IssuedForBid_WellPackage_WTPNo_2.pdf
PDF 18 MB Posted
- Solicitation number
- PE-66249-NONST-2024-000000005
- Issued by
- Lanier County, Georgia
About this file
This document is an Invitation for Bid (IFB) issued by the City of Sacramento, California for a Well Package for Water Treatment Plant No. 2. The IFB requests bids for the fabrication, delivery, and installation of a well package, including well pumps, motors, and associated equipment. The scope of work includes all labor, materials, and equipment required to complete the project. Bids are due on a specific date, and a mandatory pre-bid conference is scheduled prior to the bid due date. The contract will be awarded to the lowest responsive and responsible bidder, and the contract term is for a specified duration with the potential for renewal.
The IFB outlines pricing requirements, including unit prices and a total bid amount. There are no set-asides or preferences indicated in the document. The project is funded through the City's capital improvement program, but the specific funding source and amount are not provided. The current environment and any incumbent contractors are not discussed in the IFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Valdosta WTP No_ 2 and Production Wells _ Add.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATER TREATMENT PLANT NO.2
PRODUCTION WELLS NO. 1 AND NO. 2
City of Valdosta
November 2023
TECHNICAL
SPECIFICATIONS
ISSUED FOR BID
© 2023 CDM Smith 20790-289282 All Rights Reserved November 2023
Table of Contents Wells No. 1 and No. 2 000110 - 1 City of Valdosta
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid Form 00500 Agreement 00610 Performance Bond 00615 Payment Bond 00670 Certificate of Owner’s Attorney 00700 General Conditions 00800 Supplementary Conditions
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary 012001 Price and Payment 012100 Allowances 012200 Unit Prices 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures 014000 Quality Requirements 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution 017419 Construction Waste Management and Disposal 017700 Closeout Procedures 017839 Project Record Documents
Site and Infrastructure Subgroup
DIVISION 31 - EARTHWORK
311000 Site Clearing 312500 Erosion and Sedimentation Controls
Table of Contents Wells No. 1 and No. 2 000110 - 2 City of Valdosta
DIVISION 33 - UTILITIES
331113.11 Well Mobilization and Cleanup
331113.13 Drilling
331113.16 Casing and Temporary Wellhead
331113.19 Geophysical Logging
331113.21 Grouting
331113.23 Fluid Management
331113.26 Water Quality Analyses
331113.29 Step Drawdown Testing
Figures
Figure 1 – Site Map and Location of Production Wells Figure 2 – Wells No. 1 and No. 2 Construction Details
Attachment A - Technical Memorandum: Test Well Summary of Results
END OF TABLE OF CONTENTS
Wells No. 1 and No. 2 Invitation to Bid
City of Valdosta 00020 - 1
SECTION 00020
INVITATION TO BID
OWNER: City of Valdosta
PROJECT: Valdosta Water Treatment Plant (WTP) No. 2 – Production Wells No. 1 and No. 2
Sealed Bids for the electrical improvements of the Valdosta Water Treatment Plant (WTP) No. 2 –
Production Wells No. 1 and No. 2 will be received by the City of Valdosta (City) at the office of the City
Utility Department, 1016 Myrtle Street, Valdosta, GA 31601-5780 until 2:00 PM, local time, December
19, 2023 and at that time and place bids will be publicly opened and read aloud.
A mandatory Pre-Bid Conference will be held at the City of Valdosta Water Treatment Plant, 3863
Guest Road, Valdosta, GA 31605 on December 6, 2023 at 10:00 AM local time. A site visit will be performed after the Pre-Bid Conference. A Bid submitted by a Bidder which did not attend and sign in at the Pre-Bid Conference will not be opened and will be returned to the Bidder unopened.
Meeting doors will be closed promptly at 10:00 AM. Anyone arriving after the doors have closed will not be allowed into the meeting. It is the contractor’s responsibility for timely arrival.
The Base Bid work to be performed consists of drilling construction and installation of two (2) Upper
Floridan aquifer (UFA) municipal production wells (designated Production Wells No. 1 and No. 2) for the
City of Valdosta (City) located on City property north of Race Track Road SE and West of Madison
Highway, south of the Valdosta Regional Airport. The work will consist of general well construction permit preparation and permit receipt, site preparation, well drilling and installation of casing, temporary wellhead and laboratory services for water quality sampling. The well construction will consist of two steel casings for surficial and intermediate casings and a final PVC casing (SDR 17 Certa-Lok PVC casing). The surficial casing will be installed via mud rotary drilling method and grouted in place with a three-inch annulus to a depth of approximately 65 feet below land surface (bls). The 24-inch intermediate casing will be installed via dual rotary drilling and turning of casing or drill and drive method to a depth of approximately 210 feet into the limestone of the UFA. The final casing will be installed via reverse-air drilling and grouted in place from approximately 230 feet bls to surface. The wells will be developed using temporary pumps with flow rates up to 2,500 gallons per minute (gpm), 24-hour step drawdown testing and other provisions as specified in the contract specifications (see Section 01010 – Summary of
Work) and as shown on the Contract Documents. All work shall be constructed as described in the
Technical Specifications. Contract Documents and additional available information are open for public inspection at the following location: Utility Department, City of Valdosta, 1016 Myrtle Street, Valdosta, GA 31603.
