ITB 1052 - Amended (3) - Administrative Document - Requirements and SpecifIcations - Stencil Tr.docx
DOCX document 131 KB Posted
- Attached to
- Stencil Truck
- Solicitation number
- 1052
- Issued by
- Idaho
About this file
Summary of ITB 1052 - Stencil Truck Requirements and Specifications
This is an Amended (3) Administrative Document containing requirements and specifications issued by the State of Idaho for a Stencil Truck procurement. The document establishes the technical and operational requirements that bidders must meet when submitting proposals for this specialized vehicle. The solicitation was posted on October 9, 2025, with a submission deadline of October 30, 2025. The procurement seeks acquisition of a stencil truck designed for roadway, parking lot, or municipal infrastructure marking purposes. Specific details regarding quantities, site visits, bidders' conferences, and award dates are not fully articulated in the available documentation summary. Interested vendors must obtain the complete ITB package from the Idaho state procurement office to access comprehensive specifications, submission protocols, and detailed project scope information.
The document does not disclose pricing terms, budget ranges, or estimated contract values in the available summary. No set-asides for disadvantaged business enterprises, small businesses, women-owned small businesses, or other protected vendor classifications are explicitly identified as selected. Information regarding incumbent vendors, contract term length, renewal options, funding sources, and specific operational requirements for the stencil truck is not provided in the current documentation summary. Bidders should contact the appropriate Idaho state procurement office to obtain the full solicitation package, technical specifications, evaluation criteria, and complete submission requirements necessary to prepare a competitive proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB1052 - Attachment - 4 - Product Information Sheet - Stencil Truck.docx | DOCX document | |
| Stencil Truck Photos.pdf | ||
| Stencil truck layout MB.pdf | ||
| ITB1052 - Attachment - 5 - Delivery Acceptance Form - Stencil Truck.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
FOR
IDAHO TRANSPORTATION DEPARTMENT
Amended Invitation to Bid (ITB) 1052 Stencil Truck
| 1 | GENERAL INFORMATION, solicitation instructions and standard terms and conditions | 4 |
| 2 | INQUIRIES | 4 |
| 3 | SPECIFICATIONS | 4 |
| 4 | PRE-BUILD CONFERENCE | 5 |
| 5 | quantity | 5 |
| 6 | COST | 5 |
| 7 | BILLING PROCEDURE – Invoice and Payment | 5 |
| 8 | SUBMISSION REQUIREMENTS | 6 |
| 9 | AWARD | 7 |
| 10 | Acceptance | 7 |
| 11 | UPFITTING Warranty | 7 |
| 12 | TRUCK CAB AND CHASSIS WARRANTY | 8 |
| 13 | training | 8 |
| 14 | PRE-DELIVERY INSPECTION | 9 |
| 15 | changes/amendments | 9 |
| 16 | DELIVERY | 9 |
| 17 | ASSEMBLY | 10 |
| 18 | TESTING | 10 |
| 19 | Manuals | 10 |
| 20 | PRODUCT SUBSTITUTION | 10 |
| 21 | Audit Rights | 10 |
| 22 | tariffs | 10 |
| 23 | termination and cure | 11 |
| 24 | RESPONSIBILITIES PURSUANT TO IDAPA 38.05.01.081 | 11 |
| 25 | RECORDS MAINTENANCE | 11 |
| 26 | AUDIT RIGHTS | 11 |
| 27 | SUBCONTRACTING | 11 |
| 28 | INSURANCE REQUIREMENTS | 11 |
| 29 | additional insurance requirements | 11 |
| 30 | DISPUTE RESOLUTION | 11 |
| 31 | NON-COMPLIANCE AND REMEDIES | 12 |
| ATTACHMENT 1 – BIDDER QUESTIONS | 13 | |
| ATTACHMENT 2 – Specifications | 15 | |
| attachment 3 – Bid Schedule – Attached separately in ipro | 25 | |
| EXHIBIT A – CHANGE REQUEST FORM | 26 | |
| Exhibit B – ACRONYM LIST | 27 |
ITB Administrative Information
| ITB Title: |
| Stencil Truck |
| ITB Project Description: |
| The State of Idaho Transportation Department (ITD is requesting Bids from qualified Vendors for the purchase and delivery of one (1) stencil truck |
ITB Lead:
Doug Buswell, Contracting and Grants Officer Idaho Transportation Department 3311 West State Street Boise Idaho 83703 208-772-8077 Preferred method of contact: Doug.buswell@itd.idaho.gov
| Submit sealed Bid electronically via IPRO: |
| Electronic Submission |
IPRO LOGIN
Bid Opening
Dial-In:
Phone Conference ID Number:
Link:
Link:
Meeting ID Number:
Pass code:
A public bid opening will be made available via Microsoft Teams. Below is the information needed to access the call
+1 208-473-7075,,335965046# 335 965 046# Join the meeting now United States, Boise Event 1052 Stencil Truck | Meeting-Join | Microsoft Teams 226 187 857 917 2 4dj9cD2s
| Deadline To Receive Questions: |
| See IPRO Header Document |
| ITB Closing Date: |
| See IPRO Header Document |
| ITB Opening Date: |
| See IPRO Header Document |
| Delivery Date: |
| Delivery is desired within one hundred eighty (180) days after receipt of order (ARO). The state may accept delivery dates outside the desired date when it is determined to be in the best interest of the state. |
THE ADMINISTRATIVE FEE DETAILED IN SECTION 5.2 OF THE STATE’S STANDARD CONTRACT TERMS AND CONDITIONS WILL NOT APPLY TO THE CONTRACT(S) THAT RESULT FROM THIS SOLICITATION.
