Addendum No. 2 for the Rehabilitation of Powder House project in Idaho Springs, Colorado, was issued by Hoehn Architects PC on October 15, 2024, and distributed to several construction contractors including Performance Construction, Whitestone Construction, Spectrum General Contractors, and Rocky Mountain Building Restoration, with a copy to the City of Idaho Springs. The addendum provides key clarifications for the construction project, specifically addressing four critical points: (1) confirming that picnic tables and benches are not to be included in the bid, (2) clarifying that neither the underside of the new roof structure nor the new wood floor will be painted, (3) noting that a 5' x 5' stoop will be added at a later date, and (4) confirming that the "dry zone" drainage work immediately adjacent to the building is within the project's scope of work.
The addendum serves to refine and clarify the project details for potential bidders, ensuring precise understanding of the rehabilitation requirements for the historic Powder House. By providing these specific instructions, the document helps contractors accurately prepare their bids and understand the exact expectations for the project. The document does not discuss specific pricing terms, funding sources, or contract financial details, but focuses on technical and scope-related clarifications for the construction work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ISPH_Addendum 1_20241009.pdf | ||
| 2404_Powder House Project Manual_20240930.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R E H A B I L I T A T I O N O F P O W D E R H O U S E – I D A H O S P R I N G S , C O L O R A D O Addendum No. 2
Hoehn Architects PC
DISTRIBUTION: James Crane, Nick Zouch/Performance Construction; Nik Foster/Whitestone Construction;
Jonas Landes/Spectrum General Contractors; Ryan Gillmore/Rocky Mountain Building Restoration
COPY: Andy Marsh, Dylan Graves/City of Idaho Springs
DATE ISSUED: October 15, 2024
DESCRIPTION/REFERENCES/DATES
The following additions/revisions/clarifications to the construction documents dated September 30, 2024 are hereby described:
1. Key Notes SF1 and SF2, Page 54: SF1 Picnic Tables and SF2 Benches are shown on the site drawing. At the pre-bid meeting, it was stated that these were NOT to be included in the bid. Please confirm.
Confirmed. The picnic tables and benches are not to be included in the bid.
2. Key Note D3, page 54, calls for painting or staining of new door bucks. I can find no other reference to painting or staining on the drawings. Please clarify if the underside of the new roof structure is to be painted.
Please clarify if the new wood floor is to be painted.
Neither the underside of the new roof structure nor the new wood floor is to be painted.
3. Site Plan: The site plan shows a “New Stoop” that scales 5’ x 5’. Is this part of the project?
No. The stoop will be added at a later date.
4. Key Note S1, page 54: Please confirm that the “dry zone” is in the scope of work for this project.
We want to address the drainage immediately adjacent to the building. The dry zone is in the scope of work for this project.
End of Addendum #2