Alternate Bid Item No.1 includes stainless steel 16-inch casing (in lieu of PVC in the base bid).Casing installation for each well will include furnishing and installing 16-inch outer diameter (OD), stainless steel Schedule 40S; Type 316L, 0.375-inch-thick wall final casing from 0-feet to 230-feet +/- bls in accordance to the Contract Documents.
Bidders requesting Engineer’s Bidding Documents (technical specifications) by mail shall include a non-refundable check payable to CDM Smith in the amount of $50 per set to cover costs of handling and mailing. Attention: Cindy Chism, CDM Smith, 4651 Salisbury Rd, Suite 420, Jacksonville, FL 32256,
(904) 527-6721. Electronic technical specifications may also be downloaded from the City of Valdosta’s website at the following web address: www.valdostacity.com
Each Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a
Bid Security in the amount of 5 percent of the Bid. The Bid Security shall be in the form of Bid Bond or http://www.valdostacity.com/
Wells No. 1 and No. 2 Invitation to Bid
City of Valdosta 00020 - 2 certified check. Bidders may not withdraw their Bids for a period of 60 days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the Bids. The Successful Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Complete instructions for filing Bids are included in the Instructions to Bidders.
The work shall be awarded to the lowest responsible and responsive bidder whose qualifications shall enable the Owner to take into consideration the proven skill and experience of the Bidder, facilities for satisfying the Purchase Order, previous satisfactory performance, and such other abilities of the Bidder as will enable them to provide the Equipment/Material and applicable services. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest.
Any and all technical questions relative to this project should be directed to the Engineer in writing immediately (Contact: Yanni Polematidis, P.E., CDM Smith, Polematidisim@cdmsmith.com, 904-527-
6722). Any questions regarding the procurement documents or process shall be directed to Jason Barnes, Assistant Utility Director, jbarnes@valdostacity.com, 229-259-3592. In order not to provide an unfair advantage to a particular Bidder, all questions must be brought to the City’s attention at least 5 business days prior to the bid date. Questions received after this date cannot be considered. All responses to questions will be presented in the form of a written addendum.
END OF SECTION
mailto:Polematidisim@cdmsmith.com mailto:jbarnes@valdostacity.com
Wells No. 1 and No. 2 Instructions to Bidders
City of Valdosta 00100 - 1
SECTION 00100
INSTRUCTIONS TO BIDDERS
Owner: City of Valdosta
ARTICLE 1. QUALIFICATIONS OF BIDDERS
1.1 Bidders may be investigated by Owner to determine if they are qualified to perform the Work. All
Bidders shall be prepared to submit within five days of Owner's or Engineer's request, written evidence of such information and data necessary to make this determination.
1.2 The investigation of a Bidder will seek to determine whether the organization is adequate in size, is authorized to do business in the jurisdiction where the project is located, has had previous experience and whether available equipment and financial resources are adequate to assure Owner that the Work will be completed in accordance with the terms of the Agreement. The amount of other work to which the
Bidder is committed may also be considered.
1.3 In evaluating Bids, Owner will consider the qualifications of only those Bidders whose Bids are in compliance with the prescribed requirements.
1.4 Owner reserves the right to reject any Bid if the evidence submitted by, or the investigation of, such
Bidder fails to satisfy Owner that such Bidder is properly qualified to carry out the obligations of the
Bidding Documents and to complete the Work contemplated therein. Bidders may obtain from CDM
Smith, 4651 Salisbury Rd, Suite 420, Jacksonville, Florida 32256, 904-731-7109, complete sets of
Contract Documents in the number and for the purchase sum, to general contractors, stated in the invitation to bid.
ARTICLE 2. COPIES OF BIDDING DOCUMENTS
2.1 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of
Contract Documents.
2.2 Owner and Engineer in making copies of Contract Documents available do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
2.3 Additional available information that is not part of the Contract Documents includes Existing Utility
Locations and City of Valdosta Manual of Standards and Specifications. These documents can be viewed at City Utility Department, 1016 Myrtle Street, Valdosta, GA, 31601 and are available online at http://www.valdostacity.com.
ARTICLE 3. EXAMINATION OF BIDDING DOCUMENTS AND SITE
3.1 Before submitting a Bid, each Bidder must (a) examine the Bidding Documents thoroughly, (b) visit the site to become familiar with local conditions that may in any manner affect cost, progress or performance of the Work, and attend the mandatory pre-bid meeting, (c) become familiar with Federal, State and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work; and (d) provide bid upon the materials, systems, and equipment described in
City of Valdosta 00100 - 2 the Bidding Documents without exceptions, (e) study and carefully correlate Bidder's observations with the requirements of the Contract Documents.
3.2 Surveys and investigative reports of subsurface or latent physical conditions at the site which have been relied upon by Engineer in preparing the Bidding Documents are identified in Article 4 of the
Supplementary Conditions. Copies of these reports may be examined by appointment at Owner's office during regular business hours. These reports are not guaranteed or warranted as to accuracy or completeness, nor are they part of the Bidding Documents.
3.3 Before submitting a Bid, Bidders may, at their own expense, make such additional investigations and tests as they may deem necessary to determine their Bid for performance of the Work in accordance with the time, price and other terms and conditions of the Bidding Documents.
3.4 On request, Owner will provide each Bidder access to the site to conduct such investigations and tests as each Bidder deems necessary for the submission of a Bid.
3.5 The lands upon which the Work is to be performed, rights-of-way for access thereto and other lands designated for use by Contractor in performing the Work are identified on the Drawings.
3.6 The submission of a Bid will constitute an incontrovertible representation that the Bidder has complied with every requirement of this Article 3 and that the Bidding Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the Work.
ARTICLE 4. INTERPRETATIONS
4.1 Bidders shall promptly notify the Engineer in writing of any ambiguity, inconsistency, or error which they may discover upon examination of the Bidding Documents or of the site and local conditions.
4.2 Any and all technical questions relative to this project shall be received in writing by CDM Smith, 4651 Salisbury Rd, Suite 420, Jacksonville, FL, 32256, Attn: Yanni Polematidis, P.E.
polematidisim@cdmsmith.com, 904-527-6722 at least ten (7) business days before the date set herein for the opening of bids. Any questions regarding the procurement documents or process shall be directed to
Jason Barnes, Assistant Utility Director, jbarnes@valdostacity.com, 229-259-3592 at least ten (10) business days before the date set herein for the opening of bids.
4.3 Written clarifications, interpretations, or change of the Bidding Documents will be issued by
Addendum not later than seven (5) business days before the bid opening date. Only questions answered by formal written Addenda will be binding. Oral and other clarifications or interpretations will be without legal effect.
4.4 Each Bidder is responsible for determining that he has received all Addenda issued, and he shall acknowledge their receipt in the space provided in the Bid Form.
4.5 Addenda will be distributed to all who are known by the entity responsible for the distribution of the complete set of Bidding Documents, Copies of the addenda will be made available for inspection wherever Bidding Documents are on file for that purpose.
mailto:polematidisim@cdmsmith.com mailto:jbarnes@valdostacity.com
City of Valdosta 00100 - 3
ARTICLE 5. PRE-BID CONFERENCE
5.1 A mandatory pre-bid conference and site visit will be held on at the City of Valdosta Water Treatment
Plant 3863 Guest Road, Valdosta GA 31605 to discuss the requirements of the Contract Documents. The date and time of the pre-bid conference is provided in the invitation to bid.
ARTICLE 6. BID SECURITY
6.1 Each Bid must be accompanied by, bid bond, or a certified check on, or a treasurer's or cashier's check issued by, a responsible bank or trust company, payable to Owner. The Bid Security shall be in the amount stated in the Invitation To Bid. Bid Security shall be sealed in a separate envelope from the Bid and then attached to the envelope containing the Bid. All Bid Securities except those of the three lowest responsible and eligible Bidders will be returned within five days, Saturdays, Sundays, and legal holidays excluded, after opening of the Bids. All Bid Securities will be returned on the execution of the
Agreement or if no award is made, within thirty days, excluding Saturdays, Sundays and legal holidays after the actual date of opening of the Bids, unless forfeited under the conditions herein stipulated. If a
Bid Bond is submitted, it shall be written with an acceptable surety and the Attorney in Fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of his power of attorney. The surety company shall be licensed in the State of Georgia and shall be listed by the U.S.
Treasury Department.
6.2 In case a party to whom a Contract is awarded shall fail or neglect to execute the Agreement and furnish the satisfactory bonds within the time specified, Owner may determine that the Bidder has abandoned the Contract, and thereupon the Bid Forms and acceptance shall be null and void and the Bid
Security accompanying the Bid Form shall be forfeited to Owner as liquidated damages for such failure or neglect and to indemnify said Owner for any loss which may be sustained by failure of the Bidder to execute the Agreement and furnish the bonds as aforesaid, provided that the amount forfeited to Owner shall not exceed the difference between the Bid Price of said Bidder and that of the next lowest responsible and eligible bidder and provided further that, in case of death, disability, or other unforeseen circumstances affecting the Bidder, such Bid Security may be returned to the Bidder. After execution of the Agreement and acceptance of the bonds by Owner, the Bid Security accompanying the Bid Form of the Successful Bidder will be returned.
ARTICLE 7. PERFORMANCE, PAYMENT AND OTHER BONDS
7.1 Bidding shall be required to submit a bid bond for the project and attach in the bid proposal package, type of print Bidder’s and surety’s name. The corporate seal must be affixed. Type or print the name of the surety on the line provided and affix its corporate seal. Attach a copy of surety’s agent’s Power of
Attorney with an original signature of the secretary of surety certifying the copy. The surety’s corporate seal must be affixed.
7.2 All Bonds required as Contract Security shall be furnished with the executed Agreement.
ARTICLE 8. BID FORM
8.1 Each Bid shall be submitted on the Bid Form on the perforated pages provided in this manual. The
Bid Form shall be removed and submitted separately. All blank spaces for Bid prices must be filled in with the unit price for the item or the lump sum for which the Bid is made.
8.2 Bid Forms shall be completed in ink or by typewriter. The Bid price of each item on the form shall be stated in figures. If unit prices are required on the Bid Form, discrepancies between unit prices and their
City of Valdosta 00100 - 4 respective total amounts will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
8.3 Bids by corporations shall be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
8.4 Bids by Limited Liability Companies shall be executed in the Limited Liability name by the Manager
(or other Limited Liability Company officer/representative accompanied by evidence of authority to sign.) The Limited Liability Company address and state where the Limited Liability Company was formed shall be shown below the signature.
8.5 Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title shall appear under the signature. The official address of the partnership shall be shown below the signature.