PURPOSE
The State of Idaho Transportation Department (ITD) is requesting Bids from qualified Vendors for the purchase and delivery of one (1) stencil truck (Truck) in accordance with the specifications provided below.
GENERAL INFORMATION, solicitation instructions and standard terms and conditions This Solicitation is issued by the state of Idaho (the in State in) via IPRO Powered by Luma (IPRO). The ITB Lead is the only contact for this Solicitation. All correspondence regarding this ITB shall be in writing. In the event that it becomes necessary to revise any part of this ITB, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this ITB shall not be relied upon. All changes to this ITB must be in writing and posted at IPRO to be valid. Alternate Bids are not allowed.
INQUIRIES
Questions or other correspondence must be submitted in writing to the ITB Lead listed below. QUESTIONS MUST BE RECEIVED BY 11:59:59 P.M. Mountain Time ON THE DATE LISTED IN THE ITB ADMINISTRATIVE INFORMATION. Written questions must be submitted using Attachment 1 - Bidder Questions. Official answers to all written questions will be posted on IPRO as an amendment to this ITB.
ITB Lead: Doug Buswell Phone: 208 - 772 - 8077 E-mail: Preferred method of contact Doug.Buswell@itd.idaho.gov
Any questions regarding the State of Idaho Standard Contract Terms and Conditions (found on the Questions Tab in IPRO Powered by LUMA) must also be submitted in writing, using Attachment 1 - Bidder Questions, by the deadline identified in the ITB Administrative Information. The State will not consider proposed modifications to these requirements after the date and time set for receiving questions. Questions regarding these requirements must contain the following:
1. The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency).
2. Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned.
3. Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.
Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, or which take exception to the State’s terms and conditions, will be found non-responsive, and no further consideration of the Bid will be given.
SPECIFICATIONS
See Attachment 2 - Specifications.
The purpose of this conference (meeting) is to define roles and responsibilities, review specifications, identify risks, define expectations and determine any ITB solicitation amendments.
Each vendor will be given one (1) hour to ask questions, seek clarity on specifications and offer alternative products. (Alternatives may or may not be considered) Only one (1) vendor per session will be allowed. Each vendor will be allowed to have four (4) representatives on Microsoft Teams, at their scheduled session.
Vendors must have reviewed all specifications prior to the meeting and be prepared to ask questions. Questions are expected to be in writing and available for the State representatives at the time of the meeting. Questions must be in the order they are listed in Attachment 3 Specifications Vendors must provide drawings, documentation and justification for any requested changes to listed specifications contained within this ITB during the Pre-Bid Conference in order to be considered for any amendment to the specifications.
All ITB amendments as a result of these meetings must be posted in writing in IPRO powered by LUMA for public visibility and incorporation into submitting vendors bids prior to the ITB close date. Questions and answers during the meetings are unofficial until posted as an amendment in IPRO powered by Luma. Vendors are cautioned against relying on any verbal information and do so at the Vendor’s sole risk.
Failure to attend the optional Pre-Bid Conference will not relieve the Bidder of meeting the requirements of this ITB.
PRE-BUILD CONFERENCE
The Contractor must coordinate and conduct a pre-build conference with ITD’s Maintenance Services Manager, or designee, at the ITD Headquarters facility located at 3311 West States Street, Boise, ID 83703. This conference must be conducted within fourteen (14) calendar days after award of the Contract and prior to beginning the manufacturing process of the Truck. The purpose of this conference is to review the requirements of the Contract, detailed specifications, component placement, and drawings.
Engineered design Drawing(s) of the Truck must be provided to ITD after its approval to proceed with the manufacturing process of the Truck. Drawing(s) must show structural design and placement of all installed components. Drawing(s) must be provided at the time of the pre-build conference; Drawing(s) are not required with the bid submittal.
quantity This stencil truck will be a one (1) time purchase.
COST
Provide your fully burdened Total Cost on the Bid Schedule (Attachment 3).
BILLING PROCEDURE – Invoice and Payment Invoices must be submitted further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below will be returned to the Contractor for correction and resubmission. Resubmitted invoices must be sent with a new invoice date, which will restart the timeline required for payment.
Invoices must be submitted as follows:
One (1) invoice per unit after acceptance by ITD.
Invoices must include the following information:
Contractor Company & Contact Information;
Contract Name & Number;
Order Number;
Invoice Number & Date;
Itemization of the Property provided and accepted to include description matching the contract, quantity, unit of measure, unit price, extended price, total invoice amount and;
Invoices must be emailed to:
HQAP@itd.idaho.gov HQFLEET@itd.idaho.gov
ITD’s Contract Management Team (CMT will review each invoice and dispute with the Contractor, if needed, prior to forwarding to ITD’s accounts payable to process the payment.
Payment Payment will be made in accordance with Idaho Code 67-2302 after receipt of the Contractor's itemized invoice and is accepted by ITD. Total payments under this Contract shall not exceed the Total Price provided on Attachment 3 – Bid Schedule unless otherwise modified in an amendment to this Price Agreement.
SUBMISSION REQUIREMENTS
Required Bid Submission Items Your Bid Submission must consist of the following:
Bid Schedule Provide your cost information on Attachment 3 - Bid Schedule. Do not submit your Bid on any other form. Submitting your Bid on a form different than the Bid Schedule may cause your Bid to be rejected as non-responsive.
Attachment 4 – Product Information.
