This is a Statement of Requirements for an Integrated Telemetry Analysis System (ITAS) Upgrade prepared by the JDAM Program Office under AFLCMC/EBHTA at Hill Air Force Base, Utah. The document outlines the procurement of telemetry equipment required to support Joint Direct Attack Munitions operations. The government requires four commercial rugged telemetry controller integrated laptops (Panasonic Toughbook, Windows 11 OS with minimum specifications of 14" display, 32GB RAM, and 1TB SSD); one Edge2 Compact 1U 2-channel Receiver Decom Telemetry Processing Unit with IRIG Time Code Transmitter (L-S-C Bands, PCM/FM, SOQPSK, and BPSK demodulators, low latency audio, CH10 and TMoIP outputs); four Edge2 Compact 1U 1-channel Receiver Decom Telemetry Processing Units with the same specifications as the 2-channel unit; and three Edge2 Compact 1U 2-channel Bit Sync Decom Telemetry Processing Units with upgraded specifications (PCM Bit Sync up to 50 Mbps and 25 Mbps capabilities). All equipment must include external AC-DC power converter modules, BNC breakout cables, and rubber feet.

The contract delivery timeline specifies a maximum of 120 days from award, with early delivery authorized. Shipment is directed to JDAM/Eglin HGR 71, Eglin Air Force Base, Florida. The government will provide Government Furnished Equipment as needed through the contracting office, and any Non-Recurring Engineering for obsolescence will be priced separately. This procurement is controlled by the Department of Air Force and contains Controlled Technical Information with limited dissemination restricted to the Department of Defense and U.S. DoD contractors only. The document contains export-controlled technical data subject to the Arms Export Control Act and Export Administration Act.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Requirements

Integrated Telemetry Analysis System (ITAS) Upgrade

25 March 2026

Prepared By

AFLCMC/EBHTA

6034 Dogwood Ave Hill AFB, UT 84056

Controlled by: DAF Controlled by: AFLCMC/EBHTA CUI Category(ies): Controlled Technical Information Limited Dissemination: FEDCON POC: Anthony Koberstein

DISTRIBUTION STATEMENT D. Secondary distribution authorized to the Department of Defense and U.S. DoD contractors only; administrative or operation use and vulnerability information; 19 January 2022. Other requests for this document shall be referred to JDAM Program Office, AFLCMC/EBHTB, 6034 Dogwood Ave, Bldg. 1257 Hill AFB, UT 84056-5816.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

DESTRUCTION NOTICE. Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

1. INDUCTUCTION AND PURPOSE:

Joint Direct Attack Munitions (JDAM) Program Office is in need for Integrated Telemetry Analysis System upgrade. The program office is requesting to purchase the following below as defined.

2. Item/Product Description:

The following items are required for performance under this contract:

2.1 Commercial rugged telemetry controller - integrated laptop, Quantity: 4 ea.

• Panasonic Toughbook, Windows 11 OS (brand name or equivalent)

• Min Specs: 14" display, 32G Ram, 1TB SSD

2.2 Edge2 Compact 1U 2-ch Receiver Decom Telemetry Processing Unit w/IRIG Time Code Trans, Quantity: 1 ea.

• L-S-C Bands

• PCM/FM, SOQPSK, and BPSK Demods included

• Low Latency Audio, CH10, and TMoIP Outputs

• External AC-DC power converter module

• BNC Breakout cable, and rubber feet

2.3 Edge2 Compact 1U 1-ch Receiver 1-ch Decom Telemetry Processing Unit w/IRIG Time Code Trans is the Single-Input RF Receiver, Quantity: 4 ea.

• L-S-C Bands

• PCM/FM, SOQPSK, and BPSK Demods

• Low Latency Audio, CH10, and TMoIP Outputs

• BNC Breakout cable and rubber feet

2.4 Edge2 Compact 1U 2-ch Bit Sync Decom Telemetry Processing Unit w/IRIG Time Code Trans (Dual-Input PCM Databrick), Quantity: 3 ea.

(upgraded version of our current X-5000 PCM Databrick)

• PCM Bit Sync – 50Mbps, NRZ-L/M/s, RNRZ-L codes

• 25Mbps, BIO L/M/S codes

• Low Latency Audio, CH10 and TMoIP outputs

• NBC breakout cable and rubber feet.

3. DELIVERY DATE:

3.1. The proposed delivery date is no later than 120 days from the contract award, with early delivery authorized.

3.2. Shipment Address:

ATTN: JDAM / Eglin HGR 71

DODAAC - EY0305

305 W. Choctawhatchee Road Eglin AFB, FL 32542-5701

4. GROUND RULES AND ASSUMPTIONS

4.1. Government Furnished Equipment (GFE) will be provided as needed/requested through the Government Contracting office.

4.2. Any associated Non-Recurring Engineering (NRE) for obsolescence will be priced separately.

5. DELIVERABLES:

5.1 Four (4) commercial rugged telemetry controller - integrated laptops

5.2 One (1) Edge2 Compact 1U 2-ch Receiver Decom Telemetry Processing Unit w/IRIG

Time Code Trans

5.3 Four (4) Edge2 Compact 1U 1-ch Receiver 1-ch Decom Telemetry Processing Unit w/IRIG Time Code Trans is the Single-Input RF Receiver

5.4 Three (3) Edge2 Compact 1U 2-ch Bit Sync Decom Telemetry Processing Unit w/IRIG Time Code Trans Dual-Input PCM Databrick)

1. INDUCTUCTION AND PURPOSE:
2. Item/Product Description:
The following items are required for performance under this contract:
2.2 Edge2 Compact 1U 2-ch Receiver Decom Telemetry Processing Unit w/IRIG Time Code Trans,
Quantity: 1 ea.
2.3 Edge2 Compact 1U 1-ch Receiver 1-ch Decom Telemetry Processing Unit w/IRIG Time Code Trans is the Single-Input RF Receiver,
Quantity: 4 ea.
2.4 Edge2 Compact 1U 2-ch Bit Sync Decom Telemetry Processing Unit w/IRIG Time Code Trans (Dual-Input PCM Databrick),
Quantity: 3 ea.
(upgraded version of our current X-5000 PCM Databrick)
3. DELIVERY DATE:
3.1. The proposed delivery date is no later than 120 days from the contract award, with early delivery authorized.
3.2. Shipment Address:
4. GROUND RULES AND ASSUMPTIONS
5. DELIVERABLES: