ITB 1049 - Adminstration Document - Lenore Rest Area Janitorial Services.docx
DOCX document 4 MB Posted
- Solicitation number
- 1049
- Issued by
- Canyon County, Idaho
About this file
This Invitation to Bid (ITB 1049) is issued by the Idaho Department of Transportation (ITD) District 2 for comprehensive janitorial services and snow removal at the Lenore Rest Area located at US 12 Mile Post 27.67, Orofino, Idaho 83544. The solicitation requests qualified vendors to provide daily restroom cleaning (two times daily including toilets, urinals, sinks, mirrors, soap dispensers, hand dryers, and floors), weekly facility inspections and maintenance tasks, monthly deep cleaning services including high-pressure washing of building exteriors and clearing of debris from gutters and arbor roofs, quarterly power scrubbing and resealing of restroom floors, semi-annual light fixture and skylight cleaning, grounds maintenance including litter removal and sidewalk cleaning, and seasonal snow removal and ice management to maintain bare sidewalks and safe access available 24/7. The facility inventory includes two restrooms, three arbors, 21 tables, two parking areas, 10 garbage containers, one drinking fountain, one visitor center, four benches, two concrete butt receptacles, and one pet waste station. The deadline for submitting questions is November 5, 2025, at 5:00 PM Mountain Standard Time, with the ITB closing date and opening date specified in the IPRO header document. An optional pre-bid tour is scheduled for November 4, 2025, at 10:30 AM Pacific Standard Time at the rest area location, with a maximum of two people per vendor permitted to attend. The contract award will be made to the responsive, responsible bidder with the lowest total cost. The initial contract term is two years with the option to renew for two additional two-year periods upon mutual written agreement, providing a total anticipated contract term of six years.
Bidders must submit a fully burdened total cost on the Bid Schedule (Attachment 3) via the electronic IPRO Powered by LUMA platform; no alternate bids are permitted. The solicitation does not identify any set-asides. Payment will be made in accordance with Idaho Code 67-2302 after receipt and acceptance of the contractor's itemized invoice, with total payments not exceeding the bid schedule amount unless modified by contract amendment. A price adjustment may be considered after the first twelve months of the initial contract term and every twelve months thereafter, provided the contractor submits supporting documentation of industry-wide increases sixty calendar days in advance. The contractor's monthly payment is subject to reduction for substandard performance based on monthly inspection ratings, with reductions ranging from 5 percent to 30 percent depending on the average rating scale score. ITD reserves the right to decommission or move the rest area with one year's notice, or to add or remove locations with pricing equal to or less than existing similar locations. The contractor must reside on-site or designate a resident caretaker to live on-site at a contractor-provided residence on an ITD-supplied concrete pad with utility hookups; occupancy is limited to the contractor or caretaker and immediate family. The contractor must maintain worker's compensation insurance as required by Idaho law, comply with federal ADA guidelines regarding service animals, adhere to specified ITD policies including harassment in the workplace and alcohol and drug-free workplace requirements, obtain appropriate insurance for the residence and personal property, and provide current Safety Data Sheets for all cleaning chemicals in an accessible binder maintained at the rest area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 1049 - Attachment 1 - Lenore Rest area Janitorial Requirements and Scope of Work.docx | DOCX document | |
| Solicitation_Instructions-July-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
IDAHO TRANSPORTATION DEPARTMENT
Invitation to Bid (ITB) 1049
ITD D2 LENORE REST AREA JANITORIAL SERVICES
ITB Administrative Information
| ITB Title: |
| ITD D2 Lenore Rest Area Janitorial Services |
| ITB Project Description: |
| ITD D2 Lenore Rest Area Janitorial Services |
ITB Lead:
Doug Buswell Contracting and Grants Officer Phone: 208-772-8077 Email: Doug.buswell@itd.idaho.gov Preferred method of contact is email
Idaho Transportation Department
Public Bid Opening:
Teams Link:
Phone:
Phone Conference ID:
The Public Bid Opening will take place the next business day after the ITB Close Date.
Join the meeting now Meeting ID: 231 464 023 779 8 Passcode: ub7Gf3hN
Submit electronically via IPRO Powered by LUMA (IPRO):
Electronic Submission IPRO Powered by LUMA (hereafter referred to as “IPRO”)
Optional Pre-Bid Tour Location:
November 4, 2025 – 10:30 AM PST District 2 Lenore Rest Area US 12 Mile Post 27.67, Orofino, Idaho 83544
| Deadline To Receive Questions: |
| November 5, 2025 5:00 PM MST |
| ITB Closing Date: |
| See IPRO Header Document |
| ITB Opening Date: |
| See IPRO Header Document |
| Term |
| The initial term of the contract will be two (2) years, with the option to renew for two additional two (2) year periods for a total of six (6) upon mutual, written agreement between the parties. |
THE ADMINISTRATIVE FEE DETAILED IN SECTION 5.2 OF THE STATE’S STANDARD CONTRACT TERMS AND CONDITIONS WILL NOT APPLY TO THE CONTRACT(S) THAT RESULT FROM THIS SOLICITATION.
| 1 | PURPOSE | 5 |
| 2 | GENERAL INFORMATION, SOLICITATION INSTRUCTIONS AND STANDARD TERMS AND CONDITIONS | 5 |
| 3 | INQUIRIES | 5 |
| 4 | BACKGROUND | 5 |
| 5 | SUBMISSION REQUIREMENTS | 6 |
| 6 | BID SUBMISSION METHODS | 6 |
| 7 | AWARD | 6 |
| 8 | PRE-SITE INSPECTION | 7 |
| 9 | KICK OFF & PERFORMANCE REVIEW MEETINGS | 7 |
| 10 | GENERAL INFORMATION | 7 |
| 11 | ITD CONTRACT MONITOR AND MANAGER | 7 |
| 12 | CONTRACTORS EMPLOYEES | 8 |
| 13 | SUBCONTRACTING | 9 |
| 14 | PROPERTY DAMAGE | 9 |
| 15 | SERVICE ADJUSTMENTS | 9 |
| 16 | WORK SCHEDULE | 9 |
| 17 | CHANGES TO SCOPE OF WORK | 9 |
| 18 | NOTIFICATION OF MAINTENANCE ISSUES OR DAMAGE | 10 |
| 19 | QUANTITY | 10 |
| 20 | KEY MONITORING METRICS | 10 |
| 21 | INSPECTIONS | 11 |
| 22 | REPORTING REQUIREMENTS | 12 |
| 23 | REMEDIAL ACTION | 12 |
| 24 | TRANSITION | 12 |
| 25 | SAFETY DATA SHEET | 12 |
| 26 | COMPLIANCE WITH FEDERAL AND STATE LAW, AND ITD POLICIES FEDERAL AND STATE LAW | 13 |
| 27 | ITD POLICIES | 13 |
| 28 | payment ADJUSTMENT CLAUSE | 13 |
| 29 | TERMINATION | 14 |
| 30 | WORKPLACE ENVIRONMENT | 14 |
| 31 | REPLACEMENT OF CONTRACTOR EMPLOYEE | 14 |
| 32 | TERM AND RENEWALS | 14 |
| 33 | QUANTITY | 14 |
| 34 | COST | 15 |
| 35 | INVOICING | 15 |
| 36 | PAYMENT | 15 |
| 37 | SPECIAL TERMS AND CONDITIONS PRICE ADJUSTMENT | 15 |
| 38 | RESPONSIBILITIES PURSUANT TO IDAPA 38.05.01.081 | 16 |
| 39 | RECORDS MAINTENANCE | 16 |
| 40 | AUDIT RIGHTS | 16 |
| 41 | INSURANCE REQUIREMENTS | 16 |
| ATTACHMENT 1 – BIDDER QUESTIONS | 17 | |
| ATTACHMENT 2 – PRE-BID TOUR REGISTRATION FORM | 19 | |
| ATTACHMENT 3 – BID SCHEDULE | 20 | |
| EXHIBIT 1 – Daily Log | 21 | |
| EXHIBIT 2 - WEEKLY, MONTHLY, QUARTERLY, SEMI-ANNUALLY LOG OF CLEANING | 22 | |
| EXHIBIT 3 – monthly inspection report | 23 | |
| EXHIBIT 4 – janitorial caretaker requirements | 24 | |
| EXHIBIT 5 – Lenore Rest Area Housing Policy | 26 | |
| EXHIBIT 6 – Housing Policy Signature Page | 28 | |
| EXHIBIT 7 – Employee Caretaker Scope of Work Acknowledgement | 29 | |
| EXHIBIT 8 – Lenore Rest Area Inventory | 30 | |
| EXHIBIT 9 – LENORE REST AREA PHOTOS | 31 | |
| EXHIBIT 10 – MAPS | 32 |
PURPOSE
The Idaho Department of Transportation (ITD), through the Idaho Division of Purchasing (“ITD”), is requesting Bids from qualified Vendors for ITD District 2 Lenore Rest Area janitorial services and snow removal in accordance with the specifications provided in this ITB.
GENERAL INFORMATION, SOLICITATION INSTRUCTIONS AND STANDARD TERMS AND CONDITIONS
This Solicitation is issued by the state of Idaho (the “State”) via IPRO Powered by LUMA. The ITB Lead is the only contact for this Solicitation. All correspondence regarding this ITB shall be in writing. In the event that it becomes necessary to revise any part of this ITB, amendments will be posted in IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this ITB shall not be relied upon. All changes to this ITB must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.
INQUIRIES
Questions or other correspondence must be submitted in writing to the ITB Lead listed below. QUESTIONS MUST BE RECEIVED BY 4:59:59 P.M. Mountain Time ON THE DATE LISTED IN THE ITB ADMINISTRATIVE INFORMATION. Written questions must be submitted using Attachment 1 - Bidder Questions. Official answers to all written questions will be posted on IPRO as an amendment to this ITB.
ITB Lead: Doug Buswell Phone: (208) 772-8077 E-mail: doug.buswell@itd.idaho.gov
Any questions regarding the State of Idaho Standard Contract Terms and Conditions found in this event in IPRO Powered by LUMA, must be submitted in writing, using Attachment 1 - Bidder Questions, by the deadline identified in the ITB Administrative Information. The State will not consider proposed modifications to these requirements after the date and time set for receiving questions. Questions regarding these requirements must contain the following:
1. The rationale for the specific requirement being unacceptable to the party submitting the question (define the deficiency);
2. Recommended verbiage for the State’s consideration that is consistent in content, context, and form with the State’s requirement that is being questioned and;
3. Explanation of how the State’s acceptance of the recommended verbiage is fair and equitable to both the State and to the party submitting the question.
Bids which condition the Bid based upon the State accepting other terms and conditions not found in the ITB, or which take exception to the State’s terms and conditions, will be found non-responsive, and no further consideration of the Bid will be given.
BACKGROUND
4.1. ITD operates more than twenty (20) Rest Areas located on ten (10) highways throughout Idaho. Rest Areas offer travelers opportunities to take breaks from driving, stretch, walk the dog and let the kids run off pent up energy. Most importantly, they allow travelers to return to the highways refreshed and alert and;
4.2. Rest Area facilities vary from site to site, but they offer restrooms, tables (with or without shelters), trash receptacles, drinking fountains, shaded areas and travel information boards. Some of the large facilities offer walking and paved biking trails, larger parking areas for recreation vehicles and semi-trucks.
SUBMISSION REQUIREMENTS
Required Bid Submission Items.
Your Bid Submission must consist of the following:
Bid Schedule;
Provide your cost information on Attachment 3 - Bid Schedule. Do not submit your Bid on any other form. Submitting your Bid on a form different than the Bid Schedule may cause your Bid to be rejected as non-responsive;
State of Idaho Signature Page and;
The State of Idaho Signature Page must be completed and submitted as part of your Bid. The State of Idaho Signature Page is attached in IPRO.
BID SUBMISSION METHODS
Bids must be submitted electronically via IPRO. Do not fax or e-mail your Bid. Your Bid must be received at the Division of Purchasing by the date and time specified on the IPRO header document. The official time, for bid closing purposes, is the Division of Purchasing’s time clock;
Electronic Submission via IPRO;
Submitting electronically via IPRO, upload all of the Required Bid Submission Items (See Section 5.1) and enter your cost in IPRO for each line item; as the “Total Cost” on the Bid Schedule OR $0.01 as your cost in IPRO;
Upload all Required Bid Submission Items using Microsoft products such as Word and Excel. Do not submit items in .pdf format, unless provided otherwise in this ITB and;
Submitting via IPRO be advised that the Bidder for Bid evaluation and award purposes is the entity profile under which submit in IPRO, which must be the same legal entity presented in your uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Bid in IPRO, the information provided on the Signature Page prevails;
It is mandatory to submit your Bid electronically via IPRO, all Bidders participating in a Solicitation issued through IPRO must establish an account in the IPRO system as it is necessary in order to process and/or award the resulting Contract(s). It is free to establish an account and only takes a few minutes and;
Bidders are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows the State to efficiently navigate the Bidder’s response as the State will print uploaded documents for evaluation in the manner received via IPRO.
AWARD
7.1. Award will be made all to one to the responsive responsible Bidder with the lowest Total Cost, as provided on Attachment 3 – Bid Schedule;
7.2. The State reserves the right not to evaluate or make an award in the best interest of the State. The State also reserves the right to make multiple awards per manufacturer, per area, in accordance with Section 67-9211 of Idaho Code in the best interest of the State and;
7.3. ITD reserves the right to award in the best interest of the State.
*It is within ITD’s rights to decommission/move a Rest Area in the best interest of the State. If a Rest Area is decommissioned the Contractor will be given one (1) year notice and the last day of the contract is when the decommissioned Rest Area is closed. If a Rest Area is moved the Contractor will be given one (1) year notice and up to $3,000 or actual cost, whichever comes less from ITD to help relocate the caretaker residence within the District.
PRE-SITE INSPECTION
8.1. All parties interested may attend the optional pre-bid tour. Parties interested in attending this conference should notify the ITB lead no later than one (1) business day prior to the date of the pre-bid conference. The written request should specify the name and title of each person who will be attending. A maximum of two (2) people for each party interested will be allowed to attend and;
8.2. See Attachment 2 – Pre-Bid Tour Registration for registration.
KICK OFF & PERFORMANCE REVIEW MEETINGS
The Contractor(s) must attend a contract kick-off meeting located at ITD’s District 2 HQ facility, within two (2) weeks after contract award. This meeting will consist of an overview of the contract requirements;
The Contractor and Contractor’s employee(s) contact information must be provided to the ITD Contract Monitor at the kick-off meeting. Contract Monitor contact information will be provided at the time of Contract award and;
ITD may require the contractor’s contract monitor to attend performance review meetings. These meetings are typically held when the contractor continues to fail to meet the requirements of the contract. This is a way for ITD and the contractor to meet in person or over the phone (at ITD’s discretion) to discuss discrepancies together in a constructive environment. The contractor’s attendance is mandatory when required by ITD and are at no additional cost to ITD when they are required.
GENERAL INFORMATION
Overview The Lenore Rest Area, located on US 12 Mile Post 27.67, Orofino, Idaho 83544.
And serves as a critical facility for travelers, providing amenities such as restrooms, picnic areas, parking, and information kiosks. The rest area requires regular maintenance to ensure a clean, safe, and welcoming environment. The caretaker services include janitorial tasks to maintain the facility’s functionality and appearance, with the Contractor (or their designated Resident Caretaker) required to reside on-site. ITD provides a concrete pad and utility hookups for the caretaker residence, while the Contractor must provide and maintain the residence, adhering to the housing policy in Exhibit 5.
ITD CONTRACT MONITOR AND MANAGER
Contract Monitor contact information will be provided at the time of Contract award. The Contract Monitor is responsible for managing the performance of the contract;
Contract Manager contact information will be provided at the time of the contract award. The Contract Manager is responsible for managing the Contract and remedial action and;
The Contractor and Contractor’s employee(s) contact information must be provided to the ITD Contract Monitor at the kick-off meeting.
CONTRACTORS EMPLOYEES
The Contractor must provide the ITD Contract Monitor, or designee, with the names and telephone numbers of all employees who will be utilized in the performance of the Contract, including the Janitorial Caretaker. This information must be updated if personnel changes occur during the term of the Contract and be provided in writing via email to ITD as quickly as possible, with a maximum of twenty-four (24) hours;
Uniforms, Class III Vests, and Name Tags must be worn by employees while on duty at the Rest Area. Uniforms and Name Tags must be presented to ITD Contract Monitor or designee for written approval seven (7) calendar days prior to contract start date or as authorized by ITD. Employees must display easily read identification badges, either attached to or printed on the uniforms, which identify the employee’s name and the Contractor. Employees’ attire must be clean and presentable during their entire shift;
The Contractor and employees must treat the public in a friendly, courteous manner. The public have many questions: employees should be well informed on local road conditions, detours, service stations, motels, restaurants, and tourist attractions. Employees must be able to communicate effectively with the public in English;
Tips or other gratuities must not be accepted by the Contractor or employees for any services performed in the Rest Area;
Guests or immediate family of the Contractor or employees will not be allowed to accompany or assist with janitorial services unless they are also employees. Pets will not be allowed to accompany Contractor or employees while performing duties in the Rest Area without written approval from ITD;
Contractor and employees are prohibited from operating or advertising any commercial enterprise or activity on any part of the Rest Area premises;
Contractor and employees are prohibited from having firearms in their possession while on duty;
Contractors employees must be properly classified as employees and be on the Contractors payroll and NOT be treated as Independent Contractors;
It is distinctly and particularly understood and agreed between the parties to the Contract that the State is in no way associated or otherwise connected with the performance of any service under the Contract on the part of the Contractor or with the employment of labor or the incurring of expenses by the Contractor. Said Contractor is an independent contractor in the performance of each and every part of the Contract, and solely and personally liable for all labor, taxes, insurance, required bonding and other expenses, except as specifically stated herein, and for any and all damages in connection with the operation of the Contract, whether it may be for personal injuries or damages of any other kind. The Contractor shall exonerate, defend, indemnify and hold the State harmless from and against and assume full responsibility for payment of all federal, state and local taxes or contributions imposed or required under unemployment insurance, social security, worker’s compensation and income tax laws with respect to the Contractor or Contractor’s employees engaged in performance under the Contract. The Contractor will maintain any applicable worker’s compensation insurance as required by law and will provide certificate of same if requested. There will be no exceptions made to this requirement and failure to provide a certificate of worker’s compensation insurance may, at the State’s option, result in cancellation of the Contract or in a contract price adjustment to cover the State’s cost of providing any necessary worker’s compensation insurance. The Contractor must provide either a certificate of worker’s compensation insurance issued by a surety licensed to write worker’s compensation insurance in the state of Idaho, as evidence that the Contractor has in effect a current Idaho worker’s compensation insurance policy, or an extraterritorial certificate approved by the Idaho Industrial Commission from a state that has a current reciprocity agreement with the Idaho Industrial Commission. The State does not assume liability as an employer. (See Idaho Standard Terms and Conditions) and;
Contractor’s employees must be paid the federal minimum wage provisions as contained in the Fair Labor Standards Act (FLSA) https://www.dol.gov/general/topic/wages/minimumwage. In cases where an employee is subject to both the state and federal minimum wage laws, the employee is entitled to the higher of the two minimum wages.
SUBCONTRACTING
See section 1.13 of Idaho Standard Terms and Conditions for Subcontracting rules.
PROPERTY DAMAGE
In the event ITD property is damaged by the Contractor, the Contractor must:
Take immediate corrective action to prevent further damage;
Prevent pedestrians from coming in contact or harming themselves as a result of the damage;
Take photographs and notify ITD, via phone and in writing, within the same business day;
Provide ITD with a corrective action plan to repair damages within twenty-four (24) hours of the damage;
Repairs must be approved by ITD prior to work taking place and be completed within seven (7) business days after approval by ITD;
In the event repairs are not made within seven (7) business days, ITD will have the right to have repairs made or to make repairs and deduct this amount from any invoices due to the Contractor and;
The property must be repaired to restore the damaged area(s) back to the original condition at no additional cost to ITD.
SERVICE ADJUSTMENTS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
In the event that ITD needs to add or remove a location from this contract, it is expected that the Contractor will be able to expand or eliminate services without other locations being affected;
Any new locations must receive pricing that is equal to or less than the pricing offered to similar locations currently being serviced as part of the resulting Contract and;
In addition, if a location is removed from this contract, the pricing for the other locations currently being serviced as part of this contract will not be altered unless mutually agreed to by both parties.
WORK SCHEDULE
16.1. Employees are not required to work specific hours; however, the work schedule must be maintained to meet the requirements identified in Section 9 of Attachment 1 – Requirements & Scope of Work, to keep the rest area clean and open to the public.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
CHANGES TO SCOPE OF WORK
The State reserves the right to revise the Scope of Work and Buildings as may be deemed to be in the best interest of the State. Any changes to the Scope of Work, including changes in Contract price resulting from revisions to the Scope of Work by adding additional cleaning duties must be documented by a formal Amendment to the Contract, which will not be valid until signed by ITD and the Contractor.
NOTIFICATION OF MAINTENANCE ISSUES OR DAMAGE
The contractor’s employees must advise the ITD Contract Monitor or designated staff if there are any maintenance problems in any of the facilities on the premises;
Emergency maintenance issues, which are maintenance issues that present a likelihood of safety concerns or additional damage if not addressed quickly, must be reported immediately upon observing the issue. ITD will give the Contractor an emergency number to be used to report emergency maintenance issues. This number is intended to allow employees to reach ITD twenty-four (24) hours per day. Emergency maintenance issues include, but are not limited to, serious leaks, broken windows, and electrical hazards;
Non-emergency maintenance issues must be reported by the end of the shift during which the issues are observed. ITD will provide an ITD office number to call, which will allow ITD employees to receive the message during the following workday. Non-emergency maintenance issues include, but are not limited to, damaged furniture, minor leaks, damaged plumbing components, damaged or broken office accessories, broken or cracked glass, or any other maintenance or repair concerns that do not pose an immediate threat to people or property and;
The Contractor must report to the ITD Contract Monitor any damage to state or ITD personnel property caused by Contractor’s employees by the end of the shift during which the damage was caused. Within twenty-four (24) hours, the Contractor must notify ITD of its plans to repair or replace the damaged property as quickly as possible.
QUANTITY
ITD reserves the right to change items, quantities, and/or frequency of tasks at any time during the life of the Contract upon written notification to the Contractor and;
If circumstances require extended closure of the Leonore Rest Area, the Contractor’s duties and compensation may be suspended for the closure period.
KEY MONITORING METRICS
Below is a list of requirements within the scope of the Contract that ITD will be monitoring. This is not an exhaustive list; ITD will be monitoring all requirements and will take remedial action as necessary. The key metrics below have payments associated with them, thus are called out in this separate section;
ITD will determine acceptance of service by performing monthly, random, and public inspections as detailed below. These inspections will determine if the service being provided is in compliance with the Contract and to assess price adjustments for Substandard Performance. Failure of the Contractor to perform any of the requirements will be defined as a “Discrepancy(ies)”. Discrepancies include, but are not limited to:
Failure to comply with all requirements of the Contract;
Failure to complete tasks as described in Attachment 5 – Weekly Log of Facility Cleaning;
Failure to notify ITD of any needed repairs, replacements, or non-functioning items within twenty-four (24) hours;
Failure to notify ITD of emergencies or incidents within the required time frame;
Assignment of the Contract without prior approval of the State;
Replacement of a Contractor without prior notice to ITD and;
Receipt of excessive or serious complaints from public citizens or ITD Staff. Ongoing or repeated complaints regarding the same or similar problems will be considered excessive. Complaints related to issues of the public safety or criminal activity will be considered serious.
INSPECTIONS
20.1 20.2 20.3 20.4 20.5 20.6 20.7 20.8 20.9 20.10 20.11 20.12 20.13 20.14 20.15 20.16 20.17 20.18 20.19 20.20 20.21 20.22 20.23 20.24 20.25 Monthly Inspections – ITD will perform monthly inspections to verify the Contractor’s compliance with the Contract. ITD will provide a schedule for the monthly inspections at the kickoff meeting. ITD reserves the right to modify the scheduled monthly inspection, and it will provide the update to the Contractor at least one (1) week in advance of the modification. The Contractor must be present during every scheduled monthly inspection. If the Contractor is not present for the scheduled inspection, the inspection will be conducted, and the Contractor will be subject to all findings in their absence. If monthly inspections continue to show Substandard Performance, the Contractor’s Contract Manager will be required to attend the scheduled inspections, at no additional cost to ITD;
ITD will assign a representative to conduct each monthly inspection. The ITD representative will complete the Attachment 6 – Janitorial Inspection Report and email it to the Contractor’s Contract Manager within twenty-four hours (24) after completion of the inspection. This Report will document all items inspected, rating for each item, and comments as needed. All Discrepancies found will be noted in the “comments” field of the Report and photographs may be attached as needed;
The Contractor’s Contract Manager must confirm receipt of the Report and provide a written response explaining how and when each Discrepancy will be corrected. All Discrepancies must be corrected and brought back into compliance with the Contract within twenty-four (24) hours after receipt of the Report from ITD;
Random Inspections – ITD may perform random inspections at any time during the Contract. No notice will be given prior to random inspections. The Contractor may accompany ITD’s representative during each inspection, but it is not required. The ITD representative will complete the Report and email it to the Contractor’s Contract Manager within twenty-four hours (24) after completion of the inspection. This Report will document all items inspected, rating for each item, and comments as needed. All Discrepancies found will be noted in the “comments” field of the Report and photographs may be attached as needed;
The Contractor’s Contract Manager must confirm receipt of the Report and provide a written response explaining how and when each Discrepancy will be corrected. All Discrepancies must be corrected and brought back into compliance with the Contract within twenty-four (24) hours after receipt of the Report from ITD and;
Public Inspections – ITD will review all notifications made by public citizens and ITD staff that relate to the Contractor’s performance. ITD may conduct a random inspection or forward a copy of the notification to the Contractor. If a random inspection is performed by ITD, the same conditions apply per the above section for “Random Inspections”. If a copy of the notification is provided to the Contractor, all Discrepancies must be corrected and brought back into compliance with the Contract within twenty-four (24) hours after receipt of the notification from ITD. Price Adjustments (see below) will not apply to forwarded public notifications; price adjustments will only apply if ITD performs a monthly or random inspection.
REPORTING REQUIREMENTS
The following records must be maintained carefully and accurately.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
1.
Weekly & Daily Log (See Attachment 4 – Daily Log and Attachment 5 – Weekly, Monthly, Quarterly, Semi-Annually Log of Cleaning);
The Contractor or employees must keep a Weekly & Daily Log (See Attachment 4 – Daily Log and Attachment 5 – Weekly, Monthly, Quarterly, Semi-Annually Log of Cleaning);
Detailing tasks completed; times of completion; details of unusual activities, including, but not limited to, accidents; vandalism and other incidents; lost and found articles; if applicable and;
ITD will supply one master log sheet set to the Contractor. The Contractor must make enough copies to have at least one (1) Weekly Log available at ITD District 2 Lenore Rest Area for each week of the Contract term. Weekly Log sheets must be digitized and e-mailed by the Contractor to the Contract Monitor weekly.
REMEDIAL ACTION
In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to the State, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) withhold and reduce payment pursuant to Section – 28 Price Adjustment Clause, 5) terminate the Contract pursuant to Section 29 – Termination, in addition to any remedies imposed by the State and;
If ITD must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, ITD may withhold the actual cost to ITD from the Contractor’s payment(s).
TRANSITION
Prior to the end of the Contract term (including any extensions), the Contractor must provide all reasonable transition assistance to ITD to ensure the orderly transfer of service to another service provider. In the event that there may be a potential gap in service, when transitioning to a new service provider, the Contractor must continue to provide service for a period up to ninety (90) calendar days, or such less time as the parties may agree to in writing. The Contractor will be compensated for all services extended in writing beyond original contract term, at the Unit Price as outlined in ATTACHMENT 3, Bid Schedule.
SAFETY DATA SHEET
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
The Contractor must provide a binder at the ITD District 2 Lenore Rest Area containing current Safety Data Sheets (SDS) and inventory list of all materials used at the ITD District 2 Lenore Rest Area. The SDS binder must always be kept updated with all the chemicals being applied on ITD property. The binder must be stored at the associated ITD District 2 Lenore Rest Area at all times and made available when requested by ITD or if needed in an emergency and;
The Contractor must make ITD aware of the location of this notebook so that ITD can access it quickly if necessary. A copy of the associated SDS must be provided to the ITD Contract Monitor within twenty-four (24) hours after each application.
COMPLIANCE WITH FEDERAL AND STATE LAW, AND ITD POLICIES FEDERAL AND STATE LAW
The Contractor must comply with the Federal Highway Administration (FHWA) guidelines, available at: https://www.fhwa.dot.gov/ and state law regarding the use of service animals under the Americans with Disabilities Act (ADA), Idaho Code § 18-5812A, available at https://legislature.idaho.gov/statutesrules/idstat/title18/t18ch58/sect18-5812a/ and Idaho Code § 56-704, available at https://legislature.idaho.gov/statutesrules/idstat/title56/t56ch7/sect56-704/.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
The Contractor must comply with Guide to Compliance with the ADA – Service Animals and provide copies to all employees who will perform tasks at the ITD District 2 Lenore Rest Area. The Contractor must provide training to all employees who will perform tasks at the ITD District 2 Lenore Rest Area regarding the Service Animal guidelines and compliance and;
The Contractor must provide written documentation stating the following: that ALL EMPLOYEES employed at the ITD District 2 Lenore Rest Area have read and understand the ‘Guide to Compliance with the ADA – Service Animals’ the date training was offered and completed; the signature of each employee. Training documentation must be provided to the ITD Contract Monitor Representative within fifteen (15) calendar days after effective date of the Contract. Failure to comply with this statute will result in the termination of the Contract. Additional information can be found at http://www.usdoj.gov/crt/ada/adahom1.htm
ITD POLICIES
The following ITD policies apply when the Contractor is performing work at an ITD facility or when using ITD equipment or other property. These policies will remain in force for the duration of the Contract:
| A-18-10 | Harassment in the Workplace policy |
| 5523 | Alcohol and Drug-free Workplace policy |
| 5510 | Computer, E-Mail, and Internet Usage policy |
| 5033 | Workplace Violence Policy |
https://itd.idaho.gov/wp-content/uploads/ITD-Policy-Compliance-Dec-2015.pdf
The Contractor must read, understand and comply with these policies: 100% compliance is mandatory. Furthermore, the Contractor must ensure that all employees and Subcontractors adhere to these policies. ITD reserves the right to remove from its premises, at any time, any Contractor or its employee or subcontractor that fails to follow these policies.
payment ADJUSTMENT CLAUSE The Contractor’s monthly payment may be adjusted under the following circumstances and according to the following methods;
Monthly payment will be reduced for sub-standard performance, based on the janitorial Inspection Report Exhibit 3 - Janitorial Inspection Report which will be completed by an ITD Contract Monitor at each monthly inspection. The reduction will be as follows:
Average Rating from Exhibit 3 Percent (%) Reduction in Pay
| 0.00 – 2.10 |
| 30% |
| 2.11 – 2.25 |
| 25% |
| 2.26 – 2.55 |
| 15% |
| 2.56 – 2.70 |
| 10% |
| 2.71 – 2.79 |
| 5% |
| 2.80 – 5.00 |
| 0% |
Rating Scale Definitions 5 = Excellent: Task is completed to the highest standard, with no visible issues.
4 = Good: Task is completed well, with only minor, non-critical issues.
3 = Average: Task is completed but with noticeable issues requiring improvement.
2 = Poor: Task is incomplete or completed poorly, with significant issues.
1 = Unacceptable: Task is not completed or is done in a way that creates additional problems.
If ITD determines that the Contractor has failed to perform the daily jobs or duties specified in this Contract on one or more days during the month, the Department may withhold, as a penalty, the daily pro-rated share from that month’s payment and;
If ITD must perform or hire a firm or individual(s) to perform emergency, safety, or health-related tasks which are the responsibility of the Contractor under the terms of this Contract, ITD may withhold the costs associated with that emergency, safety, or health-related work from the Contractor’s monthly payment. Such costs will be itemized as to labor, materials, equipment, and travel costs.
TERMINATION
See State of Idaho Contract Terms and Conditions located on the Questions Tab IPRO powered by LUMA.
WORKPLACE ENVIRONMENT
While providing services for ITD under this Contract at ITD locations, the Contractor must maintain a workplace free of harassment, alcohol, drugs, and violence. Further, the Contractor must treat public citizens and ITD employees with kindness and respect. All Contractor employees and subcontractors are required to dress in professional manner consistent with the general industry for the scope of work performed in this Contract, and they must wear identification badges at all times while on ITD’s property.
REPLACEMENT OF CONTRACTOR EMPLOYEE
If ITD receives excessive or serious complaints regarding Contractor employees, or if ITD has determined that the Contractor employee continues to fail to meet the requirements of the Contract, ITD reserves the right, after having consulted with the Contractor, to require the Contractor to remove the Contractor employee from the Contract. The Contractor must replace the non-compliant employee with a compliant employee of equal or greater abilities within forty-eight (48) hours after removal of the non-compliant employee. ITD will not be responsible for any costs incurred by the Contractor in replacing the employee. Employees replaced multiple times for non-compliance may result in termination of the Contract.
TERM AND RENEWALS
The initial term of the contract will be two (2) years. Upon mutual, written agreement, the Contract may be renewed, extended, or amended. The anticipated total Contract term is six (6) years.
QUANTITY
Quantities included in this ITB represent the number of times a particular task is expected to be completed in a two-year period; these quantities are estimates for evaluation purposes only, now quantities are implied or guaranteed and may be increased or decreased due to weather constraints or other circumstances. The contractor must invoice the actual quantities performed during that billing period.
COST
Provide your fully burdened total cost on the bid schedule found in IPRO as Attachment 3 – Bid Schedule.
INVOICING
Invoices must be submitted as further detailed below. Invoices submitted prior to acceptance, or without the required information listed below will be returned to the Contractor for correction and resubmission. Resubmitted invoices must be sent with a new invoice date, which will restart the timeline required for payment. Invoices must be submitted as follows:
One (1) invoice per unit after acceptance by ITD;
Invoices must include the following information:
Contractor Company & Contact Information;
Contract Name & Number;
Order Number;
Invoice Number & Date;
Itemization of the Property provided and accepted to include description matching the contract, quantity, unit of measure, unit price, extended price, total invoice amount and;
Invoice must be emailed to (Microsoft Office products preferred):
D2AP@ITD.IDAHO.GOV
ITD’s Contract Management Team (CMT) will review each invoice and dispute with the Contractor, if needed, prior to forwarding to ITD’s accounts payable to process the payment.
PAYMENT
Payment will be made in accordance with Idaho Code 67-2302 after receipt of the Contractor’s itemized invoice and is accepted by ITD. Total payments under this Contract shall not exceed the Total Price provided on Attachment 3 – Bid Schedule unless otherwise modified in an amendment to this Contract.
SPECIAL TERMS AND CONDITIONS PRICE ADJUSTMENT
The following terms and conditions will apply to the resulting Contract (in addition to the terms and conditions incorporated in the State of Idaho Contract Terms and Conditions of this ITB).
Price Adjustment – A price adjustment may be considered after the first twelve (12) months of the initial term of the Contract, and every twelve (12) months thereafter. If a price increase is requested, it will be the responsibility of the Contractor to notify ITD sixty (60) calendar days in advance of the desired effective date and provide supporting documentation showing industry wide increases justifying the request. ITD will notify the Contractor whether the request is approved within thirty (30) calendar days of receipt of the request and;
If there is an industry-wide price decrease, the Contractor must notify ITD immediately of the decrease; and make the price decrease effective for ITD on the same day it becomes effective for the Contractor. If the State is not properly notified of price decreases, the pricing at the time of order will be used for invoice payment and the Contractor will provide refunds or credits as necessary.
RESPONSIBILITIES PURSUANT TO IDAPA 38.05.01.081
The ITB Lead may, in the State’s sole discretion, require the apparent lowest responsive Bidder’s to provide documentation to demonstrate its responsibility. The ITB Lead may request documentation including, but not limited to credit or financial reports, and references. Failure to provide requested documentation may result in the Bidder’s being deemed non-responsible. Nothing herein shall prevent the State from using other means to determine Bidder’s responsibility.
RECORDS MAINTENANCE
The Contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records must be retained by the Contractor for at least three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.
AUDIT RIGHTS
The Contractor agrees to allow State and Federal auditors and State purchasing staff access to all the records relating to this Contract, for audit, inspection, and monitoring of services or performance. Such access will be during normal business hours or by appointment.
INSURANCE REQUIREMENTS
See Insurance Requirements Located on the Questions Tab IPRO powered by LUMA.
ATTACHMENT 1 – BIDDER QUESTIONS
ITB 1049 – ITD D2 LENORE REST AREA JANTIORIAL SERVICES
PLEASE DO NOT IDENTIFY YOUR NAME OR YOUR COMPANY’S NAME OR PRODUCT NAMES OF INTELLECTUAL PROPERTY IN YOUR QUESTIONS.
ADD ROWS BY PRESSING THE TAB KEY WHILE IN THE TABLE AND WITHIN THE FINAL ROW.
The following instructions must be followed when submitting questions using the question format on the following page.
1. DO NOT CHANGE THE FORMAT OR FONT. Do not bold your questions or change the color of the font.
2. Enter the ITB section number that the question is for in the “ITB Section” field (column 2). If the question is a general question not related to a specific ITB section, enter “General” in column 2. If the question is in regard to a State Term or Condition or a Special Term or Condition, state the clause number in column 2. If the question is in regard to an attachment, enter the attachment identifier (example “Attachment A”) in the “ITB Section” (column 2), and the attachment page number in the “ITB page” field (column 3).
3. Do not enter text in the “Response” field (column 5). This is for the State’s use only.
4. Once completed, this form is to be e-mailed per the instructions in the ITB. The e-mail subject line is to state the ITB number followed by “Questions.”
ITB Event 1049 ITD D2 Lenore Rest Area Janitorial Page 6
Event ITB 1049 – ITD D2 LENORE REST AREA JANTIORIAL SERVICES
| ITB Section |
| ITB Page |
| Question |
| Response |
ATTACHMENT 2 – PRE-BID TOUR REGISTRATION FORM
ITB 1049
ITD D2 Lenore Rest Area Janitorial Services
| Walkthrough Location: |
| Title: |
November 4, 2025 – 10:30 AM PST District 2 Lenore Rest Area US 12 Mile Post 27.67, Orofino, Idaho 83544
ITD D2 Lenore Rest Area Janitorial and Snow Removal
A walkthrough of all ITD locations outlined in this ITB will be on November 4, 2025 – 10:30 AM PST.
Only two (2) people per vendor will be allowed. We respectfully ask that anyone showing symptoms of cold, flu, or Covid, that they do not attend. The vendors will be required to register with Attachment 2 – Pre-Bid Registration Form.
Potential bidders choosing to participate in the Walkthrough must pre-register by submitting this completed form, via e-mail, to the ITB Lead at doug.buswell@itd.idaho.gov. Attendees are asked to register for the Walkthrough no later November 3, 2025, 5:00pm Pacific Standard time.
PLEASE PRINT:
| Name |
| Company |
| Phone Number |
ATTACHMENT 3 – BID SCHEDULE
(ATTACHED SEPARATELY)
EXHIBIT 1 – Daily Log
Lenore Rest Area **Include “am” or “pm” in all time entries
| Daily Activity |
| Time |
| Time |
| Time |
| Time |
| Time |
| Time |
Clean Toilets- Women's Restroom
Clean Sinks, Mirrors, Soap Dispensers and Hand Dryers- Women's Restroom
Clean and Mop Floors/ Wash Walls & Partitions- Women's Restroom
Clean Toilets and Urinals- Men's Restroom
Clean Sinks, Mirrors, Soap Dispensers and Hand Dryers- Men's Restroom
Clean and Mop Floors/ Wash Walls & Partitions- Men's Restroom
Clean Toilets- Family Assist Restroom
Clean Sinks, Mirrors, Soap Dispensers and Hand Dryers- Family Restroom
Clean and Mop Floors/ Wash Walls & Partitions- Family Assist Restroom
Remove Graffiti (specify location):
Empty Trash Containers- Outside Area
Pick Up Litter and Pet Waste Core Area
Clean Picnic Tables and Arbors
Clean Sidewalk and Plaza Area
Kiosk Lighting and Light Fixtures
Building Exterior
Drinking Fountains
Video Recorder
Other (Specify): Bladder Tank Inspections / Valves
Other (Specify):
Other (Specify):
Other (Specify):
Snow Removal/Deicing
Comments: (Lost and Found, Repair, Vandalism, etc.)
IT will collect Daily Logs during monthly inspection
Sign: Print: Date: Time:
NOTE: This is a sample log. The version used during the contract may differ. Please refer to Attachment 1 – Required Tasks for the full list of duties the Contractor must perform.
EXHIBIT 2 - WEEKLY, MONTHLY, QUARTERLY, SEMI-ANNUALLY LOG OF CLEANING
Janitorial Services for ITD District 2 Lenore Rest Areas Include "am" or "pm" in all time entries
| Weekly: |
| DATE |
| TIME |
| COMPLETED |
Inspect and clean heating and air exchange vents and grills to insure adequate air movement and cleanliness.
Check fire extinguishers
Clean and organize utility/storage room
Check first aid kits, replace items as needed
Check operation of odor suppressants
| Monthly: |
| DATE |
| TIME |
| COMPLETED |
Remove all visible cobwebs from ceilings and walls in the rest area buildings
Use high pressure wash to clean building exteriors
Clear debris from rain gutters
Clear debris from arbor roofs
Use high pressure wash to clean cobwebs, bugs from eaves and soffits
Replace furnace filters
| Quarterly: |
| DATE |
| TIME |
| COMPLETED |
Steam clean all bathroom surfaces to remove buildup of dirt, grime
Clean floor drain grates ad partition base plates, add drain deodorizer as needed
Power scrub and reseal all rest room hard surfaced floors.
| Semi-Annually: |
| DATE |
| TIME |
| COMPLETED |
Inspect and clean light fixtures/skylights, remove dead insects, clean light fixture covers/lenses
Other (Specify):
Other (Specify):
Week of:
Comments: (Lost and Found, Repair, Vandalism, etc.) ______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sign: Print: Date: Time:
EXHIBIT 3 – monthly inspection report Janitorial Monthly Inspection Report
NOTE: This is a sample report. The version used during the contract may differ. Please refer to Attachment 1 – Requirements for the full list of duties the Contractor must perform.
EXHIBIT 4 – janitorial caretaker requirements
| Task |
| Instructions |
| Minimum Frequency |
Restrooms
Clean and inspect partitions Clean all partition walls and stall doors with soap, water and disinfectant. Rinse and wipe dry. Remove all dirt, grime and graffiti. Check to make sure doors operate and lock properly and that walls are sturdy and undamaged.
Two (2) times daily;
additionally as needed
Clean and inspect urinals Thoroughly clean and scrub with high-strength detergent containing a deodorant and anti-bacterial agent. Rinse with clean water and wipe dry. Check that urinals flush properly. Check the odor blocks and replace as necessary.
Two (2) times daily;
additionally as needed
Clean and inspect toilets, stools and seats Thoroughly clean and scrub with high-strength detergent containing a deodorant and anti-bacterial agent. Rinse with clean water and wipe dry. Check that toilets flush properly and seats work properly.
Two (2) times daily;
additionally as needed
| Clean floors |
| Clean and thoroughly scrub with a high strength detergent |
containing a deodorant and anti-bacterial agent. Rinse and mop dry. Check to make sure floor drains operate properly and disinfect traps.
Two (2) times daily;
Additionally, as needed
| Clean Ceilings |
| Wash and scrub with soap and water or appropriate cleaner. |
Sweep down all cobwebs. Remove all graffiti.
Daily; additionally, as needed
Clean and inspect sinks and mirrors Clean and thoroughly scrub with a high strength detergent containing a deodorant and anti-bacterial agent. Rinse with clean water and wipe dry. Check to see if faucets and drains operate properly. Remove all graffiti.
Two (2) times daily; additionally, as needed
Clean and inspect soap dispensers and hand dryers Clean and thoroughly scrub with a high strength detergent containing a deodorant and anti-bacterial agent. Rinse and wipe dry. Check to see if hand dryer operates safely and properly and soap dispensers have adequate supply of soap.
Two (2) times daily;
additionally, as needed
Clean and inspect toilet paper seat and cover dispensers Wipe the exterior finish of the toilet paper and toilet seat cover dispensers with a damp cloth. Check to make sure adequate supplies of toilet paper and toilet seat covers are present in the dispensers. At least ½ roll of biodegradable toilet paper must be in evidence in each stall.
Two (2) daily;
additionally, as needed
| Power scrub |
| Floors must be power scrubbed quarterly (January, April, July and October). |
| Quarterly; January, April, July and October (low peak) |
| Repair/replace -plumbing fixtures and parts |
| Repair/replace minor parts, including hinges, valves, seals, etc. |
Repair/replace ITD-provided, non-plumbing fixtures including soap dispensers, mirrors, etc.
Note: major repair/replacement of plumbing fixtures including toilets, urinals, and sinks will NOT be Contractor’s responsibility As needed
Continued Next Page
Continued
| Task |
| Instructions |
| Minimum Frequency |
Plaza Areas
Clean cigarette butt receptacles Remove and dispose of all tobacco butts and trash. Replace sand as necessary.
Two (2) times daily; additionally, as needed
Clean and inspect heating and air exchange Inspect all grills and vents to assure adequate air movement and cleanliness. Check operation of odor suppressants.
Weekly; additionally, as needed
| Clean and inspect drinking fountain(s) |
| Clean entire drinking fountain with antibacterial disinfectant. |
Wash with soap and water; rinse and wipe dry. Check faucet for leaks and proper operation.
Two (2) times daily; additionally, as needed
Clean and inspect light fixtures and skylights Clean and inspect all light fixtures and skylights with a damp cloth.
Remove all cobwebs. Notify ITD when Bulbs burn out.
Weekly; additionally, as needed
Clean inside and outside plaza areas
| Clean walls, doors, entry ways, floors and windows with soap and wipe dry. |
| Daily; additionally, as needed |
Clean and organize utility and storage room Keep utility and storage room clean, organized and free of litter. Keep up-to-date SDS sheets on all cleaning product in a visible place and easily accessible in case of emergency. Check fire extinguishers and first aid kits.
Weekly; additionally, as needed
Clean and wash signs and kiosk Clean and wash Plexi-glass with soap and water, wipe clean with soft, dry cloth. Clean benches with soap and water, rinse and wipe them dry.
Once daily; additionally, as needed
| Sweep cobwebs and bugs from eves and soffits. |
| Sweep down cobwebs and bugs from eves and soffits. |
Check for bees and bee hives.
Monthly; additionally as needed
| Paint/oil/stain buildings |
| Within thirty (30) days notification by ITD that painting/oiling/staining is required |
| As directed by ITD; usually once per year |
Grounds and Parking Lot(s)
| Pick up litter |
| Pick up and dispose of litter from all outdoor areas, including sidewalks, parking lots, lawns, natural areas, all landscape areas. |
| Daily; additionally, as |
needed
Clean sidewalks and pathways
| Clean, sweep and wash spilled food, drinks, dirt and sand. |
| Daily; additionally, as needed |
Remove snow and ice from sidewalks and walkways Apply ITD approved ice melt and remove snow and ice from sidewalks and walkways in plaza areas to provide bare sidewalks and safe access.
Available 24/7 (seasonal)
Check and replace trash bags in containers Check and replace trash bags to prevent overflow or unsanitary conditions. Clean trash containers with disinfecting soap and rinse with water.
Daily; additionally, as needed (seasonal)
| Clean trash can lids |
This is the start of the file's text. The full file is on GovTribe.