State of Idaho Signature Page The State of Idaho Signature Page must be completed and submitted as part of your Bid. The State of Idaho Signature Page is attached in IPRO.
Supporting documentation if offering equal as indicated in Attachment 2 – Specifications.
Warranty Statement, see Section 13, Warranty.
Electronic Submission Bids must be submitted electronically via IPRO Powered by LUMA. Do not fax or e-mail your Bid. Your Bid must be received at the Division of Purchasing by the date and time specified on the IPRO header document. The official time, for bid closing purposes, is the Division of Purchasing’s time clock.
Electronically submitted Bids must be submitted through IPRO, at IPRO Powered by LUMA. When submitting through IPRO, enter your Cost in IPRO as $0.01, in and UPLOAD YOUR SEPARATE BID SCHEDULE AND ALL OTHER REQUIRED SUBMITTAL ITEMS. Remember to submit an additional redacted version of the documents if you have identified trade secrets.
Upload all Required Bid Submission Items using Microsoft products such as Word and Excel. Do not submit items in .pdf format, unless provided otherwise in this ITB.
When submitting via IPRO, be advised that that the Bidder for Bid evaluation and award purposes is the entity profile under which the Bid is submitted in IPRO, which must be the same legal entity presented in your uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Bid in IPRO, the information provided on the Signature Page prevails.
All Bidders participating in a Solicitation issued through IPRO must establish an account in the IPRO system as it is necessary to process and/or award the resulting Contract(s). It is free to establish an account and only takes a few minutes.
Bidders are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows the State to efficiently navigate the Bidder’s response as the State will print uploaded documents for evaluation in the manner received via IPRO.
Trade Secrets If your Bid contains trade secret information which you have identified, you must also submit a redacted copy of the Bid (in electronic format, with the word in redacted in in the file name) with all trade secret information removed or blacked out; as well as a separate document containing a complete list (per the instructions in the three (3) paragraphs directly below) of all trade secret information which was removed or blacked out in the redacted copy.
Paragraph 28 of the Solicitation Instructions to Vendors describes trade secrets to in include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.in In addition to marking each page of the document with a trade secret notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Bidders must also:
Identify with particularity the precise text, illustration, or other information contained within each page marked in trade secretin (it is not sufficient to simply mark the entire page). The specific information you deem in trade secretin within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a in trade secret.in
Provide a separate document entitled in List of Redacted Trade Secret Information in which provides a succinct list of all trade secret information noted in your Bid; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure.
AWARD
Award will be made to the responsive responsible Bidder with the lowest Total Cost, as provided on Attachment 3 - Bid Schedule.
The State reserves the right to evaluate or make an award in the best interest of the State.
Acceptance Upon receipt, the truck shall be inspected by the ITD Maintenance Services Manager or designee to ensure the minimum specifications are met. Acceptance shall occur fourteen (14) calendar days after delivery, unless ITD has notified the Contractor in writing that the product delivered does not meet the minimum specifications. If ITD determines that the Truck is not in accordance with the specifications, ITD shall provide the Contractor with a written notification. The Contractor must pick up, correct any discrepancies, and re-deliver to the ITD specified location at the Contractor’s expense (for minor repairs, onsite repairs at ITD locations may be allowed with ITD approval). The timeframe for completion of corrective action must not exceed thirty (30) calendar days from receipt of written notification from ITD.
UPFITTING Warranty The warranty will begin on the date when the vehicle is put into service at ITD. The contractor will formally inform ITD in writing when the warranty period starts;
The warranty must be for a minimum period listed below after ITD’s Acceptance. The warranty must include all parts, labor, and freight to replace a defective warranted item.
One (1) year on the entire Truck;
Deck Surface must come with a lifetime warranty on the delamination;
Paint warranty must come with a three (3) year full coverage warranty from fading or peeling not directly related to general wear and tear;
Drawer slides must come with a lifetime warranty; The Contractor may elect to authorize a dealer of their choice or authorize ITD to perform the necessary repairs in accordance with the manufacturer’s standards. If the Contractor authorizes ITD to perform any warranty work, it is the responsibility of the Contractor to guarantee the work is completed in accordance with the manufacturer’s standards at the expense of the Contractor. Completion of warranty repairs by ITD must not affect warranty and;
If any warranty work is to be performed by the Contractor, it must be complete within thirty (30) calendars days after receipt of notice from ITD. In the event of a major repair(s) (i.e. engine or transmission overhaul) the timeframe will be mutually agreed upon by the Contractor and ITD.
TRUCK CAB AND CHASSIS WARRANTY
The Truck cab and chassis must include the manufacturer’s standard warranty for all parts bumper to bumper to include but not limited to electical componets, braking systems, suspension/steering, climate control, body parts, power train, paint, engine, cab/body, emissions, and all other drive train components Must be warranted against all defects in material and workmanship by the manufacturer or Contractor, for the stand manufactureres warran (See Section 3.5) date described below. In addition to the complete one (1) year warranty, the following components are to be warranted for the timeframes specified below:
Engine (including injectors) – Three (3) years or 150,000 miles, whichever comes first.
Engine Emission Control System – Five (5) years.
Cab and Body – Three (3) years on structural components and cab corrosion.
Frame – Three (3) years or 150,000 miles, whichever comes first.
Other Drive Train Components – Three (3) years or 150,000 miles, whichever comes first.
Warranty must include all travel, parts, labor, and freight to replace a defective warranted item for the timeframes listed;
All warranty repairs must be completed by the contractor within seventy – two (72) hours of notification by ITD;
If any warranty work is to be performed, the Contractor may elect to authorize a dealer of its choice or authorize ITD to perform the necessary repairs in accordance with the manufacturer’s standards. If the Contractor authorizes ITD to perform any warranty work, it is the responsibility of the Contractor to guarantee that the work is completed in accordance with the manufacturer’s standards at the expense of the Contractor. Completion of warranty repairs by ITD which are authorized by the Contractor will not adversely affect the warranty. Reimbursement to ITD for warranty repairs will be based on the manufacture’s standard rate for the repair authorized and completed;
The Contractor must offer a delayed warranty on the Truck. Warranty must commence when completed truck chassis unit is placed into service. “In-Service” date is defined as the date the completed unit passes final inspection ITD will be responsible for reporting “In-Service” dates to the Contractor and;
Bidders must submit warranty documentation and an acceptance letter agreeing to warranty provisions of the Truck.
training The Contractor must provide an experienced authorized representative, within fourteen (14) calendar days after delivery, to provide training on vehicle and listed equipment. The representative must be versed in all aspects of the entire truck and its components. Representative must able to make any necessary field adjustments during the training period;
The Contractor must contact ITD to schedule training at a mutually agreed upon date and time. training must occur Monday through Thursday, 8:00 am to 3:00 pm local time, excluding state of Idaho recognized holidays (State Holidays | The Official Website of the State of Idaho). Training must be for a minimum of four (4) hours and take place at the Delivery Location and;
Training Topics: Operations, break-in procedures, equipment limitations, lifting, inspection, maintenance, safety, safety features, pre-operation checks, lubrication, cold weather operations, set-up, deployment, equipment accessory locations, equipment stowage, and transporting of the Truck and its components, along with any other items in question.
PRE-DELIVERY INSPECTION
Upon 100% completion of the Truck, ITD (HQ Equipment Manager) will conduct an inspection at the manufacturer’s facility. The purpose of this inspection is to inspect the Truck to ensure all specifications are met. Delivery will not be made until the inspection has been conducted and approved by ITD (HQ Equipment Manager) only;
NOTE: During the inspection, changes that are necessary must not substantially alter the original specifications. Workmanship issues must be completed within five (5) days following the inspection. Any substantial changes must be annotated as an amendment to the Contract and approved by ITD Equipment Manager;
If Contractor is located outside fifty (50) miles from ITD, the Contractor must make all arrangements for travel and lodging. Must include all costs associated with the pre-delivery inspection including travel (all transportation), lodging, and meals for two (2) ITD employees. Inspections must be included in the fully burdened bid price for usability and function verification. In the event that multiple inspections are required prior to final approval of Truck, the costs for the additional trips will be at the responsibility of the Contractor. The Truck must be 100% ready for service when delivered and;
In order to prevent the overtime cost for ITD employees traveling, all flights should be reserved during the normal business hours of 8:00 am to 5:00 pm MST. And not on state of Idaho recognized holidays. Every effort shall be made to ensure flights are booked to make the most direct flight possible to the end destination (if necessary – maximum of two (2) layovers). The contractor must contact ITD for travel approval prior to booking.
changes/amendments
1.1 Either party may, at any time by a written request, request changes to the Contract. The party requesting the change must complete the Change Request Form (see Exhibit A, below), providing all details for the change. The party receiving the Change Request Form must confirm receipt and provide feedback regarding any desired changes to the request within ten (10) days of receipt of Change Request Form;
1.2 If the Change Request consists solely of plan, timeline, schedule, or key personnel changes; or which otherwise acts to clarify the roles and responsibilities or modify the activities within the scope of the Contract, without an impact on cost, the ITD CMT is authorized to negotiate and execute the Change Request Form with the Contractor and;
1.3 If the Change Request directly or indirectly increases the monetary obligations of the State, expands the scope of the Contract, changes Contract requirements or terms and conditions or extends the Contract term, a formal Amendment will be issued by the DOP. The ITD Contract Management Team (CMT) will submit the drafted Change Request Form to the State of Idaho’s Contract Administration Team (CAT) for review. Any Amendment must be in writing and mutually agreed upon by both parties. No amendment will be effective until executed by the ITD An Amendment not executed in compliance with the section may be void pursuant to Idaho Code, Section 67-9213, and may cause the entire Contract to be void.
DELIVERY
The Contractor must deliver and unload the truck within the desired delivery date of one hundred eighty (180) calendar days after receipt of each order. The state may accept delivery dates outside of the desired date when it is determined to be in the best interest of the state;
Deliveries must be made Monday through Thursday, 8:00 am to 3:00 pm local time (per Delivery Location), excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved by ITD and;
Delivery Location (the in Ship To in will be indicated on each Order):
Idaho Transportation Department 3311 W. State Street Boise ID 83707
ASSEMBLY
The Truck must be assembled and all equipment calibrated and operational when delivered to the ITD location specified. All equipment, including standard and supplemental equipment, must be installed as per the manufacturer’s specifications, serviced and ready for continuous operation at the time of delivery, unless otherwise stated in this ITB.
TESTING
Truck must have a minimal three (3) hours of documented testing before ITD factory (100% completed) inspection.
Manuals For each Truck, the Contractor must provide two (2) each of the following in PDF (via USB flash drive) and/or paper manual format:
19.1. Operator’s manual
19.2. Parts manual
19.3. Shop manual
All paper manuals must be bound or installed in a binder and provided at the time of delivery. Boxed, shrink wrapped, or otherwise unbound loose papers SHALL NOT be acceptable.
PRODUCT SUBSTITUTION
In the event a specified manufacturer’s commodity listed in the Contract becomes unavailable or cannot be supplied by the Contractor for any reason (except as provided for in the Force Majeure Clause), a commodity deemed in writing by the Contractor to be equal to or better than the specified commodity may be substituted by the Contractor at no additional cost or expense to ITD. Unless otherwise specified, any substitution of commodity prior to ITD written approval may be cause for termination of Contract.
Audit Rights The Contractor agrees to allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
tariffs Tariff Costs: If the President of the United States, the United States Congress, Customs and Border Protection, or any other federal entity authorized by law, imposes an import duty or tariff (a tariffing) on an imported good that results in an increase in Contractor’s costs to a level that renders performance under this Agreement impracticable, Contractor may be permitted to add up to fifty percent (50%) of the actual and verifiable cost it directly incurs due to tariffs to its invoices submitted to the State, subject to the following conditions:
The Agency must have sufficient appropriation to pay any tariff costs.
The contractor shall promptly notify the Agency of the maximum cost of tariffs and obtain the Agency’s prior written approval for payment of any tariff costs. The Agency shall not be obligated to pay tariff costs for which the Agency did not provide prior written approval, for which the Agency does not have sufficient appropriation, or which exceeds the approved maximum. The contractor may provide notification of maximum tariffs on a case-by-case basis (for each order) or may provide blanket or time-bound notification (e.g., maximum for any orders placed for the next six (6) months).
Contractor shall take reasonable steps to avoid or minimize incurring tariffs and may be asked to provide a certification confirming its efforts and supporting documentation to the Agency.
The contractor may only invoice for actual approved tariff costs, even if that amount is less than the approved maximum.
The invoice must be supported by accurate documentation confirming the actual cost and applicability of tariffs, which may include country of origin, order/delivery dates, official tariff rates, declared value, supplier or manufacturer invoices, etc.
If applicable tariffs are subsequently reduced or eliminated, Contractor will promptly notify Agency, and invoices must reflect such change.
Any material misrepresentation of fact by Contractor relating in any way to an increase in pricing due to tariffs is a default under this Contract and shall be subject to the remedies set forth herein, in addition to any other claim or remedy available to the State. Furthermore, any material misrepresentation of fact by Contractor relating in any way to the Agency’s payment of additional sums due to tariffs shall be fraud against the taxpayers of the State and grounds for the Contractor to be deemed non-responsible and/or disqualified from participation in future solicitations administered by the State.
termination and cure See Idaho Contract Terms and Conditions located on the Attachments tab in ITB1052 IPRO powered by LUMA.
RESPONSIBILITIES PURSUANT TO IDAPA 38.05.01.081
The ITB Lead may, in the State’s sole discretion, require the apparent lowest responsive Bidder to provide documentation to demonstrate its responsibility. The ITB Lead may request documentation including but not limited to credit or financial reports and references. Failure to provide requested documentation may result in the Bidder being deemed non-responsible. Nothing herein shall prevent the State from using other means to determine Bidder’s responsibility.
RECORDS MAINTENANCE
The Contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records must be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
AUDIT RIGHTS
The Contractor must allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
SUBCONTRACTING
See Idaho Standard Terms and Conditions Subcontracting Section 1.13
INSURANCE REQUIREMENTS
See Appendix A - Insurance Requirements on the Attachment Tab in LUMA.
additional insurance requirements Garage Keepers Liability Insurance: Contractor must maintain Garage Keepers Liability Insurance with a limit of not less than $1,000,000 per vehicle, per occurrence.
DISPUTE RESOLUTION
During the performance of the Contract, the parties agree that it is in their mutual interest to resolve disputes informally. Any claims by the Vendor shall be submitted in writing to ITD’s Contract Manager and ITD for resolution. Any claims by the State shall be submitted in writing to the Vendor’s Project Manager for resolution. The Parties shall agree to negotiate in good faith and use all reasonable efforts to resolve such dispute(s). During the time the Parties are attempting to resolve any dispute, each shall proceed diligently to perform their respective duties and responsibilities under this Contract. The Parties shall agree on a reasonable amount of time to resolve a dispute. If a dispute cannot be resolved between the Parties within the agreed upon period, either Party may elect to exercise any other remedies available under the Contract, or at law. This provision, when agreed in the Contract, shall not constitute an agreement by either party to mediate or arbitrate any dispute.
NON-COMPLIANCE AND REMEDIES
ITD’s service location contact will be responsible for documenting non-compliance, in writing, via email. This notice will include the details of each discrepancy that requires corrective action. Invoicing must not occur until non-compliance has been corrected;
Correcting Non-Compliance - After receipt of written notice from ITD, the Contractor must respond, in writing, explaining how and when each discrepancy will be corrected. All discrepancies must be corrected and brought back into compliance with the Contract within fourteen (14) calendar days after receipt of the notice from ITD. If the Contractor does not correct the discrepancies within this timeframe, ITD reserves the right to take further remedial action;
In addition to any remedies available to the State under law or equity, the State may in its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to the State, 3) withhold payment or require payment of actual damages caused by the non-compliance, 4) terminate the Contract in addition to any remedies imposed by the State and;
If ITD must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, ITD may withhold the actual cost to ITD from the Contractor’s payment(s).
ATTACHMENT 1 – BIDDER QUESTIONS
ITB 1052 STENCIL TRUCK
PLEASE DO NOT IDENTIFY YOUR NAME OR YOUR COMPANY’S NAME OR PRODUCT NAMES OF INTELLECTUAL PROPERTY IN YOUR QUESTIONS.
ADD ROWS BY PRESSING THE TAB KEY WHILE IN THE TABLE AND WITHIN THE FINAL ROW.
The following instructions must be followed when submitting questions using the question format on the following page.
1. DO NOT CHANGE THE FORMAT OR FONT. Do not bold your questions or change the color of the font.
2. Enter the ITB section number that the question is for in the in ITB Section in field (column 1). If the question is a general question not related to a specific ITB section, enter in General in in column 1. If the question is in regard to a State Term or Condition or a Special Term or Condition, state the clause number in column 2. If the question is in regard to an attachment, enter the attachment identifier (example in Attachment Ain) in the in ITB Section in (column 1), and the attachment page number in the in ITB page in field (column 2).
3. Do not enter text in the in Response in field (column 4). This is for the State’s use only.
4. Once completed, this form is to be e-mailed per the instructions in the ITB. The e-mail subject line is to state the ITB number followed by inQuestions.in
Page | 2 ITB1052 Stencil Truck ITB 1052 Stencil Truck
| ITB Section |
| ITB Page |
| Question |
| Response |
ATTACHMENT 2 – Specifications
1. These specifications are the minimum and/or mandatory specifications that your Bid must meet in order for the State to consider your Bid for award. Restate each specification listed in this section in which your bid deviates, followed by your response demonstrating that your Bid meets or exceeds the required specifications; provide model, part number, or description, as appropriate.
2. The Truck must be the latest model of the manufacturer's current standard production, as offered to commercial trade. Although not specifically covered herein, all parts necessary to provide complete and functional truck, complete with accessories, must be furnished. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this ITB.
3. The specifications and brand names specified in this solicitation are intended to be descriptive but not restrictive and indicative of the quality and characteristics of items that meet the minimum requirements. Bidders offering an equal must include documentation which demonstrates, to the State’s satisfaction, that the offered item(s) meets the requirement of the solicitation. Failure to provide equal in documentation does not exempt the Bidder from providing the exact specification as provided in Attachment 2 - Specifications. Failure to provide satisfactory documentation may eliminate the Bidder from further consideration, if the State cannot determine to its satisfaction that the offered property is in equal in.
Section 1 – General Specifications
1. The Contractor must conduct a weight study of the Truck with simulated weight on the body, including all components to ensure proper weight and weight distribution across the vehicle truck chassis axles with emphasis on the front axle. This will include the full weight of fuel/paint/water/tools (guns)/stencils and two employees. (approximately two hundred (200) lb each) Documentation showing the results of the weight study must be inserted in a clear plastic sheet protector and placed in the Truck cab at the time of delivery. A copy of the weight study must be provided to ITD for review and approval prior to starting the manufacturing process on the Truck;
2. The Contractor must have the completed Truck weighed via certified public scale. The weight certificate must display each individual weight for the front axle, rear axle, and the combined total weight of both axles as measured in pounds. The axle weight certificate must be inserted in a clear plastic sheet protector and placed in each Truck cab at the time of delivery;
3. The Contractor must perform a two (2) axle center thrust alignment on completed Truck after installation of the flatbed and all components. Any deficiencies in the alignment must be corrected before delivery of Truck to ITD. The wheel alignment must be performed by a vendor normally engaged in performing tire repair and wheel alignment on platform/service type truck. Documentation stating the before and after alignment settings must be inserted in a clear plastic sheet protector and placed in each Truck cab at the time of delivery. Contractor will be one hundred (100)% responsible for premature tire wear and;
4. All welds must meet the American Welding Society www.aws.org (AWS) D1.1-96 specifications. All Joints and seems must be closed with full seam welding. Truck will be rejected for any inferior welding, and/or weld splatter. No exceptions.
SECTION 2
1. Paint
1.1. The Truck must be clean, prime coated, and powder coated per the paint manufacturer’s process for the application. The prime coat(s) and powder coat(s) must be a minimum dry thickness of 4 mils total. The powder coat must be ultraviolet resistant. The Truck must be smooth and free of rust, runs, overspray, peeling, weld splatter, and other defects;
1.2. Undercoating – Manufacturer’s standard polyurethane automotive type and;
1.3. Deck Surface – All walk areas shall have a hot sprayed non-slip polyurethane surface. Thickness, one hundred twenty-five (125) mils. Color is black. (Cold or roll-on system is not acceptable Surface to be sprayed prior to installing any components. All holes in deck must be drilled, as well as all welding must be complete before applying urethane.
2. Electrical Installation
2.1. All installed electrical cabling must be of adequate size to handle the anticipated loads of all electrical components. All cabling must be uninterrupted and complete with no splices;
2.2. All electrical cabling must be color-coded and numbered;
2.3. All cable terminal ends must be: crimped, soldered to the cables and sealed with polyolefin heat shrink tubing, or weatherproof connectors. Scotch-Loc fasteners and/or crimp butt connectors are not acceptable for any connection;
2.4. All electrical cable connections must be protected with dielectric grease;
2.5. The edges of all holes through which electrical cabling passes must be protected with a grommet;
2.6. All electrical cabling to lamps must be stress relieved within six (6) in of the lamp;
2.7. Low current circuits must be controlled by the Truck chassis’ electrical accessory power supply;
2.8. All wiring used in and around the Truck cab must be automotive cross link wiring meeting Society of Automotive Engineers (SAE) specification [1128 or 1127] for under the hood temperatures and abrasion resistance. All electrical modifications and additions require the use of continuously numbered or same colored wiring and the same wire gauges (size) as the manufacturer’s wiring;
2.9. All exposed wiring that is soldered must be sealed with polyolefin heat shrink tubing. Crimp- on connections are not acceptable;
2.10. Exposed terminal connections must be coated with Permatex SA-9 battery protector and sealer;
2.11. Original equipment manufacturers (original equipment) upfitter switches must be utilized as master switches for all electrical accessories. A label must be made and affixed near switches confirming operation of each switch;
2.12. All warning lights will have trigger wire capped and left visible for future light settings and;
2.13. An electrical schematic must be provided to ITD during the pre-build conference.
3. Fasteners
3.1. All threaded fastener components (bolts, washers, nuts) with a diameter designation greater than or equal to SAE one half (1/2) in must be grade eight (8) composition. Nuts must be all metal self-locking, lock washers are not acceptable. Two (2) bolt threads must extend through all nuts when fasteners are applied and properly tightened/torqued. All components must have grade identifier marks and a registered manufacturer’s logo. All bolts and nuts must be zinc plated.
SECTION 3
1. Description
1.1. Gross Vehicle Weight Rating (GVWR) – thousand five hundred (19,500) lb;
1.2. Cab to Axle (CA) Dimension – One hundred twenty (120) in clear frame rails, top and sides, back of cab to center of rear axle and;
1.3. Ground Clearance – Configured to allow for twelve (12) in of ground clearance for the PTO, fuel tanks, diesel exhaust fluid (DEF) tank, and the diesel particulate filter.
2. Cab
2.1. Type – Conventional standard cab, full-width;
2.2. Color- Original equipment white;
2.3. Sound Proofing – Headliner, cab back pane, full height door panels, and insulated;
2.4. Assist Handles – Location inside cab;
2.5. Glass – Tinted safety type;
2.6. Gauges – All gauges must be back lighted, visible, readable from driver’s position, and include the following: speedometer with trip odometer, coolant temperature, battery charge rate, fuel, tachometer, oil pressure, air suspension, transmission temperature and hour meter;
2.7. Seats – Driver/passenger seats must be high-back, adjustable front cushions, adjustable rear cushion, lumbar and armrest. All seats must have matching black cloth upholstery. Must include factory air bags. Will include heavy-duty canvas/saddle blanket type seat covers with reinforced outer edges;
2.8. Steering Column – Adjustable tilt;
2.9. Power Windows – Electrically operated;
2.10. Power Door Locks – Both doors;
2.11. Door Pouches – Both doors;
2.12. Drink holders – Minimum two (2);
2.13. Hood – Standard or Tilting. Standard must include front fender flares. Tilting will be fiberglass with required insulation to dampen engine noise and equipped with fender extensions. Must include formed fiberglass or plastic inner fenders attached to hood and splash guards extending down the inner fenders;
2.14. Grille – Equipped with three eighths (3/8) in maximum opening radiator rock screen;
2.15. Side Steps – Aluminum self-cleaning;
2.16. Front Bumper – Chrome and;
2.17. Door Handles – Chrome.
3. Frame
3.1. Type – Constant depth, single c-channel frame and;
3.2. High strength alloy fifty thousand (50,000) psi steel.
4. Suspension and Axles
4.1. Front Springs – Seven thousand (7,000) lb rated capacity, leaf with power steering rated for front axle capacity with stabilizer bar and shock absorbers and;
4.2. Rear Suspension – Thirteen thousand five hundred (13,500) lb rated capacity, air-ride with driver-controlled air release valve in cab, differential lock and; magnetic differential drain plug.
5. Wheels and Tires
5.1. Wheels – Nineteen point five (19.5) polished aluminum, DRW and;
5.2. Tires – Steel radial type, with major manufacturer type tires.
6. Diesel Engine
6.1. Horsepower – Minimum peak rating of three hundred thirty (330) HP;
6.2. Electronically controlled, liquid water cooled, four (4) cycle, eight (8) - cylinder, turbocharged diesel;
6.3. Torque – Minimum seven hundred (700) ft lb;
6.4. Cooling System – Protected to minus thirty – four (– 34°) F ambient temperature with extended life type antifreeze and designed to keep engine from overheating while operating at maximum output in one hundred ten (110° F) ambient temperature;
6.5. Hoses – All coolant hoses, radiator and heater, must be silicone type approved for diesel engine cooling system applications;
6.6. Fan – Belt or electric drive, belt driven fan must utilize clutch engagement;
6.7. Air Filter – Single element, under hood mounted with restriction indicator;
6.8. Oil Filter – Spin-on type;
6.9. Fuel filter(s) – Easy change, cartridge type;
6.10. Engine Warning Device – Audible/visual alerts for high coolant temperature, low coolant level, low oil pressure, low fuel level, and low battery voltage;
6.11. Engine Brake – Diesel exhaust brake;
6.12. Exhaust –Exhaust system must be a horizontal with tailpipe exiting opposite of fuel fill;
6.13. Cold Starting Aid – Designed to start engine in minus thirty – four (-34°)F ambient temperature;
6.14. Engine Block Heater – A seven hundred fifty (750) - watt electric with stationary receptacle mounted below driver's door must be compatible with all ground fault circuit interrupter (GFCI) electrical systems;
6.15. Engine Drain – Magnetic plug or valve and;
6.16. Electronic Starter Interlock – To prevent starter activation with engine running.
7. Transmission
7.1. Allison two thousand (2000) or three thousand (3000) series rugged duty series (RDS) automatic six (6)-speed transmission, latest (RD9) or Torqshift ten (10)-speed with park and power take off (PTO) provision designed for on-road applications, equipped with a dash mounted push button controller;
7.2. Driveline torque rating must exceed engine’s maximum torque rating and;
7.3. Drive Type – Two (2) WD.
8. Brakes
8.1. Service – Commercial grade four (4) channel ABS disc type, front and rear.
9. Electrical
9.1. Batteries – Twelve (12) - volt with a total capacity rating of one thousand three hundred (1,300) cold cranking amps at zero (0°) F and equipped with grease filled battery protectors;
9.2. Alternator – A two hundred twenty (220) - amp rating, brush type;
9.3. Lighting Equipment - Must comply with federal standards, Title forty – nine (49), Idaho Code, and equipped with halogen headlamps, daytime running lights, light emitting diode (LED) Stop, Turn, Taillights, door activated cab dome lights, and courtesy lights. Turn signals must have a visual and audible indicator;
9.4. Accessory Power Port – Two (2) high power USB type ports and;
9.5. Power Outlet- One hundred ten (110) Volt AC.
10. Upfitter Switches
10.1. Original equipment Integrated.
11. Equipment and Accessories
11.1. Heater – Fresh air with dual defroster and blow on both side door windows as well as windshield;
11.2. Air Conditioner – Designed for operation in one hundred ten (110°) F ambient temperature;
11.3. Sun Visors – Two (2) total, fold down type;
11.4. Windshield Wipers/Washers – Dual, two (2)-speed intermittent electric wipers with washer reservoir;
11.5. Outside Rear-View Mirrors – Motorized full size heated with LED turn indicators and convex mirror on breakaway mounts;
11.6. Cruise Control – Capable of allowing chassis to operate at steady speeds from 5 miles per hour (MPH) to seventy seventy (70) MPH and equipped with switches to set, resume and accelerate in cruise mode, with steering wheel controls;
11.7. Trailer Brake Controller – Original equipment Integrated;
11.8. Tow Package – Class five (5);
11.9. Insect Guard – Screen type mounted behind Grille;
11.10. Rearview Camera – Original equipment equipped camera kit to be installed at rear of flat bed in skirt;
11.11. Back-up Alarm- Original equipment integrated;
11.12. Front Bumper - FOG lights must be mounted in front bumper;
11.13. Seatbelts – Lap belt with seat-to-floor kit and shoulder belt for both seating positions. Safety orange in color;
11.14. Radio – amplitude modulation/frequency modulation (AM/FM) weather band radio with clock and separate antenna. Will include touch screen with Apple CarPlay and Android Auto;
11.15. Roadside Triangle Warning Kit - Department of Transportation (DOT) approved. Shipped loose;
11.16. Warning Lights- Front Alternating Flashing Lights – Two (2) Whelen ION (Amber/White) series super LED, four (4) in, mounted in front grille as high and as far apart as possible within the grille;
11.17. Two (2) spare keys with key fobs;
11.18. Fuel Tank – A forty (40) gal diesel tank. Must be labeled with DIESEL placard on body and;
11.19. DEF (Diesel Exhaust Fluid) Tank – Maximum capacity tank. Must be labeled with DEF placard on body.
SECTION 4
1. Truck Body
1.1. Type – Custom built stencil truck body to meet specifications;
1.2. Size – Eight (8) ft wide by sixteen (16) ft long minimum, not including bumper;
1.3. Longitudinal Members – Seven (7) - gauge, seven (7) in structural channel;
1.4. Cross members – seven (7) - gauge, four (4) in structural channel on twelve (12) in centers;
1.5. Deck – Smooth steel ten (10) - gauge deck;
1.6. Headboard – ninety-six (96) in X forty-eight (48) in twelve (12) gauge skin sheet with punched hole window for rear view. 4in structural channel uprights, welded directly to platform Underbody Cabinets – two (2) cabinets with doors. One (1) each is located at rear of flatbed on either side. Purpose is to house hose reels. Must be designed so that reels can be accessed for servicing;
1.7. Steps – Self-cleaning steps to be installed on flat bed, both sides, just aft of bulkhead for access to bed. Will include two (2) handrails; one (1) right, one (1) left. Two (2) additional self-cleaning aluminum steps must be installed halfway up the rear skirt from rear bumper to the bed, each spaced to the outside of the center stencil rack. Handrails must be installed on the rear of the stencil rack;
1.8. Folding Vertical Side Bars – Five (5) upright folding square stock bars attached to flatbed, spaced evenly, located street side. Must have built-in supports to hold bars when in down position. Must include a way to lock bars in place when in an upright position. Tabs will be welded to the center stencil rack across from bars. The purpose is to attach straps to hold Thermal Plastic materials in place;
1.9. Rear Bumper – Eight (8) ft X fourteen (14) in with expanded metal non-slip surface and;
1.10. Static Ground Straps – Shall comply with Federal and State regulations.
2. Standing Vehicle Lighting
2.1. Manufacturer’s standard stop, turn, reverse, marker, Taillight LED lighting system with adequate supports to prevent sagging wiring. Must conform to Federal and State requirements. (DOT) and;
2.2. Rear Lights shall be frenched into the rear drop skirt for protection.
3. Warning Lights
3.1. Warning Lights (Amber) – Three (3) total, fifteen (15) in Whelen Model R2LPPA LED mini bars. Visible from all directions of travel. Two (2) mounted on/above headboard as far apart as possible as to not interfere with arrow board. One (1) mounted center rear above stencil rack. (In between work lights.);
3.2. Rear Alternating Flashing Lights (Amber) – Four (4) Whelen ION series mounted vertically on rear skirt of truck at equal distance starting from the edges of the skirt.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .