 28 of the Solicitation Instructions to Vendors describes trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” In addition to marking each page of the document with a trade secret notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:

Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret.”

Provide a separate document entitled “List of Redacted Trade Secret Information” which provides a succinct list of all trade secret information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure.

AWARD

Award will be made in its entirety to the most responsive and responsible Bidder with the lowest Total Cost, as provided on Attachment 2 - Bid Schedule;

The State reserves the right not to evaluate or make an award in the best interest of the State. The State also reserves the right to make multiple awards per manufacturer, in accordance with Section 67-9211 of Idaho Code in the best interest of the State.

AUTHORIZED DISTRIBUTOR/MANUFACTURER

Submitting vendors must be an authorized distributor or manufacturer of the Trailer offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products. Bids from Contractors who are not an authorized distributor by the manufacturer shall not be considered.

ITD reserves the right to request Authorized Distributor/Manufacturer documentation from the submitting vendors.

DEALERS AND SALESMAN LICENSE AND MANUFACTURER’S STATEMENT OF ORIGIN

Bidders must comply with Idaho Code, Section 49, Chapter 16, “Dealers and Salesmen Licensing”. The dealer furnishing the new Trailer(s) must provide the original Manufacturer's Statement of Origin (MSO) and an ITD0502, Report of Sale and Application for Certificate of Title, directly to ITD upon payment of completed Trailers to the Contractor for titling as new Trailers

MANUFACTURER BRAND COMPONENTS – BRAND NAMES

Any Manufacturer Brand Components referenced in this solicitation are intended to be descriptive—not restrictive—and serve only to illustrate the quality and characteristics required. Bidders proposing an equivalent Manufacturer Brand Component must provide documentation demonstrating, to the State’s satisfaction, that the offered item(s) meet all minimum requirements outlined in the solicitation. This documentation must be submitted prior to the closing of the question period as noted in Section 3.

If your product offered does not meet any of the specifications, Bidder must provide an explanation of how the product offered is functionally equivalent to the stated specification, as well as descriptive literature that supports the product offered.

This explanation must be declared during the question period of this event as stated in Attachment 1 – Questions of this ITB. State acceptance will be in the form of an amendment.

SPECIFICATIONS

These specifications are the minimum mandatory specifications that your Bid must meet in order for the State to consider your Bid for award.

The Trailers must be the latest model of the manufacturer's current standard production, as offered in commercial trade. Though they are not specifically covered herein, all parts necessary to provide complete and functional Trailers, complete with accessories, must be furnished. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this ITB.

DESCRIPTION

Type – Cylindrical tanker;

Capacity – six thousand (6,000) U.S. gallons with an additional three (3)% air gap;

Length – forty-eight (48) feet maximum;

Weight – ten thousand six hundred (10,600) pounds minimum;

Color – Stainless steel components must be unpainted. All mild steel components must be painted black and;

Tank Operating Pressure – twenty-five (25) pounds per square inch (PSI).

TANKER

Type – Single compartment tri-axle semi-trailer;

Product Density – thirteen (13) pounds per U.S. gallon maximum;

Shell Material – Grade T three sixteen (316) stainless steel with two B (2B) finish;

Heads – Grade T three sixteen (316) stainless steel with two B (2B) finish.;

Surge Baffles – two (2) to four (4) equally spaced and constructed of the same material as tank shell;

Manhole – one (1) each, located on top to service each section of tank created by the installation of surge baffles;

Manhole must be twenty (20) inches, domed style with plated swing bolts and wing nuts;

Reinforcing Rings – Channel section type constructed of stainless steel. Each ring must be fully welded to barrel;

Stainless Steel Tank Passivation – The fabricated tank surfaces, inside and outside, must receive a chemical treatment with a citric acid passivation solution to create a monomolecular oxide film coating for additional corrosion resistance;

Venting;

One-and-one-half (1-1/2) inch vacuum relief located on top;

Two (2) inch pressure relief located on top;

Sump – Grade T three sixteen (316) stainless steel mounted pad on belly of tank at center;

Valves;

Emergency Valve – Stainless steel grade T three sixteen (316) internal hydraulic, Teflon seat, attached to sump;

Outlet Valve – three (3) inch grade T three sixteen (316) stainless steel gate valve, SSG-one thousand three (1003), flange by thread;

Catwalk – Occupational Safety and Health Administration (OSHA) approved catwalk. (https://www.osha.gov) Stainless steel diamond grip;

Approximately twenty-four (24) feet long from front cleanout to rear cleanout at the three-o’clock (3) position of tank on curbside.

If catwalk exceeds the legal allowable width, then catwalk must be adjusted upward.

Hand Rails – Dual stainless steel handrails, thirty-six (36) inches high the full length of catwalk with chain at ladder;

Ladder – One (1) stainless steel one (1) inch tube with grip strut rungs, located near center on curbside.

PRODUCT DISTRIBUTION SYSTEM

Type – Self-contained engine/pump combination unit;

Engine/Pump Assembly – Banjo model three hundred (300) PH-six V (6V) (https://www.banjocorp.com);

Three (3) inch inlet/outlet;

Polypropylene pump rated at three hundred (300) gallons per minute (GPM) with gasoline engine;

Piping – Stainless steel pipe and elbows;

Connections – three (3) inch stainless steel male camlock with dust cap and keeper wire located near center of curbside and;

Requirement – System must be equipped with necessary butterfly valves to allow loading and unloading tank.

AXLES & SUSPENSION

Axles – three (3) twenty-five thousand (25,000) pound axles with steel out-board oil seal hubs;

Brakes – Meritor Q-Plus S-cam sixteen-and-one-half (16-1/2) inch by seven (7) inch anti-lock braking (ABS) air brakes;

Four S/two M (4S/2M) Antilock Braking System (ABS) system with Roll Stability Support (RSS)-Plus triaxle roll stability.

Rear brake actuators must be sealed, internally vented brake chambers on all axles. Spring brake on center axle;

Slack Adjusters – Automatic type for all axles;

Wheels – eight-point-two-five (8.25) by twenty-two-point-five (22.5) aluminum disc wheels with outboard ten (10) hole pilot mount hubs;

Suspension – Air ride suspension with raise and lower valve and ride height control and outfitted with air scales;

Control Valve – Installed on street side near landing gear on landing gear frame;

Rear Axle – Rear (third) axle to be an air-lift axle with separate controls at the rear of the trailer housed in weatherproof box;

Tires – Twelve (12) eleven-point-zero-zero R by twenty-two-point-five (11.00R x 22.5) – sixteen P R (16PR) (H) radial trailer tread tires and;

Axle Spacing – One hundred twenty-six (126) inch axle spacing between front and rear axle.

ACCESSORIES

Landing Gear – two-speed crank load-bearing type on street side with sand shoes;

Bumper – Must comply with the National Highway Traffic Safety Administration (NHTSA) requirements (https://www.nhtsa.gov);

Constructed of stainless steel;

Sight Glass – two (2) inch sight glass fittings in rear head, one-and-one-half (1-1/2) inch plastic sight glass tube installed in two (2) inch fittings;

Fenders – Polyethylene (black in color) rolled type with stainless steel support brackets.

Must include one (1) pair of tandem axle front fenders and;

one (1) pair tri-axle rear fenders;

Hose Storage Tubes – one (1) total, constructed of eight (8) inch diameter aluminum tube by twenty-one (21) feet long with two (2) bolt-on cast aluminum doors per tube (one (1) per end).

1.1.1 Hose tube ends must be reinforced with aluminum wrap;

Registration Holder – Document holder mounted on lander gear frame, curbside;

Mud Flaps – Standard plain (no writing or logos) twenty-four (24) inches by thirty (30) inches;

Mud flaps must be mounted on stainless steel brackets of sufficient length to provide for correct ground clearance with anti-sail brackets;

Tool Box – Underbody type constructed of stainless steel with door seal;

Tool Box Size – Twenty-four (24) inches height, eighteen (18) inches depth, and forty-two (42) inches length;

Door – Equipped with double-panel stiffeners, stainless steel piano-type hinge running the full width of the door, and stainless steel drop chains;

Door Latch – Stainless steel T-handle, single-point latch with adjustable tension plate.

Door Seal – Continuous bulb type;

Door Mounting – Mounted to tanker curb side utilizing a cradle-type mount constructed of stainless steel and high-quality zinc-plated fasteners;

Conspicuity Tape – On sides, bumper, and rear head meeting NHTSA requirements. (https://www.nhtsa.gov).

LIGHTS

Must meet all State of Idaho requirements and Federal Motor Vehicle Safety Standards (FMVSS). (https://www.ecfr.gov/current/title-forty-nine/subtitle-B/chapter-V/part-five-hundred-seventy-one)

1.1.2 Sealed Lighting – All lighting will be a sealed system, rubber-mounted LED lamps.

QUANTITY

One time purchase of two (2) Brine Tanker Trailers to be delivered one (1) to each location as listed in Section 15.

COST

Provide your fully burdened Total Cost on the Bid Schedule (Attachment 2).

ASSEMBLY

The Trailers must be assembled and adjusted when delivered to the ITD locations specified.in Section 15. All equipment, including standard and supplemental equipment, must be installed as per the manufacturer’s specifications, and serviced and ready for continuous operation at the time of delivery, unless otherwise stated in this ITB.

DELIVERY

The Contractor must deliver and unload the Trailers within one hundred twenty (120) calendar days after receipt of each Order.

Deliveries must be made Monday through Thursday, 8:00 am to 3:00 pm local time (per Delivery Location), excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved by ITD.

Delivery Locations (the “Ship To” will be indicated on each Order):

ITD District 5 Yard, 5151 South 5th, Pocatello, ID 83204

ITD District 6 Yard 206 N. Yellowstone, Rigby, ID 83442

MANUALS

Contractor must provide two (2) each of the following in PDF and paper manual format for the Trailers, operator’s manual, parts manual, and shop manual. Manuals must be bound or installed in a binder and provided to the delivery location at the time of delivery. Boxed, shrink wrapped, or otherwise unbound loose papers SHALL NOT be acceptable.

ACCEPTANCE

Upon receipt, the Trailers shall be inspected by the ITD Maintenance Services Manager or designee to ensure the minimum specifications are met. Acceptance shall occur fourteen (14) calendar days after delivery, unless ITD has notified the contractor in writing that the product delivered does not meet the minimum specifications. If ITD determines that the Trailers are not in accordance with the specifications, ITD shall provide the contractor with a written notification. The contractor must pick up, correct any discrepancies, and re-deliver to the ITD specified location at the contractor’s expense. The timeframe for completion of corrective action must not exceed thirty (30) calendar days from receipt of written notification from ITD.

BILLING PROCEDURE – INVOICE AND PAYMENT

Invoices Must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below will be returned to the Contractor for correction and resubmission. Resubmitted invoices must be sent with a new invoice date, which will restart the timeline required for payment.

Invoices must be submitted as follows:

One (1) invoice per unit after acceptance by ITD.

Invoices must include the following information:

Contractor Company & Contact Information;

Contract Name & Number;

Order Number;

Invoice Number & Date and;

Itemization of the Property provided and accepted to include, description matching the contract, quantity, unit of measure, unit price, extended price, and total invoice amount.

Invoices must be emailed to:

HQAP@itd.idaho.gov HQFLEET@itd.idaho.gov

Payment will be made in accordance with Idaho Code 67-2302 https://legislature.idaho.gov/statutes after receipt of the Contractor's itemized invoice and is accepted by ITD. Total payments under this Contract shall not exceed the Total Price provided on Attachment 2 Bid Schedule unless otherwise modified by a contract amendment issued pursuant to the award.

TRAINING

The Contractor must provide an authorized technician, within fourteen (14) calendar days upon acceptance, to provide training for operations, maintenance, safety, etc. of the Trailers to each location referenced in Section 16 – Delivery. Training must include but not be limited to set-up, initial start-up, operation of the Trailer, and maintenance and servicing.

Training must take place Monday thru Thursday, 8:00 am to 5:00 pm local time, excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html).

The technician must be versed in all aspects of the Trailers and able to make any necessary field adjustments to the Trailers during the training period. Training must be no less than eight (8) hours at the delivery location.

The Contractor must coordinate training with ITD’s contact for delivery.

WARRANTY

Manufacturer Standard Warranty for two years;

If the Trailer(s) continuously malfunctions and causes it to be out of service on multiple occasions, the Agency reserves the right to require the Contractor to pick up, repair, and return the Trailers at no additional cost to the Agency. In the event of a major repair(s) the timeframe must be mutually agreed upon by the Contractor and ITD.

If any warranty work is to be performed, the Contractor may elect to have a dealer of its choice perform the work in accordance with the manufacturer’s standards.

Bidders must submit warranty documentation and an acceptance letter agreeing to warranty provisions of the Trailers (See IPRO powered by Luma).

NON-COMPLIANCE AND REMEDIES

ITD’s service location contact will be responsible for documenting non-compliance, in writing, via email. This notice will include the details of each discrepancy that require corrective action. Invoicing must not occur until non-compliance has been corrected.

Correcting Non-Compliance – After receipt of written notice from ITD, the Contractor must respond, in writing, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within fourteen (14) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further remedial action.

In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to the State, 3) withhold payment or require payment of actual damages caused by the non-compliance, 4) terminate the Contract, in addition to any remedies imposed by the State.

If ITD must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, ITD may withhold the actual cost to ITD from the Contractor’s payment(s).

PRODUCT SUBSTITUTION

In the event a specified manufacturer’s commodity listed in the Contract becomes unavailable or cannot be supplied by the Contractor for any reason (except as provided for in the Force Majeure Clause), a commodity deemed in writing by the Contractor to be equal to or better than the specified commodity may be substituted by the Contractor at no additional cost or expense to ITD. Unless otherwise specified, any substitution of commodity prior to ITD written approval may be cause for termination of Contract.

RECORDS MAINTENANCE

The contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the contractor pursuant to the contract. These records must be retained by the contractor for at least three (3) years after the contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.

AUDIT RIGHTS

The Contractor must allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.

TERMINATION AND CURE

See Idaho Contract Terms and Conditions located on the Terms tab in ITB 1255 IPRO powered by LUMA.

RESPONSIBILITIES PURSUANT TO IDAPA 38.05.01.081

The ITB Lead may, in the State’s sole discretion, require the apparent lowest responsive Bidder’s to provide documentation to demonstrate its responsibility. The ITB Lead may request documentation including, but not limited to credit or financial reports, and references. Failure to provide requested documentation may result in the Bidder’s being deemed non-responsible. Nothing herein shall prevent the State from using other means to determine Bidder’s responsibility.

INSURANCE REQUIREMENTS

Within five (5) days of notification of award (or such other time as designated by the Purchasing Activity), the apparent successful Bidder or Offeror will provide certificates of insurance required herein and will maintain the insurance during the life of the Contract. There are no provisions for exceptions to this requirement. Failure to provide the certificates of insurance within the five (5) business day period may be cause for your Bid or Proposal to be declared non-responsive or for your Contract to be cancelled and;

See Attachment 3 – Insurance Requirements on Attachment Tab in LUMA.

TARIFF COSTS

If the President of the United States, the United States Congress, Customs and Border Protection, or any other federal entity authorized by law, imposes an import duty or tariff (a “tariff”) on an imported good that results in an increase in Contractor’s costs to a level that renders performance under this Agreement impracticable, Contractor may be permitted to add up to fifty percent (50%) of the actual cost it incurs due to tariffs to its invoices submitted to the State, subject to the following conditions:

Contractor shall notify the Agency of the maximum cost of tariffs and obtain the Agency’s written approval. The Agency shall not be obligated to pay costs associated with tariffs for which the Agency did not provide prior written approval, or which exceed the approved maximum. Contractor may provide notification of maximum tariffs on a case-by-case basis (for each order) or may provide blanket or time-bound notification (e.g., maximum for any orders placed for the next six (6) months);

Contractor may only invoice for actual costs incurred due to tariffs, even if that amount is less than the agreed upon maximum;

Contractor shall provide evidence documenting the actual cost and applicability of tariffs, which may include country of origin, order/delivery dates, official tariff rates, declared value, etc;

Any material misrepresentation of fact by Contractor relating in any way to an increase in pricing due to tariffs is a default under this Contract and shall be subject to the remedies set forth herein, in addition to any other claim or remedy available to the State. Furthermore, any material sums due to tariffs shall be fraud against the taxpayers of the State and grounds for the Contractor to be deemed non-responsible and/or disqualified from participation in future solicitations administered by the State and;

Contract pricing will be adjusted via an amendment to the Contract.

ITB 1255 BRINE TANKER TRAILERS

ATTACHMENT 1-BIDDER QUESTIONS

PLEASE DO NOT IDENTIFY YOUR NAME OR YOUR COMPANY’S NAME OR PRODUCT NAMES OF INTELLECTUAL PROPERTY IN YOUR QUESTIONS.

ADD ROWS BY HITTING THE TAB KEY WHILE WITHIN THE TABLE AND WITHIN THE FINAL ROW.

The following instructions must be followed when submitting questions using the question format on the following page.

1. DO NOT CHANGE THE FORMAT OR FONT. Do not bold your questions or change the color of the font.

2. Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2. If the question is in regards to a State Term or Condition or a Special Term or Condition, state the clause number in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment A”) in the “ITB Section” (column 2), and the attachment page number in the “ITB page” field (column 3).

3. Do not enter text in the “Response” field (column 5). This is for the State’s use only.

4. Once completed, this form is to be e-mailed per the instructions in the ITB. The e-mail subject line is to state the ITB number followed by “Questions.”

ITB 1255 Brine Tanker Trailers Page 12

ATTACHMENT 1 – BIDDER QUESTIONS

ITB 1255 BRINE TANKER TRAILERS

ITB 1255 Bidder Questions

ITB Section
ITB Page
Question
Response

image1.png

File details come from the government source that posted it. Updated .