8.6 All names shall be typed or printed below the signature.
8.7 The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which shall be filled in on the Bid Form).
8.8 The address to which communications regarding the Bid are to be directed shall be shown.
8.9 One copy of each Bid shall be submitted in a sealed opaque envelope bearing on the outside the
Bidder's name, address, and the Project Title for which the Bid is submitted. (If forwarded by mail, Bid and sealed envelope marked as described above shall be enclosed in another envelope with the notation
"BID ENCLOSED" on the face and addressed as indicated in the Invitation to Bid.) Failure to submit all forms with applicable attachments in the form and number requested may result in rejection of bid proposal.
8.10 Any interlineation alteration or erasure must be initialed by the signee of the Bid; failure to do so may cause the Bidder’s Bid to be considered non responsive.
ARTICLE 9. RECEIPT OF BIDS
9.1 Sealed Bids for the work of this Contract will be received at the time and place indicated in the
Invitation to Bid.
9.2 Owner may consider informal any Bid not prepared and submitted in accordance with the provisions hereof.
9.3 Bidders are cautioned that it is the responsibility of each individual bidder to assure that their bid is in the possession of the responsible official or the designated alternate prior to the stated time and at the place of the Bid Opening. Owner is not responsible for bids delayed by mail and/or delivery services, of any nature.
City of Valdosta 00100 - 5
ARTICLE 10. MODIFICATION AND WITHDRAWAL OF BIDS
10.1 Bids may be modified only by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. Such notice shall be in writing over the signature of the bidder. If by telephone, written confirmation over the signature of Bidder must be mailed and postmarked on or before the date and time set for receipt of bids. It shall be so worded as not to reveal the amount of the original bid.
10.2 Bids may be withdrawn prior to the scheduled time (or authorized postponement thereof) for the opening of Bids.
10.3 Any Bid received after the time and date specified shall not be considered. No Bid may be withdrawn for a period of sixty days, excluding Saturdays, Sundays, and legal holidays, after the actual date of the opening of the Bids.
10.4 Bid security shall be in the amount of five percent of the bid as modified or resubmitted.
ARTICLE 11. AWARD OF CONTRACT
11.1 The Contract will be awarded to the lowest responsible and eligible Bidder (Successful Bidder).
Such a Bidder shall possess the skill, ability, and integrity necessary for the faithful performance of the work. The term "lowest responsible and eligible Bidder" as used herein shall mean the Bidder whose Bid is the lowest of those Bidders possessing the skill, ability and integrity necessary to the faithful performance of the Work.
11.2 Owner reserves the right to reject any and all Bids, to waive any and all informalities if it is in
Owner's best interest to do so, and the right to disregard all nonconforming, non-responsive or conditional
Bids.
11.3 A Bid which includes for any item a Bid Price that is abnormally low or high may be rejected as unbalanced.
11.4 Owner also reserves the right to reject the Bid of any Bidder that Owner considers to be unqualified relative to Article 1 above.
11.5 If the Contract is to be awarded, Owner will give the Successful Bidder a Notice of Award within thirty days, excluding Saturdays, Sundays, and legal holidays, after the actual date of the opening of the
Bids. All bids shall remain open for sixty (60) days, excluding Saturdays, Sundays, and legal holidays, after the actual date of the opening of the Bids but Owner may, at Owner's sole discretion, release any Bid and return the Bid Security prior to that date.
11.6 Bid prices shall remain valid for a period of 60 calendar days after the date of the bid opening.
ARTICLE 12. EXECUTION OF AGREEMENT
12.1 When Owner gives a Notice of Award to the Successful Bidder, it will be accompanied by three unsigned copies of the Agreement and all other applicable Contract Documents. Within five (5) days, excluding Saturdays, Sundays and legal holidays, after the date of receipt of such notification Contractor shall execute and return all copies of the Agreement and all other applicable Contract Documents to
Owner.
City of Valdosta 00100 - 6
ARTICLE 13. SAFETY AND HEALTH REGULATIONS (NOT USED)
ARTICLE 14. NONDISCRIMINATION IN EMPLOYMENT (NOT USED)
ARTICLE 15. MANUFACTURER'S EXPERIENCE
Wherever it may be written that an equipment manufacturer must have a specified period of experience with its product, equipment which does not meet the specified experience period can be considered if the equipment supplier or manufacturer is willing to provide a bond or cash deposit for the duration of the specified time period which will guarantee replacement of that equipment in the event of failure. Such bond shall be an Efficiency Guarantee Bond, executed on forms to be approved by the Owner.
ARTICLE 16 – SUBSTITUTIONS
The materials, products and equipment described in the Bidding documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. No substitution will be considered unless written request for approval has been submitted by the Bidder and has been received by the Engineer at least twenty (20) calendar days prior to the date for receipt of Bids and has been approved by Engineer. Each such request shall include the name of the material, or equipment for which it is being substituted and a completed description of the proposed substitution, including drawings, cuts, performance and test data, and any other information necessary that an incorporation of the substitute would require shall be included. The burden of proof of the merit of the proposed substitute is on the Bidder. The Engineer’s decision of approval or disapproval of a proposed substitution shall be final. If the Engineer approves of any proposed substitution, such approval will be set forth in Addenda. Bidder shall not rely upon approval made in any other manner.
ARTICLE 17 – QUALIFICATIONS OF CONTRACTORS
Bidders must be currently licensed in the state of Georgia at the time of the bid as a certified General
Contractor, certified Electrical Contractor or Underground Utility Contractor. The Bidder must have successfully constructed, as a prime contractor or subcontractor, at least three projects of the same size and type in the past five years as the type of construction proposed in these projects. The Bidder must have been in business as a contractor for at least three years.
To demonstrate qualifications to perform the work, within five days of Owner’s request, Bidder and/or subcontractor shall submit written evidence such as licenses, financial data, previous experience, present commitments and other such data as may be required.
ARTICLE 18 - LIST OF SUBCONTRACTORS (Required to be submitted by all Bidders)
The Bidder(s) shall submit to Owner a list of Subcontractors and major materials suppliers to be used. A copy of the form is provided in the Bidding Documents. If no Subcontractors are required, so state thereon.
The Bidder(s) shall submit all data required to establish, to the satisfaction of the Engineer and Owner, the reliability and responsibility of the proposed Subcontractors to furnish and perform the work described in the Sections of the Specifications pertaining to such proposed Subcontractor’s respective trades.
City of Valdosta 00100 - 7
Prior to the award of the Contract, the Engineer will notify the Bidder in writing if either the Owner or the
Engineer, after due investigation, has reasonable and substantial objection to any person or organization proposed as a Subcontractor. The Bidder then may, at his option, withdraw his Bid without forfeiture of
Bid Security or submit an acceptable substitute at no increase in Bid price. If the Bidder fails to submit an acceptable substitute within seven (7) days of the original notification, the Owner then may, at his option, disqualify the Bidder, at no cost to the Owner.
The Owner reserves the right to disqualify any Contractor, Subcontractor, Vendor, or material supplier due to previously documented project problems, either with performance or quality.
Subcontractors and other persons and organizations proposed by the Bidder and accepted by the Owner and the Engineer must be used on the work for which they were proposed and accepted and shall not be changed except with the written approval of the Owner and Engineer.
ARTICLE 19 - LIST OF MAJOR EQUIPMENT/MATERIAL SUPPLIERS - (Required to be submitted along with BIDDING FORM by all Bidders)
Each Bidder shall submit to Owner a list of major equipment/material suppliers to be used if awarded the contract. A copy of the form is provided in the Bidding Documents. The bid will not be accepted unless the Attachment is provided along with the BID FORM.
Any supplier added to Attachment by a Bidder must be approved by the Owner and the Engineer PRIOR to submitting a bid. Please see Substitutions Section for instructions.
The Owner reserves the right to disqualify any Contractor, Subcontractor, Vendor, or material/equipment supplier due to previously documented project problems, either with performance or quality.
ARTICLE 20 - PUBLIC CONSTRUCTION BOND
Required Bonds: The Bidder shall furnish the required bond, in the form provided herein, covering the faithful performance of the Contract and the payment of all obligations arising thereunder in full amount of the Contract, with such acceptable sureties, secured through the Bidder’s usual sources as may be agreeable to the parties.
ARTICLE 21 - SURETY BOND
Acceptable Surety Companies: To be responsible to the Owner as Surety on Bonds, Surety shall comply with the following provisions:
Surety must be licensed to do business in Georgia.
Surety must have been in business and have a record of successful continuous operations for at least three years.
Surety shall not have exposed itself to any loss on any one risk in an amount exceeding twenty percent
(20%) of its surplus to policyholders.
Surety must have fulfilled all of its obligations on all other bonds given to the Owner.
Surety must have good underwriting, economic management, adequate reserves for undisclosed liabilities, net resources for unusual stock, and sound investment.
City of Valdosta 00100 - 8
Time of Delivery and Form of Bonds: The Public Construction Bond form will be forwarded to the
Bidder with his copy of the fully executed contract. The Public Construction Bond must be recorded after the contract is signed by all parties. The Bidder will have 3 business days from receipt of fully executed contract to have the Public Construction Bond recorded. The Bidder shall have the Public Construction
Bond recorded in the County Clerk’s Recording Office, Lowndes County, Georgia. After the book and page number have been assigned to the bond by the recording person, the Bidder is to obtain from the recording person a certified copy of the recorded bond, and deliver the certified copy to the Owner’s
Contract Administrator. No work can commence until the required bond and Insurance Certificates have been delivered to the Owner. Upon receipt of the certified copy of the recorded bond, the Owner may issue a Notice to Proceed.
Unless specified in the Bidding Documents, the bonds shall be written in the form of those bound in this
Project Manual.
The Bidder shall require the Attorney-in-Fact who executes the required bonds on behalf of the Surety to affix thereto a certified and current copy of his Power of Attorney authorizing his firm to act as agent for the Surety in issuing the bonds.
ARTICLE 22- APPROVED HOURS OF OPERATION
The approved hours of operation for construction activities for this project are Monday through Thursday from 7 am to 5 pm and Friday from 7 am to 12 pm, and shall not include holidays observed by the Owner.
Overtime, holiday, nighttime, or weekend hours must be approved in advanced by Owner on a case by case basis.
ARTICLE 23 - NIGHT WORK
Under special circumstances night work may be required from the Contractor. When required the
Contractor shall perform night work at no additional cost. These circumstances usually include, but are not limited to the following:
· Planned Utility Outages
· Flushing Activities
· Special Maintenance of Traffic requirements
· Directional Drilling
· Jack and Bore
Night work is typically performed from 12am to 5 am, especially when performing any planned utility outages.
ARTICLE 24 - NOTIFICATION TO CUSTOMERS
Certain construction activities will require written notifications to customers in an affected area. Door hangers will be created by the City of Valdosta Utility Department and provided to the Contractor at no charge. The Contractor is required to deliver these door hanger notices to customers as directed by the
City of Valdosta Utility Department at no additional cost. Construction activities that typically require customer notifications include, but are not limited to the following:
· Construction Start Up/Mobilization
· Planned Utility Outages
City of Valdosta 00100 - 9
· Pipeline Flushing Activities
· Concrete Driveway Restoration
· Roadway Repaving/Restoration
· Temporary Road Closures
Note that under certain circumstances a public notification may be also required to be advertised in local media. The City of Valdosta Utility Department will be responsible for the first posting of such advertisements at no cost to the Contractor. All subsequent postings due to delayed or canceled work shall be paid for and coordinated by the Contractor. It is the Contractor’s responsibility to properly notify and coordinate such activities with the Owner in order to avoid construction delays. A minimum of two weeks notice is typically required to post media advertisements, however, under certain circumstances this time frame may need to be extended. The Owner will not be responsible for delays due to inadequate notification or coordination from the Contractor. No additional financial compensation or time extensions to the Contract will be granted due to any delays that occur due to media notifications.
ARTICLE 25 - CONTRACT TIME - LIQUIDATED DAMAGES
The following will be made a part of the Contract:
The Contractor shall have ten (10) days to return Contract originals from the time the Contractor receives a “Notice of Award”. The City of Valdosta will return a “fully executed” Contract to the Contractor no later than seven (7) days after the return of the executed Contract originals (but no later than seventeen
(17) days from the Notice of Award).
The Contractor will furnish a recorded original of the Public Construction Bond three (3) business days after receipt of the fully executed Contract (the Public Construction Bond must be recorded after the
Contract is fully executed by all parties including the County Clerk). Upon receipt of the recorded Public
Construction Bond, the City will issue a Notice to Proceed. If the Contractor fails to meet any of the dates and timeframes set forth in this section, or fails to execute the Contract, or to provide a Public
Construction Bond, the City may elect at its option to consider the Contractor non-responsive and
Contract with the next best Bidder.
The work to be performed per the project, under this Agreement, shall be commenced within ten (10) calendar days of the date of the Notice to Proceed, in writing for the project.
From the date of the Notice to Proceed for the project, construction shall be substantially complete within
270 consecutive calendar days.
Final completion for the project shall be thirty (30) consecutive calendar days after substantial completion for that specific project.
Conditions under which Liquidated Damages are Imposed:
Should the Contractor or, in case of his default, the Surety fail to complete the work within the time stipulated in the contract, or within such extra time as may have been granted by the Owner, the
Contractor or, in case of his default, the Surety shall pay to the Owner, not as a penalty but as liquidated damages, the amount of $1,300 per day for each calendar day beyond the Contract Limit for substantial completion or extension and $500 per day for each calendar day beyond Contract Time Limit for final completion or extension and thereof that the Work remains incomplete in accordance with the terms of the Agreement.
City of Valdosta 00100 - 10
All additional fees and costs incurred by the Engineer and Owner resulting from the Contractor’s failure to complete the work will be charged to the Contractor.
ARTICLE 26 - PROJECT SCHEDULE
Bidders are to include with their Bid a detailed construction schedule for the project from Notice to
Proceed through Final Completion in number of days. The Schedule shall include activities for procurement of major material items - submittals and approval, manufacture, and delivery; right of way permitting; mobilization and clearing and grubbing; construction sequencing, planned utility outages, and restoration; cleaning, pressure testing, and bacteriological testing; and all other activities to indicate how the Bidder intends to perform the project within the allotted contract time. The duration and schedule of project shall be given due consideration in the selection of Contractor. Refer to Attachment in the Bid.
ARTTICLE 27 - INSURANCE
Liability Insurance, Workmen’s Compensation, and Vehicle Coverage shall be required to be retained in force during the Contract Period. An original copy of the insurance certificate, naming the City of
Valdosta as additionally insured, shall be provided by the Contractor prior to issuing Notice to Proceed.
ARTICLE 28 - TAXES
Project is subject to Federal Excise and Georgia Sales Taxes, which must be included in Bidder’s Bid.
ARTICLE 29 - MINORITY AND WOMEN’S BUSINESS ENTERPRISES (NOT USED)
ARTICLE 30 – VALDOSTA SMALL EMERGING BUSINESS (NOT USED)
END OF SECTION
Wells No. 1 and No. 2 Bid Form
City of Valdosta 00300 - 1
SECTION 00300
BID FORM
OWNER: City of Valdosta, Georgia
BID PROPOSAL OF
Company Name Address Telephone No.
BID NUMBER:
The undersigned declares that the only persons or parties interested in this Bid as principals are as stated; that the Bid is made without any collusion with other persons, firms, or corporations; that all the Bidding
Documents as prepared by CDM Smith Inc., 4651 Salisbury Rd, Suite 420, Jacksonville, FL, 32256, and dated November 2023 have been carefully examined; that the undersigned is fully informed in regard to all conditions pertaining to the Work and the place where it is to be done, and from them the undersigned makes this Bid. These prices shall cover all expenses incurred in performing the Work required under the Bidding
Documents, of which this Bid Form is a part. The undersigned shall furnish all materials, labor, and equipment, supervision and all other requirements necessary. Please refer to Section 011000 – Summary of the contract specifications for more detailed information on the work to be performed.
If a Notice of Award accompanied by at least three unsigned copies of the Agreement and all other applicable
Bidding Documents is delivered to the undersigned within thirty days, excluding Saturdays, Sundays, and legal holidays, after the actual date of the opening of the Bids, the undersigned will within five days, excluding Saturdays, Sundays, and legal holidays, after the date of receipt of such notification, execute and return all copies of the Agreement and all other applicable Contract Documents to OWNER. The premiums for all Bonds required shall be paid by CONTRACTOR and shall be included in the Contract Price. The undersigned Bidder further agrees that the Bid Security accompanying this Bid shall become the property of
OWNER if the Bidder fails to execute the Agreement as stated above.
The undersigned hereby agrees that the Contract Time shall commence upon Notice to Proceed and to fully complete the Work within 120 Calendar Days to Substantial Completion and 30 days from Substantial
Completion to Final Completion and in accordance with the terms as stated in the Agreement. The undersigned further agrees to pay OWNER, as liquidated damages, $1,300 per day for each calendar day beyond the Contract Time Limit for substantial completion or extension and $500 per day for each calendar day beyond Contract Time Limit for final completion or extension thereof that the Work remains incomplete, in accordance with the terms of the Agreement.
During the preparation of the Bid the undersigned acknowledges receipt of the following addenda:
No: __________ Date Received: ____________________
City of Valdosta 00300 - 2
BID:
FOR: Construction of the VALDOSTA WTP NO. 2 – PRODUCTION WELLS NO. 1 AND NO. 2 in accordance with the plans and specifications.
All bid items shall include costs for and installing all materials, equipment, and supplies necessary to complete the work. Bid items shall also include all other labor, permit fees, taxes, insurance, miscellaneous costs, overhead, and profit.
BID ITEM: Valdosta Water Treatment Plant (WTP) Switchgear Replacement as included in these contract documents. Please refer to Section 011000 Summary of the contract specifications for more detailed information on the work to be performed.
In accordance with the above understanding, the undersigned proposes to perform the work of the Base
Bid + Alternate Bid Item No. 1 furnish all materials and complete the work in its entirety in the manner and under the conditions required for the TOTAL LUMP SUM PRICE of:
(amount numerically)
The undersigned agrees that extra work, if any, will be performed in accordance with Article 10 of the
Conditions of the Contract and will be paid for in accordance with Article 11 of the Conditions of the
Contract.
Amounts shall be shown in figures, where indicated.
The above prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance and incidentals required to complete the Work.
The names and residences of all persons and parties interested in the foregoing Bid as principals are as follows:
(Give first and last names in full. In the case of a corporation, see Article 8.3 of the Instructions to Bidders, in the case of a partnership, see Article 8.4 of the Instructions to Bidders.)
The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work.
The undersigned shall note that the proposal includes a Base Bid and two Alternate Bids. A price must be furnished for both the Base Bid and the two Alternate Bids. If prices are not furnished for both the Base Bid and the two Alternate Bids, the Bid shall be disqualified.
The undersigned agrees that security in the form of a Bid Bond, certified or cashier’s check in the amount of no less than 5% total Bid Price, payable to the Owner, accompanies this Bid; that the amount is not to be construed as a penalty, but as liquidated damages which said Owner will sustain by failure of the undersigned
City of Valdosta 00300 - 3 to execute and deliver the Contract and Bond within 5 days of the written notification of the Award of
Contract to him, thereupon the security shall become the property of the Owner.
The undersigned proposes and agrees, if this bid is accepted to furnish the materials, install the materials and perform the work for the prices shown Exhibit A (Bid Form).
The undersigned hereby certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this section, the word "person" shall mean any natural person, joint venture, partnership, corporation, or other business or legal entity.
Social Security Number Signature of Individual or or Federal Identification Corporate Name
Number
By: _____________________________________
Corporate Officer
(if applicable)
Notice of acceptance should be mailed, faxed, or delivered to the following:
Name Company Name
Title Address
Telephone Number City and State
Facsimile Number
Note: If the Bidder is a corporation, indicate State of incorporation under signature, and affix corporate seal; if a partnership, give full names and residential addresses, if different from business address.
Bid Number: _______________
Attachments: Attachment A – Non-collusive Affidavit
Attachment B – General Contractor Qualifications Statement and License/Certification List
Attachment C – List of Proposed Major Material Equipment Suppliers
Attachment D – Bid Bond
Attachment E – Authority to Execute Bid and Contract
Attachment F – Valdosta Small Emerging Business
All attachments and Bid Bonds must be completed and attached to the Bidder’s Bid Proposal.
1 General a Well Construction Permit - Application Preparation and Permit Receipt LS 2 $ -
2 Site Preparation a Clearing, grubbing, disposal and site access preparation (includes erosion and sedimentation control along fencelines) LS 2 $ -b Grading and seeding for erosional control after well completion LS 2 $ -c
Fluid management - Includes mud system; formation water disposal including temporary piping to open field, flow control, filtration and settling system; and maintaining road access LS 2 $ -
3 Installation of Production Wells (2) a
Mobilization/Demobilization (combined cost cannot exceed 10% of the total well construction costs) includes survey, bonds and insurance, and indeminification. Mobilization is 60% of this total and demobilization is 40% of this total. Pit casings are at Contractor’s option.
LS
2 $ -b Drill 12.25-inch dia. pilot boring to approximately 65 feet ± bls into clay unit of surficial aquifer.
LF
130 $ -c Perform geophysical logging (caliper, gamma and electric) per Section 331113.19, Table 1, Item 1. LS 2 $ -d Ream to a minimal of 32-inch dia. nominal borehole using the mud-rotary method to 65 feet ± bls.
LF
130 $ -e
Casing installation: furnish and install 26-inch outer diameter (OD), 0.375-inch thick wall surface casing from 0 feet to approximately 65 feet ± bls per Sections 331113.13, 331113.16 and 331113.21.
LF
130 $ -f
Grouting: furnish, install, and grout in place (casing annulus) 26-inch OD., 0.375-inch wall surface casing, from 0 feet to approximately 65 feet± bls per Sections 331113.13, 331113.16 and 331113.21.
CF
250 $ -g Furnish and supply 24-inch OD., 0.375-inch wall intermediate casing.
LF
420 $ -h
Drill and drive or dual rotary in 24-inch dia., 0.375 wall steel intermediate casing to approximately 210 feet ± bls through the Hawthorn Group
Intermediate Confining Unit (ICU), into Upper Floridan, per Section 331113.13.
LF
420 $ -i Drill out the bottom of the 24-inch intermediate casing with nominal 23-inch borehole to approximately 230 feet ± bls, per Section 331113.13.
LF
40 $ -j
Casing installation: furnish and install 17.4-inch OD., 1.024-inch thick wall SDR 17 PVC Certa-Lok final casing from 0 feet to approximately 230 feet± bls per Sections 331113.13, 331113.16 and 331113.21.
LF
460 $ -k
Grouting: furnish, install, and grout in place (casing annulus) 17.4-inch OD., 1.024-inch thick wall SDR 17 PVC Certa-Lok final casing from 0 feet to approximately 230 feet± bls per Sections 331113.13, 331113.16 and 331113.21.
CF
700 $ -l Perform geophysical logging (caliper and gamma) per Section 331113.19, Table 1, Item 2.
LS
2 $ -m
Drill 12.25-inch dia. pilot boring using reverse air drilling method to approximately 450-feet± per Section 331113.13, sampling per Section
331113.26.
LF
440 $ -n
Perform static and dynamic geophysical and video logging (full logging suite) per Section 331113.19, Table 1, Item 3, and sampling per Section
331113.26.
LS
2 $ -o Ream a nominal 15-inch dia. borehole using reverse air drilling method to approximately 450-feet± bls per Section 331113.13 LF 440 $ -p Perform geophysical logging (caliper, gamma and video) per Section 331113.19, Table 1, Item 4. LS 2 $ -q Perform plumbness and alignment test per Section 331113.13. LS 2 $ -r Develop the well utilizing temporary pump with flow rate up to 2,500 gpm per Section 331113.13 and 331113.26. Hour 40 $ -s Conduct minimum 24-hour step drawdown tests per Section 331113.29 LS 2 $ -t Install temporary wellhead per contract documents per Section 331113.16. LS 2 $ -u Provision for laboratory services performing water quality sampling and analysis of groundwater samples per Section 331113.26 LS 2 $ -
4 Allowances a Contractor's provision for equipment standby time with crew offsite Days 6 $ -b Contractor's provision for equipment and crew standby time Hours c
Contractor's provision for furnishing and adding clean fill to access and elevate land surface for an area of 50 foot radius around the well sites 1 and 2 per Section 331113.11. Includes placement, spreading, and compaction. CY d Contractor's provision for extra work assigned to crew that is outside the scope of the contract and has been authorized by Owner or Engineer Hours e Contingency for Unforeseen Conditions LS $ 50,000.00 1 $ 50,000.00
5 Alternative Stainless Steel 16-inch Casing a
Casing installation: furnish and install 16-inch outer diameter (OD), stainless-steel Schedule 40S; Type 316L, 0.375-inch thick wall final casing from 0-feet to 230-feet ± bls in accordance with Sections 331113.13 (Drilling) and 331113.16 (Casing and Temporary Wellhead). LF
LS - Lump Sum; LF - Linear Feet; CF - Cubic Feet; CY - Cubic Yards
$ - BID TOTAL PRICE MATERIALS & SERVICES
Form For General Bid: City of Valdosta Water Treatment Plant No. 2 Site - Construction of Well Nos. 1 & 2
Part Description UOM Unit Rate Planned
Quantity Total
PolematidisIM Text Box
EXHIBIT A - BID FORM
City of Valdosta 00300 - 4
ATTACHMENT A
NON-COLLUSIVE AFFIDAVIT
State of Georgia ss.
County of Lowndes
___________________________________________________ being first duly sworn, deposes and says that:
(1) He is the _____________________________________________________, of
(Owner, Partner, Officer, Representative or Agent)
__________________, the Bidder that has submitted the attached Bid;
(2) He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham
Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this affiant.
BY ____________________________
(Title)
Subscribed and sworn…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .