IRV_Exhaust_Pump_Sources Sought _Vendor Response.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
IRV Lab Exhaust and Vacuum Pump Replacement
Solicitation number
OC-2026-131276
Issued by

About this file

This is a vendor response questionnaire template for a Sources Sought Notice issued by the FDA Office of Acquisition and Grant Services for IRV Lab Exhaust and Vacuum Pump Replacement (Solicitation OC-2026-131276). The Government is conducting market research to assess small business capability and product availability for a FAR Part 36 construction project at an FDA laboratory facility in Irvine, California.

The questionnaire requires vendors to provide comprehensive information across eight sections: business registration details (company name, UEI, CAGE code, business size status, and NAICS codes); technical capability specifications for exhaust and vacuum pump systems including capacity, pressure ranges, materials of construction, controls, and compliance with OSHA, NFPA, ASME/ASHRAE/SMACNA, and EPA requirements; installation and integration experience in occupied healthcare and laboratory facilities with hazardous exhaust systems; equipment lead times and schedule risk factors; financial capability documentation including three years of construction revenue history and bonding capacity; past performance references with contract values and periods of performance; supply chain and commerciality information including lead times and country of origin for fans, pumps, controls, and ductwork; and general comments regarding scope and proposed equipment. The anticipated scope includes removal and installation of commercial exhaust and vacuum pump units, selective demolition, integration with existing building systems, testing and commissioning, and warranty support with minimal disruption to ongoing FDA operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Vendor Response

FDA IRV Exhaust and Vacuum Pump Construction Sources Sought Vendor Response Questionnaire
SECTION A – BUSINESS INFORMATIONVENDOR RESPONSE
A1. Company Legal Name
A2. Company Address (Street, City, State, ZIP)
A3. Point of Contact – Name
A4. Point of Contact – Title
A5. Point of Contact – Email
A6. Point of Contact – Phone Number
A7. SAM.gov UEI
A8. CAGE Code
A9. Business Size Status (check all that apply: SB, 8(a), HUBZone, SDVOSB, WOSB, Other)
A10. Primary NAICS Code for this Response
A11. Additional NAICS Codes Relevant to this Work
SECTION B – TECHNICAL CAPABILITY
B1. Description of Exhaust Systems Offered
B2. Description of Vacuum Pump Systems Offered
B3. Are the products Commercial Off-the-Shelf (COTS)? (Yes/No)
B4. Manufacturer(s) of Exhaust Equipment
B5. Manufacturer(s) of Vacuum Pump Equipment
B6. Performance – Capacity (CFM/SCFM)
B7. Performance – Pressure/Vacuum Range
B8. Performance – Materials of Construction
B9. Performance – Controls and Automation Capabilities
B10. Performance – Noise/Vibration Characteristics
B11. Compliance with OSHA Requirements (Describe)
B12. Compliance with NFPA Requirements (Describe)
B13. Compliance with ASME/ASHRAE/SMACNA (Describe)
B14. Compliance with EPA/Environmental Requirements (Describe)
SECTION C – INSTALLATION AND INTEGRATION
C1. Experience Installing HVAC/Exhaust Systems in Occupied Facilities (Describe)
C2. Experience in Laboratory, Research, or Healthcare Facilities
C3. Experience with Hazardous or Chemical Exhaust Systems (e.g., VHP)
C4. Capability to Coordinate Shutdowns and Temporary Utilities
C5. Capability to Meet FAR Part 36 Construction Requirements
C6. Safety, QA/QC, Scheduling, and Site Coordination Approach
SECTION D – SCHEDULE AND RISK CONSIDERATIONS
D1. Estimated Equipment Lead Times (by major component)
D2. Identify Key Schedule Risks or Constraints the Government should consider
SECTION E – FINANCIAL CAPABILITY
E1. Average Annual Construction Revenue – FY-25
E2. Average Annual Construction Revenue – FY-24
E3. Average Annual Construction Revenue – FY-23
E4. Ability to Obtain Performance Bonds (Yes/No)
E5. Ability to Obtain Payment Bonds (Yes/No)
E6. Ability to Obtain Required Federal Insurance Coverage (Yes/No)
E7. Ability to Finance Labor, Materials, and Equipment Upfront (Yes/No)
SECTION F – PAST PERFORMANCE
F1. Project 1 – Customer Name, Address and Point of Contact Name and Email
F2. Project 1 – Government or Commercial
F3. Project 1 – Scope Description
F4. Project 1 – Contract Value
F5. Project 1 – Period of Performance
F6. Project 2 – Customer Name, Address and Point of Contact Name and Email
F7. Project 2 – Government or Commercial
F8. Project 2 – Scope Description
F9. Project 2 – Contract Value
F10. Project 2 – Period of Performance
SECTION G – COMMERCIALITY AND SUPPLY CHAIN
G1. Market Availability of Proposed Equipment
G2. Estimated Lead Time – Fans
G3. Estimated Lead Time – Vacuum Pumps
G4. Estimated Lead Time – Controls
G5. Estimated Lead Time – Specialty Ductwork
G6. Country of Origin – Fans
G7. Country of Origin – Vacuum Pumps
G8. Country of Origin – Controls
G9. Country of Origin – Specialty Ductwork
SECTION H - COMMENTS
Provide comments/questions as they relate to the Scope of Work, NAICS, proposed equipment, etc

File details come from the government source that posted it. Updated .