RFI ISS20220150 Question and Answers
#Respondent QuestionRFI SectionLOC Answer
1Is Google mapping survive required or is any internet-based mapping service acceptable?Attachment 1- SOW C.3.1.1-1 BThe mapping service must be compatible with all of the following: Autodesk/AutoCAD licenses (Architectural, Revit, Civil 3D, Inventor, Navisworks, and Tririga
2Will the model libraries match the required formats outlined in the same section?Attachment 1- SOW C.3.1.1-1 BYes, the model libraries match the required formats outlined in the same section.
3Do these services apply to all the locations mentioned in the Overview/Background section of the RFI?Attachment 1- SOW C.3.1.2-1 Technical ServicesYes, these services in the cited SOW section apply to all the locations mentioned in the Overview/Background section of the RFI.
4How many total floors are in the portfolio?Attachment 1- SOW C.3.1.2-1 Technical ServicesCurrently there are 61 floors captured but additional floors need to be captured
5Are the Library standard blocks already created and available to insert into Master CAD files?Attachment 1- SOW C.3.1.2-1 Technical ServicesThe Library has standard blocks used for its new furniture drawings. However, the master files do not currently have master blocks for all furniture represented. Standard block creation is one of the services under this contract.
6Please confirm that TRIRIGA is already implemented, and the modules currently being used by LOC.Attachment 1- SOW C.3.1.2-1 Technical ServicesYes, TRIRIGA is already implemented; Space Manager, Portfolio, Project, Workplace Services, Reports, Request, Tasks.
7Is LOC already using Revit? If so, how many locations are in Revit and do they need to be prepared/integrated into TRIRIGA?Attachment 1- SOW C.3.1.2-1 Technical ServicesYes, for Space Planning and 3D modeling on some projects; all locations need to be prepared / integrated into TRIRIGA.
8Please confirm that all existing CAD files are integrated into TRIRIGAAttachment 1- SOW C.3.1.2-1 Technical ServicesOnly 3 buildings (Jefferson, Madison, Adams) are currently captured in TRIRIGA.
9Please confirm the data points being captured in the TRIRIGA database (HR/Org/Space Type/Number/etc.)Attachment 1- SOW C.3.1.2-1 Technical ServicesThe data points being captured in the TRIRIGA database (HR/Org/Space Type/Number/etc.) are Organization, Space Type, Number, People, Reservation Type, Occupancy Status.
10Are there any customizations or enterprise system integrations in place with TRIRIGA?Attachment 1- SOW C.3.1.2-1 Technical ServicesMinor customizations.HR has a personnel and organization data feed connected to TRIRIGA; CAD and Revit are to be integrated.
11Is there in fact BIM requirements for this project?Attachment 1- SOW C.3.1.2-1 Technical ServicesThere is a requirement to provide BIM software and training. However the master files are not maintained to BIM standards.
12Please confirm that this needs to be performed for each location mentioned in the Overview/Background section of the RFI?Attachment 1- SOW C.3.1.3 Task Area 3: Facility site surveying and auditing servicesYes, this needs to be performed for each location mentioned in the Overview/Background section of the RFI.
13Will we need to be escorted?Attachment 1- SOW C.3.1.3 Task Area 3: Facility site surveying and auditing servicesContractors performing regular on-site work can apply for a badge. However, even badged contractors will require escorting in specific locations with elevated security.
14Please confirm the level of detail for Occupants and Occupant types. Is this identifying the employee/contractor occupying a space?Attachment 1- SOW C.3.1.3 Task Area 3: Facility site surveying and auditing servicesAll occupant organization data has been updated in TRIRIGA but will need to be updated as orgs move and construction projects complete. Collecting and updating staff and contractor names are not required with this effort.
15A. Which software will training be required? AutoCAD, Revit, TRIRIGA?Attachment 1- SOW C.3.1.4 C.3.1.4 Task Area 4: Training for users and administrators on basic and advanced features of the software including development and training of standard operating procedure documents.Training will be required for these software: AutoCAD, Revit and Tririga integrator.
16B. How many end users will need to be trained for each software?Attachment 1- SOW C.3.1.4 C.3.1.4 Task Area 4: Training for users and administrators on basic and advanced features of the software including development and training of standard operating procedure documents.A minimum of 12 end users will need to be trained for each software.
17C. Will standard training courses suffice, or will customization be necessary?Attachment 1- SOW C.3.1.4 C.3.1.4 Task Area 4: Training for users and administrators on basic and advanced features of the software including development and training of standard operating procedure documents.Customization training may be necessary based on specific Library CAD standards
18Clarification of "contractor's offices" - does this include WFH users?Attachment 1- SOW C.5.1For clarification purposes regarding "contractor offices", this includes WFH users.
19Is there a requirement for work to be done in the US?Attachment 1- SOW C.5.1All Work will be done in the US.
201. What format are the existing electronic files in? Are they in CAD and/or REVIT or a mix. If in CAD are the expectations that they will remain in CAD or is there an effort to convert these into REVIT in the future?GeneralThe existing electronic files are in CAD .dwg, but these files will be converted to Revit in the near future.
21To what degree of Tririga is the software being utilized? Is it only utilized as a spatial connection or are there additional modules it is tracking?GeneralCurrently only the Space related modules are utilized with integrators but the Library will be looking to use additional modules (e.g. Project, Workplace Services, etc.).
22Is it part of the IDIQ to maintain the Tririga system or just to be able to import CAD/REVIT into Tririga?GeneralThis is just to be able to import CAD/Revit into Tririga. Contractor will not maintain the Tririga system, just the files for integration.
23Are there security protocols against using cloud-based documents for surveying purposes?GeneralThere are security protocols for cloud based documents. Secure severs are needed to send files over ftp site.
24Will updating of electronic files need to be done directly on the client network or will work be allowed locally on the IDIQ teams’ secure servers to send files over FTP site. How are the electronic files then linked with existing files for Tririga?GeneralUpdating can be done directly on the LOC network and Clients network through secure servers to send files over ftp. The contractors servers must meet the security guidines set by the AOC.
25Please confirm updates to electronic files are only across the architectural/interiors discipline. Please confirm no MEP, IT, AV, security, or life safety systems are updated or tracked under this IDIQ.GeneralElectronic files are across the architectural/interior updates, the location of electrical and data outlets/monuments, and devices mounted on the walls, floors, and ceilings. MEP infrastructure will not be included.
26Is the Library interested in having multiple vendors provide only some but not all items listed in the SOW? (i.e. Contractor providing the necessary items for Item 2: CAD, BIM, and (CAFM) drafting and technical services and Item 3: Facility site surveying and auditing services but not the software, training and help desk items)GeneralThe Library is seeking one vendor to provide all services listed in the SOW. The vendor may subcontract the work as part of their proposal, but they must address how they will manage sub-contractors. The Library is only interested in multiple contractors if subcontracting is not an option.
27Is this considered a new requirement or is there an incumbent? If there is an incumbent, would you be able to share the following:

• Vendor Name:

• Contract Number:

• Value:

• Award Date:

• Expiration Date:

General The only new requirement is the survey and cafm components. CGD can share the prior contract info if they wish