ITB_02-25_Addendum_No._1.pdf
PDF 12 MB Posted
- Attached to
- Security and Electrical Repairs State and local contract opportunity
- Solicitation number
- ITB 2024-1108A
- Issued by
- Florida
About this file
This document is Addendum No. 01 to Invitation to Bid (ITB) No. 02-25 issued by New Smyrna Beach Utilities for the Field Street Transmission Line Rebuild East project in Florida. The addendum provides clarifications and additional details for bidders, addressing key questions about the project such as right-of-way/easement widths (predominantly 100'), access through Holland Park for pole maintenance, temporary pole installations, pole relocation parameters, and public notification requirements. The document specifies that contractors can install new dead-end poles within 5' of existing poles for certain pole types, must use matting when accessing certain areas, and are responsible for removing trees and restoring the park to its pre-construction condition. Working hours are defined as Monday-Friday 7AM-7PM, Saturday 8AM-6PM, and Sunday 11AM-6PM, with potential for extended hours with proper discretion.
The addendum includes technical specifications for wire types, conductor details, and pole characteristics, noting that existing wood poles range from 70'-95' and are either class 1 or class 2, while non-wood poles are 75' composite poles weighing approximately 1,467 lbs. New Smyrna Beach Utilities will provide two dumpsters at the staging site - one for old aluminum conductor and another for old hardware/steel material - with contractors responsible for disposing of poles. The utility will handle relocating security cameras currently mounted on existing poles. The project requires a 4-hour emergency re-energization turnaround time, and contractors must ensure the transmission line can be safely re-energized during any work breaks or overnight periods. Notably, the utility recently adopted a new public-facing name "New Smyrna Beach Utilities" while maintaining its legal name as the Utilities Commission, City of New Smyrna Beach, Florida.
View the file
Other files for this state and local contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200 CANAL STREET / P.O. BOX 100
NEW SMYRNA BEACH, FL 32170-010
ITB#02-25
FIELD STREET TRANSMISSION LINE REBUILD EAST
DATE: December 2, 2024
RE: ITB No. 02-25 ADDENDUM NO. 01
Please note: The Utilities Commission, City of New Smyrna Beach, Florida, has adopted a new name “New Smyrna Beach Utilities” and corresponding logo, effective July 1, 2022. The New Smyrna Beach Utilities name will be used as the public, outwardly facing name of the organization.
We adopted this new name as a DBA however, our legal name, the Utilities Commission, City of New Smyrna Beach, Florida, remains. Adopting this new name has not changed anything in our ownership or operations.
The New Smyrna Beach Utilities is issuing the following addendum. As such it becomes an integral part of the proposal and must be acknowledged by the return of this signed form, with your proposal form, acknowledging receipt of the addendum.
1. What are the right-of-way / easement widths?
The Right-Of-Way / Easement for the project area varies but is predominantly 100’. NSBU has provided an as-built drawing for its 30” force main that was built in the majority of the project area for reference.
Note that some pole locations and pole numbers on the force main record drawing will differ from the Field Street Transmission Line Plan. Additionally, note the North arrow on the force main record drawings. The drawing is provided as a reference for Right-Of-Way widths.
In the project area that is not shown east of the 30” force main record drawings, NSBU was able to identify and locate plats showing old right-of-way widths of 100’. That said, there is no current survey verifying those widths and NSBU’s pole locations within the Right-Of-Way.
2. Can Holland Park be utilized to access the 4 poles between the bridges?
Per the City:
“Regarding the use of Holland Park for access, I believe we can accommodate this for limited access. Both bridges routinely see loads from large vehicles. While I understand the potential limitations for long wheel base to cross the bridge West of the park, we don’t want to see the park used indiscriminately for all vehicular access. There is curbing, wheel stops, sidewalk and landscaping that would most certainly sustain damage and would be expected to be restored. We recently had the lookout pier contractor for the City do the same.
Once you have an award or contractor would like to discuss the specifics of utilizing the park for access we can meet.”
Based on inability to get weight limitations on northwestern bridge, contractors shall bid the job as if accessing the poles between the bridges via Holland Park. At a minimum, matting must be used between the parking lot and south edge of pavement of the Multi-Use Trail where land is traversed with equipment (be it grass, sidewalk, etc.). Contractor shall bid the job to include the removal of necessary trees at Holland Park to gain access to the area. Contractor shall include in its restoration costs any damage in this area requiring work to bring the Park back to pre-construction condition including the replanting of any removed trees.
3. Can temporary poles be installed for dead-end pole change outs?
Yes. Additionally see answer on deadend pole relocation options.
4. Can the new dead-end pole be installed within 5’ of the existing pole instead of going in the same hole?
NSBU received verification from permitting side that poles can be set in a different location provided they are within 5’ of the existing pole (including deadends). Contractors shall bid the project as if only the deadend poles (both transmission and distribution deadends), span guy poles, and 3-phase distribution underbuild poles will be allowed to move within 5’ of the existing locations and not be placed in the same hole.
In these aforementioned locations where the contractor wants to relocate new poles within 5’, the contractor shall place a stake at the desired new pole location and have the new location approved by NSBU before relocating.
Any poles next to or along the multi-use trail must go back in the same hole regardless of framing/construction type.
5. What does “public notification” mean for the contractor to manage when it comes to the general public?
For work in the multi-use trail and/or Holland Park, a minimum of 2 weeks prior to starting work and continuing through construction completion, the contractor shall install two (2) DOT style instant message boards at the entrance points of the section of Multi-Use Trail construction will be commenced in that will notify the public of the pending construction activities along the Multi-use path and inform trail users that the trail will be closed to use during New Smyrna Beach Utilities construction activities. The rolling message shall list the start and end dates of the construction activities and supply a phone number to call with questions. The contractor shall physically barricade the Multi-use trail entry/exit locations, during the length of construction, to prevent public access to the construction area. The barricades shall be actively monitored and maintained to provide temporarily removal for construction equipment and material access but be immediately replaced after the equipment or material enters/exits the transmission right of way.
Note if multiple sections are to be closed simultaneously, then additional DOT style instant message boards and barricading shall be installed such that all sections are covered via notification signage and barricades.
6. What is the official re-energization time frame, outside of wire pulls?
The turnaround time for an emergency re-energization shall be 4 hours. This includes overnight hours and any days off the contractor shall take. If the contractor cannot meet the 4 hour duration prior to leaving each day or prior to taking a day off, the transmission line shall be left in a condition such that NSBU can re-energize it without performing any work on the transmission line (ie grounds must be removed and the transmission line in such a condition that there will be no safety hazards upon re-energizing).
7. What are the weight restrictions on the 2 bridges?
NSBU could not find information or confirm the weight limit of the bridge on the northwest side of Holland Park. The bridge on the north east side of Holland park has a weight limit of 20,000lbs.
8. Who is responsible for relocating the security cameras on the poles?
NSBU will relocate any security cameras that are installed on existing poles.
9. Will the contractor be responsible for temporary-ing the line every time we leave over a day off?
The turnaround time for an emergency re-energization shall be 4 hours. This includes overnight hours and any days off the contractor shall take. IE, if the contractor cannot be called in during overnight hours or days off and meet the 4 hour duration upon call receipt, the transmission line shall be left in a condition such that NSBU can re-energize it without any additional work needing to be performed by NSBU or the contractor. IE grounds must be removed, framing, structures, and connections in a condition that such that there will be no safety hazards upon re-energizing, etc.
10. Can the contractor work 7 days a week?
Yes, the contractor can work 7 days a week. The standard pre-approved working hours are as follows for the City of New Smyrna Beach:
Monday-Friday: 7AM - 7PM Saturday: 8AM - 6PM Sundary: 11AM – 6PM
That said, the City will allow 7AM – 7PM working hours for the weekend as well provided:
“The contractor uses discretion regarding work noise and light shed towards homes and no complaints are being generated for hours outside of those (pre-approved working hours), we can allow extending the work hours on weekends. If some special need arises that is well outside of that, please let us know as an after-hours request. We see these for large concrete pours that want to start at 3AM for example. I know concrete is not likely, but I could see possibly having lights or some oversized delivery trying to avoid daytime traffic, etc.”
11. Pole depth is the standard 10% plus 2’
Yes, this is correct.
12. Will New Smyrna Beach Utilities please provide conductor and static wire reel sizes (# FT of wire on each reel) if available?
795 Arbutus: 65” Diameter Reels; Conductor quantity per reel ranges from 4,960’-5,200’
3#6 Alumoweld: 24” Diameter Reel; Qty (3) reels of 3,400’ of conductor and Qty (1) reel of 1’000’ of conductor
DSA 3#10 Copperweld: 30” Diameter Reel; Qty (1) reel of 5,679’ of conductor
Standard 652 AAAC Reel Size: 67” ; Standard 652 AAAC Reel Length: 6,000’
Standard 4/0 AAAC Reel Size: 48” ; Standard 4/0 AAAC Reel Length 5,000’
13. It appears that there are metal poles and concrete poles that will be removed as part of this project. Will NSBU please provide existing pole heights and weights if available?
All existing wood poles requiring removal are either class 1 or class 2 poles and range from 70’- 95’.
The non-wood poles requiring removal have Shakespeare H2B75 pole tags. Per the manufacturer’s catalogue, these are 75’ composite poles with 2 sections. Additionally, per the manufacturer’s catalogue, Section 1 weighs 1,039lbs and Section 2 weighs 428lbs with the pole having a total weight of 1,467lbs.
14. What will be the turn-around time if an emergency re-energization of the Field Street transmission line is required?
The turnaround time for an emergency re-energization shall be 4 hours. This includes overnight hours should an emergency occur during night time hours.
15. Will NSBU please provide the conductor sag charts static sag charts?
NSBU will add sag and tension data to the plan set prior to the pre-construction meeting that will be held with the awarded bidding contractor.
16. We have not been able to determine the weight limit of the Multi-Use Trail bridges. Will equipment be allowed to utilize these bridges? What are the weight limits for trail bridges between P43 and P44 and between P47 and P48?
NSBU could not find information or confirm the weight limit of the bridge on the northwest side of Holland Park. The bridge on the north east side of Holland park has a weight limit of 20,000lbs.
Per the City:
“Regarding the use of Holland Park for access, I believe we can accommodate this for limited access. Both bridges routinely see loads from large vehicles. While I understand the potential limitations for long wheel base to cross the bridge West of the park, we don’t want to see the park used indiscriminately for all vehicular access. There is curbing, wheel stops, sidewalk and landscaping that would most certainly sustain damage and would be expected to be restored. We recently had the lookout pier contractor for the City do the same.
Once you have an award or contractor would like to discuss the specifics of utilizing the park for access we can meet.”
17. Is any portion of the field st. transmission ROW shared with a gas main?
Per correspondence and photos with Florida Public Utilities, gas lines do intersect portions of the transmission ROW, but they don’t run within the transmission ROW parallel the transmission line. See provided PDF.
There is a New Smyrna Beach Utilities owned 30” force main that runs through the Transmisison ROW and it is imperative that the contractor not damage due to its critical nature. An as-built drawing of the this 30” force main has been provided for reference.
18. Is it permissible to install new pole locations 5'-10' offset from the existing structure locations? Dead-end poles, span guy poles, and tangents poles with distribution underbuild would immensely benefit from this relocation.
NSBU received verification from permitting side that poles can be set in a different location provided they are within 5’ of the existing pole (including deadends). Contractors shall bid the project as if only the deadend poles (both transmission and distribution deadends), span guy poles, and 3-phase distribution underbuild poles will be allowed to move within 5’ of the existing locations and not be placed in the same hole.
In these aforementioned locations where the contractor wants to relocate new poles within 5’, the contractor shall place a stake at the desired new pole location and have the new location approved by NSBU before relocating.
19. To confirm, will the GOAB switch will be fully de-energized during wire pulling operations?
Reviewing the location in more detail, everything on the entirety of the GOAB switch cannot be de-energized. All switch positions can be opened and locked out, but due to the inability to take an outage on the Airport Transmission Line, the jumper from the Airport Transmission line to the switch blade and thus that switch blade would be energized. See the provided PDF picture for more detail / visual illustration.
20. Loc. 73 does not call for guying on the pole framing detail table, is this accurate?
The pole framing detail table has been updated. See revised prints dated 11/22/24.
21. On the pole framing table, Loc. 68 shows 10x down guys, is this accurate?
The pole framing detail table has been updated. See revised prints dated 11/22/24.
22. Is there a structure list with pole weights and heights?
While weights are not given for new poles, see the pole framing table on Sheet EP-4 of the revised bid prints dated 11/22/24 to find new pole height and class ratings.
All existing wood poles requiring removal are either class 1 or class 2 poles and range from 70’- 95’.
The non-wood poles requiring removal have Shakespeare H2B75 pole tags. Per the manufacturer’s catalogue, these are 75’ composite poles with 2 sections. Additionally, per the manufacturer’s catalogue, Section 1 weighs 1,039lbs and Section 2 weighs 428lbs with the pole having a total weight of 1,467lbs.
23. Will there be a continuous clearance for outages?
Yes, the intent is for there to be a continuous outage when the awarded contractor is ready to begin actual construction activities. That said, there must be a turnaround time of 4 hours for the contractor to have the Field Street Transmission Line ready to be energized in the event of an emergency.
24. Is it ok to energize wire in blocks during an emergency?
It will be permissible to energize wire in blocks should there be an emergency that requires the transmission line to be re-energized.
25. What type of wire is being removed?
Transmission Phase Conductor: 795 AAAC “Arbutus” Transmission Static Conductor: 3#6 Alumoweld
If the option to replace distribution conductor is activated:
3-phase Distribution Conductor: 652 AAAC phase with 4/0 AAAC neutral Single-phase Distribution Conductor: #2 AAAC phase with #2 AAAC neutral
26. Would it be permissible to install the new pole within 5-10' of existing location?
NSBU received verification from permitting side that poles can be set in a different location provided they are within 5’ of the existing pole (including deadends). Contractors shall bid the project as if only the deadend poles (both transmission and distribution deadends), span guy poles, and 3-phase distribution underbuild poles will be allowed to move within 5’ of the existing locations and not be placed in the same hole.
In these aforementioned locations where the contractor wants to relocate new poles within 5’, the contractor shall place a stake at the desired new pole location and have the new location approved by NSBU before relocating.
27. How many fiberglass poles are on this line that the contractor is required to remove?
NSBU counted 9 fiberglass / composite poles for removal.
28. Cable Trench inside the service center substation drivable?
The cable trench inside the Field Street Substation is not drivable.
29. Will security cameras attached to structures located inside the service center be transferred by New Smyrna Beach Utilities?
The security cameras will be relocated/transferred by NSBU.
30. Does NSBU want any of the retired / removed material?
Upon further internal discussions, NSBU does want its old conductor and hardware. NSBU will set two dumpsters at the staging site. One dumpster will be for the contractor to place all the old aluminum conductor in and the other dumpster will be for the contractor to place all the old hardware/steel material in.
Any other material such as poles shall be the responsibility of the contractor to dispose of including the coordination of any additional dumpsters.
A Copy of This Signed Form Must Accompany Your Proposal
Acknowledgment of Receipt of Addenda No. 1
Company_______________________________________
Title___________________________________________
Signature_______________________________________
Due to the inability to take an outage on the Airport transmission line, the jumpers from the Airport transmission line to the 3-way tie switch blades will be energized (see arrows). All 3-way tie switch positions can be opened and locked out during construction.
Airport Transmission Line (On north side of Field
Street Transmission Line)
Jameson Parker
From: Dunn, Colin <cdunn@chpk.com> Sent: Tuesday, November 26, 2024 3:49 PM To: Jameson Parker Cc: ENGINEERING-DeBary; Van-Leeuwen Fernando Subject: RE: New Smyrna Beach Transmission Rebuild: Utility Info Request
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Hi Jameson, I’m copying our engineering group on this email to help you out with this request. In the mean me this is what we’ve got along that easement:
And a line at the west end:
Thank you, Colin Dunn Operations Assistant 386-414-1462 Florida Public Utilities 450 S Charles Richard Beall Blvd Debary, FL 32713 www.fpuc.com
From: Jameson Parker <jparker@nsbufl.com> Sent: Tuesday, November 26, 2024 3:38 PM To: Dunn, Colin <cdunn@chpk.com> Subject: [EXTERNAL] New Smyrna Beach Transmission Rebuild: Utility Info Request
Colin, Not sure who the cont act shoul d be for this request, but New Smyrna Beach Utilities have a job out to bid for re buil di ng a portion of our el ectric transmissi on li ne i n New Smyrna Beach and got asked if ther e were gas lines locate d in ZjQcmQR YF pfptBannerStart
This Message Is From an Untrusted Sender
You have not previously corresponded with this sender.
ZjQcmQR YF pfptBanner End
Colin, Not sure who the contact should be for this request, but New Smyrna Beach Utilities have a job out to bid for rebuilding a portion of our electric transmission line in New Smyrna Beach and got asked if there were gas lines located in the corridor as part of the bid questions that I need to try and answer. The bidders know they have to call in locates and y’all would participate/mark where your facilities are as part of that, but I’m guessing they are just curious what all they might have to work around.
I’ve attached a PDF map of the area in question. It is the old railway easement ROW where the multi-use trail is installed in. There is a section/portion east of the multi-use trail where we are rebuilding as well.
To my knowledge there aren’t any gas lines in our actual transmission corridor, but I would expect where the corridor crosses roads that there might be gas lines present.
Thanks and let me know if you have any questions or if you need additional information.
Jameson Parker | Electrical Engineering Manager New Smyrna Beach Utilities Phone 386-424-3040 and Cell 386-314-9622 | Email jparker@nsbufl.com www.nsbufl.com
PLEASE NOTE: Florida has a very broad public records law. Most written communications, and email addresses, sent to or from the Utilities Commission, City of New Smyrna Beach are public records available to the public and media upon request. Your e-mail communications may be subject to public disclosure. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this message in error, please notify the Utilities Commission, City of New Smyrna Beach immediately by replying to the message and deleting it from your computer. Thank you.
NEW SMYRNA BEACH UTILITIES - ITB # 02-25
FIELD STREET TRANSMISSION LINE REBUILD (EAST)
PROJECT LOCATION
BID DRAWING INDEX
DWG # REVISION DRAWING TITLE
REVISION # DATE
EC-1 1 11/22/2024 COVER SHEET, LOCATION, AND INDEX OF DRAWINGS
EC-2 11/6/2024 GENERAL CONSTRUCTION NOTES
EC-3 1 11/22/2024 PLAN SHEET 1
EC-4 11/6/2024 PLAN SHEET 2
EC-5 1 11/22/2024 PLAN SHEET 3
EC-6 11/6/2024 SILT FENCE INSTALLATION
ED-1 11/6/2024 TRANSMISSION POLE GROUNDING
ED-2 11/6/2024 BIRD PROTECTION
ED-3 11/6/2024 TRANSMISSION FRAMING - T1
ED-4 11/6/2024 TRANSMISSION FRAMING - T2
ED-5 11/6/2024 TRANSMISSION FRAMING - D1
ED-6 11/6/2024 TRANSMISSION FRAMING - GUYING
ED-7 11/6/2024 TRANSMISSION FRAMING - ANCHORS
ED-8 11/6/2024 DISTRIBUTION UNDERBUILD - VA11R
ED-9 11/6/2024 DISTRIBUTION UNDERBUILD - VA5.2
ED-10 11/6/2024 DISTRIBUTION UNDERBUILD - VC1RVN.2
ED-11 11/6/2024 DISTRIBUTION UNDERBUILD - VG1.2
ED-12 11/6/2024 DISTRIBUTION UNDERBUILD - VC5.1
ED-13 11/6/2024 DISTRIBUTION UNDERBUILD - VC5.2
ED-14 11/6/2024 DISTRIBUTION UNDERBUILD - VC7.2
ED-15 11/6/2024 DISTRIBUTION UNDERBUILD - UC2G
ED-16 11/6/2024 DISTRIBUTION UNDERBUILD - SPAN GUY
ED-17 11/6/2024 DISTRIBUTION UNDERBUILD - SWITCHES
EP-1 11/6/2024 WOOD POLE DRILLING - T1 PATTERN
EP-2 11/6/2024 WOOD POLE DRILLING - T2 PATTERN
EP-3 11/6/2024 WOOD POLE DRILLING - T3 PATTERN
EP-4 1 11/22/2024 POLE FRAMING TABLE
N
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
COVER SHEET, LOCATION, AND
AutoCAD SHX Text
INDEX OF DRAWINGS
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/22/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EC-1
AutoCAD SHX Text
BID DRAWINGS
GENERAL CONSTRUCTION NOTES
1. PROJECT SPECIFICATIONS FORM AN INTEGRAL PART FOR THE PROJECT CONSTRUCTION
DOCUMENTS AND SHALL BE USED IN CONJUNCTION WITH THE DRAWINGS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
2. PHASE RELATIONSHIP FOR TRANSMISSION LINES SHALL BE A B C TOP TO BOTTOM AND
AS SHOWN IN THE DRAWINGS. CONTRACTOR SHALL VERIFY PHASING PRIOR TO
ENERGIZING CIRCUIT.
3. CONTRACTOR SHALL MAKE ALL EFFORTS TO INSTALL NEW POLES IN THE EXISTING POLE
HOLES. WHERE UNDERGROUND FACILITIES ARE IN CLOSE PROXIMITY TO A PROPOSED
POLE, THE CONTRACTOR SHALL HAND-DIG THE TOP 4' TO EXPOSE THE UTILITY. WHERE
THERE IS A POSSIBLE RISK TO A UTILITY DUE TO EXCAVATION, THE CONTRACTOR SHALL
TAKE ALL STEPS NECESSARY TO AVOID DAMAGE TO THE UTILITY, AND IS RESPONSIBLE FOR
ANY DAMAGE TO THAT UTILITY.
4. MATERIAL MANUFACTURERS AND STOCK NUMBERS SHOWN ARE RECOMMENDATIONS
AS TO FORM, FIT, AND QUALITY.
5. THE CONTRACTOR SHALL NOTIFY UTILITY OWNERS THROUGH SUNSHINE STATE ONE
CALL OF FLORIDA, INC. (800-432-4770) AT LEAST 2 BUSINESS DAYS IN ADVANCE OF
CONSTRUCTION, FOR LOCATION MARKING OR FLAGGING OF UNDERGROUND FACILITIES
BEFORE EXCAVATING. LOCATION OF UNDERGROUND FACILITIES ARE NOT INCLUDED IN
THE PLANS AND ARE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE IDENTIFIED.
WHERE UNDERGROUND FACILITIES ARE IN CLOSE PROXIMITY TO A PROPOSED POLE OR
ANCHORS, THE CONTRACTOR SHALL HAND-DIG THE TOP 4' TO EXPOSE THE UTILITY, AND
SHALL TAKE ALL STEPS NECESSARY TO AVOID DAMAGE. THE CONTRACTOR SHALL BE
LIABLE FOR ANY DAMAGE CAUSED TO SUCH UTILITY FACILITIES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL REQUIREMENTS
FOR CONSTRUCTION OPERATIONS WITHIN CITY, COUNTY AND STATE ROAD RIGHT-OF-WAY.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPROPRIATE SEDIMENT CONTROL DUE
TO CONSTRUCTION ACTIVITIES.
8. CONTRACTOR SHALL COORDINATE WITH NEW SMYRNA BEACH UTILITIES BEFORE CUTTING
ANY EXISTING CONDUCTORS.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING PHASE ROTATION, SETTING
UP OUTAGES, M.O.T. AND THE SAFETY OF WORKERS AND THE PUBLIC.
10. CONTRACTOR SHALL PROVIDE OVERHEAD CABLE SPLICES, WHERE NECESSARY.
11. THE CONTRACTOR SHALL COORDINATE WITH NEW SMYRNA BEACH UTILITIES FOR
ACCESS TO THE PROJECT SITE.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE NEW SMYRNA
BEACH MULTI-USE PATH. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
TO THE FENCED ENTRANCE TO THE MULTI-USE PATH DURING CONSTRUCTION SERVICES.
THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY PROPERTY DAMAGE DURING
CONSTRUCTION SERVICES.
13. THE CONTRACTOR IS ADVISED THAT THERE ARE EXISTING GOPHER TORTOISE BURROWS
IN THE PROJECT AREA. THE OWNER WILL PERFORM AN ENVIRONMENTAL SURVEY PRIOR
TO THE START OF THE PROJECT TO IDENTIFY THESE LOCATIONS. CONTRACTOR SHALL
NOTIFY OWNER IF ADDITIONAL PROTECTED WILDLIFE IS IDENTIFIED WHILE ON SITE.
14. ALL DRAWINGS ARE NOT TO SCALE (NTS) AND SHALL NOT BE USED / REFERENCED
FOR DETERMINING DIMENSIONS.
15. CONTRACTOR RESPONSIBLE FOR DRILLING POLES AS NEEDED.
LEGEND & WORK DESCRIPTIONS
343'
EXISTING POLE (TO REMAIN)
REMOVAL OF EXISTING POLE
AND INSTALLATION OF NEW POLE
REMOVAL AND INSTALLATION OF NEW 3-PHASE
OVERHEAD TRANSMISSION CONDUCTOR
PHASE CONDUCTOR: 795AAAC
STATIC CONDUCTOR: 3 #6 ALUMOWELD
TRANSFER OF NEW SINGLE-PHASE OVERHEAD
DISTRIBUTION CONDUCTOR
PHASE CONDUCTOR: #2 AAAC
NEUTRAL CONDUCTOR: #2 AAAC
TRANSFER OF NEW THREE-PHASE OVERHEAD
DISTRIBUTION CONDUCTOR
PHASE CONDUCTOR: 652 AAAC
NEUTRAL CONDUCTOR: 4/0 AAAC
INSTALLATION OF NEW SPAN GUY WIRE(S)
SPAN GUY WIRE: 7/16" EHS
INSTALLATION OF NEW SILT FENCE
P34
70' - H1
T1 Const.
P35
70' - H1
T1 Const.
SPAN DISTANCE
LINE 1: POLE NUMBER
LINE 2: POLE HEIGHT AND CLASS
LINES 3-7: POLE FRAMING AND
GUYING ASSEMBLIES
POLE LOCATION(S) WHERE NSBU IS
EXPECTING MATTING TO BE REQUIRED
FOR WETLAND PERMITTING PURPOSES
NTS: NOT-TO-SCALE
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
GENERAL CONSTRUCTION NOTES
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EC-2
P34 70' - H1
T1 Const.
343' 258' 307' 287' 305' 301' 292' 289' 316'
298' 300'
P35 70' - H1
T1 Const.
P36 70' - H1
T1 Const.
P37 70' - H1
T1 Const.
P38 70' - H1
T1 Const.
P40
75' - H1 T2 Const.
VA11R (UB)
Guy Top Ph Guy Bottom Ph
Guy-SI(x2)
P41 75' - H1
T2 Const.
VA11R (UB)
P42 75' - H1
T2 Const.
VA5.2 (UB)
Guy-SI
P43 75' - H1
T2 Const.
Guy Top Ph
Guy Bottom Ph Guy-SI(x2)
P44 75' - H1
T2 Const.
Guy Top Ph
Guy Bottom Ph Guy-SI (x2)
P45 75' - H1
T2 Const.
Guy Top Ph
Guy Bottom Ph Guy-SI (x2)
N P900
45' - 2 Guy Top Ph
Guy Bottom Ph Guy-SG
Guy-SI (x2)
304'
287'
P39 70' - H1
T2 Const
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
PLAN SHEET 1 OF 3
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/22/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EC-3
300'
300'
300'
363'
300'
300'
300'
300'
300'
293'
313'
295'
300'
278'
266'
310'
P51
70' - H1
T1 Const.
P52
70' - H1
T1 Const.
P53
70' - H1
T1 Const.
P54
70' - H1
T1 Const.
P55
70' - H1
T1 Const.
P56
70' - H1
T1 Const.
P57
75' - H1
T1 Const.
P58
80' - H1
T1 Const.
P59
80' - H1
T1 Const.
P60
80' - H1
T1 Const.
P44
75' - H1
T2 Const.
Guy Top Ph
Guy Bottom Ph
Guy-SI(x2)
P45
75' - H1
T2 Const
Guy Top Ph
Guy Bottom Ph
Guy-SI (x2)
P46
75' - H1
T2 Const
Guy Top Ph
Guy Bottom Ph
Guy-SI (x2)
P47
75' - H1
T2 Const
Guy Top Ph
Guy Bottom Ph
Guy-SI (x2)
P48
80' - H1
T2 Const
Guy Top Ph
Guy Bottom Ph
Guy-SI (x2)
P49
75' - H1
T2 Const
Guy Top Ph
Guy Bottom Ph
Guy-SI (x2)
P50
75' - H1
T2 Const
Guy Top Ph
Guy Bottom Ph
Guy-SI (x2)
N
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
PLAN SHEET 2 OF 3
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EC-4
310'
343'
252'
290'
310' 300' 300' 329'
270' 288'
333' 332'
332' 288'
300'
290'
127'
211'
80' Sub
P59 80' - H1
T1 Const.
P61 85' Concrete
Replace Hardware Only
T1 Const.
Guy-SI
P62 80' - H1
T2 Const.
Guy-SI
P63 80' - H1
T2 Const.
Guy Top Ph Guy Bottom Ph
Guy-SI(x2)
P68 95' - H1
T2 Const.
VC5.2 (UB)
S2.1 (x3)
Guy Top Ph Guy Bottom Ph
Guy-SI (x2)
P69 90' - H1
T1 Const.
VC1RVN.2 (UB)
VG1.2 (UB)
S2.1 (x3)
P60 80' - H1
T1 Const.
P64 80' - H1 T2 Const Guy Top Ph Guy Bottom Ph Guy-SI (x2)
P65 85' - H1
T2 Const Guy Top Ph
Guy Bottom Ph Guy-SI (x2)
P66 90' - H1 T2 Const Guy Top Ph Guy Bottom Ph Guy-SI (x2)
P67 90' - H1
T2 Const Guy Top Ph
Guy Bottom Ph Guy-SI (x2)
VC5.1 (UB)
P70 85' - H1
T1 Const
VC1RVN.2 (UB)
P71 80' - H1
T1 Const
VC1RVN.2 (UB)
P72 80' - H1
T1 Const
VC1RVN.2 (UB)
VG1.2 (UB)
P73 85' - H1 D1 Const
VC7.2 (UB)
Guy all conductors
Guy-SI (x12)
P74 80' - H1
T1 Const
VC1RVN.2 (UB)
UC2G
S2.1 (x3)
P75a 75' - H1
T1 Const
VC1RVN.2 (UB)
S2.1 (x3)
P75b 75' - H1
T1 Const
VC5.1 (UB)
Guy-SG (x3)
P76 70' - H1 D1 Const Guy all conductors Guy-SI (x4) Guy-SG (x4)
N
P901 45'-2
Guy Top UB Ph Guy Middle UB Ph Guy Bottom UB Ph
Guy-SG (x3) Guy-SI (x3)
P902 50'-2
Guy-SG (x4) Guy-SI (x4)
1 1
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
PLAN SHEET 3 OF 3
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/22/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EC-5
S u r f a c e
R u n o f f
Fence Fabric
Staked and Trenched Silt Fence
Backfill
4" Typ.
4" Typ.
UNLESS OTHERWISE NOTED BY NSBU, SILT FENCE TO BE INSTALLED AROUND PERIMETER OF JOB SITE FOR PREVENTING EXCAVATION
MATERIAL FROM ENTERING CANALS, DITCHES, ETC. AND TO PREVENT GOPHER TORTOISES FROM ENTERING ONTO JOBSITE
SILT FENCE INSTALLATION INSTRUCTIONS
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
GENERAL CONSTRUCTION NOTES
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EC-6
POLE GROUND / GROUNDING ASSEMBLY
Item #
Quantity Description
Manufacturer Model #
3 #10 Copperweld Grounding Wire - 40% Conductivity
AFL CCS03104DR5679F
Staple, Galvanized 1 1/2" x 3/4" x 1/4"
3 1
Pole Riser Ground Molding Wood 1" x 8'0" Hughes Brothers
2501.8
Staples, Galvanized 3" x 1 1/16"
5 3 10' Copper Clad Ground Rod, 3/4" Diameter
Powerline Hardware PLH-3410C
6 1
Ground Rod Clamp, 3/4" Diameter
ERICO HDC34
7 2
3/4" Ground Rod Coupling, Threadless
Powerline Hardware P34C
8 1
Compression Connector, Type H, (3#10 CW) to (3#10 CW)
Blackburn WR159
EXCEPT FOR THE TOP 2' AND BOTTOM 8' OF THE POLE, STAPLES ATTACHING THE GROUND WIRE TO THE POLE SHALL BE SPACED 2'
APART. STAPLES SHALL BE SPACED 6" APART FOR THE TOP 2' AND BOTTOM 8' OF THE POLE.
STAPLES ATTACHING THE MOLDING WOOD OVER THE GROUND WIRE SHALL BE SPACED 1' APART.
STAPLE SPACING
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
TRANSMISSION FRAMING - GROUNDING
AutoCAD SHX Text
POLE DETAIL
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-1
INSTALL BIRD PROTECTION / POLE WRAP(S) ON EVERY POLE FROM THE TOP OF THE POLE TO A MINIMUM OF 2' BELOW THE
BOTTOM TRANSMISSION PHASE INSULATOR.
CONTRACTOR TO FOLLOW MANUFACTURER'S INSTRUCTIONS FOR PROPER INSTALLATION OF BIRD PROTECTION / POLE WRAP(S)
BIRD PROTECTION INSTALLATION
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
TRANSMISSION FRAMING - BIRD PROTECTION
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-2
TANGENT POST INSULATOR ASSEMBLY [T1]
Qty Description
Manufacturer Model #
1 1
OHGW Support, Single Bolt 3/4", with link, 14" length
Hubbell PSC2061002
2 1
OHGW Suspension Clamp
Maclean FSC46
3 1 Washer 3" Round Flat, HDG, 3/4" Bolt
4 1
Square Curved Washer, HDG, 4" x 4", 3/4" Bolt
5 1
Locknut, HDG, Concave Square 3/4" Bolt
6 1
Compression Connector, Type H, (3#6 AW) to (3#10 CW)
Blackburn WR189
7 3
Insulator, Post, 138/161 kV, Polymer, Drop Tongue 2 Hole
Maclean H29010054AXSS021
8 3 Ball Y Clevis
Powerline
Hardware
PYBC30
9 3
Socket Eye
Maclean SE-1000-6
10 3 Armor Grip Suspension for 795 AAC Arbutus
PLP AGS5127
11 2
Square Curved Washer, HDG, 4" x 4", for 7/8" Bolts
12 10
Locknut, Concave Square, HDG, for 7/8" Bolt
13 12 Washer 3" Round Flat, HDG, For 7/8" Bolts
14 2 DA Bolt, Machine, HDG, 7/8" x 32"
15 4
Square Curved Washer, HDG, 3" x 3", for 7/8" Bolts
16 4 Washer 2" Round Flat, HDG, For 7/8" Bolts
17 2 Washer 2" Round Flat, HDG, For 3/4" Bolts
18 3
Compression Connector, Type H, 3#10 to 3#10
Blackburn WR159
19 2 Bolt, Machine, HDG, 7/8" x 20"
Staples
21 Phase Conductor - 795 AAC Arbutus
22 OHGW - 3#6ALWD
Pole - Wood - Class H1
795 Arbutus - Full Tension Sleeve Eaton HR795-37AL
3#6 ALWD - Full Tension Sleeve
Burndy
YDS7M9T
3, 4, 5, 17(x2)
8, 9, 10
11, 12, 13
8, 9, 10
12, 13, 15
12, 13
3 #10CW
3#10 CW
6"
13' 6" (NTS)
10'
12, 13, 16(x2)
11, 12, 13, 16(x2)
A-PHASE INSULATOR
C-PHASE INSULATOR
B-PHASE INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
TRANSMISSION FRAMING - T1
AutoCAD SHX Text
THREE PHASE TANGENT (VERTICAL ALTERNATE)
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-3
TANGENT POST INSULATOR ASSEMBLY [T2]
Qty Description
Manufacturer Model #
1 1
OHGW Support, Single Bolt 3/4", with link, 14" length
Hubbell PSC2061002
2 1
OHGW Suspension Clamp
Maclean FSC46
3 1 Washer 3" Round Flat, HDG, 3/4" Bolt
4 1
Square Curved Washer, HDG, 4" x 4", 3/4" Bolt
5 1
Locknut, HDG, Concave Square 3/4" Bolt
6 1
Compression Connector, Type H, (3#6 AW) to (3#10 CW)
Blackburn WR189
7 3
Insulator, Post, 138/161 kV, Polymer, Drop Tongue 2 Hole
Maclean H29010054AXSS021
8 3 Ball Y Clevis
Powerline
Hardware
PYBC30
9 3
Socket Eye
Maclean SE-1000-6
10 3
Armor Grip Suspension for 795 AAC Arbutus
PLP AGS5127
11 6 Square Curved Washer, HDG, 4" x 4", for 7/8" Bolts
12 6 Locknut, Concave Square, HDG, for 7/8" Bolt
13 12 Washer 3" Round Flat, HDG, For 7/8" Bolts
14 4 Bolt, Machine, HDG, 7/8" x 20"
15 4
Compression Connector, Type H, 3#10 to 3#10
Blackburn WR159
16 2 Bolt, Machine, HDG, 7/8" x 22"
17 2 Washer 2" Round Flat, HDG, For 3/4" Bolts
18 6 Washer 2" Round Flat, HDG, For 7/8" Bolts
19 2
Staples
20 Phase Conductor - 795 AAC Arbutus
21 OHGW - 3#6ALWD
Pole - Wood - Class H1
795 Arbutus - Full Tension Sleeve Eaton HR795-37AL
3#6 ALWD - Full Tension Sleeve
Burndy
YDS7M9T
3, 4, 5, 17(x2)
8, 9, 10
11, 12, 13
8, 9, 10
3 #10CW
3#10 CW
11, 12, 13
6"
8, 9, 10
11, 12, 13
12'(NTS)
10'
10'
11, 12, 13, 18(x2)
A-PHASE INSULATOR
B-PHASE INSULATOR
C-PHASE INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
TRANSMISSION FRAMING - T2
AutoCAD SHX Text
THREE PHASE TANGENT (VERTICAL)
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-4
DOUBLE DEADEND ASSEMBLY [D1]
Qty Description
Manufacturer Model #
1 2
Deadend Tee (OHGW)
Maclean EPF-88-8
2 2
Y-Clevis Eye (OHGW)
Maclean YCE65-625
3 2
Deadend Clamp Quadrant Strain (OHGW)
Maclean DA22-N
4 4 Bolt, Machine, HDG, 7/8" x 16"
5 32 Washer 3" Round Flat, HDG, For 7/8" Bolts
6 16
Square Curved Washer, HDG, 4" x 4", for 7/8" Bolts
7 16
Locknut, Concave Square, HDG, for 7/8" Bolt
8 1
Compression Connector, Type H, (3#6 AW) to (3#6 AW)
Blackburn WR1010
9 1
Compression Connector, Type H, (3#6 AW) to (3#10 CW)
Blackburn WR189
10 4
Compression Connector, Type H, (3#10 AW) to (3#10 CW)
Blackburn WR159
11 4 Bolt, Machine, HDG, 7/8" x 18", With Nuts
12 6
Deadend Tee (Phase)
Maclean DETR60K-88
13 6
Suspension Insulator 138/161kV, Polymer, Y Clevis to Ball, Ansi 25 KIP
Maclean S14080054VXSS027
14 6
Socket Eye
Maclean SE-1000-6
15 4
Deadend Clamp Quadrant Strain (Phase)
Maclean ADE140S
16 3
795AAC Aluminum Sleeve Jumper (Non-Tension Splice)
Hubbell JLS1111
17 8 Bolt, Machine, HDG, 7/8" x 20", With Nuts
18 4 Washer 2" Round Flat, HDG, For 3/4" Bolts
18 12 Washer 2" Round Flat, HDG, For 7/8" Bolts
Staples
19 Phase Conductor - 795 AAC Arbutus
20 OHGW - 3#6ALWD
Pole - Wood - Class H1
795 Arbutus - Full Tension Sleeve Eaton HR795-37AL
3#6 ALWD - Full Tension Sleeve
Burndy
YDS7M9T
1, 2
5, 6, 7
5, 6, 7
6"
12'(NTS)
10'
10'
4, 5
11, 5
3#10CW
5, 6, 7, 18(x2)
5, 6, 7, 19(x2)
A-PHASE INSULATORS
B-PHASE INSULATORS
C-PHASE INSULATORS
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
TRANSMISSION FRAMING - D1
AutoCAD SHX Text
THREE PHASE DEADEND (VERTICAL)
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-5
6, 7 7, 8, 9
GUYING ASSEMBLY - NO STRAIN INSULATOR [GUY-NSI]
Item #
Quantity Description
Manufacturer Model #
1 1
Dead-End Tee (Guy)
Maclean DETR60K67
2 1 Clevis Thimble MacLean CT88-H
3 2
7/16" Guy Grip Dead-End
PLP GDE-1108
4 1
7/16" EHS Guy Wire
5 1
Guy Guard (Marker) 8'
6 2 Bolt, Machine, HDG, 3/4" x 20", With Nuts
7 4 Washer 3" Round Flat, HDG, 3/4" Bolt
8 2
Square Curved Washer, 4" x 4", HDG, 3/4" Bolt
9 2
Locknut, Concave Square, HDG, 3/4" Bolt
10 2
Compression Connector, Type H, (3#10 CW) to (3#10 CW)
Blackburn WR159
11 1
Compression Connector (3#10 CW) to 7/16" Burndy
YHD200
12 2 Washer 2" Round Flat, HDG, For 3/4" Bolts
6, 7
7, 8, 9
GUYING ASSEMBLY - STRAIN INSULATOR [GUY-SI]
Item #
Quantity Description
Manufacturer Model #
1 1
Dead-End Tee (Guy)
Maclean DETR60K67
2 1
Insulator, Strain Fiberglass, Clevis Ends with 1 roller, 3/4" x
144"
MacLean GCC30-144RSC
3 2
7/16" Guy Grip Dead-End
PLP GDE-1108
4 80
7/16" EHS Guy Wire
5 1
Guy Guard (Marker) 8'
6 2 Bolt, Machine, HDG, 3/4" x 20", With Nuts
7 4 Washer 3" Round Flat, HDG, 3/4" Bolt
8 2
Square Curved Washer, 4" x 4", HDG, 3/4" Bolt
9 2
Locknut, Concave Square, HDG, 3/4" Bolt
10 2
Compression Connector, Type H, (3#10 CW) to (3#10 CW)
Blackburn WR159
12 2 Washer 2" Round Flat, HDG, For 3/4" Bolts
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
TRANSMISSION FRAMING - GUYING
AutoCAD SHX Text
TRANSMISSION GUYING DETAILS
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-6
ANCHOR ASSEMBLY
Quantity Description
Manufacturer Model #
1 1 Anchor, 8" - 10" -12" Helix
Maclean D6636-DU
2 1
Guy Adapter 18"
Maclean D6606US
3 1 Anchor Extension, 1-1/2" x 5'
Hubbell 12656
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
TRANSMISSION FRAMING - ANCHORS
AutoCAD SHX Text
ANCHOR DETAIL
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-7
VA11R ASSEMBLY
Qty Description
NSBU Stock #
1 1
Bracket Offset for Post Insulator Mounting
285-74-100849
2 1 Horizontal Post Insulator, 46kV, 3/4"-10 UNC Threaded Hole
285-74-100238
3 1
Clamp, Side Post, (Trunnion) .25-.56 Alum
450-83-100096
4 1
Post Insulator Stud (Short), 3/4" x 3/4" x 1 3/4"
285-74-100344
5 3
Bolt, Machine Square Head, HDG, 5/8" x 22"
285-74-100081
6 3
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
7 3
Washer, Spring, 3/4"
285-74-100714
8 1
Clevis, Secondary, HDG, 1" x 1/2" x 1/8"
285-74-100113
9 1
Insulator Spool Type, Wet Process, Gray Glazed Porcelain
285-74-100235
10 10 Wire Tie, #4 Solid AL Bare Soft Drawn
280-16-109371
11 1
Connector Compression Parallel Tap, WR-159
285-93-100118
6, 7
6, 7
9'0" (NTS)
4'0"
C-PHASE TRANSMISSION INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
DISTRIBUTION UNDERBUILD - VA11R
AutoCAD SHX Text
SINGLE PHASE TANGENT (ALTERNATE)
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-8
VA5.2 ASSEMBLY
Qty Description
NSBU Stock #
1 3
Deadend Suspension Insulator
285-74-100248
2 5
Deadend Shoe Aluminum, Straight (#4 - 2/0)
285-74-100161
3 2 Bolt, Double Armed 5/8" x 20"
285-74-100026
4 5
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
5 5
Washer, Spring, 3/4"
285-74-100714
6 5
Oval Eye Nut, 5/8"
285-74-100603
7 4
Connector Compression Parallel Tap, WR-159
285-93-100118
4, 5, 6
9'0" (NTS)
4'0"
4, 5, 6
C-PHASE TRANSMISSION INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
DISTRIBUTION UNDERBUILD - VA5.2
AutoCAD SHX Text
SINGLE PHASE DOUBLE DEADEND
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-9
3, 13
6, 7
6, 7
9'0" (NTS)
4'0"
3, 13
7'0"
VC1RVN.2 ASSEMBLY
Item #
Qty Description
NSBU Stock #
1 3
Bracket Offset for Post Insulator Mounting
285-74-100849
2 3 Horizontal Post Insulator, 46kV, 3/4"-10 UNC Threaded Hole
285-74-100238
3 3
Clamp, Side Post, (Trunnion) 1.00-1.50 Alum
450-83-100097
4 3
Post Insulator Stud (Short), 3/4" x 3/4" x 1 3/4"
285-74-100344
5 5
Bolt, Machine Square Head, HDG, 5/8" x 20"
285-74-100081
6 5
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
7 5
Washer, Spring, 3/4"
285-74-100714
8 1
Clevis, Secondary, HDG, 1" x 1/2" x 1/8"
285-74-100113
9 1
Insulator Spool Type, Wet Process, Gray Glazed Porcelain
285-74-100235
10 10 Wire Tie, #4 Solid AL Bare Soft Drawn
280-16-109371
11 1
Connector Compression Parallel Tap, WR-379
285-93-100127
12 1
Connector Compression Parallel Tap, WR-159
285-93-100118
13 3
Rod Armor, Line Guard 652.4AAAC, 43" Length Cable
285-74-100289
14 2 Bolt, Double Armed 5/8" x 20"
285-74-100026
C-PHASE TRANSMISSION INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
DISTRIBUTION UNDERBUILD - VC1RVN.2
AutoCAD SHX Text
THREE PHASE VERTICAL (MODIFIED)
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-10
41"
VG1.2 ASSEMBLY
Item #
Qty Description
NSBU Stock #
1 1
Stirrup Alum. 336-954
285-10-100108
2 1
Clamp, Hot-Line, Small
285-10-100086
3 15
#4 Solid Copper, Soft Drawn, Poly Black Coating
280-16-109385
4 1
Cutout 21-27kV, 100A SS Fuse Type
285-28-100140
5 1
Bracket Single Phase Device Arm
285-74-100637
6 1 Arrester, Riser Pole, 18kV MCOV
285-03-100848
7 1 Bracket Tank Arrester 285-74-100074
8 1 Arrester Guard, Cover
285-74-100796
9 4
Bolt, Machine Square Head, HDG, 5/8" x 22"
285-74-100081
10 4
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
11 4
Washer, Spring, 3/4"
285-74-100714
12 2
Connector Compression Parallel Tap, WR-159
285-93-100118
1, 2
6, 7, 8
9, 10, 11
9, 10, 11
12"
7'0" (NTS)
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
DISTRIBUTION UNDERBUILD - VG1.2
AutoCAD SHX Text
SINGLE PHASE TRANSFORMER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-11
VC5.1 ASSEMBLY
Qty Description
NSBU Stock #
1 6
Deadend Suspension Insulator
285-74-100248
2 6
Deadend Shoe, Straight 652AAAC
285-74-100658
3 7 Bolt, Double Armed 5/8" x 20"
285-74-100026
4 16
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
5 16
Washer, Spring, 3/4"
285-74-100714
6 7
Oval Eye Nut, 5/8"
285-74-100603
7 3 Connector AMPACT 652-652AAAC 285-95-100582
8 1
Deadend Shoe Aluminum, Straight, 1/0STR 397 AAAC
285-74-100162
9 1 Connector, AMPACT 4/0-4/0
285-95-100587
10 1
Connector Compression Parallel Tap, WR-379
285-93-100127
11 1
Connector Compression Parallel Tap, WR-159
285-93-100118
4, 5
9'0" (NTS)
4'0"
4'0"
0'6"
4'6"
0'6"
C-PHASE TRANSMISSION INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
DISTRIBUTION UNDERBUILD - VC5.1
AutoCAD SHX Text
THREE PHASE DOUBLE DEADEND (VERTICAL)
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-12
11, 12
9'0" (NTS)
7'0"
VC5.2 ASSEMBLY
Item #
Qty Description
NSBU Stock #
1 5
Clamp, Top Post Insulator, (Trunnion) 1.00-1.50 Alum
450-83-100097
2 5
Top Post Insulator, 46kV, 3/4"-10 UNC Threaded Hole
285-74-100239
3 1
Crossarm Fiberglass Heavy Tangent - Brace Type 8'
285-74-100066
4 5 Bolt, Stud 3/4" x 3/4" x 7" Galvanized Steel
285-74-100867
5 6 Connector AMPACT 652-652AAAC 285-95-100582
6 1
Connector Compression Parallel Tap, WR-379
285-93-100127
7 3
Deadend Shoe, Straight, 652AAAC
285-74-100658
8 1
Deadend Shoe Aluminum, Straight, 1/0STR 397 AAAC
285-74-100162
9 3
Deadend Suspension Insulator
285-74-100248
10 5
Bolt, Machine Square Head, 5/8" x 22"
285-74-100081
11 5
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
12 5
Washer, Spring, 3/4"
285-74-100714
13 3
Bolt, Oval Eye 5/8" x 10"
285-74-100013
14 1
Bolt, Double Arming, 5/8" x 30"
285-74-100030
15 5
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
16 5
Washer, Spring, 3/4"
285-74-100714
17 1
Oval Eye Nut, 5/8"
285-74-100603
18 1
Clevis, Secondary, HDG, 1" x 1/2" x 1/8"
285-74-100113
19 1
Insulator Spool Type, Wet Process, Gray Glazed Porcelain
285-74-100235
20 20 Wire Tie, #4 Solid AL Bare Soft Drawn
280-16-109371
21 1
Connector Compression Parallel Tap, WR-379
285-93-100127
22 1
Connector Compression Parallel Tap, WR-159 285-93-100118
23 1 Crossarm Galvanized Steel Deadend, 102"
285-74-100071
23 3
Rod Armor, Line Guard 652.4 AAAC 43" Length Cable
285-74-100289
2'0"
5, 6
7, 8
10, 11, 12
13, 14, 15, 16, 17
*Note: Neutral Deadend on Crossarm
10, 11, 12
C-PHASE TRANSMISSION INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
FIELD STREET TRANSMISSION LINE REBUILD
AutoCAD SHX Text
DISTRIBUTION UNDERBUILD - VC5.2
AutoCAD SHX Text
THREE PHASE DEADEND (CROSSARM)
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
J. PARKER
AutoCAD SHX Text
NTS
AutoCAD SHX Text 11/6/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ED-13
9'0" (NTS)
2'0"
7'0"
VC7.2 ASSEMBLY
Item #
Qty Description
NSBU Stock #
1 6 Connector AMPACT 652-652AAAC 285-95-100582
2 1 Connector, AMPACT 4/0-4/0
285-95-100587
3 6
Deadend Shoe, Straight, 652AAAC
285-74-100658
4 6
Deadend Suspension Insulator
285-74-100248
5 4 Crossarm Galvanized Steel Deadend, 102"
285-74-100071
6 6
Bolt, Machine Square Head, 5/8" x 22"
285-74-100081
7 14
Washer, Square Curved, 3" x 3", 11/16" Hole
285-74-100720
8 14
Washer, Spring, 3/4"
285-74-100714
9 6
Bolt, Double Arming, 5/8" x 30"
285-74-100030
10 8
Oval Eye Nut, 5/8"
285-74-100603
11 2
Deadend Shoe Aluminum, Straight, 1/0STR 397 AAAC
285-74-100162
12 1
Connector Compression Parallel Tap, WR-379
285-93-100127
13 1
Connector Compression Parallel Tap, WR-159
285-93-100118
14 15 Wire Tie, #4 Solid AL Bare Soft Drawn
280-16-109371
2'0"
6, 7, 8
9, 7, 8
6, 7, 8, 10
6, 7, 8, 10
6, 7, 8
C-PHASE TRANSMISSION INSULATOR
AutoCAD SHX Text
NEW SMYRNA BEACH UTILITIES
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CKD.
AutoCAD SHX Text
APP.
AutoCAD SHX Text
DWN.
AutoCAD SHX Text
SHEET OF
AutoCAD SHX Text
REV.
AutoCA…